Loading...
HomeMy WebLinkAbout0103493-Building (siding/windows/misc)OSHKOSH ON THE WATER Job Address 352 BAY ST Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner TIMOTHY R EIERMAN Contractor D & J QUALITY CONSTRUCTION No 103493 Create Date 08/13/2003 Category 141 - Exterior Remodeling Plan Type · Building (~ Sign (~ Canopy ~) Fence ~) Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection I Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies __ Garage 0 Sq. Ft. Baths 0 Signs Foundation · Poured Concrete (~ Floating Slab O Pier C) Other O Concrete Block (~) Post (~ Treated Wood Occupancy Permit Flood Plain __ Height Permit Park Dedication # Dwelling Units 0 # Structures 0 0 0 Use/Nature ~FPJ Remodel and repair the house to include siding replacement windows redrywalling part of some rooms throughout, repairing the of Work oundation and razing a shed. HVAC Contractor Electric Contractor Fees: Valuation Issued By: ~ $10,500.00 Plan Approval $0.00 Permit Fee Paid [] Permit Voided J Plumbing Contractor $68.00 Park Dedication $0.00 Date 08/13/2003 FinallO.P. 00/00/0000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement rastdctions of which it is not a party, if you perform the work described in this permit application within an.j~ement, the City stro~Jrges the permit applicant to contact the easement holder(s) and to secure an~ov~ bef~ing~tc~'~l~ctivity. Signature /~ /,~~~.¢ ~.~ Date ~,2~/-~ ~ Agent/Owner Address 2415 HICKORY LN OSHKOSH WI 54901 - 0000 Telephone Number 232-0538 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.