HomeMy WebLinkAbout03-83.docMARCH 25, 2003 03-83 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: INITIATED BY: CHANGE ORDER NO. 3, PUBLIC WORKS CONTRACT NO. 02-03A DEPARTMENT OF PUBLIC WORKS BE IT RESOLVED by the Common Council of the City of Oshkosh that the following Change Order, a copy of which is attached, is hereby approved: DORNER-STAHL, INC. PO Box 129 Luxemburg, WI 54217-0129 Net Increase to contract: $18,362.39 PURPOSE: See attached Change Order. from: BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated Acct. No. 541-1810-1799-00000 - Water Utility - Construction in Progress Acct. No. 551-1910-1799-00000 - Sewer Utility - Construction in Progress TO: Dorner-Stahl, Inc. P. O. Box 129 Luxemburg, WI 54217-0129 CHANGE ORDER # 3 DATED: March 14, 2003 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 02~03A , is hereby amended NET DECREASE TO SECTION II- STORM SEWER: NET iNCREASE TO SECTION Ill - SANITARY SEWER: NET INCREASE TO SECTION IV - WATER MAIN ($8,857.22) $18,044.11 $9.175.50 NET INCREASE TO CONTRACT: $18,362.39 Recommended: "[~i"~ector of Pt~bliclWorks CITY OF OSHKOSH BY: City Manager City Clerk Approved and accepted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: Comptroller City Attorney CONTRACT: 02-03A CHANGE ORDER # 3 SECTION II - STORM SEWER · NUMBER I QUANTITIES I I DECREASE IN · ITEM DESCRIPTION CONTRACT INSTALLED NET NET COSTPER INCREASEIN CONTRACT QUANTITIES INCREASE DECREASE UNIT CONTRACT PRICE PR CE 28. Furnish and install approx. 215 linear feet of 6" Storm Sewer, complete as specified, per linear foot 215.00 215.00 $21.00 29. Furnish and install approx. 5,050 linear feet of 12" Storm Sewer, complete as specified, per linear foot 5,050.00 4,979.90 -70.10 $25.00 ($1,752.50 30. Furnish and install approx. 1,425 linear feet of 15" Storm Sewer, complete as specified, per linear foot 1,425.00 1,386.00 -39.00 $29.00 ($1,131.00 31. Furnish and install approx. 45 linear feet of 18" Storm Sewer, complete as specified, per linear foot 45.00 54.00 9.00 $29.00 $261.00 32. Furnish and install approx. 10 linear feet of 24" Storm Sewer Relay, complete as specified, per linear foot 10.00 8.00 -2.00 $45.00 ($90.00~' 33. Furnish and install approx. 145 linear feet of 19" x 30" HERCP Storm Sewer Relay, complete as specified, per linear foot 145.00 142.50 -2.50 $66.00 ($165.00 34. Furnish and install approx. 620 linear feet of 24" x 38" HERCP Storm Sewer Relay, complete as specified, per linear foot 620.00 578.50 -41.50 $79.00 ($3,278.50) 35. Furnish and install approx. Five (5) std. Inlets (Type 1 zcith 18" sump) with castings, complete as specified, each 5.00 5.00 $ 1,000.00 36. Furnish and install approx. 77 std. inlets (Type 3 with 18" sump) with castings, complete as specified, each 77.00 77.00 $1,000.00 Page 1 CONTRACT: 02-03A CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 37. Furnish and install approx. PRICE PR/CE 3.25 vertical feet of std. Storm Inlet Manhole 4 ft. LD. in one (1) location with casting, complete as specified, per vertical foot 3.25 3.06 -0.19 $360.00 ($68.40) 38. Furnish and install approx. 9.50 vertical feet of std. Storm Inlet Manhole 6 ff. I.D. in two (2) locations with castings, complete as specified, per vertical foot 9.50 8.21 -1.29 $490.00 ($632.10 39. Furnish and instaJl approx. 92.00 vertJcaJ feet of std. Storm Manhole (4' Inside Diameter) in 23 locations ,vith castings, complete as specified, per vertical foot 92.00 88.44 -3.56 $290.00 ($1,032.40) 40. Furnish and install approx. 