Loading...
HomeMy WebLinkAbout0103548-Building (siding)OSHKOSH ON THE WATER Job Address 1732 DOEMEL ST Designer Category 141 - Exterior Remodeling CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Owner MR/MRS FREDR]C KIMBALL Create Date Contractor OWNER No 103548 08/15/2003 Plan Type · Building 0 Sign 0 Canopy 0 Fence (~ Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation · Poured Concrete O Floating Slab O Pier (~ Other O Concrete Block (~ Post O Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 0 0 Use/Nature of Work SFR/Replacing existing wood siding with hardboard siding on attached garage only, to match house. *NO STRUCTURAL WORK, ELECTRIC NOT APPLICABLE - No outside lights, ~ HVAC Contractor Electric Contractor Fees: Valuation Issued By: $500.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided~ Plumbing Contractor $20.00 Park Dedication $0.00 Date 08/15/2003 Final/O.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you ped~orm the work described in this.~it application within an ease0cent, the City strongly urges the permit applicant to contact the easement holder(s) and(t~ sec¥.e an.~ce.~ry apl~'ov~efg, re starling such activity. Signature ~k,-.~('~ ~. /~ Date /~entJOwner Address 1732 DOEMEL ST OSHKOSH WI 54901 - 3173 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.