HomeMy WebLinkAbout09. 22-487NOVEMBER 22, 2022 22-487 RESOLUTION (CARRIED 6-0 LOST LAID OVER WITHDRAWN ) PURPOSE: APPROVE CIP BUDGET AMENDMENT AND CHANGE ORDER NO. 2 (FINAL) FOR PUBLIC WORKS CONTRACT NO. 21-03 OREGON STREET AND FOND DU LAC ROAD SANITARY INTERCEPTOR SEWER CONSTRUCTION / ADVANCE CONSTRUCTION, INC. (+$110,281.18) INITIATED BY: PUBLIC WORKS DEPARTMENT WHEREAS, the City previously entered into an Agreement with Advance Construction, Inc. for the Oregon Street and Fond du Lac Road Sanitary Interceptor Sewer Construction; and WHEREAS, the Common Council has adopted the 2021 Capital Improvement Program and Budget, which is on file in the Office of the City Clerk and available for public inspection; and WHEREAS, the contract was originally awarded in February of 2021 and Change Order No. 1 was awarded in November of 2021 WHEREAS, it is necessary to amend the 2021 Capital Improvement Program Budget to transfer funds for additional services and adjust quantities with the project. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the 2021 Capital Improvements Budget, on file in the City Clerk’s Office, is hereby amended as follows: o To transfer $15,000 from Account No. 03210410-6804-04004 (Contract Control- Storm Sewer-20-04 Snell Road Reconstruction) to Account No. 03210410-6804- 04103 (Contract Control-Storm Sewer-21-03 Oregon Intr Fond du Lac SS). o To transfer $140,000 from Account No. 03210410-6803-04105 (Contract Control- Water Main-21-05 Ceape Avenue Reconstruction) to Account No. 03210410-6803- 04103 (Contract Control-Water Main-21-03 Oregon Intr Fond du Lac SS). NOVEMBER 22, 2022 22-487 RESOLUTION CONT’D BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh that the following change Order, a copy of which is attached, is hereby approved: ADVANCE CONSTRUCTION 2141 Woodale Avenue Green Bay, WI 54313 Net Increase to Contract: $110,281.18 PURPOSE: See attached Change Order. Money for this purpose is hereby appropriated from: Acct. Nos. 03210410-6804-04103 Contract Control-Storm Sewer-21-03 Oregon Intr Fond du Lac SS 03210410-6803-04103 Contract Control-Water Main-21-03 Oregon Intr Fond du Lac SS I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Correspondence\Memo\21-03 Memo for CO #2 (Final)_11-17-22.docx Page 1 of 2 TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer DATE: November 17, 2022 RE: Approve CIP Budget Amendment and Change Order No. 2 (Final) for Public Works Contract No. 21-03 Oregon Street and Fond du Lac Road Sanitary Interceptor Sewer Construction / Advance Construction, Inc. (+$110,281.18) BACKGROUND Change Order No. 2 (Final) for Contract 21-03 is scheduled for consideration by the Common Council at the November 22, 2022 meeting. The Contract was originally awarded to Advance Construction, Inc. in February of 2021 and Change Order No. 1 was awarded in November of 2021. This change order is for additional services requested by the City and to adjust quantities to match the necessary installation in the field. ANALYSIS Following is a summary of the significant changes to each section of the Capital Improvement Program (CIP):  Street – Final quantities were adjusted to match field conditions.  Storm Water – Final quantities were adjusted to match field conditions.  Sanitary Sewer – Final quantities were adjusted to match field conditions.  Water Main – This change order includes additional water main repair work at the intersection of Oregon Street and West Waukau Avenue to eliminate utility conflicts. The limits of the water main construction were also extended for water main relayed on Oregon Street, north of West Waukau Avenue to West 29th Avenue. Water services were relayed from new main to the right-of-way. Additionally, final quantities were adjusted to match field conditions.  