HomeMy WebLinkAboutStorm Managemnent Facility Maintence Agmt Oshkosh corp 4/17/2023CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number Document Title
The City of Oshkosh, the Governing Body, and Oshkosh Corporation, the Property owner,
along with their successors and assigns, are the parties to this Agreement. The purpose of
this Agreement is to ensure adequate storm water drainage facilities for the Property
described in this Agreement in connection with the surrounding public storm water
facilities. The consideration for this Agreement includes the City's approval of proposed
development on the Property. Additional consideration includes the Property owner's
clearer understanding of storm water drainage obligations for the Property, and the
Governing Body's assurance that the storm water drainage issues relating to the property
can be more easily achieved through this Agreement.
CURRENT PROPERTY OWNERS SUBJECT TO THIS AGREEMENT:
Oshkosh Corporation
1917 Four Wheel Drive
Oshkosh, WI 54902
GOVERNING BODY: City of Oshkosh
PROPERTY SUBJECT TO THIS AGREEMENT
If I ®I811®® ® III itI 1
!II "^l�"R_I.nnn-nrn
uuv ill : ooJ r uoV
IX:'+OfVfJO
DOC# 1902013
NATALIE STROHMEYER
REGISTER OF DEEDS
INNEBAGO COUNTY, WI
RECORDED ON:
04/ 17/2023 02.38 PM
RECORDING NEE: 30.0-0—
PAGE: 13
Recording Area
Name & Return Address:
Oshkosh City Attorney's Office
PO Box 1130
Oshkosh, WI 54903-1130
Tax Parcel Numbers:
91413490000
The Property subject to this Agreement is located in the City of Oshkosh, Winnebago County, and is more particularly described as
follows:
SEE EXHIBIT "A"
GRADING AND DRAINAGE PLAN
The Property must always comply with the grading and drainage plan approved by the City. The approved grading and drainage plan
may be amended or modified fi•om time to time after consultation with the Property owner. Compliance will be evaluated according to
the most current approved plan. A small scale version of the current grading and drainage plan is attached as Exhibit "B" for
identification and reference purposes. The full scale grading and drainage plan is on file for review with the City Department of Public
Works, and will be used to provide grading and drainage criteria and to govern compliance and any disputes.
PURPOSE
The three (3) primary purposes of this Agreement:
1) Notify the Property owner, as well as anyone interested in or connected to the Property that the Property is subject to this Agreement
and Chapter 14 of the Oshkosh Municipal Code, as amended, and that any owner of the Property assumes these obligations; and,
2) Identify specific storm water facilities that currently exist on the Property, or may be constructed or installed in the future; and,
3) Describe the minimum responsibilities for maintaining the Property's approved storm water management facilities and grading and
drainage plan.
January 5, 2023 -17
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number Document Title
RESTRICTIONS
The Property must always conform to its most current grading and drainage plan approved by the City. The Property is also subject to
all aspects of the Municipal Code, including storm water management requirements, as may be amended, which are currently located in
Chapter 14 of the Municipal Code. The storm water management requirements of the Municipal Code change from time to time, with
the Property owner receiving public notice as required by law. Changes may be made to the grading and drainage plan for the Property
if requested by the Property owner and after review of any changed circumstances on the Property. The approved grading and drainage
plan for the Property will be on file in the City of Oshkosh Department of Public Works and is fully incorporated by reference in this
Agreement.
RESPONSIBLE PARTIES
Each owner of the Property, jointly and severally, as well as their heirs, successors, and assigns, is responsible for maintaining the
Property in the matmer described in this Agreement. The Property owner's responsibilities include maintaining approved vegetation,
grading, drainage, and storm water facilities on the Property.
