Loading...
HomeMy WebLinkAboutItem 1.A. - 1.B. PLAN COMMISSION STAFF REPORT DECEMBER 6, 2022 ITEM IA: ACCEPT SANITARY SEWER EASEMENTS NORTHEAST OF VACATED E. 8TH AVENUE ITEM IB: RELEASE EASEMENT RIGHTS WITHIN PART OF VACATED E 8TH AVENUE GENERAL INFORMATION Applicant: City Administration Owners: City of Oshkosh, City of Oshkosh Redevelopment Authority Actions Requested: The City of Oshkosh is requesting acceptance of three sanitary easements located northeast of Vacated E. 8th Avenue and the release of easement rights over a portion of Vacated E. 8th Avenue. Applicable Ordinance Provisions: N/A Property Location and Background Information: The area of these requests are located within the City’s Sawdust District, generally situated south of the Fox River, west of Lake Winnebago and adjacent to S. Main Street to the west. The City is working with T. Wall Enterprises for plans of a large-scale mixed-use development east of S. Main Street and south of the Fox River. The proposed easements and release of easement rights are small items required to allow this development move forward. ANALYSIS Proposed Sanitary Sewer Easements: The City is requesting approval of three small easements located northeast of recently vacated E. 8th Avenue. Two of the easements are to be granted by the City of Oshkosh Redevelopment Authority (RDA) while the third, located in between the RDA easements, being granted by the City to the City (Figure 1). The easements are needed for an existing dual sanitary force mains which crosses the Fox River from the northeast, then heads westward within Vacated E. 8th Avenue. The easements are needed to ensure the City continues to have legal access to the force main after the underlying land is disposed of. Access is essential for maintenance, repair and replacement of the mains when needed. Easement 1 (RDA to City) Easement 2 (City to City) Easement 3 (RDA to City) Figure 1 Page 1 Items I-A & I-B – Accept Sanitary Sewer Easements & Release Easement Rights – Vacated E. 8th Avenue 2 Proposed Release of Easement Rights: Figure 2 The City is requesting the release of easement rights of the southern 12 feet of vacated E. 8th Avenue (Figure 2). Per statute, government entities retain rights to access, maintain/repair and replace facilities located within vacated rights-of-way. T. Wall’s submitted plans show structures potentially encroaching into the southern part of former E. 8th Avenue. The Department of Public Works reviewed this and determined the southern 12 feet of vacated E. 8th Avenue was not needed to provide service to the existing sanitary force main. The RDA, which is the current owner of the underlying land of two of the proposed easements and the proposed release of easement rights reviewed this request and recommended approval. The City Attorney’s office has drafted the necessary easement documents. T. Wall Enterprises has been informed of this request as they must give consent to any contractual obligations including easements. Final and signed easement documents will be signed and recorded at the Winnebago County Register of Deeds after Common Council approval. RECOMMENDATION/CONDITIONS Staff recommends approval of the acceptance of the proposed sanitary sewer easements and the release of easement rights within vacated E. 8th Avenue as requested. Release Easement Rights Page 2 Page 3 Page 4 SS MM AA II NN SS TT E 9TH AVE 9TH AV E 10TH AV E 10TH AV E 7TH AVE 7TH AV C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 10/10/2022 1 in = 130 ft1 in = 0.02 mi¯8TH AVE8TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 5 HI RMU-PD I-PD-RFO UMU TR-10 CMU CMU-PD UMU-PD CMU-PD RMU-PD-RFO UMU RMU-PD-RFO RMU-RFO RMU-PD-RFO RMU-PD RMU-PD Riverside Park S MAIN ST S MAIN ST W 9TH AVW 9TH AV S MAIN ST BRIDGE S MAIN ST BRIDGE EE 1100TTHH AAVV E 9TH AVE 9TH AV PPIIOONNEEEERRDDRR W 7TH AVW 7TH AV W 6TH AVW 6TH AV W 8TH AVW 8TH AV W 10TH AVW 10TH AV E 7TH AVE 7TH AV C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 10/10/2022 1 in = 200 ft1 in = 0.04 mi¯8TH AVE8TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 6 C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 10/10/2022 1 in = 130 ft1 in = 0.02 mi¯8TH AVE8TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 7