HomeMy WebLinkAbout03-115.docAPRIL 22, 2003 03 - 115 RESOLUTION
(CARRIED__ 5 - 0 _____ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: AWARD BID FOR ROAD MATERIALS FOR 2003
INITIATED BY: PURCHASING DIVISION
WHEREAS, the City of Oshkosh has heretofore advertised for b ids for road
materials for 2003; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following
are the most advantageous bids:
MCC, INC.
PO Box 1137
Appleton, WI 54912 - 1137
Ready - mix Concrete 500 CY more/less:
Class C 3/4” State Mix Alternate 64.00 cy
4,000 PSI per C.Y. Alternate 60.00 cy
5,000 PSI per C.Y. Alternate 64.00 cy
6,000 PSI per C.Y. Alternate 68.00 cy
7,000 PSI per C.Y. Alternate 72.00 cy
9 bag HI early Alternate 74.00 cy.
Hot Mix Asphalt – Picked up 3T. more/less
Binder Per ton Alternate = 22.50t + 3.25tk= 22.75t
MICHELS CORPORATION
700 Tullar Road
Neenah, WI 54956
Breaker Run 6” - 3,000 T. more or less:
-- Delivered -- Alternate 6.75t
Breaker Run 3” – 10,000 T. more or less:
-- Delivered – Alternate 6.90t
1 1/2” base course – 10,000 T. more or less:
– Delivered -- Alternate 6.90t
3/4” base course -- 6,000 T. more or less:
– Delivered -- Alternate 6.90t
3/4” clear stone -- 2,000 T. more or less:
– Delivered -- Alternate 7.85t
1 1/2” clear stone – 2,000 T. more or less:
– Delivered -- Alternate 7.85t
3” clear stone – 1,000 T. more or less:
– Delivered -- Alternate 8 .85t
6” clear stone – 1,000 T. more or less:
– Delivered -- Alternate 9.85t
Ready - mix concrete 500 cy more/less:
Class C 3/4” state mix Primary 62.00 cy
4,000 PSI per C.Y. Primary 58.00 cy
5,000 PSI per C.Y. Primary 62 .00 cy
6,000 PSI per C.Y. Primary 66.00 cy
7,000 PSI per C.Y. Primary 70.00 cy
9 bag HI early Primary 70.00 cy
NORTH EAST ASPHALT INC .
W6380 Design Drive
Greenville, WI 54942
Hot Mix Asphalt – Picked up – 3,000T. more/ less:
Binder per ton Primary = $21.15t + 1.50t = 22.65t
Surface per ton Primary = $23.50t + 1.50t = 25.00t
VULCAN MATERIAL CO.
1301 Knapp Street
Oshkosh, WI 54902
Shot Rock – 3,000 T. more or less
-- Picked up Primary = $3. 85t + 1.50tk= 5.35t
-- Delivered Alternate 5.95t
Breaker Run 6” – 3,000 T. more or less
-- Picked up Primary = 4.85t + 1.50tk= 6.35t
Breaker Run 3” – 10,000 T. more or less
-- Picked up Primary = 4.85t + 1.50 = 6.35t
1 1/2” base course – 10,000 T. more or less
-- Picked up Primary = 4.85t + 1.50tk = 6.35t
3/4” base course – 6,000 T. more or less
-- Picked up Primary = 4.85t + 1.50tk = 6.35t
3/4” clear stone – 2,000 T. more o r less
-- Picked up Primary = 5.90t. + 1.50tk = 7.40t.
1 1/2” clear stone – 2,000 T. more or less
-- Picked up Primary = 6.00t + 1.50tk = 7.50t
3” clear stone – 1,000 T. more or less
-- Picked up Primary = 7 .00t + 1.50tk = 8.50t
6” clear stone – 1,000 T. more or less
-- Picked up Primary = 7.95t + 1.50tk = 9.45t
Sealcoat chips -- 2,500 T. more or less
-- Picked up Primary = 5.80t + 1.50tk = 7.30t
-- Delivered Alternate 7.90t
BADGER HIGHWAYS CO INC.
PO Box 358
Menasha WI 54952
Hot Mix Asphalt – 3,000 T. more or less
Surface per ton – Alternate = 24.10t + 3.25tk = 27.35t
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the C ity of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appro priate agreement for the purpose of same, all
according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 100 - 0430 - 6565 - 00000 – Street Dept. – Materials & Supplies