HomeMy WebLinkAbout03-83.docMARCH 25, 2003 03-83 RESOLUTION
(CARRIED 6-0 LOST LAID OVER WITHDRAWN )
PURPOSE:
INITIATED BY:
CHANGE ORDER NO. 3, PUBLIC WORKS CONTRACT NO. 02-03A
DEPARTMENT OF PUBLIC WORKS
BE IT RESOLVED by the Common Council of the City of Oshkosh that the following
Change Order, a copy of which is attached, is hereby approved:
DORNER-STAHL, INC.
PO Box 129
Luxemburg, WI 54217-0129
Net Increase to contract:
$18,362.39
PURPOSE: See attached Change Order.
from:
BE IT FURTHER RESOLVED that money for this purpose is hereby appropriated
Acct. No. 541-1810-1799-00000 - Water Utility - Construction in Progress
Acct. No. 551-1910-1799-00000 - Sewer Utility - Construction in Progress
TO:
Dorner-Stahl, Inc.
P. O. Box 129
Luxemburg, WI 54217-0129
CHANGE ORDER # 3
DATED: March 14, 2003
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
02~03A , is hereby amended
NET DECREASE TO SECTION II- STORM SEWER:
NET iNCREASE TO SECTION Ill - SANITARY SEWER:
NET INCREASE TO SECTION IV - WATER MAIN
($8,857.22)
$18,044.11
$9.175.50
NET INCREASE TO CONTRACT:
$18,362.39
Recommended:
"[~i"~ector of Pt~bliclWorks
CITY OF OSHKOSH
BY:
City Manager
City Clerk
Approved and accepted:
Contractor
I certify that provision has been made to pay the liability that will accrue to the City of
Oshkosh, Wisconsin, under the within Change Order.
Approved as to form:
Comptroller
City Attorney
CONTRACT: 02-03A CHANGE ORDER # 3
SECTION II - STORM SEWER
· NUMBER I QUANTITIES I I DECREASE IN
· ITEM DESCRIPTION CONTRACT INSTALLED NET NET COSTPER INCREASEIN CONTRACT
QUANTITIES INCREASE DECREASE UNIT CONTRACT
PRICE PR CE
28. Furnish and install approx.
215 linear feet of 6" Storm
Sewer, complete as
specified, per linear foot
215.00 215.00 $21.00
29. Furnish and install approx.
5,050 linear feet of 12"
Storm Sewer, complete as
specified, per linear foot
5,050.00 4,979.90 -70.10 $25.00 ($1,752.50
30. Furnish and install approx.
1,425 linear feet of 15"
Storm Sewer, complete as
specified, per linear foot
1,425.00 1,386.00 -39.00 $29.00 ($1,131.00
31. Furnish and install approx.
45 linear feet of 18" Storm
Sewer, complete as
specified, per linear foot
45.00 54.00 9.00 $29.00 $261.00
32. Furnish and install approx.
10 linear feet of 24" Storm
Sewer Relay, complete as
specified, per linear foot
10.00 8.00 -2.00 $45.00 ($90.00~'
33. Furnish and install approx.
145 linear feet of 19" x 30"
HERCP Storm Sewer
Relay, complete as
specified, per linear foot 145.00 142.50 -2.50 $66.00 ($165.00
34. Furnish and install approx.
620 linear feet of 24" x 38"
HERCP Storm Sewer
Relay, complete as
specified, per linear foot 620.00 578.50 -41.50 $79.00 ($3,278.50)
35. Furnish and install approx.
Five (5) std. Inlets (Type 1
zcith 18" sump) with
castings, complete as
specified, each 5.00 5.00 $ 1,000.00
36. Furnish and install approx.
77 std. inlets (Type 3 with
18" sump) with castings,
complete as specified,
each 77.00 77.00 $1,000.00
Page 1
CONTRACT: 02-03A CHANGE ORDER # 3
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION
QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
37. Furnish and install approx. PRICE PR/CE
3.25 vertical feet of std.
Storm Inlet Manhole 4 ft.
