Loading...
HomeMy WebLinkAbout0103618-Building (awning/sign)OSHKOSH ON THE WATER ,lob Addreee 635 W 20TH AVE Designer Tim Car]son - Cr Meyer Category 254 - Signs Type O Building · Sign Zoning CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner CHAMCO INC Contractor ORDE ADVERTISING INC. Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete (~) Floating Slab (~ Concrete Block (~) Post Occupancy Permit Required Park Dedication Not Required No 103618 Create Date 08/20/2003 O Canopy (~ Fence (~) Raze Class of Const: Rooms 0 Bedrooms 0 Baths 0 O Pier O Treated Wood Flood Plain No # Dwelling Units Height 0 Ft. Stories Other Plan Size [] Projectioni Canopies Signs Height Permit Not Required # Structures 0 0 0 Use/Nature Sign/3'6" x 6'6" x3' Awning w/sign as per plans transaction ID No. 897300 and calculations. ALL LOADS MUST TRANSFER of Work PROPERLY! HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation PlanApproval $0.00 Permit Fee Paid [] Permit Voided $30.00 Park Dedication $0.00 Date 08/20/2003 FinallO. P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Qshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature ~'~r ~z:~/~_ Date Agent/Owner Address 1825 NIMITZ ROAD DEPERE WI 54115 - 0000 Telephone Number 1-414-339-4600 To schedule inspections please call the inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.