Loading...
HomeMy WebLinkAboutItem IIPLAN COMMISSION STAFF REPORT JUNE 20, 2023 ITEM II: PUBLIC HEARING: CONDITIONAL USE PERMIT AMENDMENT REQUEST FOR AN INSTITUTIONAL USE BUILDING ADDITION AT 621 EVANS STREET (SOLUTIONS RECOVERY) GENERAL INFORMATION Applicant: William Aubrey, Consolidated Construction Owner: Trevor Fenrich, Solutions Recovery, Inc. Action(s) Requested: The applicant is requesting a Conditional Use Permit amendment for a building addition and site improvements for property located at 621 Evans Street. Applicable Ordinance Provisions: Indoor Institutional land uses are permitted only through a Conditional Use Permit (CUP) in the Institutional District (I) as regulated in Section 30-50 (C) of the Zoning Ordinance. Criteria used for Conditional Use Permits are located in Section 30-382 of the Zoning Ordinance. Property Location and Background Information: The subject site consists of a 0.9-acre parcel with frontage on Evans Street, East Parkway Avenue and Bowen Street. The site is currently used by Solutions Recovery which was granted a Conditional Use Permit on December 11, 2007 (Res. 07-376) to offer recovery opportunities for adults in a group setting. The 2040 Comprehensive Land Use Plan recommends a low-density residential use for the site. The site is surrounded predominantly by single family residential uses. Subject Site: Existing Land Use Zoning Indoor Institutional I Recognized Neighborhood Organizations Menominee South Adjacent Land Use and Zoning: Existing Uses Zoning North Light Density Residential Single Family Residential-9 (SR-9) South Light Density Residential Single Family Residential-9 (SR-9) West Light Density Residential Single Family Residential-9 (SR-9) East Light Density Residential Single Family Residential-9 (SR-9) Page 1 Item II – CUP: Recovery Solutions Addition – 621 Evans St. 2 Comprehensive Plan Land Use Recommendation Land Use 2040 Comprehensive Land Use Plan Recommendation Light Density Residential ANALYSIS Use The applicant is proposing to construct an approximately 3,500 square foot addition to the existing building. The addition will also provide an elevator for ADA-compliant access to the second level. The applicant states there will not be any change to the existing use and will continue to be used as a non-profit recovery community center providing events, support meetings, and a recovery lounge. The proposed addition will provide space for the population that is already served by Solutions Recovery. The center hosts on average three meetings per day and has an approximate daily footprint of 75 individuals (including staff and guests) through the recovery center. Site Design & Access The existing site has a total of 2 accesses, one entrance-only driveway off of Evans Street with traffic flow to the west, exiting to Bowen Street. The existing parking lot contains a total of 28 stalls, including two handicap stalls. Submitted plans show the eastern portion of the parking lot shifted to the south to accommodate the addition with an increased minimum drive aisle width of 24 feet to allow two-way traffic. In the end, a total of 30 stalls will be provided, a net gain of two stalls. The entrance off Evans Street will be widened to accommodate two-way traffic flow. The Bowen Street exit will continue as a one-way egress. Plans also show relocation of the dumpster enclosure to the south of its current location. Plans for the enclosure have not been submitted and will be addressed during Site Plan Review. Page 2 Item II – CUP: Recovery Solutions Addition – 621 Evans St. 3 Required Provided Proposed Front Setback (south) 30 ft. 185 ft. +/- 139 ft. +/- Street Side Setback (east) 25 ft. 20 ft. +/- 20 ft. +/- (no change) Street Side Setback (west) 25 ft. 144 ft. +/- 144 ft. +/- (no change) Rear Setback (north) 25 ft. 10 ft. +/- 10 ft. +/- (no change) Building