Sidewalk – Final quantities were adjusted to match field conditions. I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-03 Oregon & FDL San Swr\Project_Information\Correspondence\Memo\21-03 Memo for CO #2 (Final)_11-17-22.docx Page 2 of 2 FISCAL IMPACT Contract Section Change Order Amount Estimated Total Construction Costs CIP Budget/ Transferred Amount Street $2,485.29 $196,466.72 $300,000 Storm Sewer $19,585.71 $528,101.62 $530,968 Sanitary Sewer -$75,760.75 $7,853,858.23 $8,020,000 Water Main $164,077.01 $588,885.87 $590,000 Sidewalk -$106.08 $57,089.67 $70,000 Admin $0.00 $2,547.93 $6,000 Total $110,281.18 $9,226,950.04 $9,516,968 Funding for the Street portion of this Change Order is in the 2021 CIP (Account No. 03210410-6801-04103/Contract Control-Paving-21-03 Oregon Intr Fond du Lac SS). Funding for the Storm Water and Water Main portions of this Change Order is available from CIP projects which have come in under budget:  $15,000 will be transferred from Account No. 03210410-6804-04004 (Contract Control-Storm Sewer-20-04 Snell Road Reconstruction) to Account No. 03210410- 6804-04103 (Contract Control-Storm Sewer-21-03 Oregon Intr Fond du Lac SS).  $140,000 will be transferred from Account No. 03210410-6803-04105 (Contract Control-Water Main-21-05 Ceape Avenue Reconstruction) to Account No. 03210410- 6803-04103 (Contract Control-Water Main-21-03 Oregon Intr Fond du Lac SS). RECOMMENDATIONS I recommend approval of Change Order No. 2 (Final) to Contact No. 21-03 in the amount of +$110,281.18 to Advance Construction, Inc. and the transfer of CIP funds. Approved: Mark A. Rohloff City Manager JLG/tlt TO: ADVANCE CONSTRUCTION CHANGE ORDER #2 (FINAL) 2141 WOODALE AVENUE GREEN BAY, WI 54313 Your present contract with the City of Oshkosh, Contract No. 21-03, awarded February 23, 2021, is hereby amended and changed as follows: $173,794.48 $1,975.50 ($31,395.60) ($139,321.00) $69,201.00 $36,026.80 $110,281.18 TOTALS $7,646,222.99 $7,646,222.99 $324,034.50 $324,034.50 $7,970,257.49 $7,970,257.49 CO #2 (FINAL)$110,281.18 $110,281.18 $8,080,538.67 $8,080,538.67 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: NOVEMBER 2, 2022 NET INCREASE TO SECTION I WORK UNIT A: ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ NET INCREASE TO ADDITIONAL WORK CO #2: NET INCREASE TO SECTION 2 WORK UNIT B: NET DECREASE TO SECTION 3 ALTERNATE 2: CONTRACT TOTAL NET DECREASE TO SECTION 4 ALLOWANCES: NET INCREASE TO ADDITIONAL WORK CO #1: NET INCREASE TO CONTRACT PREVIOUS CONTRACT TOTAL CO #1 BID TOTAL CONTRACT 21-03 CHANGE ORDER #2 (FINAL) SECTION 1: WORK UNIT A ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-1012 Limbing existing trees; complete as specified Each 20.00 3.24 -16.76 $450.00 ($7,542.00) A-1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $420,000.00 A-1100 Removing pavement; complete as specified Square Yards 50.00 24.80 -25.20 $10.00 ($252.00) A-1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 4,710.00 12,496.80 7786.80 $0.65 $5,061.42 A-1220 Excavation special (paving); complete as specified Tons 475.00 0.00 -475.00 $20.00 ($9,500.00) A-1308 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 2,625.00 3,189.10 564.10 $52.78 $29,773.20 A-1318 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 266.00 1,202.80 936.80 $54.11 $50,690.25 A-1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 1,234.00 942.20 -291.80 $57.11 ($16,664.70) A-1329 9" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 992.00 1,477.20 485.20 $65.71 $31,882.49 A-1333 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control