Loading...
HomeMy WebLinkAboutDorner Inc Change Order 3-20-23TO: DORNER INC. E506 LUXEMBURG ROAD LUXEMBURG, WI 54217 Your present contract with the City of Oshkosh, Contract No. 22-04, awarded January 11, 2022, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($176,430.81) NET INCREASE TO ADDITIONAL WORK:$32,140.82 NET DECREASE TO CONTRACT ($144,289.99) SECTION I TOTALS $8,685,603.96 $8,685,603.96 ($144,289.99)($144,289.99) $8,541,313.97 $8,541,313.97 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ ______________________________ Comptroller ______________________________ Contractor BID TOTAL CO #1 CONTRACT TOTAL CHANGE ORDER #1 (FINAL) DATE: MARCH 20, 2023 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) 22-04 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1011 Clearing; complete as specified Inch Diameter 620.00 605.00 -15.00 $21.10 ($316.50) 1021 Grubbing; complete as specified Inch Diameter 620.00 605.00 -15.00 $21.10 ($316.50) 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $442,043.00 1100 Removing pavement; complete as specified Square Yards 23,500.00 22,900.00 -600.00 $0.01 ($6.00) 1110 Removing curb and gutter; complete as specified Linear Feet 720.00 799.21 79.21 $5.00 $396.05 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 124,000.00 123,242.80 -757.20 $0.40 ($302.88) 1200 Unclassified excavation; complete as specified Cubic Yards 5,300.00 7,479.00 2179.00 $21.60 $47,066.40 1220 Excavation special (paving); complete as specified Tons 1,280.00 0.00 -1,280.00 $5.30 ($6,784.00) 1301 7" concrete pavement; with 5" CABC and grading; complete as specified Square Yards 780.00 756.30 -23.70 $53.00 ($1,256.10) 1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 2,200.00 1,751.20 -448.80 $57.00 ($25,581.60) 1314A 8" concrete pavement doweled; with 6" CABC and grading; complete as specified Square Yards 18,200.00 17,894.10 -305.90 $57.00 ($17,436.30) 1315 8" concrete pavement doweled; HES; with 6" CABC and grading; complete as specified Square Yards 1,400.00 1,698.00 298.00 $60.10 $17,909.80 1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 160.00 155.20 -4.80 $85.50 ($410.40) 1334 Concrete pavement gaps; complete as specified Each 5.00 6.00 1.00 $1,320.00 $1,320.00 1340 Crushed aggregate base course; complete as specified Tons 1,600.00 927.10 -672.90 $13.50 ($9,084.15) 1350 Pavement ties; complete as specified Each 160.00 138.00 -22.00 $8.40 ($184.80) 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 220.00 104.00 -116.00 $14.80 ($1,716.80) 1360 Adjust manholes and inlets; complete as specified Each 145.00 141.00 -4.00 $317.00 ($1,268.00) 1370 Turf restoration; complete as specified Square Yards 16,000.00 14,556.70 -1,443.30 $8.30 ($11,979.39) Page 2 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1372 Restore gravel driveway/apron; complete as specified Square Yards 50.00 75.00 25.00 $15.80 $395.00 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 5,332.00 282.20 -5,049.80 $0.01 ($50.50) 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 5,332.00 0.00 -5,332.00 $0.01 ($53.32) 1384 Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as specified Square Yards 5,332.00 0.00 -5,332.00 $0.01 ($53.32) 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 1,070.00 62.70 -1,007.30 $7.39 ($7,443.95) 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 730.00 617.00 -113.00 $11.60 ($1,310.80) 1442 30" curb and gutter; 8"; with 6" CABC and grading; complete as specified Linear Feet 450.00 471.40 21.40 $37.00 $791.80 1443 30" curb and gutter; plain; 8"; with 6" CABC and grading; complete as specified Linear Feet 400.00 658.91 258.91 $37.00 $9,579.67 1460 Sidewalk curb; complete as specified Linear Feet 550.00 694.80 144.80 $47.50 $6,878.