HomeMy WebLinkAbout03-114.docAPRIL 22, 2003 03-114 RESOLUTION (CARRIED 5-0 LOST LAID OVER WITHDRAWN ) PURPOSE: CHANGE ORDER NO. 2, PUBLIC WORKS CONTRACT NO. 02-10 INITIATED BY: DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: JAMES CAPE & SONS COMPANY PO Box 044580 Racine, WI 53404 Net Increase to contract: $41,410.12 PURPOSE: See attached Change Order. BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated from: Acct. No. 313-0410-7480-00000 - Sewer Separation Fund Expenditures 315-0410-7480-00000 - Street Improvement Fund Expenditures 541-1810-1799-00000 - Water Utility - Constr. in Progress 551-1910-1799-00000 - Sewer Utility - Constr. in Progress TO: James Cape & Sons Co. P. O. Box 044580 Racine, WI 53404 CHANGE ORDER # DATED: April 2.2003 2 Your present contract with the City of Oshkosh, Contract No. and changed as follows: NET INCREASE TO SECTION I - CONCRETE PAVING: NET INCREASE TO SECTION Il - STORM SEWER: NET INCREASE TO SECTION Iii - SANITARY SEWER: NET INCREASE TO SECTION IV - WATER MAIN: 02-10 , is hereby amended $20883.19 $12 534.27 $2,537.76 $5,654.9O NET INCREASE TO CONTRACT: $41,410.12 Recommended: Director of PublicM/orks BY: CITY OF OSHKOSH City Manager City Clerk Appr,¢ved and accepted: ~*' ~ontC~ctor / I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh. Wisconsin under the within Change Order. Approved as to form: Comptroller City Attorney CONTRACT: 02~10 CHANGE ORDER #2 SECTION I - CONCRETE PAVING ITEM I J CONTRACt- NUMBER DESCRIF-'aN QUANTITIES Aparox. 2.860 square removal, complete as specified per square yard 2.860.00 Approx. 16,755 square feet of sidewalk and driveway removal, comelete as specified, per souare foot Approx. 5,765 cubic yards )f excavation, complete as specified, per cubic yard Approx. 14.000 square including integral curb am grading (base in place), complete as specified, per Approx. 9,385 souare ards of 7" non-reinforcea concrete 3avement. including integral curb, 5" case material & grading, complete as specified aer Approx. 335 sauare yards of 8" non-reinforced concrete pavement H.E.S., including integral curb 6" base material & grading, complete as specified, per Approx. 680 linear feet of 12" radius curb & heaa. complete as specified, per linear fool Approx. 650 linear feet of standard 30" curb & gutter complete as specified. Der linear foot Approx. 5,600 square feel of 4" concrete sidewalk, complete as specified, Der uare foot 16,755.00 5,765.06 14,000.00 9,385.00 335.00 680.06 650.0( 5.600.00 INSTALLED I NET QUANTITIES tNCREASE 3,921.40 18,850.60 5,323.90 14,179.70 9,536.70 77.20 632.90 518.90 10,532.60 1.061.40 2,095.60 179.70 151.70 4,932.60 NET DECREASE -441.10 -257.80 -47.10 -131.10 COSTPER $6,00 $9.99 $2.70 $6.31 $6.697.44 $0.66 $1,383.10 $7.40 $3,264.14 $19.0( $3,414.30 $23.00 $3,489.10 $30.00 f$1.309.6~ $13.318.02 Page 1 CONTRACT: 02-10 CHANGE ORDER # 2 DESCRIPTION Approx. 27 of 6" concrete sidewalk & driveway, complete as specified, per square foot Approx. 94 square 3" thick asphaltic concrete driveway, complete as specified, per square yard Approx. 705 square yards ~f 3" asphaltic concrete transition, complete as 895 square yards of 5" asphaltic concrete transition, comolete as Furnish and install approx. 1,865 tons of 2rushed stone base course. complete as specified, Per Approx. 