HomeMy WebLinkAbout11. 22-489NOVEMBER 22, 2022 22-489 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE AMENDMENT TO CONTRACTOR AGREEMENT WITH BADGER LABORATORIES AND ENGINEERING, INC. FOR INDUSTRIAL WASTEWATER SAMPLING AND ANALYSIS (+$63,366.40) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the Wisconsin Department of Natural Resources requires that discharges from industry to the public sanitary sewers be monitored to prevent the discharge of wastes that can interfere with treatment processes at the City’s Wastewater Treatment Plant; and WHEREAS, the City and Badger Laboratories and Engineering, Inc. previously entered into an agreement in which Badger Labs would provide the City with industrial wastewater sampling and analysis services; and WHEREAS, the original agreement was scheduled to end in December 2021 and amended to continue through 2022; and WHEREAS, the City has requested an amendment to this agreement to continue services through the end of the calendar year 2023; and WHEREAS, the amended agreement will include additional services and tests to be performed, changes in testing costs, and changes to the specific industries for 2023. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the proper City officials are authorized and directed to enter into and take those steps necessary to implement an appropriate amended professional services agreement with Badger Laboratories and Engineering, Inc. for additional industrial wastewater sampling and analysis services in the amount of sixty three thousand three hundred sixty six dollars and forty cents. ($63,366.40). Acct. No. 05511955-6401 Pretreatment Program-PS – Engineer/Survey/Appraisal I:\Engineering\2019 CONTRACTS\19-16 2019-2022 Ind WW Samp\Project_Information\Correspondence\Memo\19-16 Badger Labs CA #2 Memo_11-17-22.docx TO: Honorable Mayor and Members of the Common Council FROM: Steven M. Gohde, Assistant Director of Public Works / Utilities General Manager DATE: November 17, 2022 RE: Approve Amendment to Contractor Agreement with Badger Laboratories and Engineering, Inc. (Badger Labs) for Industrial Wastewater Sampling and Analysis Services (+$63,366.40) BACKGROUND Badger Labs was awarded an agreement to provide industrial wastewater discharge sampling and analysis in November 2018. The Wisconsin Department of Natural Resources requires that discharges from industry to the public sanitary sewers be monitored to prevent the discharge of wastes that can interfere with treatment processes at the City’s Wastewater Treatment Plant. The costs of the program are billed to the local industries for the required sampling and testing. ANALYSIS The original agreement was scheduled to end in December 2021. The original agreement contained the option to renew the agreement for two (2) – additional one (1) year terms. In November 2021, the City had requested an amendment to this agreement to continue these services through the end of calendar year 2022. The City is now requesting the final amendment to continue these services through the end of calendar year 2023. Due to the fact that there are changes to some of the tests performed, changes in some of tests’ costs, and changes to the specific industries for 2023, an amendment to the original agreement is required, instead of a letter of acceptance between the two (2) parties. FISCAL IMPACT Funds are available in the Pre-Treatment Program section of the 2022 Wastewater Utility Operating Budget (Account #05511955-6401 – Pretreatment Program-PS – Engineer/Survey/Appraisal). RECOMMENDATION I recommend approval of the amendment to the Contractor Agreement with Badger Labs for industrial wastewater sampling and analysis services for calendar year 2023. Approved, Mark A. Rohloff City Manager SMG/tlt