at STA 155+70 to STA 174+55 on Oregon Street; complete as specified Linear Feet 1,728.00 1,762.00 34.00 $178.73 $6,076.83 Page 2 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-1334 Concrete pavement gaps; complete as specified Each 11.00 11.00 $1,000.00 A-1335 9" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control at STA 20+37 to STA 46+46 on Fond du Lac Road; complete as specified Linear Feet 2,860.00 2,632.00 -228.00 $105.00 ($23,940.00) A-1336 Furnish and install 6" perforated underdrain; complete as specified Linear Feet 200.00 200.00 $40.00 A-1360 Adjust manholes and inlets; complete as specified Each 69.00 62.00 -7.00 $300.00 ($2,100.00) A-1370A Turf restoration on Fond du Lac Avenue; complete as specified Square Yards 627.30 618.00 -9.30 $6.10 ($56.73) A-1370B Turf restoration on Oregon Street; complete as specified Square Yards 1,609.70 2,371.81 762.11 $6.10 $4,648.87 A-1370C Turf restoration on East Waukau Avenue; complete as specified Square Yards 474.00 929.40 455.40 $6.10 $2,777.94 A-1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 500.00 0.00 -500.00 $1.50 ($750.00) A-1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 300.00 0.00 -300.00 $2.50 ($750.00) A-1384 Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as specified Square Yards 170.00 0.00 -170.00 $10.00 ($1,700.00) A-1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 170.00 0.00 -170.00 $5.00 ($850.00) A-1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 265.00 391.60 126.60 $11.00 $1,392.60 A-1448 30" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 335.00 431.00 96.00 $37.00 $3,552.00 A-1460 Sidewalk curb; complete as specified Linear Feet 240.00 253.00 13.00 $15.00 $195.00 Page 3 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 6,935.00 10,642.15 3707.15 $5.10 $18,906.47 A-1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 1,115.00 2,250.20 1135.20 $5.45 $6,186.84 A-1520 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 790.00 2,610.62 1820.62 $6.15 $11,196.81 A-1540 Curb ramp detectable warning field (natural/non- painted); complete as specified Square Feet 60.00 70.00 10.00 $30.00 $300.00 A-1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 712.00 210.00 -502.00 $1.00 ($502.00) A-1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specified Each 102.00 80.00 -22.00 $5.00 ($110.00) A-1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 965.00 0.00 -965.00 $0.10 ($96.50) A-1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 200.00 0.00 -200.00 $0.20 ($40.00) A-1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 225.00 0.00 -225.00 $5.00 ($1,125.00) A-1650 Locate existing property monuments; complete as specified Each 21.00 12.00 -9.00 $125.00 ($1,125.00) A-1651 Replace section corner; complete as specified Each 1.00 1.00 $500.00 A-1652 Replace existing property monuments; complete as specified Each 8.00 0.00 -8.00 $50.00 ($400.00) A-1700 Sawing existing pavement; complete as specified Linear Feet 118.00 543.80 425.80 $3.50 $1,490.30 A-1710 Sawing concrete pavement full depth; complete as specified Linear Feet 120.00 141.90 21.90 $3.50 $76.65 A-1900 Tack coat; complete as specified Gallons 10.00 0.00 -10.00 $10.93 ($109.30) A-1911 4" asphaltic transition LT with 10" CABC and grading; complete as specified Square Yards 20.00 0.00 -20.00 $93.00 ($1,860.00) A-1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 104.00 363.07 259.07 $58.14 $15,062.33 Page 4 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 40.00 61.50 21.50 $75.00 $1,612.50 A-2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 205.00 217.50 12.50 $65.00 $812.50 