HomeMy WebLinkAbout03-183.docJUNE 24, 2003 03-183 RESOLUTION
(CARRIED 6-0 LOST LAID OVER WITHDRAWN )
PURPOSE:
INITIATED BY:
CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT 03-01
DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
DOERNER INC.
P.O. Box 129
Luxemburg, WI 54217-0129
Net Decrease to contract:
($67,131.79)
PURPOSE: See attached Change Order.
TO:
Dorner Inc.
P. O. Box 129
Luxemburg, WI 54217-0129
CHANGE ORDER # 1
DATED: June 16, 2003
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
03-01
is hereby amended
NET DECREASE TO SECTION 1 - CONCRETE PAVING:
NET DECREASE TO SECTION II - STORM SEWER:
NET DECREASE TO SECTION Ill - SANITARY SEWER:
NET INCREASE TO SECTION IV - WATER MAIN:
NET DECREASE TO CONTRACT:
($77,595.44
($2,4O9.5O
($1,431.30
$14,304.45
$67,131.79
Recommended:
Director of Public I/Forks
BY:
CiTY OF OSHKOSH
City Manager
City Clerk
~.~pprov.eC~nd a/~/~'~ted:
/ - ~ontractor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Approved as to form:
Comptroller
City Attorney
CONTRACT: 03-01 CHANGE ORDER # 1
SECTION I - CONCRETE PAVING
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER INCREASE /N
CONTRACT
QUANT/T/ES QUANTITIES INCREASE DECREASE UNIT CONTRADT
PRICE
1. Approx. 4,180 square
yards of pavement
removal, complete as
specified, per square yard 4,180.06 4,261.90 81.90 $2.40 $196.56
2. Approx. 19,867 square fee1
of sidewalk and driveway
removal; complete as
specified, per square foot
19,867.00 21,034.90 1,167.90 $0.20 $233.58
3. Approx. 10,592 cubic yards
of excavation, complete as
specified, per cubic yard
10,592.00 8,160.91 -2,431.09 $3.17 ($7,706.56
4. Approx. 6,035 square
,ards of 8" non-reinforced
concrete payment,
including integral curb and
grading (without base),
complete as specified, per
square yard 6,035.00 6,136.20 101.20 $20.60 $2,084.72
5. Approx. 1,050 square
yards of 8" non-reinforced
H.E.S. concrete pavement,
including integral curb and
grading (without base),
complete as specified, per
square yard 1,050.00 610.30 -439.70 $28.28 $12,434.72)
6. Provide approx, three (3)
concrete pavement gaps,
complete as specified,
each 3.00 0.00 -3.00 $505.00 ($1,515.00
7. Approx. 145 linear feet of
12" radius curb & head,
complete as specified, per
linear foot 145.00 155.20 10.20 $7.07 $72.11
8. Approx. 620 linear feet of
standard 30" curb & gutter,
complete as specified, per
linear foot 620.00 614.50 -5.50 $8.08 ($44.44)
9. Approx. 15,220 square feet
of 4" concrete sidewalk,
c. omplete as specified, per
square foot 15,220.00 15,193.30 -26.70 $1.97 ($52.60
10. Approx. 4,050 square feet
of 6" concrete sidewalk &
driveway, complete as
specified, per square foot 4,050.00 2,823.50 -1,226.50 $2.80 ($3,188.90)