LD. in one (1) location with
casting, complete as
specified, per vertical foot
3.25 3.06 -0.19 $360.00 ($68.40)
38. Furnish and install approx.
9.50 vertical feet of std.
Storm Inlet Manhole 6 ff.
I.D. in two (2) locations
with castings, complete as
specified, per vertical foot
9.50 8.21 -1.29 $490.00 ($632.10
39. Furnish and instaJl approx.
92.00 vertJcaJ feet of std.
Storm Manhole (4' Inside
Diameter) in 23 locations
,vith castings, complete as
specified, per vertical foot
92.00 88.44 -3.56 $290.00 ($1,032.40)
40. Furnish and install approx.
32.80 vertical feet of Storm
Manhole (5' Inside
Diameter) in seven (7)
Jocations with castings,
complete as specified, per
vertical foot 32.80 31.02 -1.78 $380.00 ($676.40
41. Furnish and install approx.
35.00 vertical feet of std.
Storm Manhole (6' inside
Diameter) in six (6)
rocafions with castings,
:omplete as specified, per
vertical foot 35.00 33.83 -1.17 $440.00 ($514.80
42. Reconstruct approx, two
(2) Storm Manhole,
complete as specified,
each 2.00 2.00 $1,000.00
43. Rebuild approx. 10.75
vertical feet of Storm
Manhole (4' Inside
Diameter) in three (3)
locations with base,
complete as specified, per
vertical foot 10.75 7.91 -2.84 $270.00 ($766.80
44. Rebuild approx. 29.00
vertical feet of Storm
Manhole (5' Inside
Diameter) in seven (7)
ocations with base,
complete as specified, per
ver[ical foot 29.00 28.53 -0.47 $360.00 ($169.20)
Page 2
CONTRACT: 02~03A CHANGE ORDER # 3
ITEM CONTRACT INSTALLED NET NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION COST PER
QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
45. Rebuild approx. 29,25 PRICE PRICE
vedical feet of Storm
Manhole (6' Inside
Diameter) in six (6)
ocations with base,
2omplete as specified, per
vertical foot 29.25 27.58 -1.67 $450.00 ($751.50
46. Furnish and install approx.
175 6" Storm Laterals,
complete as specified,
each 175.00 162.00 -13.00 $500.00 ($6,500.00)
47. Furnish and install approx.
twelve (12) Neenah R-
1689 Storm Manhole
Frame w/Type "B" solid lid
non-rocking, complete as
specified, each
12.00 7.00 -5.00 $310.00 ($1,550.00
48. Furnish and install approx.
two (2) Neenah R-1700-A
Storm Manhole Frames
with Type "B" solid lid with
open pick holes, non-
rocking, complete as
specified, each
2.00 1.00 -1.00 $440.00 ($440.00)
49. Furnish and install approx.
eight (8) Neenah R~1710
Storm Manhole Frames
with Type "B" solid lid with
3pen pick holes, non-
rocking, complete as
specified, each
8.00 15.00 7.00 $330.00 $2,310.00
50. Abandon approx. 70 Inlets
or Manholes, complete as
specified, each 70.00 64.00 -6.00 $150.00 ($900.00)
SECTION II - SUB-TOTALS
ADDITONAL WORK REQUIRED: C.C. # 1 - SECTION II - STORM SEWER
ITEM DESCRIPTION
NUMBER
CONTRACT
QUANTITIES
INSTALLED NET
QUANTITIES INCREASE
NET
DECREASE
COSTPER
UNIT
$2,571.00 ($20,4t8.60)
INCREASE rN DECREASE IN
CONTRACT CONTRACT
PRICE PRICE
1 -C. 11.80 vertical feet of storm
ADDITIONAL WORK: C.C. #1 - SECTION II - SUB-TOTAL
($783.00)
Page 3
CONTRACT: 02-03A CHANGE ORDER # 3
NILTME~MER DESCRIPTION CONTRACT I INSTALLED
QUANTITIESI QUANTITIES
ADDITONAL WORK REQUIRED: C.C. # 3 ~ SECTION II
INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRIC.c
- STORM SEWER
ITEM DESCRIPTION CONTRACT
NUMBER QUANTITIES
inlet
w/casting ~ Bay St. & Bay
Shore Dr. includes all pipe
3 sum
Relocate catch casm #76
and #84 and add inlet @
Rush Ave. & Josslyn St.