32.80 vertical feet of Storm Manhole (5' Inside Diameter) in seven (7) Jocations with castings, complete as specified, per vertical foot 32.80 31.02 -1.78 $380.00 ($676.40 41. Furnish and install approx. 35.00 vertical feet of std. Storm Manhole (6' inside Diameter) in six (6) rocafions with castings, :omplete as specified, per vertical foot 35.00 33.83 -1.17 $440.00 ($514.80 42. Reconstruct approx, two (2) Storm Manhole, complete as specified, each 2.00 2.00 $1,000.00 43. Rebuild approx. 10.75 vertical feet of Storm Manhole (4' Inside Diameter) in three (3) locations with base, complete as specified, per vertical foot 10.75 7.91 -2.84 $270.00 ($766.80 44. Rebuild approx. 29.00 vertical feet of Storm Manhole (5' Inside Diameter) in seven (7) ocations with base, complete as specified, per ver[ical foot 29.00 28.53 -0.47 $360.00 ($169.20) Page 2 CONTRACT: 02~03A CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN NUMBER DESCRIPTION COST PER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 45. Rebuild approx. 29,25 PRICE PRICE vedical feet of Storm Manhole (6' Inside Diameter) in six (6) ocations with base, 2omplete as specified, per vertical foot 29.25 27.58 -1.67 $450.00 ($751.50 46. Furnish and install approx. 175 6" Storm Laterals, complete as specified, each 175.00 162.00 -13.00 $500.00 ($6,500.00) 47. Furnish and install approx. twelve (12) Neenah R- 1689 Storm Manhole Frame w/Type "B" solid lid non-rocking, complete as specified, each 12.00 7.00 -5.00 $310.00 ($1,550.00 48. Furnish and install approx. two (2) Neenah R-1700-A Storm Manhole Frames with Type "B" solid lid with open pick holes, non- rocking, complete as specified, each 2.00 1.00 -1.00 $440.00 ($440.00) 49. Furnish and install approx. eight (8) Neenah R~1710 Storm Manhole Frames with Type "B" solid lid with 3pen pick holes, non- rocking, complete as specified, each 8.00 15.00 7.00 $330.00 $2,310.00 50. Abandon approx. 70 Inlets or Manholes, complete as specified, each 70.00 64.00 -6.00 $150.00 ($900.00) SECTION II - SUB-TOTALS ADDITONAL WORK REQUIRED: C.C. # 1 - SECTION II - STORM SEWER ITEM DESCRIPTION NUMBER CONTRACT QUANTITIES INSTALLED NET QUANTITIES INCREASE NET DECREASE COSTPER UNIT $2,571.00 ($20,4t8.60) INCREASE rN DECREASE IN CONTRACT CONTRACT PRICE PRICE 1 -C. 11.80 vertical feet of storm ADDITIONAL WORK: C.C. #1 - SECTION II - SUB-TOTAL ($783.00) Page 3 CONTRACT: 02-03A CHANGE ORDER # 3 NILTME~MER DESCRIPTION CONTRACT I INSTALLED QUANTITIESI QUANTITIES ADDITONAL WORK REQUIRED: C.C. # 3 ~ SECTION II INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRIC.c - STORM SEWER ITEM DESCRIPTION CONTRACT NUMBER QUANTITIES inlet w/casting ~ Bay St. & Bay Shore Dr. includes all pipe 3 sum Relocate catch casm #76 and #84 and add inlet @ Rush Ave. & Josslyn St. along w/inlet # 79 (includes all castings, pipe, mobilization, dewatering), ) SLIm INSTALLED QUANTITIES 1.00 1.00 I NET J NET COSTPER INCREASE I DECREAS'C UNIT 1.00 1.00 $2.184.26 $7,589.12 ADDITIONAL WORK: C.C. #3 - SECTION II - SUB-TOTAL NET DECREASE TO SECTION II - STORM SEWER $2,184.26 $7,589.12 $9,773.38 ($8,857.22) SECTION 111 - SANITARY SEWER ITEM NUMBER DESCRIPTION Furnish and instau approx. linear feet of 8' Sanitary Sewer (New and Relay), complete as Furnish and install approx. 17.23 vertical feet of 8" Sanitary Sewer Droo. complete as specified, per vertical foot Furnish and install approx. 1,409 linear feet of 10" Sanitary Sewer [Joss]yn Street), complete as specifiec per linear foot Fumish and install approx. 