Page I
CONTRACT: 03-01 CHANGE ORDER# 1
ITEM CONTRACT INSTAU. ED NET NET COBT PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION CONTRACT CONTRACT
QUANT/TIES QUANT/TIES INCREASE DECREASE UNIT
PRICE PRICE
11. Approx. 1,580 square feet
of 8" H.E.S. concrete
sidewalk and driveway,
complete as specified, per
square foot 1,580.00 2,911.90 1,331.90 $3.34 $4,448.55 I
12. Approx. 795 square yards
of 3" thick asphaltic
concrete driveway,
complete as specified, per
square yard 795.00 774.00 -21.00 $13.63 ($286.23
13. Furnish and install approx.
21,400 tons of crushed
stone base course,
complete as specified, per
ton 21,400.00 15,260.39 -6,139.61 $6.7~ ($41,442.37
14. Approx. 1,290 linear feet of
sawing, complete as
specified, per linearfoot 1,290.00 1,274.80 -15.20 $3.00 ($45.60
15. Furnish and install approx.
210 pavement ties,
complete as specified,
each 210.00 233.00 23.00 $6.00 $138.00
16. Adjust approx. 45
manholes and inlets,
complete as specified,
each 45.00 46.00 1.00 $250.00 $250.00
17. Remove approx. 50 I.D. of
trees and stumps,
complete as specified, per
inch diameter 50.06 22.00 -28.00 $20.00 ($560.00
18. Remove approx. 2,850
linear feet of railroad rails
and ties, complete as
specified, per linear foot 2,850.00 471.00 -2,379.00 $1.87 ($4,448.73
19. Remove approx. 45 steel
posts, complete as
specified, each 45.00 44.00 -1.00 $20.20 ($20.20
20. Remove approx, four (4)
light poles and bases,
complete as specified,
each 4.00 4.00 $80.80
21. Furnish and install approx.
820 linear feet of No. 4
reinforcing bars, complete
as specified, per linear foot
820.00 600.00 -220.00 $0.76 ($167.20)
22. Terrace work, complete as
specified, lump sum 1.00 1.00 $20,000.00
23. Provide $2,000 to the City
of Oshkosh for project
management
communications, complete
as specified, lump sum
1.06 1.00 $2,000.00
Page 2
CONTRACT: 03-01 CHANGE ORDER # 1
I
ITEM DESCRIPTION CONTRACT INSTALLED NET NET I COSTPER J INCREASEIN
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE I UNIT I CONTRACTpRiCE
SECTION I - (BID ITEMS I - 23) - SUB-TOTALS
DECREASE IN
CONTRACT
PRICE
$7,423.52 ($71,912.55)
ADDITONAL WORK REQUIRED: C. O. #1 - SECTION I
ITEM DESCRIPTION INSTALLED
NUMBER QUANTITIES
1 Deduct for salvaged
crushed concrete base
course available on site,
per ton (per addendum 1
2)
COSTPER
UNIT
DEDUCTIN
CONTRACT
PRICE
6,653.00
ADDITIONAL WORK: C.O. #I (ITEM 1) - SUB-TOTAL
NET DECREASE TO SECTION I -
($13,106.41)
($77,595.44)
SECTION II - STORM SEWER
I
ITEM DESCRIPTION CONTRACT INSTALLED I NET NET COST PER I INCREASE IN DECREASE IN
NUMBER QUANTITIES QUANTITIESI INCREASE DECREASE UNIT I CONTRACTpRiCE CONTRACTpRiCE
24. Furnish and install approx.
35 linear feet of 6" Storm
Sewer, complete as
specified, per linear foot 65.00 73.50 8.50 $20.00 $170.00
25. Furnish and install approx.
265 linear feet of 12" Storrr
Sewer, complete as
specified, per linear foot 265.0~ 287.40 22.40 $25.00 $560.00
26. Furnish and install approx.
420 linear feet of 24" Storm
Sewer, complete as
specified, per linear foot 420.0( 407.40 -12.60 $30.00 ($378.00)
27. Furnish and install approx.
26 linear feet of 27" Storm
Sewer Relay, complete as
specified, per linear foot 26.00 14.50 -11.50 $40.00 ($460.00
28. Furnish and install approx.
1,060 linear feet of 54"
RCP Class III Storm
Sewer, complete as
specified, per linear foot 1,060.00 1,050.60 -9.40 $195.00 ($1,833.00
29. Furnish and install approx.
[wo (2) std. Inlet (Type 1
with 18" sump) with
castings, complete as
specified,each 2.00 2.00 $750.00
Page 3
CONTRACT: 03-01 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
30. Furnish and install approx.
twelve (12) std. Inlets
(Type 3 with 18" sump)
with castings, complete as
specified, each 12.00 12.00 $850.00
31. Furnish and install approx.
7.3 vertical feet of std.
Storm Manhole (5' Inside
Diameter) in two (2)
locations, without casting,
complete as specified, per
vertical foot 7.30 4.20 -3.10 $425.00 ($1,317.50
32. Furnish and install approx.
5.70 vertical feet of std.
Storm Manhole (6' inside
Diameter) in one (1)
location, without casting,
complete as specified, per
~,erticai foot 5.70 5.82 0.12 $425.00 $51.00
33. Furnish and install approx.
24.0 vertical feet of std.
Box Storm Manhole in
!hree (3) locations, without
casting, complete as
specified, per vertical foot 24.00 24.07 0.07 $600.00 $42.00
34. Reconstruct approx, one
(1) Storm Manhole,
complete as specified,
each 1.00 1.00 $500.00
35. Rebuild approx. 11.8
vertical feet of Storm
Manhole (5' Inside
Diameter) in three (3)
locations with base,
complete as specified,
each 11.80 11.72 -0.08 $800.00 ($64.00
36. Install and remove 700
linear feet of 4' high orange
poly fence with steel posts,
complete as specified, per
linear foot 700.0( 0.00 -700.00 $4.00 ($2,800.00
37. Abandon approx. 14 Inlets
2r Manholes, complete as
specified, each 14.00 21.00 7.00 $350.00 $2,450.00
SECTION II - (BID ITEMS 24 - 37) - SUB-TOTALS
$3,273.00 ($6,852.50)
ADDITONAL WORK REQUIRED: SECTION II - STORM SEWER
ITEM
NUMBER
DESCRIPTION
NET
INCREASE
NET
DECREASE
COSTPER
UNIT
CONTRACT
PRICE
DECREASE IN
CONTRACT
PRICE
Page 4
CONTRACT: 03-01 CHANGE ORDER # 1
N I£T~M~R DESCRIPTION
Furnish and install approx.