1,585 linear~-e~ of sawing, complete as Furnish and install 265 pavement ties. complete as specified each Furnish and install a 660 linear feet of No. 4 reinforcing bars complete as specified, per linear fool Adjust approx. 145 manholes and inlets. complete as specified. each Furnish and install approx. Fourteen (14) trees, complete as specified. each Remove aeurox. 135 i.D. of trees and stumps, complete as specified, per inch diameter Terrace work on Church Avenue. complete as ~ sum CONTRACT INSTALLED NET NET COST PER INCREASE DECREASE IN QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 27,600.00 94.00 72.90 7O5.0O 678.3O 895.0( 875.30 1,000.80 $2.8 -21.10 $27.0~ -26.70 $22.5C -19.70 $23.1 1,865.00 47.00 -1,818.00 $6.78 1,585.00 1,339.90 -245.10 $3.00 265.00 288.00 23.00 660.0 540.00 $5.11 $117.3£ -120.00 $0.60 -2.OO $355.OO 20.00 143.00 14.0 135.00 155.00 1.00 1.00 1.00 1.00 -5.OO $225.OO $20.00 $1,724.25 $1,724.25 $400.00 ~12,326.04 ($1,125.00 Page 2 CONTRACT: 02-10 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION CONTRACT CONTRAC~T QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 23. Terrace work on Franklin Street, complete as specified, lump sum 1.00 1.00 $1,724.25 24. Terrace work on Golden Iris Drive, complete as specified, lump sum 1.00 1.00 $1,724.25 25, iTerrace work on Hickory Court, complete as specified, lump sum 1.00 1.00 $1,724.25 26. Terrace work on Jacktar Road, complete as specified, lump sum 1.00 -1.00 $1,724.25 ($1,724.25 27. Terrace work on Jefferson Street, complete as specified, lump sum 1.00 1.00 $1,724.25 28. Terrace work on Michigan Street, complete as specified, lump sum 1.00 1.00 $1 ,'~24.25 29. Terrace work on Purple Crest Court & Drive, complete as specified lump sum 1.00 1.00 $1,724.25 30. Terrace work on Sawyer Creek Drive, complete as specified, lump sum 1.00 1.00 $1,724.25 31. Terrace work on Wellington Drive, complete as specified, lump sum 1.00 1.00 $1,724.25 32. Terrace work on Zache¢ Drive, complete as specified, lump sum 1.00 1.00 $1,724.25 SECTION I - (BID ITEMS 1 - 32) - SUB-TOTALS $31,671.54 ($30,909.60) ADDITONAL WORK REQUIRED: C.O. #2 - SECTION I - CONCRETE PAVING ITEM NUMBER DESCRIPTION CONTRACT QUANTITIES INSTALLED QUANTITIES NET INCREASE NET DECREASE COSTPER UNIT INCREASEIN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1. Additional landscaping on Koeller Street, lump sum 1.00 1.00 $1,800.00 $1,800.00 2. Additional cost for 8" special High Early Strength Concrete (9 bag) @ 9th & Michigan and Harrison & Custer intersections in lieu of High Early (7 bag), per sq. yd. 77.20 77.20 $13.43 $1,036.80 Page 3 CONTRACT: 02~10 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES NET COST PER QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 3. Remove concrete pavement and install cul de sac at east end of Abbey Avenue 3-A. Pavement removal, per sq. d. 404.10 404.10 $6.31 $2,549.87 3-B. Sidewalk and driveway removal, per sq. ff. 1,331.7C 1,331.70 $0.66 $878.92 3-C. Excavation, per cubic yard 76.50 76.50 $7.40 $566.10 3-D. 7" concrete pavement w/integral curb 5" base & grading, per sq. yd. 264.6( 264.60 $30.00 $7,938.00 3-E. 6" concrete sidewalk & driveway, per sq, f. 101.60 101.60 $2.85 $289.56 3-F. Sawing full depth concrete, ~er linear ft. 62.'10 02.10 $3.00 $186.30 3-G, Pavement ties, each 11.00 11.00 $5.10 $56.10 3-H. Adjust mhs/inlets, each 4.00 4.00 $355.00 $1,420.00 3-1. Terrace work, lump sum 1.00 1.00 $1,960.00 $1,960.00 4. Removing rails & ties @ Irving & Franklin intersection, lump sum 1.00 1.00 l $1,239.60 $1,239.60 ADDITIONAL WORK: c.c. #2 - {iTEMS t - 4) - SUB-TOTAL NET INCREASE TO SECTION I - SECTION II - STORM SEWER $'19,921.25 $20,683.19 ITEM CONTRACT INSTALLED NET i~IET NUMBER DESCRIPTION COST PER INCREASE IN DECREASE IN QUANTITIES QUANTITIES INCREASE DECREASE I UNIT CONTRACT CONTRACT PRICE PRICE 33. Furnish and install approx. 