HomeMy WebLinkAboutItem V
PLAN COMMISSION STAFF REPORT APRIL 18, 2023
ITEM V: PUBLIC HEARING: ZONE CHANGE FROM HEAVY INDUSTRIAL DISTRICT
(HI) TO HEAVY INDUSTRIAL DISTRICT WITH A PLANNED
DEVELOPMENT OVERLAY (HI-PD) AND APPROVAL OF A GENERAL
DEVELOPMENT PLAN & SPECIFIC IMPLEMENTATION PLAN FOR
PROPERTY LOCATED AT 2665 OREGON STREET
GENERAL INFORMATION
Owner/Applicant: Karl Loewenstein
Action(s) Requested:
The applicant requests a zone change from the existing Heavy Industrial District (HI) to Heavy
Industrial District with a Planned Development Overlay (HI-PD). The applicant also requests
approval of General Development Plan and Specific Implementation Plan to allow outdoor
commercial entertainment at 2665 Oregon Street.
Applicable Ordinance Provisions:
Zoning map amendment standards are found in Section 30-381 of the Zoning Ordinance.
Planned Development standards are found in Section 30-387 of the Zoning Ordinance.
Property Location and Background Information:
The subject site is a 0.97-acre property located on the west side of Oregon St., south of W. 25th
Ave. The site is used as Sturgeon Spirits Distillery and is bordered by residential uses to the north
and south and the surrounding area consists primarily of industrial uses to the east, south, and
west, and residential uses to the north. The 2040 Comprehensive Land Use Plan recommends
Industrial use for the subject site.
Subject Site
Existing Land Use Zoning
Commercial HI
Recognized Neighborhood Organizations
None
Page 1
ITEM V: Rezone & GDP/SIP 2665 Oregon St. 2
Adjacent Land Use and Zoning
Existing Uses Zoning
North Residential SR-5
South Residential HI
East Industrial HI
West Industrial HI
Comprehensive Plan Land Use Recommendation Land Use
2040 Comprehensive Land Use Recommendation Industrial
ANALYSIS
Zone Change
The applicant is requesting a zone change to add a Planned Development Overlay for the subject
property. This request is intended to provide some flexibility to the zoning ordinance to
accommodate site improvements including an outdoor seating area. The applicant has submitted
plans for the outdoor seating area, which will be addressed as General Development Plan (GDP)
and Specific Implementation Plan (SIP) review to follow. Staff is supportive of the proposed
rezone as it will provide opportunity for enhancements to the site and will also allow for further
review to mitigate potential impacts on neighboring residential properties.
Use
The applicant is proposing to install a 21’ X 29’ outdoor patio seating area to the rear (west) of the
existing building. According to the applicant, the outdoor seating area will be utilized for
additional seasonal seating for patrons of the Sturgeon Spirits tasting room.
Rezone to HI-PD
Page 2
ITEM V: Rezone & GDP/SIP 2665 Oregon St. 3
Site plan
The outdoor seating area is considered “outdoor commercial entertainment” under the zoning
ordinance, which is prohibited in the Heavy Industrial district (HI). Staff is supportive of a base
standard modification (BSM) to allow outdoor commercial entertainment as it is compatible with
the existing use of the property and should not be detrimental to neighboring properties.
Although the property is zoned HI, the existing use (retail manufacturer) and site design is
consistent with what would typically be seen in a mixed-use zoning district where outdoor
commercial entertainment would be a permitted or conditional use. Also, the applicant has
stated that they have discussed the plans with the owners of the neighboring residence to the
north and they are supportive of the proposed outdoor seating area.
Site Design
No changes are being proposed to the site other than the proposed patio area. The patio will be
constructed of patio pavers and surrounded by 4’ tall decorative metal fencing on the south and
west sides and 8’ solid cedar fencing to the north. The existing manufacturing retail use requires
18 parking spaces (1 space per 300 sq. ft. of gross floor area) and 20 spaces are provided in the
existing parking lot. The proposed patio area will result in a need for two additional parking
spaces, with the existing parking lot meeting that requirement.