along w/inlet # 79 (includes
all castings, pipe,
mobilization, dewatering),
) SLIm
INSTALLED
QUANTITIES
1.00
1.00
I
NET J NET COSTPER
INCREASE I DECREAS'C UNIT
1.00
1.00
$2.184.26
$7,589.12
ADDITIONAL WORK: C.C. #3 - SECTION II - SUB-TOTAL
NET DECREASE TO SECTION II - STORM SEWER
$2,184.26
$7,589.12
$9,773.38
($8,857.22)
SECTION 111 - SANITARY SEWER
ITEM
NUMBER DESCRIPTION
Furnish and instau approx.
linear feet of 8'
Sanitary Sewer (New and
Relay), complete as
Furnish and install approx.
17.23 vertical feet of 8"
Sanitary Sewer Droo.
complete as specified, per
vertical foot
Furnish and install approx.
1,409 linear feet of 10"
Sanitary Sewer [Joss]yn
Street), complete as
specifiec per linear foot
Fumish and install approx.
659 linear feet of 10"
Sanitary Sewer Relay (Taft
Avenue), comolete as
specified, including
restoration, per linear foot
CONTRACT [ INSTALLED NET
QUANTITIES QUANTITIES INCREASE
810.00
17.23
1,409.00
659.00
883.10
17.05
1,421,50
661.10
73.10
12.50
2.10
NET
DECREASE
-0.18
COST PER
UNIT
$55.00
$200.00
$66.00
$119.00
JlNCREASEIN
CONTRACT
PRICE
$4,02O.5O
$825.00
$249.90
IDECREASEIN
CONTRACT
PRICE
($36.00
Page 4
CONTRACT: 02-03A CHANGE ORDER Cf 3
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBEF DESCRIPTION
QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
55. Furnish and install approx. PRICE PRICE
20 linear feet of 18"
Sanitary Sewer Relay,
complete as specified, per
linear foot 20.00 22.00 2.00 $132.00 $264.00
56. Furnish and install approx.
2,180 linear feet of 24"
Sanitary Sewer Relay,
complete as specified, per
linear foot 2,180.00 2,253.60 73.60 $85.00 $6,256.00
57. Furnish and install approx.
234.6 vertical feet of std.
Sanitary Manhole (4' Inside
Diameter) in 19 locations,
complete as specified, per
vertical foot 234.60 246.98 12.38 $155.00 $1,918.90
58. -~urnish and install approx.
21.6 vertical feet of std.
Sanitary Manhole (5' Inside
Diameter) in one (1)
location, complete as
specified, per vertical foot 21.60 21.64 0.04 $240.00 $9.60
59. Reconnect one (1) Sanitary
Lateral (Cleveland Street),
complete as specified,
each
1.00 1.00 $180.00
60. Reconnect approx, four (4
Sanitary Laterals with
nsers, complete as
specified, each 4.00 18.00 14.00 $565.00 $7,910.00
61. Furnish and install approx.
255 linear feet of 4"
Sanitary Lateral Relay,
complete as specified, per
linear foot 255.00 165.00 -90.00 $30.00 ($2,700.00),
62. Furnish and install approx.
1,690 linear feet of 6"