STORM WATER FACILITIES
The Property's storm water facilities consist of:
1. Wet Detention Ponds;
2. Storm Inlets;
3. Storm Manholes;
4. Storm Sewer; and
5. Swale.
INSPECTION AND MAINTENANCE
All storm water facilities and components of the storm water system shall be inspected at least semiannually, once in the Spring and
once in the Fall, or more often if required by law. The Property's storm water drainage system must also be inspected after major storm
events, which for purposes of this Agreement are those events with an accumulation of one-half (1/2) inch within 24 hours prior to the
site having a minimum of 70% stabilization, and an event with an accumulation of one and one-half (1'/) inches within 24 hours after
the site has a minimum of 70% stabilization. The storm water facilities and grading and drainage scheme must be maintained as
designed in order to achieve the desired storm water drainage objectives. Therefore, maintenance and repairs must be performed
expeditiously when system deficiencies are identified. The existence of soil erosion, clogged or damaged inlets and/or pipes, excessive
sediment loads within the basin and/or biofilter, rifling of side slopes, and other damaged features of the stormwater system are
examples of items requiring maintenance or repair work. Material removed from the basin or biofilter may require special handling
dependent upon current Wisconsin Department of Natural Resources disposal practices.
If a biofilter is installed/constructed, then biofilter maintenance activities include: remove coarse and gravel sediment that has
accumulated; maintaining proper level of mulch; inspecting surface and repair eroded areas; inspect filter strip rip -rap and repair as
needed; inspect energy dissipator rock or grass inlet areas; inspect overflow structures; replace filter bed; inspect perforated pipe under
drain; remove litter and debris; water plants; replace dying plants; and replace vegetation when necessary. Biofrlter inspection and
maintenance requirements applicable to the Property will change as the rules enforced by the Governing Body change.
If a wet basin is installed/constructed, then dredging operations are required to remove the excess sediment when the depth of water in
the wet detention basin diminishes below three feet causing the efficiency of the detention basin to decrease. The storm water detention
basin(s) must retain the safety shelf after dredging. Damage to the safety shelf or detention basin liner must be repaired to preserve the
safety and operation of the facilities.
If a dry basin and/or swale is installed/constructed, then dry basin and swale maintenance includes removal of trash and debris,
repairing erosion, maintaining vegetation, and dredging when necessary.
January 5, 2023
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number Document Title
The examples of maintenance activities that are identified above are not intended to be complete. The minimum information required
to be viewed as a guideline for potential maintenance or repair activities is identified in the Inspection and Maintenance Logs attached
as Exhibit "C". The Property owner shall, upon request, make available for inspection all maintenance records to the City's
Department of Public Works, or any agent of the City, during the life of the system.
Mowing in buffer areas, detention basin banks and drainage ways shall be minimized in order to maximize filtration of runoff. If
occasional mowing is necessary, the mowing height must not be less than six inches. Applications of fertilizers, herbicides, pesticide or
other chemical applications are prohibited in buffer areas, on detention basin banks and along drainage ways.
COMPLIANCE
1. The Property benefits fi•om a properly maintained grading and drainage plan as well as properly maintained storm water
facilities. In the event the Property owner fails to perform any obligation related to this Agreement, the City of Oshkosh shall
have the authority to enter the private Property to inspect, maintain, repair, reconstruct, and/or modify any component of the
approved grading and drainage plan or storm water facility. The City has no duty to take such action but may do so at its
discretion.
2. The Property owner is entering into this storm water operation and maintenance Agreement primarily so that they comply with
local and state storm water rules and regulations. In addition to achieving compliance with rules and regulations, the Property
owner's compliance with this Agreement may result in the receipt of local storm water credits. In the event the Property owner
fails to materially comply with the terms of this Agreement, the City reserves the right to deny or suspend any requested storm
water credits until the noncompliant issue is resolved to the City's satisfaction. Upon achieving compliance, storm water
credits may be reinstated but they shall not be granted retroactively.
3. The remedies described herein intended to achieve compliance are not exclusive, and may be cumulative. The City may
utilize one or more lawful actions it deems appropriate to enforce this Agreement and/or the Municipal Code.
4. The Property owner grants to the City of Oshkosh a limited, nonexclusive easement in perpetuity over the Property for the
purpose of addressing grading and drainage deficiencies, as well as providing reasonable and necessary access to any storm
water facility that is located on or within the Property. The City of Oshkosh shall use only that part of the Property reasonably
necessary to allow the inspection, maintenance, and/or repair of the approved grading and drainage plan or any storm water
facility.