A-2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 345.00 340.00 -5.00 $70.00 ($350.00) A-2009 Furnish and install 18" storm sewer; complete as specified Linear Feet 240.00 229.10 -10.90 $74.00 ($806.60) A-2015 Furnish and install 24" storm sewer; complete as specified Linear Feet 75.00 79.50 4.50 $90.00 $405.00 A-2016 Furnish and install 24" RCP Class III storm sewer; complete as specified Linear Feet 30.00 24.00 -6.00 $95.00 ($570.00) A-2021 Furnish and install 30" storm sewer; complete as specified Linear Feet 860.00 847.10 -12.90 $105.00 ($1,354.50) A-2025 Furnish and install 36" RCP Class III storm sewer; complete as specified Linear Feet 40.00 96.00 56.00 $190.00 $10,640.00 A-2027 Furnish and install 42" storm sewer; complete as specified Linear Feet 15.00 16.00 1.00 $130.00 $130.00 A-2049 Furnish and install 24" x 38" HERCP Class III storm sewer; complete as specified Linear Feet 35.00 31.00 -4.00 $130.00 ($520.00) A-2051 Furnish and install 29" x 45" HERCP Class III storm sewer; complete as specified Linear Feet 355.00 352.40 -2.60 $145.00 ($377.00) A-2157 Furnish and install 29" x 45" RCP Class III apron endwall with joint ties; complete as specified Each 1.00 1.00 $2,960.00 A-2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 25.00 9.95 -15.05 $400.00 ($6,020.00) A-2202 Furnish and install standard storm sewer manhole (5' diameter); complete as specified Vertical Feet 7.50 19.49 11.99 $500.00 $5,995.00 A-2203 Furnish and install standard storm sewer manhole (6' diameter); complete as specified Vertical Feet 7.00 6.32 -0.68 $674.00 ($458.32) A-2205 Furnish and install standard storm sewer manhole (8' diameter); complete as specified Vertical Feet 12.00 10.75 -1.25 $1,100.00 ($1,375.00) Page 5 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-2213 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specified Vertical Feet 27.00 28.00 1.00 $482.00 $482.00 A-2217 Furnish and install standard storm sewer inlet manhole (8' diameter); complete as specified Vertical Feet 6.00 5.35 -0.65 $1,280.00 ($832.00) A-2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 5.00 4.00 -1.00 $2,350.00 ($2,350.00) A-2402 Furnish and install 8" storm sewer lateral; complete as specified Linear Feet 52.00 61.50 9.50 $50.00 $475.00 A-2404 Furnish and install storm sewer marker balls; complete as specified Each 8.00 4.00 -4.00 $24.00 ($96.00) A-2406 Furnish and install storm sewer clay dams; complete as specified Each 4.00 0.00 -4.00 $380.00 ($1,520.00) A-2408 Furnish and install storm sewer lateral inlet; complete as specified Each 1.00 0.00 -1.00 $1,000.00 ($1,000.00) A-2414 Storm lateral inlet adjustments; complete as specified Each 1.00 0.00 -1.00 $300.00 ($300.00) A-2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 65.00 61.00 -4.00 $125.00 ($500.00) A-2510 Sediment removal - Type D modified inlet protection; complete as specified Each 30.00 91.00 61.00 $10.00 $610.00 A-2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 2.00 1.00 -1.00 $2,000.00 ($2,000.00) A-2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 60.00 171.00 111.00 $10.00 $1,110.00 A-2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 60.00 40.00 -20.00 $8.50 ($170.00) A-2522 Furnish; install; maintain; and remove ditch check; complete as specified Each 10.00 0.00 -10.00 $82.50 ($825.00) A-2524 Furnish; install; maintain; and remove dewatering tank system; complete as specified Each 3.00 3.00 $5,000.00 A-2526 Furnish; install; maintain; and remove turbidity barrier; complete as specified Each 1.00 1.00 $22,000.00 Page 6 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-2600 Furnish and install topsoil 6" depth; complete as specified