CHANGE ORDER NO. 1, PUBLIC WORKS CONTRACT 02-16
DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
FOUR-WAY CONSTRUCTION OF WI
PO BOX 133
Berlin, WI 54923
Net Increase to contract:
$9,576.52
PURPOSE: See attached Change Order.
from:
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
Acct. No. 313-0410-7480-00000- Sewer Separation Fund Expenditures
Acct. No. 541-1810-1799-00000 - Water Utility - Construction in Progress
Acct. No. 551-1910-1799-00000 - Sewer Utility - Construction in Progress
TO:
Four-Way Construction of WI
P. O. Box 133
Berlin, WI 54923
CHANGE ORDER #
DATED: May 27, 2003
Your present contract with the City of Oshkosh, Contract No,
and changed as follows:
02-16 , is hereby amended
NET INCREASE TO SECTION i - SANITARY SEWER:
NET iNCREASE TO SECTION II - WATER MAIN:
NET INCREASE TO SECTION Iii - STORM SEWER:
NET INCREASE TO CONTRACT:
$1,595.20
$5,247.32
$2,734.00
$9,576.52
Recommended:
· .
Director of Public Works
BY:
CITY OF OSHKOSH
City Manager
City Clerk
certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Approved as to form:
Comptroller
City Attorney
CONTRACT: 02-t6 CHANGE ORDER # 1
SECTION I - SANITARY SEWER
ITEM
NUMBER
DESCRIPTION
CONTRACT
QUANTITIES
INSTALLED
QUANTITIES
NET
INOREASE
NET
DECREASE
COSTPER
UNIT
INCREASE IN DECREASE IN
CONTRACT CONTRACT
PRICE PRICE
1. Furnish and install
approx. 985 linear feet
of 8" Sanitary Sewer,
complete as specified,
per linear foot 985.oo 951.50 -33.50 $70.50 ($2,361.75)
2. Furnish and install
approx. 3.55 vertical
feet of 8" Sanitary
I Drop, complete
Sewer
as specified, per
vertical foot 3.55 3.32 -0.23 $300.00 ($69.00)
3. Furnish and install
approx. 42.6 vertical
feet of std. Sanitary
Manhole (4' Inside
Diameter) in 3
locations, complete as
specified, per vertical
foot 42.60 41.51 -1.09 $155.00 ($168.95
SECTION I - (BID ITEMS 1 - 3) - SUB-TOTALS $0.00 ($2,599.70)
ADDITONAL WORK REQUIRED: C.C. # 1 - SECTION I - SANITARY SEWER
DESCRIPTION INSTALLED NET NET COST PER DECREASE IN
QUANTITIES INCREASE DECREASE UNIT CONTRACT
PRICE
INCREASE IN
CONTRACT
PRICE
1. Adjust two (2) sanitary
manholes and install new
casting on Chestnut St.,
each 2.00 2.00 $200.00 $400.00
2. Instatl two (2) new castings
on sanitary manholes on
Hickory St., each 2.00 2.00 $200.00 $400.00
3. Additional asphalt
replacement on Linden
Oaks Dr. to replace entire
)avement width, lump sum 1.00 1.00 $1,000.00 $1,000.00
4. Furnish and install three
(3) 8" sleeves for transition
from PVC to C-900
sanitary sewer on W. Snell
Rd., each 3.00 3.00 $135.00 $405.00
Page 1
CONTRACT: 02-16 CHANGE ORDER Cf 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PF~ICE PRICE