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 20,800.00 21,557.30 757.30 $7.50 $5,679.75 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 91,000.00 95,179.00 4179.00 $7.90 $33,014.10 1514 6" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 3,900.00 3,502.40 -397.60 $8.30 ($3,300.08) 1520 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 1,050.00 2,048.80 998.80 $8.80 $8,789.44 1524 8" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 1,700.00 1,559.90 -140.10 $9.10 ($1,274.91) 1530 6" concrete step; complete as specified Square Feet 190.00 196.40 6.40 $73.90 $472.96 1540 Curb ramp detectable warning field (natural/non- painted); complete as specified Square Feet 850.00 808.00 -42.00 $35.90 ($1,507.80) Page 3 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 3,450.00 3,050.00 -400.00 $2.10 ($840.00) 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specified Each 515.00 554.00 39.00 $8.40 $327.60 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 56,000.00 535.00 -55,465.00 $0.01 ($554.65) 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 56,000.00 535.00 -55,465.00 $0.01 ($554.65) 1584 Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specified Square Feet 56,000.00 0.00 -56,000.00 $0.01 ($560.00) 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 355.00 688.60 333.60 $10.60 $3,536.16 1600 Furnish and install tree; complete as specified Each 32.00 15.00 -17.00 $554.00 ($9,418.00) 1650 Locate existing property monuments; complete as specified Each 50.00 40.00 -10.00 $37.00 ($370.00) 1652 Replace existing property monuments; complete as specified Each 40.00 26.00 -14.00 $48.00 ($672.00) 1700 Sawing existing pavement; complete as specified Linear Feet 2,550.00 2,583.10 33.10 $2.40 $79.44 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 750.00 770.80 20.80 $2.40 $49.92 1900 Tack coat; complete as specified Gallons 130.00 110.00 -20.00 $3.80 ($76.00) 1906 4" asphaltic pavement LT with 10" CABC and grading; complete as specified Square Yards 1,650.00 1,917.70 267.70 $40.80 $10,922.16 1911 4" asphaltic transition LT with 10" CABC and grading; complete as specified Square Yards 130.00 184.80 54.80 $66.80 $3,660.64 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 250.00 385.99 135.99 $59.90 $8,145.80 1917 2" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 200.00 0.00 -200.00 $26.10 ($5,220.00) 1918 Asphaltic cold weather paving; complete as specified Square Yards 1,010.00 246.40 -763.60 $2.10 ($1,603.56) 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 7,300.00 7,104.40 -195.60 $0.60 ($117.36) 1975 Pavement markings; epoxy; 4" (yellow); complete as specified Linear Feet 230.00 181.80 -48.20 $1.00 ($48.20) Page 4 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1976 Pavement markings; epoxy; 8" (white); complete as specified Linear Feet 230.00 176.70 -53.30 $1.00 ($53.30) 1977 Pavement markings; cross- walk epoxy; 6" (white); complete as specified Linear Feet 1,950.00 1,957.80 7.80 $9.00 $70.20 1978 Pavement markings; stop-line epoxy; 18" (white); complete as specified Linear Feet 1,000.00 836.80 -163.20 $13.50 ($2,203.20) 1979 Pavement markings; arrow epoxy; Type 1 (white); complete as specified Each 1.00 1.00 $222.00 1981 Pavement markings; arrow epoxy; Type 3 (white); complete as specified Each 2.00 2.00 $396.00 1983 Pavement markings; word; epoxy (white); complete as specified Each 1.00 1.00 $338.00 1984 Pavement markings; symbol; epoxy (white); complete as specified Each 23.00 23.00 $238.00 1985 Temporary pavement markings; paint; 4" (white); complete as specified Linear Feet 4,700.00 0.00 -4,700.00 $0.60 ($2,820.00) 1986 Remove pavement markings; complete as specified Linear Feet 320.00 116.50 -203.50 $3.20 ($651.20) 1989 Pavement markings; yield line symbols; epoxy; 18" (white); complete as specified Each 15.00 13.00 -2.00 $29.00 ($58.00) 1990 Pavement markings; stall line; epoxy; 4" (white); complete as specified Each 55.00 52.00 -3.00 $7.00 ($21.00) 2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 200.00 157.00 -43.00 $96.00 ($4,128.00) 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 1,100.00 1,063.50 -36.50 $85.00 ($3,102.50) 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 1,425.00 1,180.30 -244.70 $85.00 ($20,799.50) 2009 Furnish and install 18" storm sewer; complete as specified Linear Feet 1,700.00 1,639.80 -60.20 $100.00 ($6,020.00) 2012 Furnish and install 21" storm sewer; complete as specified Linear Feet 115.00 111.10 -3.90 $110.00 ($429.00) 2015 Furnish and install 24" storm sewer; complete as specified Linear Feet 1,150.00 1,101.40 -48.60 $115.00 ($5,589.00) 2021 Furnish and install 30" storm sewer; complete as specified Linear Feet 260.00 237.00 -23.00 $150.00 ($3,450.00) 2024 Furnish and install 36" storm sewer; complete as specified Linear Feet 375.00 365.80 -9.20 $160.00 ($1,472.00) Page 5 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2027 Furnish and install 42" storm sewer; complete as specified Linear Feet 390.00 387.00 -3.00 $200.00 ($600.00) 2030 Furnish and install 48" storm sewer; complete as specified Linear Feet 445.00 437.10 -7.90 $225.00 ($1,777.50) 2033 Furnish and install 54" storm sewer; complete as specified Linear Feet 155.00 137.90 -17.10 $275.00 ($4,702.50) 2036 Furnish and install 60" storm sewer; complete as specified Linear Feet 590.00 578.90 -11.10 $260.00 ($2,886.00) 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 133.50 125.80 -7.70 $489.00 ($3,765.30) 2202 Furnish and install standard storm sewer manhole (5' diameter); complete as specified Vertical Feet 50.50 50.43 -0.07 $598.00 ($41.86) 2203 Furnish and install standard storm sewer manhole (6' diameter); complete as specified Vertical Feet 46.25 47.24 0.99 $722.00 $714.78 2205 Furnish and install standard storm sewer manhole (8' diameter); complete as specified Vertical Feet 25.75 34.41 8.66 $1,146.00 $9,924.37 2217 Furnish and install standard storm sewer inlet manhole (8' diameter); complete as specified Vertical Feet 51.00 43.27 -7.73 $1,168.00 ($9,028.64) 2235 Furnish and install Type 1 inlet (with 18" sump); complete as specified Each 1.00 0.00 -1.00 $2,026.00 ($2,026.00) 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 55.00 51.00 -4.00 $2,150.00 ($8,600.00) 2400 Furnish and install 6" storm sewer lateral; complete as specified Linear Feet 1,200.00 1,064.00 -136.00 $67.00 ($9,112.00) 2402 Furnish and install 8" storm sewer lateral; complete as specified Linear Feet 600.00 405.50 -194.50 $76.00 ($14,782.00) 2404 Furnish and install storm sewer marker balls; complete as specified Each 120.00 87.00 -33.00 $37.00 ($1,221.00) 2406 Furnish and install storm sewer clay dams; complete as specified Each 60.00 33.00 -27.00 $147.00 ($3,969.00) 2408 Furnish and install storm sewer lateral inlet; complete as specified Each 25.00 18.00 -7.00 $987.00 ($6,909.00) 2414 Storm lateral inlet adjustments; complete as specified Each 25.00 22.00 -3.00 $122.00 ($366.00) Page 6 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 130.00 79.00 -51.00 $74.00 ($3,774.00) 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 130.00 1.00 -129.00 $5.00 ($645.00) 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 2.00 0.00 -2.00 $1,000.00 ($2,000.00) 2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 150.00 100.00 -50.00 $3.20 ($160.00) 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 150.00 0.00 -150.00 $10.60 ($1,590.00) 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 50.00 20.00 -30.00 $10.60 ($318.00) 2524 Furnish; install; maintain; and remove dewatering tank system; complete as specified Each 4.00 0.00 -4.00 $2,500.00 ($10,000.00) 2600 Furnish and install topsoil 6" depth; complete as specified Square Yards 2,800.00 2,919.90 119.90 $6.30 $755.37 2620 Furnish and install turf grass; complete as specified Square Yards 1,600.00 1,651.70 51.70 $0.50 $25.85 2622 Furnish and install no-mow fescue; complete as specified Square Yards 1,200.00 1,268.10 68.10 $0.60 $40.86 2646 Furnish and install light rip- rap with filter fabric; complete as specified Square Yards 20.00 55.00 