5. The City may elect, but is not required, to perform storm water maintenance or repairs on the Property. If the City exercises
this discretion, then all associated costs for performing this work and enforcing this Agreement and/or storm water
management requirements of Chapter 14 of the Municipal Code, as may be amended from time to time, are subject to
reimbursement from Property owners, jointly and severally, or through encumbrances on the Property itself. Reimbursement
remedies include placing an encumbrance against the Property as a Special Charge for Current Set -vices pursuant to Sec.
66.0627 Wisconsin Statutes, as amended, or through other methods to collect directly from the Property owner as allowed by
law at the City's discretion. Any Special Charge for Current Services shall be a lien on the Property and shall be collected
with the real estate taxes. Notices of such charges shall be provided as required by law.
6. The storm water management facilities shall be for the benefit of the Property and the City of Oshkosh as described in this
Agreement. This Agreement is not intended to benefit third parties and there shall be no third party beneficiaries.
January 5, 2023
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number Document Title
RECORDING
This agreement shall be recorded with the land records of the Winnebago County, Wisconsin, Register of Deeds. Oshkosh Corporation,
shall bear the cost of recording this document.
AMENDMENTS
This Agreement may be amended in whole or in part at any time by the owner of the Property, provided: 1) the amendment(s) are
approved in writing by the owners of a majority of the lots within the Property as recorded with the Register of Deeds, Winnebago
County, Wisconsin; and, 2) the amendment(s) are approved in writing by the City of Oshkosh Board of Public Works. This
Agreement shall be a permanent covenant that shall, as provided by law, run with the land and any amendment to this Agreement shall
be subject to the prior approval by the City of Oshkosh.
SIGNATURES ON FOLLOWING PAGE
4
January 5, 2023
CITY OF OSHKOSH
STORMWATER MANAGEMENT FACILITY
MAINTENANCE AGREEMENT
Document Number Document Title
For the Owner/Developer:
OSHKOSH CORPORATION
By: ill,
an Meyers, i >" � " s 1;l-:--s (title)
STATE OF WISCONSIN )
ss.
WINNEBAGO COUNTY )
Personally came before me this day of (, "U, tk YMi 2023, the above named Ryan Meyers, to me known
to be such person who executed the foregoing instrument and Ackno, dged the same, for the purpose herein contained.
Dawn Diedrich A,
NOTARY PUBLIC
STATE OF WISCONSIN Notary Public, State of Wisconsin; 6 I �,
My Commission expires: - 1 U
For the City of Oshkosh:
Marls A. RohlofF, City Manager
STATE OF WISCONSIN )
ss.
WINNEBAGO COUNTY )
Jessi . Balcom, City Clerk
Personally came before me on this � day of /— / � , 2023, the above named, Mark A. Rohloff and
Jessi L. Balcom, to me known to be the persons wh4 executed the foregoing instrument and acknowledged the
same.
Approved as to form:
Dat"ore-GrW
%' rl
(\ty utorney
This document was drafted by:
David J. Praska
Deputy City Attorney
Oshkosh, WI 54903-1130
January 5, 2023
G- v✓ �\�\\l, f fP
Notary Public, State of Wisc n n �/
My Commission expires: ���- T rr;v'
J.E.ARTHUR
® I AND ASSOCIATES, INC � 9
Project No. 792,5231
548 Prairie Road
Fond du Lac, WI 54935
Phone: 920.922.5703
www.jeaaa.com
December 15, 2022
DESCRIPTION OF A STORMWATER MANAGEMENT AREA FOR
OSHKOSH CORPORATION
BEING PART OF THE SW 1/4 OF THE SE 1/4 AND PART OF THE
SE 1/4 OF THE SW 1/4 OF SECTION 35, T. 18 N.-R. 16 E.,
CITY OF OSHKOSH, WINNEBAGO COUNTY, WISCONSIN
Part of the Southwest 1/4 of the Southeast 1/4 and part of the Southeast 1/4 of the
Southwest 1/4 of Section 35, T. 18 N.-R. 16 E., City of Oshkosh, Winnebago County; Wisconsin
and more particularly described as follows:
Commencing at the Southeast corner of the Southeast 1/4 of sa�,ciCtlorj 3, thence'
North 890-25'-09" West along the South line of Southeast 1/4 of said Section 35, 1335,03 feet,
thence North 000-09'-32" East, 33.00 feet to a point on the North right of way line of W.