Square Yards 85.00 0.00 -85.00 $4.00 ($340.00) A-2620 Furnish and install turf grass; complete as specified Square Yards 85.00 0.00 -85.00 $2.10 ($178.50) A-2631 Furnish and install Class I; Type B erosion control mat; complete as specified Square Yards 85.00 0.00 -85.00 $2.00 ($170.00) A-2650 Furnish and install heavy rip- rap with filter fabric; complete as specified Square Yards 40.00 15.00 -25.00 $70.00 ($1,750.00) A-2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 40.00 0.00 -40.00 $13.00 ($520.00) A-2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 50.00 49.60 -0.40 $45.00 ($18.00) A-2810 Abandon storm sewer manholes and inlets; complete as specified Each 1.00 0.00 -1.00 $500.00 ($500.00) A-2812 Remove storm sewer manholes and inlets; complete as specified Each 3.00 2.00 -1.00 $550.00 ($550.00) A-2850 Connect to existing storm sewer main; complete as specified Each 16.00 15.00 -1.00 $1,000.00 ($1,000.00) A-2852 Connect to existing storm sewer lateral; complete as specified Each 4.00 2.00 -2.00 $250.00 ($500.00) A-2856 Connect to existing storm sewer manhole; complete as specified Each 2.00 1.00 -1.00 $1,000.00 ($1,000.00) A-2950 Excavation special (storm); complete as specified Tons 50.00 0.00 -50.00 $20.00 ($1,000.00) A-3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 515.00 545.70 30.70 $170.00 $5,219.00 A-3002 Furnish and install 10" sanitary sewer (relay); complete as specified Linear Feet 220.00 132.00 -88.00 $174.00 ($15,312.00) A-3004 Furnish and install 12" sanitary sewer (relay); complete as specified Linear Feet 32.00 30.00 -2.00 $180.00 ($360.00) A-3010 Furnish and install 21" sanitary sewer (relay); complete as specified Linear Feet 3,230.00 3,226.80 -3.20 $565.00 ($1,808.00) A-3060 Furnish and install 8" sanitary sewer drop; complete as specified Vertical Feet 67.00 68.27 1.27 $400.00 $508.00 A-3062 Furnish and install 10" sanitary sewer drop; complete as specified Vertical Feet 17.00 9.29 -7.71 $400.00 ($3,084.00) Page 7 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-3064 Furnish and install 12" sanitary sewer drop; complete as specified Vertical Feet 3.00 2.31 -0.69 $577.00 ($398.12) A-3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 324.00 310.65 -13.35 $510.00 ($6,808.50) A-3114 Furnish and install external sanitary sewer manhole chimney seal; complete as specified Each 28.00 33.00 5.00 $400.00 $2,000.00 A-3116 Furnish and install external sanitary sewer manhole chimney seal extension; complete as specified Each 3.00 2.00 -1.00 $300.00 ($300.00) A-3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specified Each 4.00 4.00 $77.00 A-3222 Furnish and install 6" sanitary sewer "Insert-A-Tee" or "Kor- N-Tee"; complete as specified Each 40.00 38.00 -2.00 $300.00 ($600.00) A-3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 986.00 1,066.50 80.50 $172.00 $13,846.00 A-3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 450.00 458.50 8.50 $172.00 $1,462.00 A-3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 80.00 74.00 -6.00 $24.00 ($144.00) A-3238 Furnish and install clay dams; complete as specified Each 35.00 33.00 -2.00 $600.00 ($1,200.00) A-3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 9.00 8.00 -1.00 $950.00 ($950.00) A-3302 Furnish and install connection to existing 10" sanitary sewer mains; complete as specified Each 5.00 2.00 -3.00 $1,000.00 ($3,000.00) A-3304 Furnish and install connection to existing 12" sanitary sewer mains; complete as specified Each 1.00 2.00 1.00 $1,100.00 $1,100.00 A-3310 Furnish and install connection to existing 21" sanitary sewer mains; complete as specified Each 1.00 1.00 $8,800.00 