35.00 $37.00 $1,295.00 2660 Biofilter restoration; complete as specified Square Yards 200.00 367.50 167.50 $89.70 $15,024.75 2662 Restore Traprock Path; complete as specified Square Yards 30.00 23.60 -6.40 $50.00 ($320.00) 2664 Vacated Blackhawk Street landscape restoration; complete as specified Lump Sum 1.00 1.00 $38,535.00 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 850.00 850.00 $5.50 2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 450.00 450.00 $16.90 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 850.00 829.50 -20.50 $28.00 ($574.00) 2810 Abandon storm sewer manholes and inlets; complete as specified Each 25.00 25.00 $353.00 2812 Remove storm sewer manholes and inlets; complete as specified Each 15.00 15.00 $449.00 Page 7 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2850 Connect to existing storm sewer main; complete as specified Each 25.00 25.00 $1,230.00 2852 Connect to existing storm sewer lateral; complete as specified Each 15.00 19.00 4.00 $274.00 $1,096.00 2856 Connect to existing storm sewer manhole; complete as specified Each 10.00 10.00 $1,123.00 2858 Connect to existing storm sewer inlet; complete as specified Each 3.00 1.00 -2.00 $756.00 ($1,512.00) 2914 Storm sewer utility line opening (ULO); complete as specified Each 20.00 1.00 -19.00 $489.00 ($9,291.00) 2950 Excavation special (storm); complete as specified Tons 100.00 0.00 -100.00 $22.00 ($2,200.00) 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 2,195.00 2,450.90 255.90 $155.00 $39,664.50 3002 Furnish and install 10" sanitary sewer (relay); complete as specified Linear Feet 50.00 96.90 46.90 $155.00 $7,269.50 3004 Furnish and install 12" sanitary sewer (relay); complete as specified Linear Feet 2,290.00 1,977.10 -312.90 $175.00 ($54,757.50) 3006 Furnish and install 15" sanitary sewer (relay); complete as specified Linear Feet 6.00 322.90 316.90 $181.00 $57,358.90 3060 Furnish and install 8" sanitary sewer drop; complete as specified Vertical Feet 15.00 17.73 2.73 $542.00 $1,479.66 3062 Furnish and install 10" sanitary sewer drop; complete as specified Vertical Feet 12.00 14.53 2.53 $601.00 $1,520.53 3064 Furnish and install 12" sanitary sewer drop; complete as specified Vertical Feet 6.00 4.66 -1.34 $672.00 ($900.48) 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 242.00 243.26 1.26 $312.00 $393.12 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 19.00 29.00 10.00 $475.00 $4,750.00 3116 Furnish and install sanitary sewer external manhole chimney seal extension; complete as specified Each 3.00 0.00 -3.00 $422.00 ($1,266.00) 3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specified Each 32.00 26.00 -6.00 $193.00 ($1,158.00) 3214 Furnish and install 12" x 6" sanitary sewer factory wyes or tees; complete as specified Each 15.00 7.00 -8.00 $428.00 ($3,424.00) Page 8 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3232 Furnish and install 6" sanitary sewer laterals (new); complete as specified Linear Feet 115.00 76.90 -38.10 $110.00 ($4,191.00) 3233 Furnish and install 6" sanitary sewer riser (new); complete as specified Linear Feet 11.00 8.50 -2.50 $138.00 ($345.00) 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 1,725.00 1,092.00 -633.00 $110.00 ($69,630.00) 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 79.00 103.60 24.60 $140.00 $3,444.00 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 99.00 83.00 -16.00 $37.00 ($592.00) 3238 Furnish and install clay dams; complete as specified Each 51.00 35.00 -16.00 $147.00 ($2,352.00) 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 6.00 7.00 1.00 $1,409.00 $1,409.00 3302 Furnish and install connection to existing 10" sanitary sewer mains; complete as specified Each 2.00 2.00 $1,051.00 3304 Furnish and install connection to existing 12" sanitary sewer mains; complete as specified Each 2.00 1.00 -1.00 $1,567.00 ($1,567.00) 3306 Furnish and install connection to existing 15" sanitary sewer