Required Provided
Impervious Surface Maximum: 70% of lot 56.7% of lot
Parking Minimum: 20 spaces 20 spaces
Page 3
ITEM V: Rezone & GDP/SIP 2665 Oregon St. 4
Minimum Provided
Front Setback (east) 30 ft. Existing
Side Setback (north) 50 ft. 10 ft.
Side Setback (south) 20 ft. +/- 85 ft.
Rear Setback (west) 25 ft. +/165 ft.
Code requires outdoor commercial entertainment areas to be located a minimum of 50’ from
residentially-zoned property. The applicant is requesting a BSM to allow reduced side yard
(north) setback for the patio area to 10’, where code requires a 50’ side yard setback. Staff is
supportive of the requested BSM as the proposed patio placement is necessary to prevent loss of
parking stalls. Also, the proposed patio area will be relatively small in size and a significant
distance from the neighboring residential structure (approximately 115’). The applicant has noted
that their normal hours are 1:00 – 8:00, so there will be no late-night activities.
Signage
This request does not include any additional signage.
Site Lighting
No new light fixtures are being proposed for the patio area. Lighting will be provided by LED
string lights.
Landscaping
Yard and bufferyard landscaping are required for the patio addition.
Page 4
ITEM V: Rezone & GDP/SIP 2665 Oregon St. 5
Points Required Points Provided
Yards 6 132
Bufferyard (west) 70 (with 6’ fence and 10’
bufferyard) 528
Total 76 660
Yards
Code requires 10 landscaping points per 1,000 sq. ft. of gross floor area. The provided yard
landscaping points exceed this requirement for the patio area.
Bufferyards
A 0.6 opacity bufferyard is required along the north property line as it is abutting a Single Family
Residential – 5 zoning district (SR-5). The applicant is providing a 10’ bufferyard along with 8’
tall wood fencing and 16 arborvitae trees. The provided bufferyard landscaping points
significantly exceed the code requirement. This will serve to offset the BSMs for an outdoor
commercial entertainment land use and reduced separation from the neighboring residential
property to the north.
Storm Water Management/Utilities
The Department of Public Works has noted that final plans shall comply with Chapter 14 Storm
water Management requirements and will be reviewed as part of the Site Plan Review process.
Building Facades
No changes are being proposed to the existing building facades.
FINDINGS/RECOMMENDATION/CONDITIONS
In its review and recommendation to the Common Council on an application for a Zoning Map
amendment, staff recommends the Plan Commission make the following findings based on the
criteria established by Chapter 30-381 (D)(2):
(a) Advances the purposes of this Chapter as outlined in Section 30-03 and the
applicable rules of Wisconsin Department of Administration and the Federal
Emergency Management Agency.
(b) Is in harmony with the Comprehensive Plan.
(c) Maintains the desired overall consistency of land uses, land use intensities, and
land use impacts within the pertinent zoning districts.
(d) Addresses any of the following factors that are not properly addressed on the
current Official Zoning Map:
Page 5
ITEM V: Rezone & GDP/SIP 2665 Oregon St. 6
(ii) Factors have changed (such as new data, infrastructure, market conditions,
development, annexation, or other zoning changes), making the subject
property more appropriate for a different zoning district.
In its review and recommendation to the Common Council on an application for a Planned
Development district, staff recommends the Plan Commission make the following findings based
on the criteria established by Chapter 30-387 (C)(6):
(a) The proposed Planned Development project is consistent with the overall purpose and
intent of this Chapter.
(b) The proposed Planned Development project is consistent with the City’s
Comprehensive Plan and other area plans. (It is the responsibility of the City to determine
such consistency.)
(c) The proposed Planned Development project would maintain the desired relationships
between land uses, land use densities and intensities, and land use impacts in the environs
of the subject site.
(d) Adequate public infrastructure is or will be available to accommodate the range of
uses being proposed for the Planned Development project, including but not limited to
public sewer and water and public roads.