Sanitary Lateral (New and
Relay), complete as
specified, per linear foot
1,690.00 2,122.60 432.60 $30.00 $12,978.00
63. Repair Sanitary Sewer
Main on Bay Street,
comp ete as specified,
rump sum 1.00 1.00 $2,000.00
64. Abandon approx, five (5)
Sanitary Manholes,
complete as specified,
each 5.00 5.00 $350.00
Page 5
CONTRACT: 02-03A CHANGE ORDER Cf 3
ITEM CONTRACT INSTALLED NET NET COST PEF INCREASE IN DECREASE IN
NUMBE$ DESCRIPTION
QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
65. Furnish and install approx. PRICE PR/CE
15 Neenah R-1710
Sanitary Manhole Frame
w/Type "B" Self-Sealing
Jd, non-rocking, complete
as specified, each
15.00 16.00 1.00 $340.00 $340.00
66. Furnish and install approx.
one (1) Neenah R-1689
Sanitary Manhole Frame
w/Type "B" Self-Sealing
Lid, non-rocking, complete
as specified, each
1.00 2.00 1.00 $315.00 $315.00
67. Furnish and install approx.
one (1) Neenah R-1700A
Sanitary Manhole Frame
w/Type "B" Self-Sealing
~ Lid, non-rocking, complete
as specified, each
1.00 1.00 $440.00
68. Rebuild approx. 15.8
vertical feet of std. Sanitary
Manhole with base,
complete as specified, per
vertical foot 15.80 15.64 -0.16 $200.00 ($32.00
69. Reconstruct approx, one
(1) Sanitary Manhole,
complete as specified,
each 1.00 1.00 $460.00
70. Abandon pedestrian tunnel
Cleveland Avenue),
complete as specified,
Jump sum 1.00 1.00 $87,000.00
SECTION III - SUB-TOTALS
$35,086.90 ($2,768.00)
ADDITONAL WORK REQUIRED: SECTION III - SANITARY SEWER
ITEM CONTRACT INSTALLED NET NET I COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPT DN QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRAC~' CONTRACT
PRICE PRICE
ADDITIONAL WORK REQUIRED: C.O.#1
1. Reconstruct 6' diameter
sanitary manhole at
Cleveland Ave. and Hazel
St. mh 11/182, labor and
materials, lump sum 1.00 1.00 $4,123,94
2. Rock removal on Taft Ave.
and Josslyn St., per cubic
yard 143.00 143.00 $75.00
Page 6
CONTRACT: 02-03A CHANGE ORDER ~ 3
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN ~ DECREASE IN
NUMBER DESCRIPTION CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
3. Seal manhole 16/149 at
Taft Ave. and Bauman St.
to stop infiltration, lump
sum 1.00 1.00 $1,392.49
4.
Sanitary manhole S6 at
Taft Ave. and Josslyn St.
was modified, original
manhole section could not
be used, purchased by City
Street Dept., lump sum 1.00 1.00 $1,405.72
5. Relay 12" sanitary sewer
on Bay St. due to storm
conflicts, 40 fl. 40.00 40.00 $70.00
6. Cut in 12" X 6" inline wyes
with ferncos for sanitary
lateral relays on Bay St. 5.00 5.00 $635.00
ADDITIONAL WORK: C.O. #1 - SECTION III - SUB TOTAL $0.00 $0.00
ADDITIONAL WORK REQUIRED: C.O.#2 (N. WASHBURN STREET)
1.
Furnish and install approx.
861.00 linear feet of 8"
Sanitary Sewer, complete
as specified, per linear foot 861.00 856.70 -4.30 $60.00 ($258.00)
2. Furnish and install approx.
62.3 vertical feet of std.
Sanitary Manhole (4' Inside
Diameter) in four (4)
locations, complete as
specified, per vertical foot 62.30 62.30 $140.00
3. Furnish and replace
approx. 933 square yards
3f 5" asphaltic concrete
3avement, complete as .
~pedified, per square yard 933.00 0.00 -933.00 $26.00 ($24,258.00)
ADDITIONAL WORK: C.O. #2 SECTION III $0.00 ($24,516.00)
ADDITIONAL WORK REQUIRED: C.O. #3
1. Add 5.6 vertical feet
sanitary drop to manhole
SI to accommodate ex
lateral, lump sum 1.00 1,00 $1,583.72 $1,583.72
2. WASHBURN EXTENSION
2-A Extra labor costs while
redesigning sanitary
connection at Sawyer
Creek stub, 12/09/02, lump
sum 1.00 1.00 $3,934.71 $3,934.71
Page 7
CONTRACT: 02-03A CHANGE ORDER # 3
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
2-B Extra gravel backfill PRICE PRICE
required for widened
Irench adjacent to 60"
storm sewer, Pump sum 1.00 1.00 $1,428.71 $1,428.71
2-C Extra laborand materials
to connect to existing
sanitary stub which fell
under existing 60" storm
sewer, lump sum 1.00 1.00 $3,004.07 $3,004.07
2-D 8 x4 tee and 5 feet
Extra " "
of sanitary riser for future
connection to 459 N.