3.12 vertical feet of std
storm manhole (4' inside
diameter) in one (1)
Ilocation, without casting,
/complete as specified per
~vertical foot
OONTRAOT
QUANTITIES
INSTALLED
QUANTITIES i
3.12
INCREASE DECREASE UNIT CONTRACT
PRICE
3.12
$375.00
$1,170.00
ADDITIONAL WORK: C.O. #1 - (ITEM 1) - SUB-TOTAL $1,170.00
NET DECREASE TO SECTION II -
($2,409.50)
PRICE
SECTION III - SANITARY SEWER
ITEM DESCRIPTION CONTRACT INSTALLED NET I NET COST PER I INCREASE IN DECREASE IN
NUMBER QUANTITIES QUANTITIES INCREASE I DECREASE UNIT I CONTRACTpRiCE CONTRACTpRiCE
38. Furnish and install approx.
375 linear feet of 8" J
Sanitary Sewer, complete
as specified, per linear foot 675.00 675.10 0.10 $38.00 $3.80
39. Furnish and install approx.
750 linear feet of 10"
Sanitary Sewer (future
street), complete as
specified, per linear foot 750.00 749.20 -0.80 $37.00 ($29.60):
40. Furnish and install approx.
35.3 vertical feet of std.
Sanitary Manhole (4' Inside
Diameter) in 5 locations,
complete as specified,
without castinq, per vertical
foot 35.30 35.44 0.14 $175.00 $24.50
41. Reconstruct approx, one
(1) Sanitary Manhole,
complete as specified,
each 1.00 1.00 $800.00
42. Reconnect one (1) Sanitary
Lateral, complete as
specified, each 1.00 2.00 1.00 $854.00 $854.00
43. Furnish and install approx.
75 linear feet of 4" Sanitary
Lateral Relay, complete as
specified, per linear foot
75.00 37.00 -38.00 $35.00 ($1,330.00)
44. Furnish and install approx.
160 linear feet of 6"
Sanitary Lateral (New and
Relay), complete as
specified, per linear foot 160.00 91.00 -69.00 $36.00 ($2,484.00
Page 5
CONTRACT: 03-01 CHANGE ORDER Cf 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
45. Abandon approx, seven (7)
Sanitary Manholes,
complete as specified,
each 7.00 9.00 2.00 $300.00 $600.00
SECTION II1 - (ITEMS 38 - 45) - SUB-TOTALS
$1,482.30 ($3,843.60)
ADDITONAL WORK REQUIRED: C.O #1 - SECTION III - SANITARY SEWER
ITEM
NUMBER
CONTRACT INSTALLED NET
QUANTITIES QUANTITIES INCREASE
I
NET I COST PER INCREASE IN
DECREASEI UNIT CONTRACT
PRICE
DECREASEIN
CONTRACT
PRICE
Excavation for and
investigation of 8" sanitary
lateral @ 474 Marion
Road, ump sum
1.00 1.00 $930.00
$930.00
ADDITIONAL WORK: C.O, cfi - (ITEM 1) - SUB-TOTAL
$930.00
NET DECREASE TO SECTION III -
($1,431.30)
SECTION IV - WATER MAIN
ITEM DESCRIPTION
NUMBER
NET NET COSTPER
INCREASE DECREASE UNIT
CONTRACT
PRICE
DECREASEIN
CONTRACT
PRICE
46. Furnish and install approx.
15 linear feet of 4" Ductile
Iron Water Main w/poly
wrap, complete as
specified (fittings not
included), per linear foot 15.00 14.50 -0.50 $50.00 ($25.00
47. Furnish and install approx.
275 linear feet of 6" Ductile
Iron Water Main w/poly
wrap, complete as
specified (fittings not
included), per linear foot 275.00 240.50 -34.50 $35.0C ($1,207.50
48. Furnish and install aprox.
60 linear feet of 8" Ductile
Iron Water Main w/poly
wrap, complete as
specified (fittings not
included), per linear foot 60.00 64.00 4.00 $50.00 $200.00
Page 6
CONTRACT: 03-01 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANT/TIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
49. Furnish and install apmx.
1,510 linear feet of 12"
Ductile Iron Water Main
Relay w/poly wrap,
complete as specified
(fittings not included), per
linear foot 1,510.00 1,510.00 $50.00
50. Furnish and install approx.
twelve (12), 6" Valves,
cbmplete as specified,
each 12.00 12.00 $550.00
51. Furnish and install approx.
two (2), 8" Valves,
complete as specified,
each 2.00 2.00 $725.00
52.