(e) The proposed Planned Development project will incorporate appropriate and adequate
buffers and transitions between areas of different land uses and development
densities/intensities.
(g) The proposed architecture and character of the proposed Planned Development
project is compatible with adjacent/nearby development.
(h) The proposed Planned Development project will positively contribute to and not
detract from the physical appearance and functional arrangement of development in the
area.
(i) The proposed Planned Development project will produce significant benefits in terms
of environmental design and significant alternative approaches to addressing
development performance that relate to and more than compensate for any requested
exceptions/base standard modifications variation of any standard or regulation of this
Chapter.
Staff recommends approval of the Rezone, General Development Plan, and Specific
Implementation Plan with the findings listed above and the following conditions:
1. BSM to allow an outdoor commercial entertainment use in a Heavy Industrial district
(HI).
2. BSM to allow an outdoor commercial entertainment area located within 10 ft. of a
residentially-zoned property, where outdoor activity areas may not be located closer than
50 ft. to a residentially-zoned property.
3. Final landscaping plan to be approved by the Department of Community Development.
Page 6
Sign_______ Staff ________ Date Rec’d ________
City of Oshkosh Application
Zoning Map Amendment (Rezoning)
**PLEASE TYPE OR PRINT USING BLACK INK**
APPLICANT INFORMATION
Petitioner: _________________________________________________________________________________ Date: ____________
Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________
Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email
Status of Petitioner (Please Check): Owner Representative Tenant Prospective Buyer
Petitioner’s Signature (required): _______________________________________________________________ Date: ____________
OWNER INFORMATION
Owner(s): __________________________________________________________________________________ Date: ____________
Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________
Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email
Ownership Status (Please Check): Individual Trust Partnership Corporation
Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative
and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons.
Property Owner’s Signature: ___________________________________________________________________ Date: ____________
ZONING AND DEVELOPMENT INFORMATION
Address/Location of Rezoning Request: _________________________________________________________________________
Tax Parcel Number(s): _________________________________________________________________________________________
Rezone property from: ___________________________________________ to ___________________________________________
Purpose for Rezoning:__________________________________________________________________________________________
____________________________________________________________________________________________________________
Describe existing property development and land use: ________________________________________________________________
____________________________________________________________________________________________________________
Describe proposed development and/or proposed land use: ____________________________________________________________
____________________________________________________________________________________________________________
Proposed time schedule for development and/or use of the property: ________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
Zoning Adjacent to the Site: North: _________________________________________________________________________
South: _________________________________________________________________________
East: _________________________________________________________________________
West: _________________________________________________________________________
SUBMIT TO:
Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, Wisconsin 54903-1130
PHONE: (920) 236-5059
HI HI-PD
Karl Loewenstein March 20, 2023
Oshkosh WI 54902
karl@sturgeonspirits.com
Iceshack Properties LLC March 20, 2023
Oshkosh WI 54902
920 267-5192 iceshackproperties@gmail.com
SR-5
HI
HI
HI
1413950000
516 Algoma Blvd. #306
2663 Oregon Street
920 774-7487
2665 Oregon St.
Construction and use would begin this summer and be used from approximately April until October each year.
March 20, 2023
March 20, 2023
Add fencing and outdoor seating area.
Sturgeon Spirits Distillery. Production and sales of distilled spirits and cocktails.
Proposed patio area is currently seeded for grass. Asphalt was removed from the area as part of initial construction.
Add outdoor patio and seating area.
This would be outdoor commercial entertainment.
Page 7
2
SUBMITTAL REQUIREMENTS – Must accompany the application to be complete.
(Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy)
Map of the immediate area showing property involved. Area to be rezoned must be outlined in color
A site plan drawn to readable scale showing present status of property and proposed development
Street address, adjacent streets, intersections and any other information or landmarks to help identify the property
Location of existing uses, structures, fences and signs and location of proposed uses, structures, fences and signs
A narrative statement explaining the zone change and discussion of the project
Application fees are due at time of submittal. Make check payable to City of Oshkosh.
Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE
SUMMARY OF PROCESS
The City of Oshkosh Plan Commission and Common Council act on all amendments to the Official Zoning Map.