mains; complete as specified Each 1.00 1.00 $1,350.00 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 3.00 0.00 -3.00 $367.00 ($1,101.00) 3402 Furnish and install 8" sanitary sewer open cut casing pipes; complete as specified Linear Feet 30.00 30.00 $179.00 3600 Rock excavation; complete as specified Cubic Yards 30.00 3.00 -27.00 $100.00 ($2,700.00) 3700 Closed circuit televising; complete as specified Linear Feet 4,546.00 4,576.00 30.00 $1.10 $33.00 3710 Closed circuit televising - using push camera; complete as specified Each 2.00 34.00 32.00 $238.00 $7,616.00 3800 Abandon sanitary sewer manholes; complete as specified Each 2.00 3.00 1.00 $488.00 $488.00 3804 Abandon 10" sanitary sewer; complete as specified Linear Feet 340.00 340.00 $6.00 3806 Abandon 12" sanitary sewer; complete as specified Linear Feet 867.00 1,174.00 307.00 $8.00 $2,456.00 3852 Remove sanitary sewer manholes; complete as specified Each 6.00 6.00 $518.00 Page 9 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 3854 Remove sanitary sewer; complete as specified Linear Feet 727.10 727.10 $31.00 3890 Sanitary sewer utility line opening (ULO); complete as specified Each 8.00 8.00 $734.00 3892 Excavation special (sanitary); complete as specified Tons 150.00 0.00 -150.00 $22.00 ($3,300.00) 4000 Furnish and install 4" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 230.00 209.00 -21.00 $110.00 ($2,310.00) 4002 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 370.00 416.30 46.30 $100.00 $4,630.00 4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 900.00 905.10 5.10 $124.00 $632.40 4006 Furnish and install 10" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 580.00 564.00 -16.00 $130.00 ($2,080.00) 4008 Furnish and install 12" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 5,150.00 5,130.00 -20.00 $160.00 ($3,200.00) 4036 Furnish and install 1" water service (relay); complete as specified Linear Feet 637.00 610.00 -27.00 $91.00 ($2,457.00) 4041 Furnish and install 3" water service (relay); complete as specified Linear Feet 15.00 0.00 -15.00 $152.00 ($2,280.00) 4042 Furnish and install 1" water service (new); complete as specified Linear Feet 32.00 22.00 -10.00 $91.00 ($910.00) 4048 Furnish and install 1" corporation and stop box; complete as specified Each 21.00 24.00 3.00 $463.00 $1,389.00 4055 Furnish and install water service clay dams; complete as specified Each 21.00 23.00 2.00 $147.00 $294.00 4056 Furnish and install connections to existing 4" water main; complete as specified Each 5.00 3.00 -2.00 $1,488.00 ($2,976.00) 4057 Furnish and install connections to existing 3" water main; complete as specified Each 2.00 2.00 $1,229.00 4058 Furnish and install connections to existing 6" water main; complete as specified Each 5.00 6.00 1.00 $1,688.00 $1,688.00 Page 10 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 4060 Furnish and install connections to existing 8" water main; complete as specified Each 6.00 6.00 $2,041.00 4062 Furnish and install connections to existing 10" water main; complete as specified Each 5.00 5.00 $2,327.00 4064 Furnish and install connections to existing 12" water main; complete as specified Each 5.00 4.00 -1.00 $2,774.00 ($2,774.00) 4110 Furnish and install 8" x 6" water main tee; complete as specified Each 1.00 2.00 1.00 $610.00 $610.00 4111 Furnish and install 8" x 8" water main tee; complete as specified Each 1.00 1.00 $710.00 4121 Furnish and install 10" x 10" water main tee; complete as specified Each 1.00 2.00 1.00 $1,001.00 $1,001.00 4127 Furnish and install 12" x 4" water main tee; complete as specified Each 6.00 6.00 $1,003.00 4128 Furnish and install 12" x 6" water main tee; complete as specified Each 18.00 19.00 1.00 $1,065.00 $1,065.00 4129 Furnish and install 12" x 8" water main tee; complete as specified Each 5.00 5.00 $1,148.00 4131 Furnish and install 12" x 12" water main tee; complete as specified Each 2.00 1.00 -1.00 $1,434.00 ($1,434.00) 