5. Furnish and install four (4)
8" x 4" wyes for future
v~es off C-900 sanitary
sewer on W. Snell Rd,,
each 4.00 4.00 $235.00 $940.00 i
6. increased material cost for
262 linear foot of c-go0
pipe instead of PVC pipe
on W. Snell Rd., per linear
foot 262.00 262.00 $2.45 $641.90
7. Furnish and install four (4)
8" x 4" inline wyes on PVC
pipe on W. Snell Rd, 4.00 4.00 $52.00 $208.00
8. Adjust sanitary manhole on!
W. 6th Ave. near iowa St., I
lump sum 1.00 1.00I $200.00 $200.00
ADDITIONAL WORK: C.C. # 1 - (ITEMS 1 - 8) - SUB-TOTAL
NET INCREASE TO SECTION ] -
$4,194.90 $0.00
$1,595.20
SECTION II - WATER MAIN
NUMBER INCREASE IN DECREASE IN
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COSTPER PRICE
CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE
4. Furnish and install approx.
680 linear feet of 6" Ductile
iron Water Main w/poly
wrap, complete as
specified (fittings not
included), per linear foot 680.00 627.50 -52.50 $118.95 ($6,244.88)
5. Furnish and install approx.
310 linear feet of 8" Ductile
Iron Water Main w/poly
wrap (Linden Oak Drive,
Witzet Avenue), complete
as specified (fittings not
included), per linear foot
310.00 309.00 -1.00 $60.60 ($60.60
6. Furnish and install approx.
2,100 linear feet of 8"
Ductile Iron Water Main
,v/poly wrap (Chestnut St.,
Hickory St., Hawk St.),
complete as specified,
(fittings no~t included) per
linear foot 2,100.00 2,089.00 -11.00 $71.60 ($787.60)
Page 2
CONTRACT: 02-16 CHANGE ORDER Cf I
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
7. Furnish and install approx.
525 linear feet of 8" Ductile
Iron Water Main w/poly
wrap (6th Ave./Mason to
Sawyer), complete as
specified, (fittings no_.~t
included, asphalt
pavement restoration only)
3er linear foot
525.00 530.50 5.50 $49.15 $270.33
8. Furnish and install approx.
710 Iinear feet of 10"
Ductile Iron Water Main
w/poly wrap (8th Ave./Iowa
to Minnesota), complete as
specified, (fittings and
)avement restoration no~t
included) per linear foot
710.00 700.00 -10.00 $57.50 ($575.00)1
9. Furnish and install approx.
1,585 linear feet of 16"
Ductile iron Water Main
w/poly wrap (Witzel
Avenue), complete as
specified, (fittings not
included) per linear foot 1,585.00 1,593.00 8.00 $66:70 $533.60
10. Reconnect approx, two (2),
1" Water Services,
complete as specified,
each 2.00 1.00 -1.00 $500.00 ($500.00
11. Furnish and install approx.
1,370 linear feet of 1"
Water Service (Relay and
New), complete as
specified, not including
corporation and stop box,
~er linear foot 1,370.00 1,395.00 25.00 $40.00 $1,000.00
12. Furnish and install approx.
sixty (60), 1" corporation
and stop box with rod,
complete as specified,
each 60.00 61.00 1.00 $120.00 $120~00
13. Furnish and install approx.
one (1), 8" plug, complete
as specified, each
1.00 1.00 $45.00
14. Furnish and install approx.
one (1), 6" x 6" Tee,
complete as specified,
each 1.00 5.00 4.00 $150.00 $600.00
15. Furnish and install approx.
eight (8), 8" x 6" Tees,
complete as specified,
each 8.00 9.00 1.00 $180.00 $180.00
Page 3
CONTRACT:02-16 CHANGE ORDER# 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
16. !Furnish and install approx.
,one (1) 10" x 6" Tee,
complete as specified,
each 1.00 1.00 $235.00
17. Furnish and install approx.
one (1) 10" x 8" Tee,
complete as specified,
each 1.00 1,00 $205.00
18. Furnish and install approx.
four (4) 16" x 6" Tees,
complete as specified,
each 4.00 4.00 $620.00
19. Furnish and install approx.
two (2) 16" x 8" Tees,
complete as specified, I
each 2.00 2.00 $600.00
20. Furnish and install approx.
one (1), 6"- 90 degree
Bend, complete as
specified, each 1.00 2.00 1.00 $120.00 $120.00
21. Furnish and install approx.
six (6), 6" - 45 degree
Bends, complete as
specified, each 6.00 12.00 6.00 $135.00 $810,00
22. Furnish and install approx.
one (1), 8"- 90 degree
Send, complete as
specified, each 1.00 1.00 $185.00
23. Furnish and install approx.
eight (8), 8" - 45 degree
Bends, complete as
specified, each 8.00 10.00 2.00 $185.00 $370.00
24. Furnish and install approx.
six (6), 16"-45 degree
Bends, complete as
specified, each 6.00 2.00 -4.00 $600.00 ($2,400.00
25. Furnish and install approx.
six (6), 8" x 6" Reducers,
3omplete as specified,
each 6.00 7.00 1.00 $105.00 $105.00
26. =umish and install approx.