659 linear feet of 10" Sanitary Sewer Relay (Taft Avenue), comolete as specified, including restoration, per linear foot CONTRACT [ INSTALLED NET QUANTITIES QUANTITIES INCREASE 810.00 17.23 1,409.00 659.00 883.10 17.05 1,421,50 661.10 73.10 12.50 2.10 NET DECREASE -0.18 COST PER UNIT $55.00 $200.00 $66.00 $119.00 JlNCREASEIN CONTRACT PRICE $4,02O.5O $825.00 $249.90 IDECREASEIN CONTRACT PRICE ($36.00 Page 4 CONTRACT: 02-03A CHANGE ORDER Cf 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBEF DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 55. Furnish and install approx. PRICE PRICE 20 linear feet of 18" Sanitary Sewer Relay, complete as specified, per linear foot 20.00 22.00 2.00 $132.00 $264.00 56. Furnish and install approx. 2,180 linear feet of 24" Sanitary Sewer Relay, complete as specified, per linear foot 2,180.00 2,253.60 73.60 $85.00 $6,256.00 57. Furnish and install approx. 234.6 vertical feet of std. Sanitary Manhole (4' Inside Diameter) in 19 locations, complete as specified, per vertical foot 234.60 246.98 12.38 $155.00 $1,918.90 58. -~urnish and install approx. 21.6 vertical feet of std. Sanitary Manhole (5' Inside Diameter) in one (1) location, complete as specified, per vertical foot 21.60 21.64 0.04 $240.00 $9.60 59. Reconnect one (1) Sanitary Lateral (Cleveland Street), complete as specified, each 1.00 1.00 $180.00 60. Reconnect approx, four (4 Sanitary Laterals with nsers, complete as specified, each 4.00 18.00 14.00 $565.00 $7,910.00 61. Furnish and install approx. 255 linear feet of 4" Sanitary Lateral Relay, complete as specified, per linear foot 255.00 165.00 -90.00 $30.00 ($2,700.00), 62. Furnish and install approx. 1,690 linear feet of 6" Sanitary Lateral (New and Relay), complete as specified, per linear foot 1,690.00 2,122.60 432.60 $30.00 $12,978.00 63. Repair Sanitary Sewer Main on Bay Street, comp ete as specified, rump sum 1.00 1.00 $2,000.00 64. Abandon approx, five (5) Sanitary Manholes, complete as specified, each 5.00 5.00 $350.00 Page 5 CONTRACT: 02-03A CHANGE ORDER Cf 3 ITEM CONTRACT INSTALLED NET NET COST PEF INCREASE IN DECREASE IN NUMBE$ DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 65. Furnish and install approx. PRICE PR/CE 15 Neenah R-1710 Sanitary Manhole Frame w/Type "B" Self-Sealing Jd, non-rocking, complete as specified, each 15.00 16.00 1.00 $340.00 $340.00 66. Furnish and install approx. one (1) Neenah R-1689 Sanitary Manhole Frame w/Type "B" Self-Sealing Lid, non-rocking, complete as specified, each 1.00 2.00 1.00 $315.00 $315.00 67. Furnish and install approx. one (1) Neenah R-1700A Sanitary Manhole Frame w/Type "B" Self-Sealing ~ Lid, non-rocking, complete as specified, each 1.00 1.00 $440.00 68. Rebuild approx. 15.8 vertical feet of std. Sanitary Manhole with base, complete as specified, per vertical foot 15.80 15.64 -0.16 $200.00 ($32.00 69. Reconstruct approx, one (1) Sanitary Manhole, complete as specified, each 1.00 1.00 $460.00 70. Abandon pedestrian tunnel Cleveland Avenue), complete as specified, Jump sum 1.00 1.00 $87,000.00 SECTION III - SUB-TOTALS $35,086.90 ($2,768.00) ADDITONAL WORK REQUIRED: SECTION III - SANITARY SEWER ITEM CONTRACT INSTALLED NET NET I COST PER INCREASE IN DECREASE IN NUMBER DESCRIPT DN QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRAC~' CONTRACT PRICE PRICE ADDITIONAL WORK REQUIRED: C.O.