4190 Furnish and install 8" x 10" water main cross; complete as specified Each 1.00 1.00 $1,246.00 4197 Furnish and install 10" x 12" water main cross; complete as specified Each 1.00 1.00 $1,662.00 4219 Furnish and install 8" 11-1/4 degree water main bend; complete as specified Each 1.00 0.00 -1.00 $419.00 ($419.00) 4221 Furnish and install 12" 11-1/4 degree water main bend; complete as specified Each 1.00 1.00 $833.00 4228 Furnish and install 8" 22-1/2 degree water main bend; complete as specified Each 2.00 3.00 1.00 $440.00 $440.00 4230 Furnish and install 12" 22-1/2 degree water main bend; complete as specified Each 1.00 0.00 -1.00 $833.00 ($833.00) 4235 Furnish and install 4" 45 degree water main bend; complete as specified Each 6.00 10.00 4.00 $238.00 $952.00 4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 40.00 37.00 -3.00 $316.00 ($948.00) Page 11 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 16.00 19.00 3.00 $440.00 $1,320.00 4238 Furnish and install 10" 45 degree water main bend; complete as specified Each 22.00 19.00 -3.00 $620.00 ($1,860.00) 4239 Furnish and install 12" 45 degree water main bend; complete as specified Each 30.00 26.00 -4.00 $904.00 ($3,616.00) 4264 Furnish and install 8" x 6" water main reducer; complete as specified Each 2.00 2.00 $384.00 4267 Furnish and install 10" x 8" water main reducer; complete as specified Each 1.00 1.00 $482.00 4270 Furnish and install 12" x 8" water main reducer; complete as specified Each 1.00 1.00 $656.00 4352 Cut and cap existing 6" water main; complete as specified Each 1.00 6.00 5.00 $744.00 $3,720.00 4354 Cut and cap existing 8" water main; complete as specified Each 1.00 1.00 $802.00 4356 Cut and cap existing 10" water main; complete as specified Each 1.00 2.00 1.00 $1,009.00 $1,009.00 4358 Cut and cap existing 12" water main; complete as specified Each 1.00 0.00 -1.00 $1,091.00 ($1,091.00) 4370 Furnish and install 4" x 3" water main reducer; complete as specified Each 2.00 2.00 $232.00 4400 Furnish and install 4" water main gate valve; complete as specified Each 6.00 6.00 $1,420.00 4401 Furnish and install 6" water main gate valve; complete as specified Each 20.00 21.00 1.00 $1,679.00 $1,679.00 4402 Furnish and install 8" water main gate valve; complete as specified Each 9.00 14.00 5.00 $2,340.00 $11,700.00 4403 Furnish and install 10" water main gate valve; complete as specified Each 8.00 10.00 2.00 $3,289.00 $6,578.00 4404 Furnish and install 12" water main gate valve; complete as specified Each 39.00 40.00 1.00 $4,110.00 $4,110.00 4439 Furnish and install 10" x 10" tapping valve and sleeve; complete as specified Each 1.00 0.00 -1.00 $6,689.00 ($6,689.00) 4500 Furnish and install hydrant; complete as specified Each 16.00 15.00 -1.00 $5,051.00 ($5,051.00) 4726 Furnish and install 18" water main casing pipe; complete as specified Linear Feet 15.00 15.00 $307.00 4728 Furnish and install 20" water main casing pipe; complete as specified Linear Feet 45.00 45.00 $360.00 Page 12 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 4730 Furnish and install 24" water main casing pipe; complete as specified Linear Feet 25.00 26.00 1.00 $478.00 $478.00 4800 Rock excavation; complete as specified Cubic Yards 70.00 0.00 -70.00 $100.00 ($7,000.00) 4900 Abandon water main on Congress Avenue; complete as specified Lump Sum 1.00 1.00 $1,957.00 4902 Abandon water main on Algoma Boulevard; complete as specified Lump Sum 1.00 1.00 $8,318.00 4904 Abandon water main on vacated Blackhawk Street right-of-way; complete as specified Lump Sum 1.00 0.00 -1.00 $1,468.00 ($1,468.00) 4920 Remove water main; complete as specified Linear Feet 240.00 240.00 $26.00 4950 Water main utility line opening (ULO); complete as specified Each 1.00 3.00 2.00 $612.00 $1,224.00 4990 Excavation special (water); complete as specified Tons 70.00 0.00 -70.00 $22.00 ($1,540.00) 5013 Furnish and install pull box (non-conductive); 18" x 36"; complete as