The petitioner or owner should be present at both the Plan Commission and Common Council meetings to
discuss and answer questions regarding the request.
The application package is reviewed by Planning Services staff to determine conformance with adopted city
plans, zoning requirements and development standards. A staff recommendation is prepared for consideration
by the Plan Commission and Common Council. The petitioner will be provided with a copy of the staff report
and meeting notice several days prior to the Plan Commission meeting. The staff report and meeting notice will
also be available on the City’s website. No notice is sent to the petitioner or owner regarding the Common
Council’s consideration of the request. Petitioners and owners are encouraged to contact Planning Services
staff to find out when the request will be sent to the Common Council for review.
Neighborhood opinion is an important factor in the decision-making process. If the proposed development is
expected to have significant impact on other properties, the petitioner may be required to conduct a
neighborhood meeting to solicit public input prior to action by the Plan Commission and City Council. Planning
Services staff is available to offer assistance in compiling a mailing list for the neighborhood meeting. If deemed
appropriate, notification by mail informing the property owners within 100 feet of the subject property of the
proposal may substitute for the public meeting. Please note that a meeting notice will be mailed to all abutting
property owners regarding your request.
Within 90 days of filing a complete application, Plan Commission shall hold a public hearing to consider the
request. Within 60 days of the public hearing, the Plan Commission may make a written report to the Common
Council with recommendations regarding the proposal. The Plan Commission’s report is advisory only. The
Common Council will make the final decision regarding all zone change requests. The Plan Commission may lay
over requests to subsequent meetings if incomplete information is provided or additional questions or concerns
are raised at the meeting.
After the Plan Commission makes its recommendation, the request will be forwarded to the Common Council for
consideration. This generally occurs three weeks after the Plan Commission meeting depending on the date the
Council meeting is scheduled (the Council meets on the 2nd and 4th Tuesday of every month) and on the
availability of a legal description for the zone change. Wisconsin State Statutes require a zone change to be
published as Class II notice in the local newspaper, the City takes care of this publication requirement prior to
the Council meeting.
The Common Council may approve the Official Zoning Map amendment as originally proposed, may approve
the proposed amendment with modifications, or may deny approval of the proposed amendment. If the
Official Zoning Map amendment is approved, the Ordinance is published in the newspaper on the following
Saturday and will be effective on Sunday. City administrative offices are notified of the effective date of the
Ordinance and will make changes to the Official Zoning Map accordingly.
For more information please visit the City’s website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm
Page 8
Sign_______ Staff ________ Date Rec’d ________
City of Oshkosh
Planned Development Application
For General Development Plan or Specific Implementation Plan
**PLEASE TYPE OR PRINT USING BLACK INK**
APPLICANT INFORMATION
Petitioner: _________________________________________________________________________________ Date: ____________
Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________
Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email
Status of Petitioner (Please Check): Owner Representative Tenant Prospective Buyer
Petitioner’s Signature (required): _______________________________________________________________ Date: ____________
OWNER INFORMATION
Owner(s): __________________________________________________________________________________ Date: ____________
Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________
Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email
Ownership Status (Please Check): Individual Trust Partnership Corporation
Property Owner Consent: (required)
By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter
upon the property to inspect or gather other information necessary to process this application. I also understand that all
meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other
administrative reasons.
Property Owner’s Signature: ___________________________________________________________________ Date: ____________
TYPE OF REQUEST:
General Development Plan (GDP)General Development Plan (GDP) Amendment
Specific Implementation Plan (SIP)Specific Implementation Plan (SIP) Amendment
SITE INFORMATION
Address/Location of Proposed Project: __________________________________________________________________________
Proposed Project Type: ________________________________________________________________________________________
Estimated Cost: _______________________________________________________________________________________________
Current Use of Property: ________________________________________________________________Zoning: ________________
Land Uses Surrounding Your Site: North: _________________________________________________________________________
South: _________________________________________________________________________
East: _________________________________________________________________________
West: _________________________________________________________________________
It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal.