#1 1. Reconstruct 6' diameter sanitary manhole at Cleveland Ave. and Hazel St. mh 11/182, labor and materials, lump sum 1.00 1.00 $4,123,94 2. Rock removal on Taft Ave. and Josslyn St., per cubic yard 143.00 143.00 $75.00 Page 6 CONTRACT: 02-03A CHANGE ORDER ~ 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN ~ DECREASE IN NUMBER DESCRIPTION CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 3. Seal manhole 16/149 at Taft Ave. and Bauman St. to stop infiltration, lump sum 1.00 1.00 $1,392.49 4. Sanitary manhole S6 at Taft Ave. and Josslyn St. was modified, original manhole section could not be used, purchased by City Street Dept., lump sum 1.00 1.00 $1,405.72 5. Relay 12" sanitary sewer on Bay St. due to storm conflicts, 40 fl. 40.00 40.00 $70.00 6. Cut in 12" X 6" inline wyes with ferncos for sanitary lateral relays on Bay St. 5.00 5.00 $635.00 ADDITIONAL WORK: C.O. #1 - SECTION III - SUB TOTAL $0.00 $0.00 ADDITIONAL WORK REQUIRED: C.O.#2 (N. WASHBURN STREET) 1. Furnish and install approx. 861.00 linear feet of 8" Sanitary Sewer, complete as specified, per linear foot 861.00 856.70 -4.30 $60.00 ($258.00) 2. Furnish and install approx. 62.3 vertical feet of std. Sanitary Manhole (4' Inside Diameter) in four (4) locations, complete as specified, per vertical foot 62.30 62.30 $140.00 3. Furnish and replace approx. 933 square yards 3f 5" asphaltic concrete 3avement, complete as . ~pedified, per square yard 933.00 0.00 -933.00 $26.00 ($24,258.00) ADDITIONAL WORK: C.O. #2 SECTION III $0.00 ($24,516.00) ADDITIONAL WORK REQUIRED: C.O. #3 1. Add 5.6 vertical feet sanitary drop to manhole SI to accommodate ex lateral, lump sum 1.00 1,00 $1,583.72 $1,583.72 2. WASHBURN EXTENSION 2-A Extra labor costs while redesigning sanitary connection at Sawyer Creek stub, 12/09/02, lump sum 1.00 1.00 $3,934.71 $3,934.71 Page 7 CONTRACT: 02-03A CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 2-B Extra gravel backfill PRICE PRICE required for widened Irench adjacent to 60" storm sewer, Pump sum 1.00 1.00 $1,428.71 $1,428.71 2-C Extra laborand materials to connect to existing sanitary stub which fell under existing 60" storm sewer, lump sum 1.00 1.00 $3,004.07 $3,004.07 2-D 8 x4 tee and 5 feet Extra " " of sanitary riser for future connection to 459 N. Washburn Street, lump sum 1.00 1.00 I $290.00 $290.00 ADDITIONAL WORK: C.O. #3 - SUB TOTAL $10,241.21 $0.00 NET INCREASE TO SECTION Iii - $18,044.11 SECTION IV - WATER MAIN ITEM DESCRIPTION QUANTITIES INSTALLED NET NET COST PER JINCREAsE IN DECREASE INI NUMBER CONTRACT QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 71. Furnish and install approx. 200 linear feet of 6" Ductile Iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 200.00 255.00 55.00 $53.00 $2,915.00 72. Furnish and install approx. ¢,075 linear feet of 8" Ductile iron Water Main w/poly wrap, complete as specified (fittings not included), per linear foot 4,075.00 4,290.00 215.00 $40.00 $8,600.00 73. Reconnect approx, three (3), 1" Water Services, complete as specified, each 3.00 4.00 1.00 $330.00 $330.00 74. Reconnect one (1), 2 1/2" Water Service (Cleveland Avenue), complete as specified, each 1.00 1.00 $730.00 75. Reconnect one (1), 4" Water Service (Cleveland Avenue), complete as specified, each 1.00 1.00 $650.00 Page 8 CONTRACT: 02-03A CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PE/; INCREASE IN DECREASE IN NUMBE! DESCRIPTION CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 76. Furnish and install approx. 