15 linear feet of 10" Storm Sewer, complete as specified, per linear foot 15,00 12.00 -3.00 $60.03 ($180.09 34. Furnish and install approx. 960 linear feet of 12" Storm Sewer, complete as specified, per linear foot 960.00 1,113.60 153,60 $36.54 $5,612.54 35. Furnish and install approx. - 15 linear feet of 15" Storm Sewer, complete as specified, per linear foot 15.00 12.00 -3.00 $76.56 ($229.68), 36. Furnish and install approx. 4-20 linear feet of 18" Storm Sewer, complete as specified, per linear foot 420.00 408.50 ~11.50 $48.72 ($560.28)1 Page 4 CONTRACT: 02~10 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED INCREASE IN DECREASE IN NUMBER DESCRIPTION NET NET COST PER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 37. Furnish and install approx. 10 linear feet of 30" RCP Storm Sewer, complete as specified, per linear foot 38. Furnish and install approx. 10.00 5.00 -5.00 $282.75 ($1,413.75) one (1) std. Inlet (Type with 18" sump) with ~asting, complete as specified, each 1.00 1.00 $739.50 39. Furnish and install approx. 38 std. Inlets (Type 3 with 8 sump) with castings, complete as specified, each 38.01 38.00 $682.95 40. Furnish and install approx. 10.00 vertical feet of std. Storm Inlet Manhole 5 f. I.D. in two (2) locations with castings, complete as specified, per vertical foot 10.00 8.71 -1.29 $234.90 ($303.02 41. Furnish and install approx. 10.10 vertical feet of std. Storm Manhole (4' Inside Diameter) in three (3) locations with casting, complete as specified, per certical foot 10.t0 12.90 2.80 $308.85 $864.78 42. ;urnish and install approx. 33.80 vertical feet of Storm Manhole (5' Inside Diameter) in six (6) locations w/castings, complete as specified, per . vertical foot 33.80 29.23 -4.57 $234.90 ($1,073.49) 43. Rebuild approx. 3.30 vertical feet of Storm Manhole (4' Inside Diameter) in one (1) location with base, complete as specified, per vertical foot 3.30 3.85 0.55 $261.00 $143.55 44. Reconstruct approx, one (1) Storm Manhole, complete as specified, each 1.00 1.00 $1,044.00 45. Reconstruct approx. 390 inear feet of Reinforced 3oncrete Box Culvert, re- use existing base, complete as specified, per linear foot 390.00 374.70 -15.30 $197.06 ($3,014.10 Page 5 CONTRACT: 02-10 CHANGE ORDER Cf 2 ITEM CONTRACT INSTALLED NET INCREASE IN DEOREASE IN NUMBEF DESCRIPTION NET COST PER QUANTITIES QUANTITIE~ INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 46. Furnish and install approx. 53, 6" Storm Laterals, complete as specified, each 53.00 53.00 $624.66 47. Furnish and install approx. ten (10) Neenah R-1710 Storm Manhole Frames with Type "B" solid lid witJ open pick holes, non- rocking, complete as specified 10.00 11.00 1.00 $326.25 $326.25 48. Furnish and install approx. three (3) Neenah R-1700-,~ Storm Manhole Frame witf Type "B" solid lid with open pick holes, non-rocking, complete as specified, each 3.00 1.00 -2.00 $326.25 ($652.50 49. Furnish and install approx. , three (3) Neenah R-1689 Storm Manhole Frames ¢vith Type "B" solid lid, non- rocking, complete as specified, each 3.06 2.00 -1.00 $326.25 ($326.25) 50. Abandon approx. 