Washburn Street, lump
sum
1.00 1.00 I $290.00 $290.00
ADDITIONAL WORK: C.O. #3 - SUB TOTAL
$10,241.21 $0.00
NET INCREASE TO SECTION Iii -
$18,044.11
SECTION IV - WATER MAIN
ITEM DESCRIPTION QUANTITIES INSTALLED NET NET COST PER JINCREAsE IN DECREASE INI
NUMBER CONTRACT QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
71. Furnish and install approx.
200 linear feet of 6" Ductile
Iron Water Main w/poly
wrap, complete as
specified (fittings not
included), per linear foot 200.00 255.00 55.00 $53.00 $2,915.00
72. Furnish and install approx.
¢,075 linear feet of 8"
Ductile iron Water Main
w/poly wrap, complete as
specified (fittings not
included), per linear foot
4,075.00 4,290.00 215.00 $40.00 $8,600.00
73. Reconnect approx, three
(3), 1" Water Services,
complete as specified,
each 3.00 4.00 1.00 $330.00 $330.00
74. Reconnect one (1), 2 1/2"
Water Service (Cleveland
Avenue), complete as
specified, each 1.00 1.00 $730.00
75. Reconnect one (1), 4"
Water Service (Cleveland
Avenue), complete as
specified, each 1.00 1.00 $650.00
Page 8
CONTRACT: 02-03A CHANGE ORDER # 3
ITEM CONTRACT INSTALLED NET NET COST PE/; INCREASE IN DECREASE IN
NUMBE! DESCRIPTION CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
PRICE PRICE
76. Furnish and install approx.
2,390 linear feet of 1"
Water Service (Relay and
New), complete as
specified, not including
2orporafion and stop box,
3er linear foot 2,390.00 2,228.50 -161.50 $25.00 ($4,037.50)
77. Furnish and install approx
152 linear feet of 2"
Copper Water Service,
complete as specified, not
including corporation and
stop box, per linear foot 152.00 117.50 -34.50 $48.00 ($1,656.00
78. Furnish and install approx.
ninety-nine (99), 1"
corporation and stop box
with rod, complete as
specified, each 99.00 94.00 -5.00 $380.00 ($1,900.00
79. Furnish and install approx.
four (4), 2" corporation and
stop box with rod, complete
as specified, each
4.00 4.00 $835.00
80. -urnish and install approx.
one (1), 8" plug, complete
as specified, each
1.00 1.00 $30.00
81. Furnish and install approx.
nme (9), 8" x 6" Tees,
complete as specified,
each 9.00 11.00 2.00 $150.00 $300.00
82. Furnish and install approx.
two (2), 8" x 8" Tees,
complete as specified,
each 2.00 3.00 1.00 $140.00 $140.00
83. Furnish and install approx.
[en (10), 8" x 6" Reducers,
complete as specified,
each 10.00 9.00 ~1.00 $80.00 ($80.00)
84. Furnish and install approx.
3ne (1), 8" x 6" Cross,
;omplete as specified,
each 1.00 1.00 $180.00
85. Furnish and install approx.
one (1), 8" x 8" Cross,
complete as specified,
each 1.00 1.00 $195.00
86. Furnish and install approx.
one (1) 6" - 90 degree
Bend, complete as
specified, each 1.00 1.00 $115.00
Page 9
CONTRACT: 02-03A CHANGE ORDER # 3
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION CONTRACT CONTRACT
QUANTITIES QUANTITIES INCREASE DECREASE UNIT
87. Furnish and install approx. PRICE PRICE
[wenty-two (22), 6" - 45
degree Bends, complete
~s specified, each
22.00 9.00 -13.00 $110.00 ($1,430.00)