2,390 linear feet of 1" Water Service (Relay and New), complete as specified, not including 2orporafion and stop box, 3er linear foot 2,390.00 2,228.50 -161.50 $25.00 ($4,037.50) 77. Furnish and install approx 152 linear feet of 2" Copper Water Service, complete as specified, not including corporation and stop box, per linear foot 152.00 117.50 -34.50 $48.00 ($1,656.00 78. Furnish and install approx. ninety-nine (99), 1" corporation and stop box with rod, complete as specified, each 99.00 94.00 -5.00 $380.00 ($1,900.00 79. Furnish and install approx. four (4), 2" corporation and stop box with rod, complete as specified, each 4.00 4.00 $835.00 80. -urnish and install approx. one (1), 8" plug, complete as specified, each 1.00 1.00 $30.00 81. Furnish and install approx. nme (9), 8" x 6" Tees, complete as specified, each 9.00 11.00 2.00 $150.00 $300.00 82. Furnish and install approx. two (2), 8" x 8" Tees, complete as specified, each 2.00 3.00 1.00 $140.00 $140.00 83. Furnish and install approx. [en (10), 8" x 6" Reducers, complete as specified, each 10.00 9.00 ~1.00 $80.00 ($80.00) 84. Furnish and install approx. 3ne (1), 8" x 6" Cross, ;omplete as specified, each 1.00 1.00 $180.00 85. Furnish and install approx. one (1), 8" x 8" Cross, complete as specified, each 1.00 1.00 $195.00 86. Furnish and install approx. one (1) 6" - 90 degree Bend, complete as specified, each 1.00 1.00 $115.00 Page 9 CONTRACT: 02-03A CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION CONTRACT CONTRACT QUANTITIES QUANTITIES INCREASE DECREASE UNIT 87. Furnish and install approx. PRICE PRICE [wenty-two (22), 6" - 45 degree Bends, complete ~s specified, each 22.00 9.00 -13.00 $110.00 ($1,430.00) 88. Furnish and install approx. one (1), 8"- 90 degree Bend, complete as specified, each 1.00 1.00 $150.00 89. Furnish and install approx. eight (8), 8" - 45 degree Bends, complete as specified, each 8.00 6.00 -2.00 $145.00 ($290.00) 90. Furnish and install approx. one (1) 6" Cut-in Valve, complete as specified, each 1.00 0.00 -1.00 $1,400.00 ($1,400.00 91. ,Furnish and install approx. , Ien (10), 6" Valves, ;omplete as specified, each 10.00 12.00 2.00 $480.00 $960.00 92. Furnish and install approx. sixteen (16), 8" Valves, complete as specified, each 16.00 21.00 5.00 $615.00 $3,075.00 93. Furnish and install approx. four (4), 6" x 6" Tapping Valve and Sleeves, complete as specified, each 4.00 1.00 -3.00 $1,450.00 ($4,350.00 94. Furnish and install approx. one (1), 8" x 8" Tapping Valve and Sleeves, complete as specified, ~ach 1.00 1.00 $1,720.00 95. Furnish and install approx. one (1), 10" x 6" Tapping Valve and Sleeves, complete as specified, each 1.00 1.00 $1,750.00 96. Furnish and install approx. two (2), 18" x 8" Tapping Valve and Sleeves, complete as specifie~, each 2.00 2.00 $3,670.00 97. Furnish and install approx. six (6) Hydrants, complete as specified, each 6.00 8.00 2.00 $1,400.00 $2,800.00 98. ~,bandon 4" - 6" Water Main on Bay Street, complete as specified, lump sum 1.00 1.00 $1,500.00 Page 10 CONTRACT: 02-03A CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION CONTRACT CONTRACT QUANTITIES QUANTITIES ~ INCREASE DECREASE UNIT 99. Abandon 4" - 6" Water PRICE PRICE Main on Cleveland Street, complete as specified, ump sum 1.00 1.00 $1,000.00 100. ~,bandon 6"Water Main on Dove Street, complete as specified, lump sum 1.00 1.00 $1,250.00 101. Abandon 6" Water Main on Oak Street, complete as specified, Jump sum 1.00 1.00 $750.00 102. Abandon 6"Water Main on Powem Street, complete 1.00 1.00 $2,000.00 SECTION IV - SUB-TOTALS $19,120.00 ($15,143.50) ADDITONAL WORK REQUIRED: SECTION IV - WATER MAIN ~ INCREASE rN I DECREASE IN NUMBERITEM DESCRIPTION CONTRACT QUANTITIEsINSTALLED NET NET COST PER CONTRACT CONTRACT QUANTITIES INCREASE DECREASEJ UNIT PRICE J PRICE ADDITIONAL WORK REQUIRED: C.C. #1 1. Relay