Application fees are due at time of submittal. Make check payable to City of Oshkosh.
Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE
For more information please visit the City’s website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm
SUBMIT TO: Dept. of Community Development
215 Church Ave., P.O. Box 1130 Oshkosh, WI 54901
PHONE: (920) 236-5059
March 20, 2023
Oshkosh2663 Oregon St.WI 54902
920 267-5192
March 20, 2023
2665 Oregon St.Oshkosh WI 54902
920 774-7487
Karl Loewenstein
Iceshack Properties LLC
2663 Oregon St.
iceshackproperties@gmail.com
karl@sturgeonspirits.com
March 20, 2023
March 20, 2023
Patio -- Outdoor Entertainment
$20000
distillery and tasting room
SR-5
HI
HI
HI
HI
Page 9
2
SUBMITTAL REQUIREMENTS – Must accompany the application to be complete.
(Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy)
The following information must be provided in order for the application to be considered complete and able to
be scheduled for Plan Commission Review. Please use the checklist below to determine the required information
to be submitted at the time of application. If all information below cannot be provided at the time of application,
please request a waiver in writing to the Division’s Director or designee.
A General Development Plan (GDP) submittal, per Section 30-387(C)(4), shall include the following items
(Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy):
General location map of the subject site depicting:
All lands for which the Planned Development is proposed and other lands within 100 feet of the
boundaries of the subject property.
Current zoning of the subject site and abutting properties, and the jurisdiction(s) that maintains that
control.
A graphic scale and north arrow.
Generalized site plan showing the pattern or proposed land uses, including:
General size, shape, and arrangement of lots and specific use areas.
Basic street pattern and pattern of internal drives.
General site grading plan showing preliminary road grades.
Basic storm drainage pattern, including proposed on-site stormwater detention.
General location of recreational and open space areas, including designation of any such areas to
be classified as common open space.
Statistical data, including:
Minimum lot sizes in the development.
Approximate areas of all lots.
Density/intensity of various parts of the development.
Building coverage.
Landscaping surface area ratio of all land uses.
Expected staging.
Conceptual landscaping plan.
General signage plan.
General outline of property owners association, covenants, easements, and deed restrictions.
A written description of the proposed Planned Development, including:
General project themes and images.
The general mix of dwelling unit types and/or land uses.
Approximate residential densities and nonresidential intensities.
General treatment of natural features.
General relationship to nearby properties and public streets.
General relationship of the project to the Comprehensive Plan or other area plans.
Proposed exceptions from the requirements of the Zoning Ordinance.
Traffic Impact Analysis (TIA), if deemed necessary by the Director of Planning Services, or designee.
A Specific Implementation Plan (SIP) submittal, per Section 30-387(C)(5), shall include the following items.
Note that the area included in an SIP may be only a portion of the area included in a previously approved GDP
(Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy):
An existing conditions map of the subject site depicting the following:
All lands for which the Planned Development is proposed and other lands within 100 feet of the
boundaries of the subject site.
Current zoning of the subject property and all abutting properties, and the jurisdiction(s) that
maintains that control.
Existing utilities and recorded easements.
All lot dimensions of the subject site.
A graphic scale and a north arrow.
An SIP map of the proposed site showing at least the following:
Lot layout and the arrangements of buildings.
Public and private roads, driveways, walkways, and parking facilities.
Specific treatment and location of recreational and open space areas, including designation of
any such areas to be classified as common open space.
Page 10
3
Proposed grading plan.
Specific landscaping plan for the subject site, specifying the location, species, and installation size of
plantings. The landscaping plans shall include a table summarizing all proposed species.
Architectural plans for any nonresidential buildings, multi-family structures, or building clusters, other than
conventional single-family or two-family homes on individual lots, in sufficient detail to indicate the floor
area, bulk, and visual character of such buildings.
Engineering plans for all water and sewer systems, stormwater systems, roads, parking areas, and
walkways.
Signage plan for the project, including all project identification signs, concepts for public fixtures and signs,
and group development signage themes that may or may not vary from City standards or common
practices.