88. Furnish and install approx.
one (1), 8"- 90 degree
Bend, complete as
specified, each 1.00 1.00 $150.00
89. Furnish and install approx.
eight (8), 8" - 45 degree
Bends, complete as
specified, each 8.00 6.00 -2.00 $145.00 ($290.00)
90. Furnish and install approx.
one (1) 6" Cut-in Valve,
complete as specified,
each 1.00 0.00 -1.00 $1,400.00 ($1,400.00
91. ,Furnish and install approx. ,
Ien (10), 6" Valves,
;omplete as specified,
each 10.00 12.00 2.00 $480.00 $960.00
92. Furnish and install approx.
sixteen (16), 8" Valves,
complete as specified,
each 16.00 21.00 5.00 $615.00 $3,075.00
93. Furnish and install approx.
four (4), 6" x 6" Tapping
Valve and Sleeves,
complete as specified,
each 4.00 1.00 -3.00 $1,450.00 ($4,350.00
94. Furnish and install approx.
one (1), 8" x 8" Tapping
Valve and Sleeves,
complete as specified,
~ach 1.00 1.00 $1,720.00
95. Furnish and install approx.
one (1), 10" x 6" Tapping
Valve and Sleeves,
complete as specified,
each 1.00 1.00 $1,750.00
96. Furnish and install approx.
two (2), 18" x 8" Tapping
Valve and Sleeves,
complete as specifie~,
each 2.00 2.00 $3,670.00
97. Furnish and install approx.
six (6) Hydrants, complete
as specified, each
6.00 8.00 2.00 $1,400.00 $2,800.00
98. ~,bandon 4" - 6" Water
Main on Bay Street,
complete as specified,
lump sum 1.00 1.00 $1,500.00
Page 10
CONTRACT: 02-03A CHANGE ORDER # 3
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION CONTRACT CONTRACT
QUANTITIES QUANTITIES ~ INCREASE DECREASE UNIT
99. Abandon 4" - 6" Water PRICE PRICE
Main on Cleveland Street,
complete as specified,
ump sum 1.00 1.00 $1,000.00
100. ~,bandon 6"Water Main on
Dove Street, complete as
specified, lump sum 1.00 1.00 $1,250.00
101. Abandon 6" Water Main on
Oak Street, complete as
specified, Jump sum 1.00 1.00 $750.00
102. Abandon 6"Water Main on
Powem Street, complete 1.00 1.00 $2,000.00
SECTION IV - SUB-TOTALS
$19,120.00 ($15,143.50)
ADDITONAL WORK REQUIRED: SECTION IV - WATER MAIN
~ INCREASE rN I DECREASE IN
NUMBERITEM DESCRIPTION CONTRACT QUANTITIEsINSTALLED NET NET COST PER CONTRACT CONTRACT
QUANTITIES INCREASE DECREASEJ UNIT PRICE J PRICE
ADDITIONAL WORK REQUIRED: C.C. #1
1. Relay existing 6" water
main with 8" main on Dove
Street, from Southland
Ave. to Porter Ave. as
follows:
1-A. 8"Water reray 585.00 585.00 $40.00
1-B. 8" x 8" Tee 1.00 1.00 $140.00
1-C. 6", 1/8 Bends 2.00 2.00 $110.00
I~D. 6" x 8" increaser 1.00 1.00 $80.00
1-E. New 2" service to west at
Southland 1.00 1.00 $2,070.55
1-F. Reconnect 1 1/2" service 5.00 5.00 $750.00
1-G. Reconnect 1 1/4"service 1.00 1.00 $675.00
1-H. Remove 4" valve, new 2"
tap and reconnect 2"
service (301-331 Sawyer) 1.00 1.00 $1,519.00
2. Insulate existing 6" water
main on Josslyn Street
from Taft Ave. south
(material provided by city)
5/21/02, lump sum 1.00 1.00 $4,056.66
3. Repay 4' water serv ce on
Cleveland Street
approximately 140 ff. east
of Grove St. (6/6/02), lump
sum 1.00 1.00 $1,359.43
4. Relay existing 6" water
main on Powers Street with
8" water main from Sterling
; Ave. to E. Melvin Ave.as
follows:
Page 11
CONTRACT: 02-03A CHANGE ORDER # 3
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
4-A. 8" Water relay 450.00 450.00 $40.00
4-B. 6"Valve 1.00 1.00 $480.00
4-C. 8" Valve 3.00 3.00 $615.00
4-E. B"x6" Reducer 2,00 2.00 $80.00
4-F. B" x 8" Tee 1.00 1.00 $140.00
4-G. -~ydrant 1.00 1.00 $1.400.00
5. Lower 8" water main at Bay
St. and Bay Shore Dr. to
facilitate storm sewer, lump
sum I 1.00 1.00 $3,981.31
ADDITIONAL WORK: C.O, #1 SUB TOTAL $0.00 $0.00
ADDITIONAL WORK REQUIRED: C.O. #2 (WASHBURN)