existing 6" water main with 8" main on Dove Street, from Southland Ave. to Porter Ave. as follows: 1-A. 8"Water reray 585.00 585.00 $40.00 1-B. 8" x 8" Tee 1.00 1.00 $140.00 1-C. 6", 1/8 Bends 2.00 2.00 $110.00 I~D. 6" x 8" increaser 1.00 1.00 $80.00 1-E. New 2" service to west at Southland 1.00 1.00 $2,070.55 1-F. Reconnect 1 1/2" service 5.00 5.00 $750.00 1-G. Reconnect 1 1/4"service 1.00 1.00 $675.00 1-H. Remove 4" valve, new 2" tap and reconnect 2" service (301-331 Sawyer) 1.00 1.00 $1,519.00 2. Insulate existing 6" water main on Josslyn Street from Taft Ave. south (material provided by city) 5/21/02, lump sum 1.00 1.00 $4,056.66 3. Repay 4' water serv ce on Cleveland Street approximately 140 ff. east of Grove St. (6/6/02), lump sum 1.00 1.00 $1,359.43 4. Relay existing 6" water main on Powers Street with 8" water main from Sterling ; Ave. to E. Melvin Ave.as follows: Page 11 CONTRACT: 02-03A CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 4-A. 8" Water relay 450.00 450.00 $40.00 4-B. 6"Valve 1.00 1.00 $480.00 4-C. 8" Valve 3.00 3.00 $615.00 4-E. B"x6" Reducer 2,00 2.00 $80.00 4-F. B" x 8" Tee 1.00 1.00 $140.00 4-G. -~ydrant 1.00 1.00 $1.400.00 5. Lower 8" water main at Bay St. and Bay Shore Dr. to facilitate storm sewer, lump sum I 1.00 1.00 $3,981.31 ADDITIONAL WORK: C.O, #1 SUB TOTAL $0.00 $0.00 ADDITIONAL WORK REQUIRED: C.O. #2 (WASHBURN) 4. Furnish and install approx. 36 linear feet of 6" Ductile Iron Hydrant Lead w/poly wrap, complete as specified (fittings not ncluded), per linear foot 36.00 31.00 -5.00 $40.00 ($200.00 5. Furnish and install approx. 1,065 linear feet of 16" Ductile Iron Water Main w/poly wrap, complete as specified (fittings no_t included), per linear foot 1,065.00 1,053.00 -12.00 $50.00 ($600.00) 6. Furnish and install approx. three (3) 16" x 6" Tees, complete as specified, each 3~00 2.00 -1.00 $750.00 ($750.00 7. Furnish and install approx. ~)ne (1) 16" x 6" Reducer, 2.omplete as specified, ~ach 1.00 1.00 $500.00 8. =umish and install approx. three (3) 6" Valves, complete as specified, each 3.00 2.00 ' -1.00 $600.00 ($600.00) 9. Furnish and install approx. two (2) 16" Valves in std. Valve Manhole, complete as specified, each 2.00 2.00 $4,000.00 10. Furnish and install approx. three (3) Hydrants, complete as specified, ~ach 3.00 3.00 $1,500.00 ADDITIONAL WORK: C.O. #2 (WASHBURN) - SUB TOTAL $0.00 ($2,150.00) ADDITIONAL WORK REQUIRED: C.O. #3 (WASHBURN) J I 1. One (1~ 16" x 8" Tee I 1.00 I 1.00 $800.00 $800.00 2. One (1 8 Valve 1.00 1.00 $$00.00 $800.00 Page 12 CONTRACT: 02-03A CHANGE ORDER # 3 ITEM CONTRACT INSTALLED NET INCREASE IN DECREASE IN NUMBER DESCRIPTION NET COSTPER QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT 3. 3 Lin. Ft. of 8" main @ PRICE PRICE __ ~45/lin. ft. 3.00 3.00 $45.00 $135.00 5. One_(1) 16", 1/16 Bend 1.00 1.00 -- $1,20'~ $1,200.00_ Extra time to obtain and install 16" bend, lump sum 1.00 1.00 $714.00 $714.00 MISCELLANEOUS WORK REQUIRED 7. 4' Waterma'n-ductile 4.00 4.00 $50.00 $200.00 8. 4"x 12" sleeve 1.00 1.00 $100.00 $100.00 9. 4" 22 1/2 degree bend 1.00 1.00 $110.00 $110.00 10. 6"x 12" sleeve 8.00 8.00 $120.00 $960.00 11. 8"X 12" sleeve 1.00 1.00 $135.00 $135.00 12. 8" x 6" tee 3.00 3.00 $140.00 $420.00 13, 10" X 8" tapping sleeve Mth valve 1.00 1.00 $1,600.00 $1,600.00 ADDITIONAL WORK: C,O. #3 (WASHBURN) - SUB TOTAL $7.349.00 $0.00 NET INCREASE TO SECTION IV - $9,175.50 NET INCREASE TO SECTIONS I, II, III, IV $27,219~61 NET DECREASE TO SECTIONS I, I1. II1. IV ($8,857.22) NET DECREASE TO CONTRACT: $18,362.39 Page 13