Furnish and install approx.
[hree (3), 12" Valves in
std. Water Valve Manhole
complete as specified,
without casting, each 3.0C 4.00 1.00 $3,000.00 $3,000.00
53. Furnish and install approx.
one (1), 8" x 8" Tapping
Valve and Sleeves,
complete as specified,
each 1.00 1.00 $1,500.00
54. Furnish and install approx.
seven (7), 12" x 6" Tees,
complete as specified,
each 7.00 12.00 5.00 $280.00 $1,400.00
55. Furnish and install approx.
two (2), 12" xS" Tees,
complete as specified,
each 2.00 2.00 $260.00
56. Furnish and install approx.
~ne (1), 12" x 12" Tee,
complete as specified,
each 1.00 1.00 $300.00
57. Furnish and install appmx.
five (5), 6" x 4" Reducers,
complete as specified,
each 5.00 4.00 -1.00 $80.00 ($80.00
58. Furnish and install approx.
one (1), 12" x 8" Reducer,
complete as specified,
each 1.00 1.00 $175.00
59. Furnish and install approx.
one (1), 16" x 12" Reducer
complete as specified,
each 1.00 1.00 $360.00
60. Furnish and install approx.
lan (10), 4" - 45 degree
3ends, complete as
specified, each 10.00 10.00 $100.00
Page 7
CONTRACT: 03-01 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
61. Furnish and install approx.
four (4), 8" - 45 degree
Bends, complete as
specified, each 4.00 2.00 -2.00 $200.00i ($400.00
62. Furnish and install approx.
eleven (11), 12" - 45
degree Bends, complete
as specified, each 11.00 9.00 -2.00 $400.00 ($800.00
63.
Furnish and install approx.
rout (4) Hydrants, complete
as specified, each 4.00 4.00 $1,400.00
64. ~.bandon 10" Water Main
'on Marion Road, complete
as specified, lump sum 1.00 1.00 $3,000.00
SECTION IV - (BID ITEMS 46 - 64) - SUB-TOTALS
$4,600.00 ($2,512.50)
ADDITONAL WORK REQUIRED: C.C. #1 (ITEMS 1 - 9) - SECTION IV - WATER MAIN
ITEM
NUMBER
DESCRIPTION
CONTRACT
QUANTITIES
INSTALLED
QUANTITIES
NET
INCREASE
NET
DECREASE
COSTPER I INCREASEIN
UNIT CONTRACT
PRICE
1 Labor to dewater trench
From abandoned wooden
¢zater main (3/24/03) 1.00 1.00 $492.00 $492.00
2 ~Relocate hydrant near
Jackson St. (4/22/03) 1.00 1.00 $1,242.70 $1,242.70
3 Investigate and locate
existing water service @
474 Marion Road 1.00 1.00 $909.00 $909.00
4 Relay 1" water service @
474 Marion Road, lump
sum 1.00 1.00 $1,648.00 $1,648.00
5 Install new 1 1/2" water
service for island irdgafion
and 4" irrigation piping,
Pump sum 1.00 1.00 $5,030.00 $5,030.00
6 Relay 2" water service @
480 Marion Road, lump
sum 1.00 1.00 $2,030.00 $2,030.00
7 Repair water service @
449 Marion Road, lump
sum 1.00 1.00 $515.25 $515.25
8 Furnish and install 16"
water main, 2 linear feet
~ $65.00 per linear ft. 2.00 2.00 $65.00 $130.00
9 Furnish and install 6" water
main plug, 4 @ $55.00 per
linear ft. 4.00 4.00 $55.00 $220.00
CONTRACT
Page 8
CONTRACT: 03-01 CHANGE ORDER # 1
ITEM J
NUMBER
DESCRIPTION
I
CONTRACT ~ INSTALLED NET
QUANTITIESI QUANTITIES INCREASE
NET
DECREASE
COSTPER
UNIT
ADDITIONAL WORK: C.C. #1 (TEMS I - 9) - SUB-TOTAL
NET INCREASE TO SECTION IV -
INCREASE IN DECREASE IN
CONTRACT CONTRACT
PRICE PRICE
$12,216.95
$14,304.45
NET INCREASE TO SECTIONS I, II, Ill, IV
NET DECREASE TO SECTIONS I, II, Ill, IV
$31,095.77
($98,227.56)
NET DECREASE TO CONTRACT:
($67,131.79)
Page 9