Specific written description of the proposed SIP including:
Specific project themes and images.
Specific mix of dwelling unit types and/or land uses.
Specific residential densities and nonresidential intensities as described by dwelling units per acre,
and landscaping surface area ratio and/or other appropriate measures of density and intensity.
Specific treatment of natural features, including parkland.
Specific relationship to nearby properties and public streets.
Statistical data on minimum lot sizes in the development, the precise areas of all development lots
and pads; density/intensity of various parts of the development; building coverage, and
landscaping surface area ratio of all land uses; proposed staging; and any other plans required by
Plan Commission.
A statement of rationale as to why PD zoning is proposed. This statement shall list the standard
zoning requirements that, in the applicant’s opinion, would inhibit the development project and the
opportunities for community betterment that are available through the proposed PD project.
A complete list of zoning standards that would not be met by the proposed SIP and the location(s)
in which such exceptions/base standard modifications would occur.
Phasing schedule, if more than one development phase is intended.
Agreements, bylaws, covenants, and other documents relative to the operational regulations of the
development and particularly providing for the permanent preservation and maintenance of common
open areas and amenities.
A written description that demonstrates how the SIP is consistent with the approved GDP and any and all
differences between the requirements of the approved GDP and the proposed SIP.
I hereby certify that to the best of my knowledge all required application materials are included with this
application. I am aware that failure to submit the required completed application materials may result in denial or
delay of the application request.
Applicant’s Signature (required): _________________________________ Date: _____________________ March 20, 2023
Page 11
STREET ADDRESS:
2663 Oregon Street
Oshkosh, Wisconsin 54902
PHONE: 920-SPIRITS
EMAIL: info@sturgeonspirits.com
WEB: www.sturgeonspirits.com
We would like to create a patio seating area on the west side of our building at 2663/5 Oregon Street in
order to provide additional seasonal seating for the patrons of our tasting room. We plan to add an
outdoor serving/bar counter on the south edge of the patio area. We would like to request a base
standard modification (BSM) so that we can place this patio approximately 15 feet from the property
line.
We will also install an 8-ft cedar privacy fence along the northside of our property to screen both the
indoor and outdoor space from the residence on that side of the property. We would like to request
that this fence be 5 feet from the property line to provide landscaping on both sides. There is only 16
feet maximum between the property line and the building. The property line gets closer to the building,
down to 11 feet at the northwest corner of the existing walkway.
The patio will be made from pavers and be surrounded by on the west and south sides by a low (4 ft)
fence. There will be openings to allow access to the parking lot and the larger yard. Lighting will be
provided by LED string lights from the outlets on the building.
We have installed a glass garage door on the west side of the property which will give access to that
patio. Our normal hours are 1-8, so that there will not be any late-night activities.
This patio and the fence will not cause any undue hardship for the neighbors. We have discussed the
location of both the patio and fence with the property owners to the north and they have agreed to
allow us to put the fence closer to the property line than code requires. We are also extending it farther
than we need to, so their swimming pool will not be visible from either the patio or the tasting room.
This will be good for both of us.
This project will benefit the business and the community while improving the quality of life for our
neighbors. Please let us know if you have any questions or need additional modifications.
Page 12
EX
I
S
T
I
N
G
A
S
P
H
A
L
T
PA
R
K
I
N
G
19
P
A
R
K
I
N
G
S
T
A
L
L
S
1
A
D
A
S
T
A
L
L
A
D
J
A
C
E
N
T
T
O
A
C
C
E
S
S
I
B
L
E
M
E
A
N
S
O
F
E
G
R
E
S
S
9
M
O
T
O
R
C
Y
C
L
E
S
T
A
L
L
S
OREGON STREET
EG
R
E
S
S
D
O
O
R
5’
W
A
L
K
F
O
R
B
U
I
L
D
I
N
G
EN
T
R
A
N
C
E
A
N
D
E
X
I
S
T
I
N
G
PU
R
P
O
S
E
S
T
O
P
A
R
K
I
N
G
20
′
5′
5′
9′6½′
21
′
30
′
34
′
28
′
5′
5′
5′
5′
PR
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
29
′
24
′
16
′
N8
6
º
—
1
5
’
—
2
5
”
E
35
8
.