Height 45 ft. max. 28.5 ft. 28.5 ft. (no change) Required Provided Parking Spaces Min: 25 30 Impervious Surface Max: 60% of lot 60% of lot The proposed plans meet all setback, building height, and impervious surface requirements for the Institutional (I) District. The applicant is also meeting the parking requirement of one space per every three expected patrons. The applicant is proposing to relocate the dumpster enclosure connected to, and southeast of the existing garage. Code prohibits exterior trash storage or dumpsters from being located between a building and a public street except if in the opinion of the Director of Community Development, or designee, no other suitable location is available for such purpose, and provided the dumpster area is developed in a manner so as to minimize its appearance from a public street. With the site being enveloped by three street frontages, staff is of the opinion that there is no other suitable location for the dumpster area and the enclosure matches and ties into the building to sufficiently minimize its visibility from the public street. Also, placement next to the existing garage helps minimize its view from the public street. Signage No proposed or changes to signage have been submitted. Any new signage will need to meet sign regulations of the Institutional District. Lighting The applicant has not submitted a photometric plan. All future lighting for the new addition and parking lot will need to be code compliant and can be reviewed during site plan review before any permits are issued. Storm Water Management The applicant has been in contact with the Department of Public Works regarding storm water management for the area. The final storm water management plans will be approved during the Site Plan Review process. Page 3 Item II – CUP: Recovery Solutions Addition – 621 Evans St. 4 Landscaping Building foundation, paved area and yard landscaping is required for the development. Points Required Points Provided Building Foundation 32 (78 additional lin. Ft.) 30 – 10 Acacias 12 – 4 Burning Bushes 42 Total Paved Area 50 50 – 1 Gray Birch 9 – 3 Acacias 6 – 2 Burning Bushes 65 Total Yards 175 (3,500 sq. ft. of new building area) 100 – 2 Gray Birches 33 – 11 Acacias 133 Total Total 257 240 Page 4 Item II – CUP: Recovery Solutions Addition – 621 Evans St. 5 Building Foundation The building foundation landscaping point requirement of 40 landscaping points per 100 linear feet of building foundation is being met for the site. Code further specifies that 25% of the points shall be on the side facing the public street and 50% shall be on the side of the main entrance. These requirements are also being met. Paved Area The paved area requirement of 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area is being met. The plan is also meeting the requirement that 30% of all points will be devoted to tall trees and 40% will be devoted to shrubs. A tall deciduous/shade tree is required at the ends of all parking rows, which has been provided on the plan. Yards Code requires 100 landscaping points per 1,000 sq. ft. of gross floor area. The provided yard landscaping points is slightly deficient in this requirement. This will be addressed during Site Plan Review. Building Facades Page 5 Item II – CUP: Recovery Solutions Addition – 621 Evans St. 6 Building Materials The City’s Exterior Design Standards do not apply to Institutional land uses. However, the exterior design may be reviewed as part of the CUP review process. The petitioner has provided elevations for the building addition as well as a material list. The specific elevations breakdown is as follows: North: N/A N/A South: Class I – 48% Class III – 52% East: Class I – 86% Class III – 14% West: Class I – 82% Class III – 18% The proposed building elevations consist of a combination of brick, glass, and lap