Waukau Avenue and to the point of beginning; thence North 890-25'-09" West along said North
right of way,1317.59 feet; thence along a curve to the right having a radius of 55.00 feet,
119.77 feet along curve to a point which is North 270-02'-07" West, 97.47 feet from last
described point; thence North 350-20'-55" East along the East right of way line of Hughes
Street, 389.92 feet; thence South 890-20'-17" East, 956.46 feet; thence South 00°-14'-31" West,
48.67 feet; thence South 89°-12'-47" East, 181.05 feet; thence South 000-09'-32" West, 356.01
feet to the point of beginning and containing 11.67 acres (508,320 sq. ft.) of land more or less.
P;\JEAAA PROJECT FOLDER\792-Oshkosh Corp\792.5231 West Plant Description\Documents\5231 DESCRIPTIONS.docx
Exhibit (1 of 1)
PROJECT NUMBER:792.5231 SKETCH MAP FOR DATE: DECEMBER 15, 2022
WEST PLANT POND DRAINAGE BASIN
PART OF THE SW 1/4 OF THE SE 1/4 & PART OF THE SE 1/4
OF THE SW 1 4 OF SECTION 335, T. 18 N.—R. 16 E.,
CITY OF OSH OSH, WINNEBAGO COUNTY, WISCONSIN
CHORD=97.47'
BRG=N27'02'07'W
RAD=55.00'
L=119.77'
DELTA=124'46'04"
SW COR— SE 1/4
SEC. 35-18-16
(BERN. LION. FOU
SE COR: SE 1/4
SEC. 35-18-16
(CUT V FOUND)
200 0 200 400
SCALE 1"=200' FEET
I
NORTH POINT REFERENCED TO THE S. LINE OF THE SE
1/4 OF SECTION 35-18-16 WHICH BEARS N89'2VO9'W
PER WINNEBAGO COUNTY COORDINATE SYSTEM.
LEGEND
0 1' IRON PIPE FOUND IN PLACE
3 o
'GUARD \\
- c SNACK
EX 13LDG
DRAINAGE AREA
508,320 SQ FT
11.67 ACRES
li
�I
S00'09'32"W
J NOOV9'32'E 33.00'
I� I
i (
7'E 955.46'
4 � �-S00'14'31"W 48.67'
58992'47'E 181.05'
EX. BLDG
FILE NO.:5231
Lo
m
0
In
m
m
Exhibit B (1 of 2)
z\�ran oxoais\o..�, z,\exro»vu.c..e.f "Im- wl-1x a+.urz. — ss.•a
�t16�i''tYBoa0ot7Q0as0'L.1 ! t I
i '7 Fz� it—� --- �L.YJ \..♦♦♦``\\\\ �� \ I � � I I
Ig
IeK
AR m V FA
Ore I �� �--_" \ � ♦\♦ �\ \ ., �. : FF
t / ♦ ♦ \ ♦\\♦ \r
/ �'� t��OgnYa Ili t�/♦_\ ♦\�`` �, i /♦\\`"�H�g88
. I s
AAP�
wnE ! 7{ c�
----gyhB / 7 z6 �• I\�
r
8-
�a�
��F • � 'i Ai I I ,
\ Pratt gQ s % 1'dil 1 I�it �� ram. i
a��"gL8 � �� �� fI I I Ir// � / �t ♦,3r � ��5j;s"' i \S rg7 � g^ F � � g� T^�$$�Zz
iiilg
AX
Berk i"�I --- - -`--
- xar
9�r
it �� I5 � �♦� � �J ,� �,/ �/ `:. !mil ' �
• l
GRADING, PAVING AND EROSION CONTROL PLAN G
OSHKOSH CORPORATION
WEST PLANT D
Q rn € WAUKAU AVENUE e O
CITY OF OSHKOSH, WISCONSIN
Exhibit B (2 of 2)
Inspection & Maintenance Log
Catch Basin / Proprietary Device
Inspection Year:
Name of Site: Address:
Inspector: Company:
Municipality Phone:
Contact:
* Facility owner is responsible for inspecting, maintaining, and repairing facility components after any
major storm event and at the beginning of the Spring and Fall seasons. Check any deficiencies noted
and comment for maintenance actions taken, date of repair, and any alerts. Inspection items with no
* should be completed by a qualified professional every five years (or more frequently if concerns are
noted).