4. Furnish and install approx.
36 linear feet of 6" Ductile
Iron Hydrant Lead w/poly
wrap, complete as
specified (fittings not
ncluded), per linear foot 36.00 31.00 -5.00 $40.00 ($200.00
5. Furnish and install
approx. 1,065 linear feet of
16" Ductile Iron Water
Main w/poly wrap,
complete as specified
(fittings no_t included), per
linear foot 1,065.00 1,053.00 -12.00 $50.00 ($600.00)
6. Furnish and install approx.
three (3) 16" x 6" Tees,
complete as specified,
each 3~00 2.00 -1.00 $750.00 ($750.00
7. Furnish and install approx.
~)ne (1) 16" x 6" Reducer,
2.omplete as specified,
~ach 1.00 1.00 $500.00
8. =umish and install approx.
three (3) 6" Valves,
complete as specified,
each 3.00 2.00 ' -1.00 $600.00 ($600.00)
9.
Furnish and install approx.
two (2) 16" Valves in std.
Valve Manhole, complete
as specified, each 2.00 2.00 $4,000.00
10. Furnish and install approx.
three (3) Hydrants,
complete as specified,
~ach 3.00 3.00 $1,500.00
ADDITIONAL WORK: C.O. #2 (WASHBURN) - SUB TOTAL $0.00 ($2,150.00)
ADDITIONAL WORK REQUIRED: C.O. #3 (WASHBURN) J I
1. One (1~ 16" x 8" Tee I 1.00 I 1.00 $800.00 $800.00
2. One (1 8 Valve 1.00 1.00 $$00.00 $800.00
Page 12
CONTRACT: 02-03A CHANGE ORDER # 3
ITEM CONTRACT INSTALLED NET INCREASE IN DECREASE IN
NUMBER DESCRIPTION NET COSTPER
QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
3. 3 Lin. Ft. of 8" main @ PRICE PRICE
__ ~45/lin. ft. 3.00 3.00 $45.00 $135.00
5. One_(1) 16", 1/16 Bend 1.00 1.00 -- $1,20'~ $1,200.00_
Extra time to obtain and
install 16" bend, lump sum 1.00 1.00 $714.00 $714.00
MISCELLANEOUS WORK REQUIRED
7. 4' Waterma'n-ductile 4.00 4.00 $50.00 $200.00
8. 4"x 12" sleeve 1.00 1.00 $100.00 $100.00
9. 4" 22 1/2 degree bend 1.00 1.00 $110.00 $110.00
10. 6"x 12" sleeve 8.00 8.00 $120.00 $960.00
11. 8"X 12" sleeve 1.00 1.00 $135.00 $135.00
12. 8" x 6" tee 3.00 3.00 $140.00 $420.00
13, 10" X 8" tapping sleeve
Mth valve 1.00 1.00 $1,600.00 $1,600.00
ADDITIONAL WORK: C,O. #3 (WASHBURN) - SUB TOTAL $7.349.00 $0.00
NET INCREASE TO SECTION IV -
$9,175.50
NET INCREASE TO SECTIONS I, II, III, IV $27,219~61
NET DECREASE TO SECTIONS I, I1. II1. IV ($8,857.22)
NET DECREASE TO CONTRACT:
$18,362.39
Page 13