specified Each 71.00 60.00 -11.00 $1,584.00 ($17,424.00) 5019 Furnish and install pull box - non-conductive; 24" x 42"; complete as specified Each 18.00 18.00 $1,584.00 5025 Adjust pull box; complete as specified Each 81.00 78.00 -3.00 $5.00 ($15.00) 5026 Remove pull box; complete as specified Each 1.00 6.00 5.00 $79.00 $395.00 5027 Remove concrete base; complete as specified Each 10.00 21.00 11.00 $158.00 $1,738.00 5032 Furnish and install communication vault; 30" x 48"; complete as specified Each 6.00 5.00 -1.00 $1,848.00 ($1,848.00) 5051 Install CITY-supplied lighting control cabinet; complete as specified Each 4.00 3.00 -1.00 $2,112.00 ($2,112.00) 5053 Install CITY-supplied fully- actuated 8-phase traffic signal control cabinet; complete as specified Each 2.00 2.00 $2,112.00 5054 Install electrical service; complete as specified Each 3.00 3.00 $1,584.00 5056 Remove and preserve light pole; complete as specified Each 12.00 11.00 -1.00 $792.00 ($792.00) 5100 Furnish and install 1" Schedule 40 PVC; complete as specified Linear Feet 270.00 209.00 -61.00 $6.30 ($384.30) 5120 Furnish and install 2" Schedule 40 PVC; complete as specified Linear Feet 6,175.00 7,141.00 966.00 $9.50 $9,177.00 Page 13 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 5130 Furnish and install 3" Schedule 40 PVC; complete as specified Linear Feet 8,125.00 7,570.00 -555.00 $12.70 ($7,048.50) 5180 Connect to existing pull box; complete as specified Each 8.00 3.00 -5.00 $132.00 ($660.00) 5181 Connect to existing conduit; complete as specified Each 30.00 38.00 8.00 $132.00 $1,056.00 5182 Connect to existing vault; complete as specified Each 4.00 4.00 $132.00 5230 Furnish and install 4 gauge red-coated wire; complete as specified Linear Feet 15,015.00 13,888.00 -1,127.00 $2.10 ($2,366.70) 5231 Furnish and install 4 gauge black-coated wire; complete as specified Linear Feet 15,015.00 13,888.00 -1,127.00 $2.10 ($2,366.70) 5240 Furnish and install 6 gauge red-coated wire; complete as specified Linear Feet 1,800.00 1,473.26 -326.74 $1.50 ($490.11) 5241 Furnish and install 6 gauge black-coated wire; complete as specified Linear Feet 1,800.00 1,473.26 -326.74 $1.50 ($490.11) 5250 Furnish and install 8 gauge red-coated wire; complete as specified Linear Feet 1,150.00 818.20 -331.80 $1.20 ($398.16) 5251 Furnish and install 8 gauge black-coated wire; complete as specified Linear Feet 1,150.00 818.20 -331.80 $1.20 ($398.16) 5252 Furnish and install 8 gauge green-coated wire; complete as specified Linear Feet 10,900.00 9,915.46 -984.54 $1.20 ($1,181.45) 5262 Furnish and install 10 gauge green-coated wire; complete as specified Linear Feet 1,300.00 1,896.00 596.00 $1.00 $596.00 5270 Furnish and install 12 gauge red-coated wire; complete as specified Linear Feet 1,220.00 920.00 -300.00 $0.80 ($240.00) 5271 Furnish and install 12 gauge black-coated wire; complete as specified Linear Feet 1,220.00 920.00 -300.00 $0.80 ($240.00) 5272 Furnish and install 12 gauge green-coated wire; complete as specified Linear Feet 1,220.00 920.00 -300.00 $0.80 ($240.00) 5282 Furnish and install 14 gauge green-coated wire; complete as specified Linear Feet 5,948.00 6,176.00 228.00 $0.80 $182.40 5310 Pulling/installing CITY- supplied 12-strand fiber; complete as specified Linear Feet 5,250.00 6,996.00 1746.00 $1.80 $3,142.80 5356 Furnish and install 14 gauge stranded single pair twisted with shield; complete as specified Linear Feet 2,420.00 1,942.00 -478.00 $1.50 ($717.00) 5372 Furnish and install 14 AWG solid 21 conductor; complete as specified Linear Feet 2,475.00 2,442.00 -33.00 $1.10 ($36.30) 5380 Furnish and install fuse holder; complete as specified Each 122.00 92.00 -30.00 $53.00 ($1,590.00) Page 14 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 5392 Furnish and install 5A fuse; complete as specified Each 122.00 92.00 -30.00 $5.30 ($159.00) 5410 Install CITY-supplied decorative pole and pole top light structure; complete as