2
0
’
N8
1
º
—
3
1
’
—
0
7
”
E
40
7
.
9
1
’
Ar
b
o
r
V
i
t
a
e
Ho
s
t
a
ST
U
R
G
E
O
N
S
P
I
R
I
T
S
26
6
3
O
r
e
g
o
n
S
t
r
e
e
t
Os
h
k
o
s
h
W
i
s
c
o
n
s
i
n
Ka
r
l
L
o
e
w
e
n
s
t
e
i
n
Ma
r
c
h
2
0
2
3
Re
q
u
e
s
t
f
o
r
Z
o
n
e
C
h
a
n
g
e
H
I
t
o
H
I
-
P
D
Ou
t
d
o
o
r
C
o
m
m
e
r
c
i
a
l
E
n
t
e
r
t
a
i
n
m
e
n
t
•
F
e
n
c
e
l
i
n
e
a
n
d
O
u
t
d
o
o
r
S
e
a
t
i
n
g
A
r
e
a
Page 13
REZONE/GDP/SIP
2665 OREGON ST
PC: 4/18/2023
H & M COMMERCIAL LLC
N69W25986 BRIGHTON DR
SUSSEX, WI 53089
2ND GARAGE STORAGE LLC
736 KENNEDY AVE
OMRO, WI 54963
DARRELL/STEVEN THOMA
5254 SAMERS BAY RD
OMRO, WI 54963
OSHKOSH CORPORATION
PO BOX 2566
OSHKOSH, WI 54903
WISCONSIN CENTRAL LTD
17641 S ASHLAND AVE
HOMEWOOD, IL 60430
CHRISTOPHER L LAYLAND
2607 OREGON ST
OSHKOSH, WI 54902
EUGENE H/VERNA J MILLER
LIVING TRUST
2573 OREGON ST
OSHKOSH, WI 54902
HYDRITE CHEMICAL COMPANY
191 W 28TH AVE
OSHKOSH, WI 54902
ICESHACK PROPERTIES LLC
50 LAKE ST
OSHKOSH, WI 54901
Page 14
HUGHES ST
OREGON ST
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 3/23/2023
1 in = 120 ft1 in = 0.02 mi¯2665 OREGON ST
City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer
Page 15
RED TAIL WAY
RED TAIL WAY
CCII MM AA RRRROONN CC TT
AAVVIIAA TT II OO NN RR DD
AAVVIIAATTIIOONNCCTT
EEAA SS TT PPEERRIIMMEETT
E
E
R
R
R
R
D
D
W 2 8 T H A V
W 23RD AV NEBRASKA ST
D
O
T
Y
S
T
D
O
T
Y
S
T
W 29TH AV
W 22ND AV
W 23RD AV
MONTANA ST
MINNESOTA ST
W 25TH AV
BRADLEY ST
W 24TH AV
S M
A
IN
S
T
HUGHES ST OREGON ST
Oshkosh
Oshkosh
City
City
Limit
Limit
O
s
h
k
o
s
h
O
s
h
k
o
s
h
C
i
t
y
C
i
t
y
L
i
m
i
t
L
i
m
i
t
DR-6HI
HI-PD
I II
I
MR-12
SR-5SR-5
SR-5-LRO
SR-9UI
UMUUMU
UMU UMU
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 3/23/2023
1 in = 500 ft1 in = 0.09 mi¯2665 OREGON ST
City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer
Page 16
OREGON ST
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 3/23/2023
1 in = 100 ft1 in = 0.02 mi¯2665 OREGON ST
City of Oshkosh maps and data are intended to be used for general identification purposes only, and the City of Oshkoshassumes no liability for the accuracy of the information. Those using the information are responsible for verifying accuracy. Forfull disclaimer please go to www.ci.oshkosh.wi.us/GISdisclaimer
Page 17