25 Inlets . or Manholes, comPlete as specified, each 25.00 25.00 $130.50 SECTION II - (BID ITEMS 33 - 50) - SUB-TOTALS $6,947.12 ($7,753.16) ADDITONAL WORK REQUIRED: C.C. #2 - SECTION II - STORM SEWER  CONTRACT INSTALLED NET NET ITEM DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE COSTPER UNIT I INCREASEI .__I_DECRE, SEiN CONTRACT CONTRACT PRICE PRICE 1. Relocate ex. inlet 1 f. and .... -- --- extend storm sewer outfall 3 ft. w/rip rap, lure sum 1.00 1.00 $896.15 $896.15 2. Seal three (3) existing cracks in box culvert on Michigan Ave., lump sum 1.0C 1.00 $1,525.02 $1,525.02 3 Sawing & removing concrete for extra thickness of box culvert on Michigan Ave., lump sum 1.00 1.00 $7,709.14 $7,709.14 4 Furnish & install materials & labor to extend & hook Jp three (3) storm laterals on Church Ave., each 3.00 3.00 $150.00 $450.00 Page 6 CONTRACT: 02-10 CHANGE ORDER cf 2 ITEM CONTRACT INSTALLED NET INCREASE IN DECREASE IN NUMBER DESCRIPTION NET COST PER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 5 Furnish & install 4" concrete adjusting rings in liew of 2" concrete adjusting rings, each 24.00 24.00 $115.00 $2,760.00 ADDITIONAL WORK: c.o. #2 - flTEMS 1 - 5) - SUB-TOTAL $13,340.31 NET INCREASE TO SECTION II - $12,534.27 SECTION III - SANITARY SEWER ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER INCREASE /N DECREASE IN QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRAC- CONTRACT PRICE E 51--'---~-, - Furnish and install approx. ' 975 linear feet of 8" Sanitary Sewer (New and Re ay), complete as specified, per linear foot 975.00 954.80 -20.20 $53.50 ($1,080.70 52. Furnish and install approx. 4.0 vertical feet of 8" Sanitary Sewer Drop, complete as specified, per vertical foot 4.00 3.89 -0.11 $180.00 ($19.8C 53. Furnish and install approx, 650 linear feet of 10" Sanitary Sewer Relay, complete as specified, per inear foot 650.00 656.50 6.50 $66.60 $432.90 54. Furnish and install approx, 125 linear feet of 12" Sanitary Sewer Reray, complete as specified, per linear foot 125.01 129.40 4.40 $70.20 $308.88 55, Furnish and install approx. 72 vertical feet of std. Sanitary Manhole (4' Inside Diameter) in seven (7) ocafions, complete as specified, per vertical foot 72.00 71,78 -0.22 $117.00 56. Reconnect approx, five (5) ($25.74 Sanitary Laterals with risers, complete as specified, each 5.00 0.00 -5.00 $270.00 ($1,350.00) 57. Furnish and install approx. 75 linear feet of 4" Sanitary Lateral (New and Relay), complete as specified, per inear foot 75.00 100.50 25.50 $35.10 $895.05 Page 7 CONTRACT: 02-10 CHANGE ORDER#2 NUMBERITEM , DESCRIPTION CONTRACT INSTALLED NET NET CO~* PER INCREASE IN DECREASE IN QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PR/CE PRICE 58. -urnish and install approx. 910 linear feet of 6" Sanitary Lateral Relay, complete as specified, per linear foot 910.00 749.30 -160.70 $36.00 ($5,785.20) 59. Abandon approx, two (2) Sanitary Manholes, complete as specified, each 2.00 1.00 -1.00 $225.00 ($225.00 60. Furnish and install approx. lhree (3) Neenah R-f700A Sanitary Manhole Frame /v/Type "B" Self-Sealing Jd, non-rocking, complete as specified, each 3.00 0.00 -3.00 $360.00 ($1,080.00) 61. Furnish and install approx. one (1) Neenah R-1710 Sanitary Manhole Frame w/Type "B" Self-Sealing Lid, non-rocking, complete as specified, each 1.00 2.00 1.00 $360.00 $360.00 SECTION fil - (BID ITEMS 51 - 61) - SUB-TOTALS $f,996.83 ($9,566.44 ADDITONAL WORK REQUIRED: C.C. #1 - SECTION III - SANITARY SEWER NUMBER QUANTITIES QUANTITIES NCREASE DESCRIPTION 1. Install 1,,6" casing pipe for future 8 sanitary sewer crossing proposed STH / Iff0 and frontage road at / /Fountain Avenue extended / I-A. /1555/2 C.Y. gravel backfill J I-B. /700/2 C.Y cay backfill J 1-C. fl00 ff. pipe (frontage road) J 1-D. f180ff, pipe (STH 110) ~ 1-E. IErosion control, lump sum NET DECREASE 777.50 350.00 1,070.00 385.00 100.00 100.00 180.00 180.00 2,000.00 2.615.82 292.50 35.00 615.82 COSTPER I INCREASE IN I DECREASE IN UNIT CONTRACT CONTRACT PRICE PRICE $12.60 $1.98 $161.04 $221.04 1.00 ADDITIONAL WORK: c.c. #1 - (ITEMS lA - 1E) - SUB-TOTAL $3,685.50 $69.30 $615.82 $4,370.62 Page 8 CONTRACT: 02-10 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NUMBER DESCRIPTION NET QUANTITIES QUANTITIES INCRBASE DECREASE ADDITONAL WORK REQUIRED: C.O. #2 - SECTION III - SANITARY SEWER NUMBER DESCRIPTION 1. Extra excavation for sanitary trench on Franklin I · ~St., per cubic yard / 2. ~Extra stone for sanitary ~ /trench on Franklin St., per / /TM I CONTRACT 'NSTA EO NET r DE %SE QUANTITIES QUANTITIES INCREASE 273.70 273.70 547.40 547.40 COSTPEP UNIT COSTPER IINCREASEINI UNIT CONTRACT PRICE $7.40 / $2,025.38 $6.78 $3,711.37 ADDITIONAL WORK: c.o. #2. (ITEMS I - 2). SUB-TOTAL DECREASEW CONTRACT PRICE $5,736.75 $2,537.76 NET INCREASE TO SECTION III - SECTION IV- WATER MAIN NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT Furnish and install approx. 5 linear feet of 4" Ductire ron Water Main w/poiy wrap, complete as specified (fittings not Furnish and install approx. 390 linear feet of 6" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not linear foot Furnish and insta approx. 8'~ ~v/po~y wrap, complete as specified (fittings nol included), per linear foot Reconnect approx, three (3), 1" Water Services. complete as specified, each 5.00 390.00 1,650.00 3.00 5.00 327.00 1.641.00 0.00 -63.00 -9.00 -3,00 $52.20 $44.37 $58.64 $282.75 INCREASE IN DECREASE IN CONTRACT CONTRACT PRICE PRICE '$2,795.31 ($527.76 ($84&25', Page 9 CONTRACT: 02-10 CHANGE ORDER # 2 ITEM CONTRA'CT INSTALLED NET NUMBER DESORIPTION NET COST PER INCREASE IN DECREASE IN QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 66. Furnish and install approx. 910 linear feet of 1" Water Service (Relay and New), 2omplete as specified, not including corporation and stop box, per linear foot 910.00 845.00 -65.00 $26.10 ($1,696.50 67. Furnish and install approx. 46, 1" corporation and stop box with rod, complete as specified, each 46.01 43.00 -3.00 $152.25 ($456.75 68. Furnish and install approx. seven (7), 8" x 6" Tees, complete as specified, each 7.00 7.00 $134.85 69. Furnish and install approx. one (1) 8"x 8" Tee, complete as specified, each 1.00 1.00 $143.55 70. Furnish and install approx. one (1) 12" x 8" Tee, complete as specified, each 1.00 1.00 $247.95 71. Furnish and install approx. one (1) 8" x 4" Reducer, complete as specified, each 1.00 1.00 $130.50 72. Furnish and install approx. six (6) 8" x 6" Reducers, complete as specified, each 6.00 6.00 $130.50 73. Furnish and install approx. one (1) 12" x 8" Reducer, complete as specified, each 1.00 1.00 $195.75 74. Furnish and install approx. one (1) 12" - 90 degree Bend, complete as specified, each 1.00 1.00 $252.30 75. Furnish and install approx ~wo (2) 4" - 45 degree Bends, complete as specified, each 2.00 2.00 $108.75 76. Furnish and install approx. I4, 6". 