specified Each 73.00 46.00 -27.00 $792.00 ($21,384.00) 5420 Install CITY-supplied 10' traffic signal pole with a pedestal base, complete as specified Each 3.00 4.00 1.00 $264.00 $264.00 5421 Install CITY-supplied 13' traffic signal pole with a decorative base; complete as specified Each 5.00 3.00 -2.00 $264.00 ($528.00) 5422 Install CITY-supplied 15' traffic signal pole with a pedestal base; complete as specified Each 8.00 7.00 -1.00 $264.00 ($264.00) 5424 Install CITY-supplied 20' traffic signal pole with a pedestal base; complete as specified Each 11.00 8.00 -3.00 $581.00 ($1,743.00) 5430 Install CITY-supplied 20' trombone arm; complete as specified Each 8.00 2.00 -6.00 $792.00 ($4,752.00) 5431 Install CITY-supplied 25' trombone arm; complete as specified Each 3.00 7.00 4.00 $792.00 $3,168.00 5434 Install CITY-supplied three- section traffic signal head; back plate; and LED modules; complete as specified Each 11.00 8.00 -3.00 $581.00 ($1,743.00) 5436 Install CITY-supplied five- section traffic signal head; back plate; and LED modules; complete as specified Each 5.00 2.00 -3.00 $686.00 ($2,058.00) 5438 Install CITY-supplied pedestrian signal head with countdown timer; complete as specified Each 13.00 9.00 -4.00 $370.00 ($1,480.00) 5440 Install CITY-supplied pedestrian push button; complete as specified Each 13.00 0.00 -13.00 $211.00 ($2,743.00) 5502 Furnish and install Type 2 base; complete as specified Each 26.00 25.00 -1.00 $977.00 ($977.00) 5504 Furnish and install Type 5 base; complete as specified Each 71.00 55.00 -16.00 $924.00 ($14,784.00) Page 15 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 5506 Furnish and install Type 9 base; complete as specified Each 5.00 5.00 $2,112.00 SECTION I (BID ITEMS 1011 - 5506) - SUBTOTAL: $380,082.68 ($556,513.49) NET DECREASE TO SECTION I: ($176,430.81) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-5426 Install City supplied 30' pole; 1 base; complete as specified Each 0.00 2.00 2.00 $750.00 $1,500.00 1-5488 Install City supplied 10' truss arm; complete as specified Each 0.00 1.00 1.00 $250.00 $250.00 1-10000 Repair irrigation system in vacated Black Hawk; complete as specified Lump Sum 0.00 1.00 1.00 $3,325.00 $3,325.00 1-10001 Credit for topsoil supplied by the City of Oshkosh to Dorner Construction; complete as specified Cubic Yard 0.00 2,280.00 2280.00 ($4.00)($9,120.00) 1-10002 Two (2) message boards for seven days; City request for opening road; complete as specified Lump Sum 0.00 1.00 1.00 $1,725.00 $1,725.00 1-20000 Per UWO request; install 6" PVC cleanout pipes connected to existing UWO biofilter underdrain; complete as specified Each 0.00 4.00 4.00 $300.00 $1,200.00 1-20001 TM 3-8 Storm outfall cleanout/downtime; complete as specified Lump Sum 0.00 1.00 1.00 $4,103.36 $4,103.36 1-30000 TM 3-9 Sanitary manhole reconstruction; complete as specified Lump Sum 0.00 1.00 1.00 $11,258.58 $11,258.58 1-30001 TM 3-22 Recore manhole A- 68; complete as specified Lump Sum 0.00 1.00 1.00 $1,256.97 $1,256.97 1-30002 TM 6-7 Sanitary Relay- Chiller; Woodland sanitary grade adjustment; complete as specified Lump Sum 0.00 1.00 1.00 $4,156.00 $4,156.00 1-40000 TM 4-19 Hydrant relocation; complete as specified Lump Sum 0.00 1.00 1.00 $1,621.91 $1,621.91 1-40001 TM 8-1 Cutting casing @ New York/Algoma; complete as specified Lump Sum 0.00 1.00 1.00 $1,320.00 $1,320.00 ADDITIONAL WORK REQUIRED: CO #1 Page 16 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03 CONTRACT 22-04 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-40002 TM 8-9 Water main shutdown - downtime at Congress and Algoma; complete as specified Lump Sum 0.00 1.00 1.00 $9,544.00 $9,544.00 (BID ITEMS 1-5426 - 1-40002) - SUBTOTAL: $41,260.82 ($9,120.00) NET INCREASE TO : $32,140.82 NET DECREASE TO SECTION I:($176,430.81) NET INCREASE TO ADDITIONAL WORK:$32,140.82 NET DECREASE TO CONTRACT:($144,289.99) Page 17 of 17 DocuSign Envelope ID: 6E270EA7-9018-49A5-9C94-10C292760F03