siding matching the materials of the existing building. When compared to the Class I material allotment that would be required under commercial standards, the proposed elevations significantly exceed the minimum of 50% Class I materials for the east and west facades and near 50% for the south facade. Staff feels that the proposed elevations provide an attractive appearance for the building that is compatible with the surrounding area. Page 6 Item II – CUP: Recovery Solutions Addition – 621 Evans St. 7 RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Conditional Use Permit, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-382 (F)(3): (1) Is in harmony with the Comprehensive Plan. (2) Would not result in a substantial or undue adverse impact on nearby property, the character of the neighborhood, environmental factors, traffic factors, parking, public improvements, public property or rights-of-way, or other matters affecting the public health, safety, or general welfare. (3) Maintains the desired consistency of land uses, land use intensities, and land use impacts as related to the environs of the subject property. (4) The conditional use is located in an area that will be adequately served by, and will not impose an undue burden on, any of the improvements, facilities, utilities or services provided by public or private agencies serving the subject property. (5) The potential public benefits outweigh any potential adverse impacts of the proposed conditional use, after taking into consideration the applicant’s proposal and any requirements recommended by the applicant to ameliorate such impacts. Staff recommends approval of the proposed Conditional Use Permit for an indoor institutional use at 621 Evans Street as proposed with the findings listed above and the following condition: (1) Final landscaping plan shall be approved by the Department of Community Development. (2) Lighting and photometric plan shall be submitted and reviewed and approved by the Department of Community Development. (3) The terms and conditions of the original Conditional Use Permit approval dated December 11, 2007, Resolution 07-376, remains in full force and effect. Page 7 Sign_______ 6WDIIBBBBBBBB'DWH5HF·GBBBBBBBB City of Oshkosh Application Conditional Use Permit **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: _________________________________________________________________________________ Date: ____________ 3HWLWLRQHU·V$GGUHVV ________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference: † Phone † Email Status of Petitioner (Please Check): Owner Representative Tenant Prospective Buyer 3HWLWLRQHU·V6LJQDWXUH UHTXLUHG BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB'DWHBBBBBBBBBBBB OWNER INFORMATION Owner(s): __________________________________________________________________________________ Date: ____________ Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference: † Phone † Email Ownership Status (Please Check): Individual Trust Partnership Corporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. 3URSHUW\2ZQHU·V6LJQDWXUH___________________________________________________________________ Date: ____________ SITE INFORMATION Address/Location of Proposed Project: __________________________________________________________________________ Proposed Project Type: ________________________________________________________________________________________ Estimated Cost: _______________________________________________________________________________________________ Current Use of Property: ________________________________________________________________Zoning: ________________ Land Uses Surrounding Your Site: North: ___________________________________________________________________ South: ____________________________________________________________________ East: ____________________________________________________________________ West: ___________________________________________________________________ **Please note that a meeting notice will be mailed to all abutting property owners regarding your request. ¾ It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal. ¾ Application fees are due at time of submittal. Make check payable to City of Oshkosh. ¾ Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE )RUPRUHLQIRUPDWLRQSOHDVHWKH&LW\·VZHEVLWHDWwww.ci.oshkosh.wi.us/Community_Development/Planning.htm SUBMIT TO: Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 Room 204 PHONE: (920) 236-5059 Email: planning@ci.oshkosh.wi.us Page 8 2 Briefly explain how the proposed conditional use will not have a negative effect on the issues below. 1. Health, safety, and general welfare of occupants of surrounding lands. 2. Pedestrian and vehicular circulation and safety. 3. Noise, air, water, or other forms of environmental pollution. 4. The demand for and availability of public services and facilities. 5. Character and future development of the area. SUBMITTAL REQUIREMENTS ² Must accompany the application to be complete. (Submit only digital files. If file size exceeds 10 mb, please send through a file transfer. Please note at the discretion of Community Development staff may request a hard copy) ¾ A narrative of the proposed conditional use and project including: ‰ Proposed use of the property ‰ Existing use of the property ‰ Identification of structures on the property and discussion of their relation to the project ‰ Projected number of residents, employees, and/or daily customers ‰ Proposed amount of dwelling units, floor area, landscape area, and parking area expressed in square feet and acreage to the nearest one-hundredth of an acre ‰ Effects on adjoining properties to include: noise, hours of operation, glare, odor, fumes, vibration, etc. ‰ Surrounding land uses ‰ Compatibility of the proposed use with adjacent and other properties in the area. ‰ Traffic generation ‰ Any other information pertinent to adequate understanding of the intended use and its relation to nearby properties ¾ A complete site plan including: ‰ Digital plans and drawings of the project ‰ Title block that provides all contact information for the petitioner and/or owner, if different ‰ )XOOQDPHDQGFRQWDFWLQIRUPDWLRQRISHWLWLRQHU·VHQJLQHHUVVXUYH\RUVDUFKLWHFWVRURWKHUGHVLJQSURIHVVLRQDOVXVHGLQ the plan preparation ‰ The date of the original plan and latest date of revision to the plan ‰ $QRUWKDUURZDQGJUDSKLFVFDOH6DLGVFDOHLVQRWWREHVPDOOHUWKDQRQHLQFKHTXDOVVL[W\IHHW µ · XQOHVV otherwise approved by the Department of Community Development prior to submittal ‰ All property lines and existing and proposed right-of-way lines with bearings and dimensions clearly labeled ‰ All required and proposed building setbacks and offset lines ‰ All existing and proposed buildings, structures, and paved areas, including building entrances, walks, drives, decks, patios, fences, walls ‰ Location of all outdoor storage and refuse disposal areas and the design and materials used for construction ‰ Location and dimension of all on-site parking (and off-site parking provisions if they are to be employed), including a summary of the number of parking stalls provided per the requirements of Section 30-175 City of Oshkosh Zoning Ordinance ‰ Location and dimension of all loading and service areas on the subject property ‰ Location, height, design, illumination power and orientation of all exterior lighting on the property including a photometrics plan ‰ Location of all exterior mechanical equipment and utilities and elevations of proposed screening devices where applicable (i.e. visible from a public street or residential use or district). Mechanical equipment includes, but is not limited to; HVAC equipment, electrical transformers and boxes, exhaust