45 degree Bends, - complete as specified, each 14.06 16.00 2.00 $108.75 $217.50 77. Furnish and install approx. four (4), 8" - 45 degree Bends, complete as specified, each 4.00 4.00 $174.00 / Page 10 CONTRACT: 02-10 CHANGE ORDER # 2 ITEM CONTRACT INSTALLED NET NET INCREASE IA DECREASE IA NUMBER DESCRIPTION COST PER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 78. Furnish and install approx. one (), 8 - 22 1/2 degree Bend, complete as specified, each 1.00 1.00 $174.00 79. Furnish and install approx. seven (7), 6" Valves, complete as specified, each 7.00 7.00 $456.75 80. Furnish and install approx. eight (8), 8" Valves, complete as specified, each 8.00 8.00 $565.50 81. Furnish and install approx. three (3), 6" x 6" Tapping Valve and Sleeves, complete as specified, : each 3.00 3.00 $2,262.00 82. Furnish and install approx. one (1), 12" x 8" Tapping ~ Valve and Sleeves, complete as specified, each 1.00 1.00 $2,697.00 83. Furnish and install approx. seven (7) Hydrants, complete as specified, each 7.00 7.00 $1,218.00 84. Abandon 6" Water Main on Church Avenue, complete as specified, lump sum 1.00 1.00 $739.50 , 85. Abandon 6" Water Main on E. Custer Avenue, complete as specified, lump sum 1.00 1.00 $1,609.50 86. Abandon 4" Water Main on Franklin Street, complete as specified, lump sum 1.00 1.00 $739.50 87. Abandon 6" Water Main on Jefferson Street, complete as specified, lump sum 1.00 1.00 $1,609.50 88. Lower existing 6" Water Main on N. Main Street and on E. Custer Avenue intersection, lump sum 1.00 1.00 $3,'/75.50 SECTION IV - (BID ITEMS 62 - 88) - SUB-TOTALS $217.50 ($6,324.57) Page CONTRACT: 92-10 CHANGE ORDER # 2 ITEM DESCRIPTION CONTRACT I INSTALLED [ NET NUMBER QUANTITIES QUANTITIES INCREASE ABDITONAL WORK REQUIRED: C.C. #1 - SECTION IV - WATER MAIN ITEM DESCRIPTION CONTRACT INSTALLED NET NUMBER QUANTITIES QUANTITIES INCREASE Install 20 sasing pipe for future 12" water main / i crossing proposed STH ~ 1110 and frontage road at ~ I Fountain Avenue extendea [ 1-A. 11555/2 C.Y. gravel backfill ~ 1-B. 1700/2 C.Y. clay backfill J 1-C. 1100 ft. pipe (fronfage rd,) / 1-D. 1180ft. pipe (STH110) / 1-E. IErosion control, lume sum 777.50 350.00 100.00 180.00 2.000.OOJ 1,070.00 385.00 100.00 180.00 2.615.82 292.50 35.00 615,82 YET I COSTPER DECREASE UNIT NET DECREASE COSTPER UNIT $12,60 $1.98 $169.68 $229.98 1.00 INCREASE IN DECREASE ~N CONTRACT CONTRACT PRICE PRICE CONTRACT CONTRACT PR/CE PRICE $3,685.50 $69.30 $615.82 ADDITIONAL WORK: C.C. #t - (ITEMS lA - tE). SUB-TOTAL $4,370.62 ADDITONAL WORK REQUIRED: C,O. #2 - SECTION IV - WATER IVIAIN ITEM DESCRIPTION CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT Repair broken water boxes on Franklin & Church per 1. Water Department 2.00 2.00 $667.00 $1,334.00 Bore water main crossing at Michigan St. and Ninth 2. Ave., (40') 1.00 1.00 $4,988.80 $4,988.80 Furnish & install 8" x 8" @ 3. Custer Ave. & Jefferson St. 1.00 1.00 $250.70 $250.70 Replace 12" water main on Franklin St., 11 lineal ft., 4. ,er foot 11.00 11.00 $74.35 $817.85 ADDITIONAL WORK: C,O. #2. [ITEMS 1-4) - SUB-TOTAL NET INCREASE TO SECTION IV - $7,391.35 $5,654.90 NET INCREASE TO SECTIONS I. II, III, IV NET DECREASE TO SECTIONS I, II, III, IV $95,963.89 ($54,553.77) NET INCREASE TO CONTRACT: $41,410.12 Page 12