one (1), 10" x 8" Reducer,
complete as specified,
each 1.00 2.00 1.00 $125.00 $125.00
27. Furnish and install approx.
one (1), 16" x 6" Reducer,
complete as specified,
each 1.00 1.00 $405.00
28. Furnish and install approx.
four (4), 6" x 6" Tapping
Valve and Sleeves,
complete as specified, ($5,200.00)
each 4.00 0.00 -4.00 $1,300.00
Page 4
CONTRACT: 02-16 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
29. Furnish and instal[ approx,
one (1), 10" x 8" Tapping
Valve and Sleeves,
complete as specified,
each 1.00 0.00 -1.00 $1,600.00 ($1,600.00
30. Furnish and install approx.
two (2), 12" x 6" Tapping
Valve and Sleeves,
complete as specified,
each 2.00 0.00 -2.00 $1,420.00 ($2,840.00
31. Fu'rnish and install approx.
one (1), 12" x 8" Tapping
Valve and Sleeves,
complete as specified,
each 1.00 1.00 $1,620.00
32. Furnish and install approx.
fifteen (15), 6" Valves,
complete as specified,
each 15.00 14.00 -1.00 $585.00 ($585.00',
33. Furnish and install approx.
nine (9), 8" Valves,
complete as specified,
~=ach 9.00 11.00 2.00 $740.00 $1,480.00
34. Furnish and install approx.
;two (2), 10" Valves,
complete as specified,
each 2.00 2.00 $1,015.00
35. Furnish and install approx.
two (2) 16" Valves in std. 5'
Water Valve Manhole,
complete as specified,
each 2.00 2.00 $3,855.00
36. Remove and replace
approx. 432 square yards
of 7" Concrete Pavement
6th Avenue/Mason to
Sawyer), including curb,
complete as specified, per
square yard 432.00 492.60 60.60 $41.40 $2,508.84
37. Remove and replace
approx. 1,740 square yard.~
of 8" Concrete Pavement,
including curb, (8th
Avenue/Iowa to
Minnesota), complete as
specified, per square yard 1,740.00 1,854.10 114.10 $40.80 $4,655.28
38. Salvage and relocate
approx, two (2) Hydrants,
somplete as specified,
~=ach 2.00 0.00 -2.00 $400.00 ($800.00)
39. Furnish and install approx.
twelve (12) Hydrants,
complete as specified,
each 12.00 15.00 3.00 $1,750.00 $5,250.00
Page 5
CONTRACT: 02-16 CHANGE ORDER# 1
ITEM CONTRACT I INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
40. Abandon 6" Water Main on
Chesnut Street, complete
as specified, lump sum
1.00 1 ~00 $3,000.00
41. Abandon 3" Water Main on
Hawk Street, complete as
specified, lump sum 1.00 1.00 $2,000.00
42. Abandon 3" Water Main on
Hawthorne Street,
complete as specified,
lump sum 1.00 1.00 $1,500.00
43. Abandon 6" Wafer Main on
Hickory Street, complete
as specified, lump sum
1.00 1 ~00 $2,500.00
44. Abandon 6" Water Main on
W. 6th Avenue (Mason St.
to S. Sawyer St.), complete
as specified, lump sum
1.00 1.00 $2,850.00
45. Abandon 6" Water Ma~n on
W. 6th Avenue (Iowa St. to
Minnesota St.), complete
!as specified, lump sum
1.00 1.00 $2,800.00
SECTION II - (BID ITEMS 4 - 45) ~ SUB-TOTALS
$18,128.0~ ($21,593.08)
ADDITONAL WORK REQUIRED: C.O. # 1 - SECTION II - WATER MAIN
NUMBER : QUANTITIES I
ITEM CONTRACT' INSTALLED
QUANTITIES
DESCRIPTION NET COST PER DECREASE IN
INCREASE UNIT CONTRACT
PRICE
NET
DECREASE
INCREASEIN
CONTRACT
PRICE
1. Replace sidewalk at 1630
Chestnut St., per sq. ft. 77.50 77.50 $3.50 $271.25
2. Replace sidewalk at
southeast corner of
t Chestnut sr. & Menominee
Dr., per sq. ft. 174.77 174.77 $3.50 $611.70
3. Extra labor to tie in new 8"
to existing 6" at
Menominee Dr. and
Chestnut St. in tieu of
lapping valve, lump sum 1.00 1.00 $410.00 $410.00
4. Extra labor to tie in new 8"
lo existing 6" at E. Murdock
Ave. and Chestnut St., in
~eu of tapping valve, lump $410.00
!sum 1.00 1.00 $410.00
Page 6
CONTRACT: 02-16 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBEr DESCRIPTION CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
5. Extra labor to tie in new 6"
[o existing 6" at Hawk St.