flues, plumbing vents, gas regulators, generators Page 9 3 ¾ A complete landscaping plan including (If deemed necessary by Planning Services): ‰ The location, species, and installation size of plantings. ‰ A table summarizing all proposed species and required and provided landscaping points for all applicable landscaping components: building foundation, paved areas, street frontages, yards, bufferyards. ¾ Architectural plan including a percentage breakdown of exterior materials applied to each building façade (if deemed necessary by Planning Services). ¾ Any other necessary information as determined during pre-submittal meeting with City staff. Planning Staff may waive certain requirements if deemed not applicable to the project review. I hereby certify that to the best of my knowledge all required application materials are included with this application. I am aware that failure to submit the required completed application materials may result in denial or delay of the application request. $SSOLFDQW·V6LJQDWXUH UHTXLUHG BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB Date: _____________________ Page 10 Solutions Recovery – Conditional Use Narrative The property in question will continue to be used as a non-profit recovery community center providing events, support meetings, and a recovery lounge. The proposed addition will provide space for the population that is already served by Solutions Recovery. The center hosts on average 3 meetings per day and has an approximate daily footprint of 75 individuals (including staff and guests) through the recovery center. There will be no adjustment to the hours of operation, noise, glare, odor, fumes, or vibration in the continued use of the facility. Construction on the proposed addition may impact this temporarily. The surrounding area is a residential neighborhood. Solutions Recovery prides itself in being a good neighbor and maintaining its properties at a high standard to appeal to the residential feel of the neighborhood. There is no expected increase in traffic generation. Page 11 EX I S T I N G H O U S E EX I S T I N G GA R A G E SE T B A C K DU M P S T E R (2 3 ) E X I S T I N G P A R K I N G EX I S T I N G B U I L D I N G PR O P O S E D A D D I T I O N EVANS STREET BOWEN STREET PA R K W A Y A V E N U E (7 ) N E W P A R K I N G NE W 4 " C O N C . S I D E W A L K NE W 4 " C O N C . S I D E W A L K 24' - 0" 5' - 3" 78 ' - 9 3 / 8 " 30 ' - 0 " EX I S T I N G A S P H A L T P A V I N G NE W 3 " A S P A L T P A V I N G LI M I T O F E X . P A V I N G 6" C O N C . P A D MO V E E X I S T I N G C U R B CU T A S R E Q U I R E D NE W 4 " C O N C . P A T I O 7' - 6 " 17' - 0"18' - 0" 5' - 0" 5' - 0" EX I S T I N G S I D E W A L K A BB BB EX I S T I N G L A N D S C A P I N G BBBB BB BB A A A BB B HA R D W O O D M U L C H CU T & P A T C H E X . S I D E W A L K AS R E Q U I R E D 9' - 0 " 18' - 0" NE W A / C C O N D E N S O R S 24 ' - 1 0 " CH A I N L I N K G A T E W / S L A T S CE D A R F E N C E ( S T A I N T O M A T C H B U I L D I N G ) 12 " D I A . C O N C . P I E R 6" C O N C . P A D 4' - 0" 6' - 0" CC C c o p y r i g h t 20 2 2 80 0 - 6 4 2 - 6 7 7 4 ww w . 1 c a l l 2 b u i l d . c o m Ap p l e t o n , W I C o l u m b u s , W I Ra p i d C i t y , S D B i s m a r c k , N D IS S U E D F O R B I D : IS S U E D F O R P E R M I T : IS S U E D F O R C O N S T R U C T I O N : PR O J E C T # : SH E E T T I T L E DR A W N B Y : IS S U E D R E V I S I O N S IS S U E D F O R R E V I E W : ST A M P S IN I T I A L S H E E T D E S I G N E D A S 2 4 x 3 6 L A Y O U T , A N Y O T H E R R EP R O D U C E D S I Z E I S N O T T O S C A L E NOT FOR CONSTRUCTION PRELIMINARY P:\0100 NONPROFIT Projects - All\0100031_Solutions Recovery_Oshkosh\Arch\Working\Solutions Recovery2.rvt 4/28/2023 1:00:56 PM AR C H I T E C T U R A L S I T E PL A N 01 0 0 0 3 1 SOLUTIONS RECOVERY, INC. EVENS STREET - OSHKOSH - WI - 54901 PROPOSED ADDITION FOR: A0 0 1 WA A 4- 2 8 - 2 3 Re v i s i o n D a t e R e v . D e s c r i p t i o n 1/ 1 6 " = 1 ' - 0 " SI T E P L A N - P R O P O S E D NO R T H PL A N T I N G S C H E D U L E Ty p e M a r k T y p e D e s c r i p t i o n C o u n t C o m m e n t s A A c a c i a 3 ' - 6 " 2 4 A: 2 4 B G r a y B i r c h - 10 ' 3 B: 3 BB B u r n i n g B u s h 4' - 6 " 6 BB : 6 Gr a n d t o t a l : 3 3 13 3 . 