** Please refer to the Maintenance at a Glance sheet for more information.
Inspection Item**
Storm
Date
Storm
Date
Storm
Date
Maintenance Action
Date
Catch Basin 1 Proprietary Device
Inlet Protection *
Remove after
Stabilization
Debris / Trash Accumulation *
Clean up/Remove
Abnormal water levels *
Contact Municipality
Sediment / Floatables Accumulation *
Remove (pump and
dispose of at
wastewater treatment
plant) **
Depressions around facility
Contact Municipality
Joint Separation
Contact Municipality
Cracks in Concrete
Contact Municipality
Deteriorated piping
Contact Municipality
Displacement of Structure
Contact Municipality
** Pumping Details (based on design guidelines):
Type of unit(s)
Dates Pumped
Pumper
Design Pumping Frequency
Disposal Location
Page 1 of 1 Rev. 02/22/2008
Exhibit C (1 of 5)
Inspection & Maintenance Log
Detention Basin
Inspection Year:
Name of Site: Address:
Inspector: Company:
Municipality
Contact: Phone:
* Facility owner is responsible for inspecting, maintaining, and repairing facility components after any
major storm event and at the beginning of the Spring and Fall seasons. Check any deficiencies noted
and comment for maintenance actions taken, date of repair, and any alerts. Inspection items with no
* should be completed by a qualified professional every five years (or more frequently if concerns are
noted).
Inspection Item
p
Storm
Date
Storm
Date
Storm
Date
Maintenance Action
Date
Pond
Bank Erosion
Debris / Trash Accumulation
Visible pollution *
Abnormal water levels
Sediment Accumulation
Depressions, Whirlpools, Sinkholes
Embankment
1. Upstream Slope- Poor Grass Cover*
Erosion or Slides *
Trees/Brush Growing on Slopes
Deficient Riprap Protection
Animal Burrows *
Depressions or Bulges
Settlement
Longitudinal Cracks
Transverse Cracks
Page 1 of 4 Rev. 02/22/2008
Exhibit C (2 of 5)
Inspection & Maintenance Log
Detention Basin
Inspection Item
Storm
Date
Storm
Date
Storm
Date
Maintenance Action
Date
2. Crest — Settlement
Misalignment
Cracking
3. Downstream Slope - Poor Grass
Cover
Erosion or Slides
Trees/Brush Growing on Slopes
Animal Burrows *
Excessive or Cloudy Seepage
Longitudinal Cracks
Transverse Cracks
Depressions or Bulges
Settlement
Seeps, leaks, or boils
Page 2 of 4
Rev. 02/2212008
Exhibit C (3 of 5)
Inspection & Maintenance Log
Detention Basin
Inspection Item
p
Storm
pate
Storm
Date
Storm
Date
Maintenance Action
Date
4. Emergency Spillway — Exposed
Fabric *
Overgrown Vegetation
Erosion/Backcutting at berm or road*
Rutting or pot -holes *
Obstructions or debris
Inadequate Riprap/Armor
Cracking
Slumping/Sloughing of Embankment
Settlement
Spillway
1. Eroding or Backcutting
Overgrown Vegetation
Obstructions with Debris
Excessive Siltation
Slumping/Sloughing
Control Structure
1. Inlet - Debris in Conveyance Area
Erosion or Undercutting *
Stop -log deterioration / leaking
Joint Separation
Cracks in Concrete
Deteriorated piping
Displacement of Structure
Page 3 of 4
Exhibit C (4 of 5)
Rev. 02/22/2008
Inspection & Maintenance Log
Detention Basin
2. Outlet - Erosion or Backcutting
Debris in Culvert or Trash Rack
Undermining/Scour *
Inoperable control valve
Inoperable flap gate
Joint Separation
Cracks in Concrete
Downstream Area
1. Erosion*
Debris / Obstructions
2, Bridge / Culvert Problems
Buildings Issues
Foundation Concerns
Page 4 of 4 Rev. 02/22/2008
Exhibit C (5 of 5)