A-3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 2.00 0.00 -2.00 $1,500.00 ($3,000.00) A-3332 Core into existing manhole; complete as specified Each 1.00 1.00 $800.00 Page 8 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-3424 Furnish and install 60" sanitary sewer open cut casing pipes; complete as specified Linear Feet 100.00 80.00 -20.00 $560.00 ($11,200.00) A-3601 Rock excavation; complete as specified Linear Feet 4,381.00 4,481.50 100.50 $270.00 $27,135.00 A-3700 Closed circuit televising; complete as specified Linear Feet 5,842.00 5,723.20 -118.80 $3.71 ($440.75) A-3710 Closed circuit televising - using push camera; complete as specified Each 3.00 0.00 -3.00 $225.00 ($675.00) A-3800 Abandon sanitary sewer manholes; complete as specified Each 10.00 10.00 $750.00 A-3802 Abandon 8" sanitary sewer; complete as specified Linear Feet 251.00 250.50 -0.50 $5.00 ($2.50) A-3804 Abandon 10" sanitary sewer; complete as specified Linear Feet 1,427.00 1,052.50 -374.50 $7.00 ($2,621.50) A-3806 Abandon 12" sanitary sewer; complete as specified Linear Feet 2,780.00 2,779.00 -1.00 $9.00 ($9.00) A-3852 Remove sanitary sewer manholes; complete as specified Each 5.00 5.00 $1,000.00 A-3854 Remove sanitary sewer; complete as specified Linear Feet 531.00 531.00 $56.00 A-3860 Abandon sanitary sewer pump station; complete as specified Lump Sum 1.00 1.00 $15,000.00 A-3890 Sanitary sewer utility line opening (ULO); complete as specified Each 3.00 0.00 -3.00 $850.00 ($2,550.00) A-3892 Excavation special (sanitary); complete as specified Tons 50.00 0.00 -50.00 $25.00 ($1,250.00) A-4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 100.00 167.00 67.00 $158.00 $10,586.00 A-4008 Furnish and install 12" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 23.00 97.00 74.00 $200.00 $14,800.00 A-4036 Furnish and install 1" water service (relay); complete as specified Linear Feet 30.00 317.00 287.00 $100.00 $28,700.00 A-4046 Furnish and install 2" water service (new); complete as specified Linear Feet 40.00 35.00 -5.00 $110.00 ($550.00) A-4048 Furnish and install 1" corporation and stop box; complete as specified Each 1.00 8.00 7.00 $542.00 $3,794.00 Page 9 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-4053 Furnish and install 2" corporation and stop box; complete as specified Each 1.00 1.00 $2,360.00 A-4055 Furnish and install water service clay dams; complete as specified Each 1.00 12.00 11.00 $400.00 $4,400.00 A-4060 Furnish and install connections to existing 8" water main; complete as specified Each 1.00 1.00 $2,500.00 A-4064 Furnish and install connections to existing 12" water main; complete as specified Each 4.00 5.00 1.00 $3,500.00 $3,500.00 A-4128 Furnish and install 12" x 6" water main tee; complete as specified Each 1.00 1.00 $940.00 A-4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 2.00 0.00 -2.00 $310.00 ($620.00) A-4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 2.00 2.00 $410.00 A-4309 Furnish and install 8" water main plug; complete as specified Each 1.00 0.00 -1.00 $220.00 ($220.00) A-4354 Cut and cap existing 8" water main; complete as specified Each 1.00 0.00 -1.00 $970.00 ($970.00) A-4358 Cut and cap existing 12" water main; complete as specified Each 2.00 0.00 -2.00 $1,105.00 ($2,210.00) A-4360 Cut and cap existing 16" water main; complete as specified Each 2.00 0.00 -2.00 $1,730.00 ($3,460.00) A-4401 Furnish and install 6" water main gate valve; complete as specified Each 1.00 3.00 2.00 $1,330.00 $2,660.00 A-4402 Furnish and install 8" water main gate valve; complete as specified Each 1.00 1.00 $1,820.00 A-4447 Furnish and install 12" x 8" tapping valve and sleeve; complete as specified Each 1.00 1.00 $4,825.00 A-4500 Furnish and install hydrant; complete as specified Each 1.00 2.00 1.00 $5,460.00 $5,460.00 A-4900 Abandon water main on Fond du Lac Avenue; complete as specified Lump Sum 1.00 0.00 -1.00 $750.00 ($750.00) $336,712.00 ($162,917.52) $173,794.48 WORK UNIT A (BID ITEMS A-1012 - A-4900) - SUBTOTAL: NET INCREASE TO WORK UNIT A: Page 10 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) SECTION 2: WORK UNIT B ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE B-1200 Unclassified excavation; complete as specified Cubic Yards 25.00 0.00 -25.00 $15.20 ($380.00) B-2970 Furnish and install concrete- tied block for channel lining; complete as specified Square Yards 38.00 43.05 5.05 $110.00 $555.50 B-2972 Remove old structure; STA 157+44; complete as specified Lump Sum 1.00 1.00 $20,000.00 B-2974 Excavation for structures; culverts; Structure B-70-085; complete as specified Lump Sum 1.00 1.00 $30,000.00 B-2976 Backfill structure; Type A; complete as specified Tons 1,000.00 1,000.00 $20.00 B-2978 Breaker run; complete as specified Tons 106.00 106.00 $20.00 B-2980 Protective surface treatment; complete as specified Square Yards 23.00 23.00 $8.00 B-2982 Adhesive anchors; No. 4 bar; complete as specified Each 42.00 42.00 $23.45 B-2984 Concrete masonry culverts; complete as specified Cubic Yards 277.00 277.00 $817.00 B-2986 Bar steel reinforcement; HS structures; complete as specified Pounds 29,950.00 29,950.00 $1.14 B-2988 Bar steel reinforcement; HS coated structures; complete as specified Pounds 4,900.00 4,900.00 $1.20 B-2990 Railing steel Type NY4; complete as specified Linear Feet 122.00 122.00 $324.00 B-2992 Rubberized membrane waterproofing; complete as specified Square Yards 24.00 24.00 $46.15 B-2994 Riprap; heavy; complete as specified Cubic Yards 25.00 43.00 18.00 $100.00 $1,800.00 B-2996 Pipe underdrain wrapped 6"; complete as specified Linear Feet 119.00 119.00 $40.00 B-2997 Temporary water diversion; complete as specified Lump Sum 1.00 1.00 $15,000.00 B-2998 Geotextile fabric Type C; complete as specified Square Yards 376.00 376.00 $2.20 B-2999 Geotextile fabric Type HR; complete as specified Square Yards 36.00 36.00 $3.50 $2,355.50 ($380.00) NET INCREASE TO WORK UNIT B: $1,975.50 WORK UNIT B (BID ITEMS B-1200 - B-2999) - SUBTOTAL: Page 11 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) SECTION 3: ALTERNATE 2 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-3046-2 Furnish and install 36" HOBAS sanitary sewer (new); complete as specified Linear Feet 1,845.00 1,793.70 -51.30 $612.00 ($31,395.60) A-3113A-2 Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specified Each 1.00 1.00 $20,000.00 A-3113B-2 Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specified Each 1.00 1.00 $19,600.00 A-3113C-2 Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specified Each 1.00 1.00 $21,600.00 A-3113D-2 Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specified Each 1.00 1.00 $21,600.00 A-3113E-2 Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specified Each 1.00 1.00 $19,600.00 A-3113F-2 Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specified Each 1.00 1.00 $20,000.00 A-3113G-2 Furnish and install HOBAS Base-T with 4' diameter riser section; complete as specified Each 1.00 1.00 $20,300.00 $0.00 ($31,395.60) NET DECREASE TO ALTERNATE 2 : ($31,395.60) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE A-2525 TCE water treatment allowance; complete as specified Lump Sum 1.00 0.00 -1.00 $125,000.00 ($125,000.00) A-2527 TSS water treatment allowance; complete as specified Lump Sum 1.00 0.81 -0.19 $75,000.00 ($14,321.00) $0.00 ($139,321.00) ($139,321.00) SECTION 4: ALLOWANCES