5 3 ' 13 3 . 9 8 ' 60.45' 60.17' 120.35' 13 3 . 7 4 ' 240.66' 3/ 8 " = 1 ' - 0 " DU M P S T E R PR O J E C T I N F O R M A T I O N OW N E R : S O L U T I O N S R E C O V E R Y C O N T A C T : T R E V O R F E N R I C H , E X E C U T I V E DI R E C T O R P H O N E : 9 2 0 - 2 3 3 - 0 8 8 8 E M A I L : T R E V O R . F E N R I C H @ S R I - W I . O R G AR C H I T E C T / C O N T R A C T O R : C O N S O L I D A T E D C O N S T R U C T I O N C O M PA N Y , I N C . C O N TA C T : B I L L A U B R E Y P H O NE : 9 2 0 - 4 1 0 - 0 3 3 6 E M A IL : B A U B R E Y @ 1 C A L L 2 B U I L D . C O M Page 12 CUP AMENDMENT 621 EVANS ST PC: 6-20-2023 MICHAEL G KELLY 716 E PARKWAY AVE OSHKOSH, WI 54901 TANIA E HANFORD 720 E PARKWAY AVE OSHKOSH, WI 54901 LONNY/JENNY REW 617 BOWEN ST OSHKOSH, WI 54901 JEFFREY L/ASHLEY A MAUCH 621 BOWEN ST OSHKOSH, WI 54901 TRAVIS L LARSON 625 BOWEN ST OSHKOSH, WI 54901 ROGER T/ELIZ M KOTENBERG 632 BOWEN ST OSHKOSH, WI 54901 626 BOWEN LLC N2004 GREENVILLE DR GREENVILLE, WI 54942 JEREMY E FRITZ 622 BOWEN ST OSHKOSH, WI 54901 DUSTIN/MELISSA D COLLETT 3412 STANFORD LN WEST BEND, WI 53090 811 EAST PARKWAY AVENUE LLC PO BOX 1871 OSHKOSH, WI 54903 BRIAN E/AUSTIN M STONE 633 EVANS ST OSHKOSH, WI 54901 SARAH B ANDERSON 627 EVANS ST OSHKOSH, WI 54901 ANDREW D/MEGAN E THOMAN 802 E PARKWAY AVE OSHKOSH, WI 54901 TYLER A KIMBALL 806 E PARKWAY AVE OSHKOSH, WI 54901 RODGER W WILTZIUS 147 W SOUTH PARK AVE OSHKOSH, WI 54902 NICOLE R VANDENHOOGEN 815 E PARKWAY AVE OSHKOSH, WI 54901 JMBM PROPERTIES LLC 5457 N PENINSULA WAY MC FARLAND, WI 53558 TERESA J MILLER 903 E PARKWAY AVE OSHKOSH, WI 54901 TIMOTHY J KULINSKI 630 EVANS ST OSHKOSH, WI 54901 BETH ANN KING 624 EVANS ST OSHKOSH, WI 54901 MEGAN D NITKA 618 EVANS ST OSHKOSH, WI 54901 SIERRA HOFFMAN 614 EVANS ST OSHKOSH, WI 54901 LYN M EDWARDS 402 LILAC ST OSHKOSH, WI 54902 SPARR INVESTMENTS LLC 4475 STONEWOOD DR OSHKOSH, WI 54902 CYNTHIA THORPE 1107 MERRITT AVE OSHKOSH, WI 54901 LINDA BAETEN 1112 MERRITT AVE OSHKOSH, WI 54901 CONSOLIDATED CONSTRUCTION FOR SOLUTIONS RECOVERY 4300 N RICHMOND ST APPLETON, WI 54913 KORNERSTONE RECOVERY INC 621 EVANS ST OSHKOSH, WI 54901 Page 13 E PARKWAY AV CLEVELAND AV EVANS ST BOWEN ST C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 5/3/2023 1 in = 120 ft1 in = 0.02 mi¯621 EVANS ST City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 14 E PARKWAY AV MERRITT AV E LINCOLN AV STERLING AV BAY ST GRAND ST MERRITT AV HUDSON AV STERLING AV BROAD ST POWERS ST MONROE ST EASTMAN ST FLUOR CT MARSTON PL FULTON AV PRATTTR WINNEBAGO AV GRAND ST S I E W ERTTR SIEWERT TR E LINCOLN AV E PARKWAY AV CLEVELAND AV FULTON AV E IRVING AV DALE AV OXFORD AV SCHOOL AV SHAWANO AV GROVE ST EVANS ST OAK ST EPARKW A Y A V PLEASANT ST GROVE ST EVANS ST BOYD ST MONROE ST MERRITT AV ROSALIA ST OAK ST OAK ST BROADST BROAD ST BROA D S T WASHINGTON AV E IRVING AV HAZEL STBOWEN ST Oshkosh City Limit Oshkosh City Limit CMUCMU DR-6-PD II I I I I I-PD I-PD I-PD I-PD MR-20 MR-36-PD SR-9 TR-10 TR-10 TR-10 TR-10-PD TR-10-PD UMU UMU UMU UMU-PD C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 5/3/2023 1 in = 500 ft1 in = 0.09 mi¯621 EVANS ST City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 15 E PARKWAY AV CLEVELAND AV EVANS ST BOWEN ST C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 5/3/2023 1 in = 100 ft1 in = 0.02 mi¯621 EVANS ST City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer Page 16