HomeMy WebLinkAbout0103493-Building (siding/windows/misc)OSHKOSH
ON THE WATER
Job Address 352 BAY ST
Designer
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner TIMOTHY R EIERMAN
Contractor D & J QUALITY CONSTRUCTION
No 103493
Create Date 08/13/2003
Category 141 - Exterior Remodeling Plan
Type · Building (~ Sign (~ Canopy ~) Fence ~) Raze
Zoning Class of Const: Size
Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection I
Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies __
Garage 0 Sq. Ft. Baths 0 Signs
Foundation · Poured Concrete (~ Floating Slab O Pier C) Other
O Concrete Block (~) Post (~ Treated Wood
Occupancy Permit Flood Plain __ Height Permit
Park Dedication # Dwelling Units 0 # Structures 0
0
0
Use/Nature ~FPJ Remodel and repair the house to include siding replacement windows redrywalling part of some rooms throughout, repairing the
of Work oundation and razing a shed.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$10,500.00 Plan Approval
$0.00 Permit Fee Paid
[] Permit Voided J
Plumbing Contractor
$68.00 Park Dedication $0.00
Date 08/13/2003 FinallO.P. 00/00/0000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement rastdctions of which it is not a party, if you perform the work
described in this permit application within an.j~ement, the City stro~Jrges the permit applicant to contact the easement
holder(s) and to secure an~ov~ bef~ing~tc~'~l~ctivity.
Signature /~ /,~~~.¢ ~.~ Date ~,2~/-~
~ Agent/Owner
Address 2415 HICKORY LN OSHKOSH WI 54901 - 0000 Telephone Number 232-0538
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.