SECTION 4 ALLOWANCES (BID ITEMS A-2525 & A-2527) - SUBTOTAL: SECTION 3: ALTERNATE 2 (BID ITEMS A-3046-2 - A-3113G-2) - SUBTOTAL: NET DECREASE TO ALLOWANCES: Page 12 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-30000 Flocculent Tubes (TSS water treatment allowance Bid Item 2527); complete as specified Each 64.00 64.00 $250.00 1-30001 New sanitary manhole base W-3; complete as specified Each 1.00 1.00 $687.50 1-30002 Additional removal of the pump station; complete as specified Each 1.00 1.00 $3,000.00 1-30003 Installation of bentonite slurry dams; complete as specified Each 3.00 3.00 $1,500.00 1-40000 Install new curb stop boxes within the sanitary sewer lateral trench (Water Distribution request); complete as specified Each 5.00 5.00 $50.00 1-40001 Install new curb stop boxes outside the sanitary sewer lateral trench (Water Distribution request); complete as specified Each 17.00 17.00 $500.00 1-40002 30" water main open cut casing pipe: complete as specified Linear Feet 80.00 80.00 $495.00 1-40003 Furnish and install 6" ductile iron water main at #82 E. Waukau Avenue; complete as specified Linear Feet 82.00 84.00 2.00 $158.00 $316.00 1-40004 Furnish and install 10" water main pipe; fittings and connections; complete as specified Linear Feet 20.00 30.00 10.00 $110.00 $1,100.00 1-40005 Furnish and install 16" water main pipe; fittings and connections; complete as specified Linear Feet 925.00 1,208.00 283.00 $214.00 $60,562.00 1-40006 Furnish and install 10" water main valve; complete as specified Each 1.00 1.00 $2,276.00 1-40007 Furnish and install 16" water main valve; complete as specified Each 5.00 6.00 1.00 $7,223.00 $7,223.00 $69,201.00 $0.00 $69,201.00NET INCREASE TO CHANGE ORDER #1: ADDITIONAL WORK REQUIRED: CO #1 ADDITIONAL WORK REQUIRED CO #1 (BID ITEMS 1-30000 - 1-40007) - SUBTOTAL: Page 13 of 14 CONTRACT 21-03 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2-4920 Remove water main on Oregon Street 158+75 to the south; complete as specified Linear Feet 0.00 80.00 80.00 $13.50 $1,080.00 2-10000 Repair existing temporary patched core holes; complete as specified Each 0.00 13.00 13.00 $370.00 $4,810.00 2-30002 Hardscape and irrigation restoration; complete as specified Lump Sum 0.00 1.00 1.00 $740.00 $740.00 2-30003 Furnish and install Arborvitaes with mulch ring; complete as specified Each 0.00 8.00 8.00 $245.00 $1,960.00 2-30004 Furnish and install chemical protective coating; complete as specified Vertical Feet 0.00 79.30 79.30 $131.00 $10,388.30 2-30005 Furnish sanitary manhole chemical protection coating set-up; complete as specified Each 0.00 7.00 7.00 $263.00 $1,841.00 2-30006 Dig down and cap manhole 0- 8 drop; complete as specified Lump Sum 0.00 1.00 1.00 $1,200.00 $1,200.00 2-30007 Extra excavating and rearranging riser sections for manhole 0-8; complete as specified Lump Sum 0.00 1.00 1.00 $5,000.00 $5,000.00 2-40008 Valve repair at Oregon/ Waukau intersection; complete as specified Lump Sum 0.00 1.00 1.00 $2,737.50 $2,737.50 2-40009 Furnish and install 16" x 12" cross; complete as specified Each 0.00 1.00 1.00 $3,250.00 $3,250.00 2-40010 Furnish and install 12" 45 degree bend; complete as specified Each 0.00 4.00 4.00 $755.00 $3,020.00 $36,026.80 $0.00 $36,026.80 $173,794.48 $1,975.50 ($31,395.60) ($139,321.00) $69,201.00 $36,026.80 $110,281.18 ADDITIONAL WORK REQUIRED: CO #2 ADDITIONAL WORK REQUIRED CO #2 (BID ITEMS 2-4920 - 2-40010) - SUBTOTAL: NET INCREASE TO CHANGE ORDER #2: NET INCREASE TO CO #2: NET INCREASE TO CONTRACT: NET INCREASE TO WORK UNIT B: NET INCREASE TO WORK UNIT A: NET DECREASE TO ALTERNATE 2: NET DECREASE TO ALLOWANCES: NET INCREASE TO CO #1: Page 14 of 14