Loading...
HomeMy WebLinkAbout0103616-Plumbing (interior)OSHKOSH ON THE WATER Job Address 4035 SHARPATT DR Contractor P&S PLUMBING CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner US LAND DEVELOPMENT LLC Category 410- Residential-Interior Bathtub 1 Shower 2 Ejector/Grind 0 DipWell 0 F Prep Sink __ Whirlpool 0 Floor Drain 1 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 3 Lndry Tray 0 Local Waste 0 Wait. St. 0 Shamp Sink __ Toilet 3 Lndry Stndp 1 CIothesWshr 0 Ice Chest 0 FIr/Wst Sink __ Res. Sink 1 Disposal 1 Bidet 0 Exam Sink 0 Catch Basin __ Bar Sink 0 Dishwasher 1 Beer Tap 0 SculrySink 0 Wash Ftn Water Heater I Sump Pump 1 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec __ Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 103616 Create Date 03/04/2003 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Int Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 1 Use/Nature of Work INSFPJ Valuation Issued By Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 $6,200.00 Plan Approval $0.00 Permit Fees $102.00 [] Permit Voided Date 08/20/2003 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before startlng such activity. Signature ~ ,~ Date AgentJOwner Address PO BOX 2153 APPLETON WI 54913 - 0000 Telephone Number 734-3912 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.