HomeMy WebLinkAbout0103579-BuildingOSHKOSH
ON THE WATER
Job Address 80 CHATEAU TER
Designer
Category
Type · Building
140 - Interior Remodeling
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner BRIAN PIZON & MARK NEABAUER
Contractor OWNER
O Sign O Canopy (~ Fence O Raze
No 103579
Create Date 08/18/2003
Plan
Occupancy Permit
Park Dedication
Zoning Class of Const:
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories
Garage 0 Sq. Ft. Baths 0
Foundation · Poured Concrete (~ Floating Slab (~ Pier ~) Other
O Concrete Block (~) Post (~ Treated Wood
Required Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
Size
[] Projection
Canopies 0
Signs 0
Use/Nature
of Work
3FR/Finishing off the 3rd level of a qued level home to create a bathroom, bedroom, and family room, This permit does not include the
'equired electrical and plumbing permits. These permits will be obtained from licensed mechanicel contractors- this house is not owner
)ccupied,
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~.~
UNKNOWN????
$5,000.00 Plan Approval
Plumbing Contractor UNKNOWN
$0.00 Permit Fee Paid $40.00 Park Dedication $0.00
Date 08/18/2003 FinallO.P. 00/00/0000
[] Permit Voided J
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is eot a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secu, Ee any necessary approvals before starting such activity.
Signature ! ~'~"¥¢/~/"/-~-"'~ Date ~_J
U AgentJOwner f
Address OSHKOSH WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.