and VanBuren Ave. in lieu
3f tapping valve, lump sum
1.00 1.00 $565.00 $565.00
6. Additional concrete
replacement on Chestnut
St., beyond estimated
amount, per sq. yd. 10.66 10.66 $48.00 $511.68
7. Reconnect 2" water service
to ball diamond on
Hawthorne St., lump sum 1.00 1.00 $820.00 $820.00
8. Additona[ concrete
replacement at Hickory St.,
beyond estimated amount
per sq. yd. 30.14 30.14 $48.00 $1,446.72
9. Replace additional curb on
Menominee Dr., per Water
Deptartment request, per
linear ft. 21.00 21.00 $21.00 $441.00
10. Extra labor to install new
hydrant at southwest
corner of Hickory St. and
Menominee Dr. (new
location), lump sum 1.00 1.00 $325.00 $325.00
11. Extra labor to tie m new 8"
to existing 6" at
Menominee Dr. and
Hickory St. in lieu of
Iapping valve, lump sum 1.00 1.00 $410.00 $410.00
12. Furnish and install 6" x 12"
offset on Hickory St., lump
sum 1.00 1.00 $420.00 $420.00;
13. Furnish and install 12"x
10" tapping valve and
sleeve at W. 6th Ave. and
Iowa St., lump sum 1.00 1.00 $1,820.00 $1,820.00
14. Furnish and install 10", 1/8
bend at W. Cth Ave. and
iowa St., lump sum
1,00 1.00 $250.00 $250.00
ADDITIONAL WORK: 0.O. # 1 - (ITEMS 1 - t4) - SUB-TOTAL
NET INCREASE TO SECTION II -
$8,712,35 $0.00
$5,247.32
SECTION III - STORM SEWER
CONTRACT
QUANTITIES
INSTALLED
QUANTITIES
NET
~CREASE
NET
DECREASE
COST PER INCREASEPRICE IN
UNIT CONTRAOT
DECREASE ~
CONTRACT
PRICE
Page 7
CONTRACT: 02-16 CHANGE ORDER# 1
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
46. Furnish and install
Storm Lateral at 316
Guenther Street, complete
as specified, lump sum 1.00 1.00 $2,775.00
47. Furnish and install 6" Mini-
Storm at 1806-1814
Marquette Avenue,
complete as specified,
lump sum 1.00 1.00 $3,560.00
48. Furnish and install 6" Mini-
Storm at 1822-1828
Menominee Drive,
complete as specified,
lump sum 1.00 1.00 $7,775.00
49. Furnish and install 6"
Storm Lateral at 1017
Pierce Avenue, complete
as specified, lump sum 1.00 1.00 $2,840.00
50. Furnish and install 12"
Storm Sewer at 180
Sullivan Street, complete
as specified, lump sum 1.00 1.00 $7,425.00
51. Furnish and install 6" Mini-
Storm at 1155 N. Westfie[d
Street, complete as
specified, lump sum
1.00 1.00 $7,520.00
SECTION Ill - (BID ITEMS 46 - 51 ). SUB-TOTALS $0.00 $0.00
ADDITONAL WORK REQUIRED: C.C. # 1 - SECTION Iii - STORM SEWER
NUMBER QUANTITIES QUANTITIE~ INCREASE IN DECREASE IN
ITEM DESCRIPTION CONTRACT INSTALLED NET NET COSTPER PRICE
CONTRACT CONTRACT
INCREASE DECREASE UNIT PRICE
1. Install new inlet north of
1635 Chestnut St., lump
sum 1.00 1.00 $1,959.00 $1,959.00
2. Rebuild storm inlet at
northwest corner of
Menominee Dr. and
Chestnut St., lump sum 1.00 1.00 $200.00 $200.00
3. Replace extra sidewalk for
storm sewer laterats at
1135 and 1155 N.
Westfield St., per sq. ft. 50.00 50.00 $3.50 $175.00
4. Extra storm laterals at
1135 and 1155 N.
Westfield St. to back of
sidewalk, per linear ft. 20.00 20.00 $20.00 $400.00
ADDITIONAL WORK: C. 0. # 1 - (ITEMS 1 - 4) - SUB-TOTAL $2,734.00
$0.00
Page 8
CONTRACT: 02-16 CHANGE ORDER # 1
DESCRIPTION
CONTRACT
QUANTITIES
INSTALLED NET NET COST PER
QUANTITIES INCREASE DECREASE UNIT
NET INCREASE TO SECTION Ill -
INCREASE IN DECREASEIN
CONTRACT CONTRACT
PRICE PRICE
$2,734.00
NET INCREASE TO SECTIONS I, II, III
NET DECREASE TO SECTIONS I, II, Ill
$33,769.30
($24,192.78)
NET INCREASE TO CONTRACT:
$9,576.52