HomeMy WebLinkAbout10. 22-436OCTOBER 25, 2022 22-436 RESOLUTION (CARRIED 7-0 LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVE SPECIFIC IMPLEMENTATION PLAN FOR A COMMERCIAL DEVELOPMENT AT 2101 WEST 9TH AVENUE INITIATED BY: BRAVEHEART DEVELOPMENT – MAU & ASSOCIATES PLAN COMMISSION RECOMMENDATION: Approved w/ findings and conditions WHEREAS, the Plan Commission finds that the Specific Implementation Plan for a commercial development at 2101 West 9th Avenue, is consistent with the criteria established in Section 30-387 of the Oshkosh Zoning Ordinance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that a Specific Implementation Plan for a commercial development at 2101 West 9th Avenue, per the attached, is hereby approved with the following findings: 1. The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. 2. The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) 3. The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. 4. Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. 5. The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. 6. The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. OCTOBER 25, 2022 22-436 RESOLUTION CONT’D 7. The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. 8. The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh that the following are conditions of approval for a commercial development at 2101 West 9th Avenue: 1. Base Standard Modification for reduced front yard setback (W. 9th Ave.) to 1.52’, where code requires a 25’ front yard setback. 2. Base Standard Modification for reduced front yard setback (S. Washburn St.) to 4.41’, where code requires a 25’ front yard setback. 3. Base Standard Modification for reduced side yard (west) setback to 7.26’, where code requires a 10’ side yard setback. 4. Base Standard Modification for reduced rear yard setback to 1.66’, where code requires a 25’ rear yard setback. 5. Base Standard Modification for reduced drive thru lane length in front of order station to 40’, where code requires 100’ in front of each order station. 6. Base Standard Modification for reduced sign setback to 1’, where code requires a 25’ front setback. 7. Base Standard Modification to allow street frontage landscaping with the drip line not located within 10 feet of the public street right-of-way. 8. Base Standard Modification for reduced Class I materials on the west façade to 35%, where code requires 50% of the façade devoted to Class I materials. 9. The applicant shall provide a minimum of 630 landscaping points for the site. 10. Final landscaping, lighting, and signage plans shall be reviewed and approved by the Department of Community Development. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Mark Lyons, Planning Services Manager DATE: October 20, 2022 RE: Approve Specific Implementation Plan for a Commercial Development at 2101 West 9th Avenue BACKGROUND The applicant requests approval of a Specific Implementation Plan for a commercial development at 2101 West 9th Avenue. The subject site is located at the southwest corner of West 9th Avenue and South Washburn Street. It consists of a former bank with drive-thru window and associated parking. The site is zoned Suburban Mixed Use District (SMU). The surrounding area consists of residential uses to the west along West 9th Avenue, and commercial uses to the north, south, and east. The 2040 Comprehensive Land Use Plans recommends Interstate Commercial use for the subject area. ANALYSIS The applicant is proposing to demolish the existing building and construct a drive-thru restaurant/coffee shop. The proposed development is a permitted use in the SMU district and is consistent with the approved General Development Plan for a drive-thru commercial use on the subject site. This proposal was discussed at a Plan Commission workshop on July 19, 2022. Plan Commission voiced support for the concept plans and recommended that the drive-thru pick up window not be on the street side of the building and that cross access drives be provided to the neighboring properties if possible. The applicant is requesting base standard modifications (BSMs) related to reduced setbacks, drive-thru stacking, a specific landscaping requirement, and reduced Class I materials on a building facade. Staff feels that the applicant can sufficiently offset these BSMs by increasing the provided overall landscaping points to 125% of the code requirement. The applicant has also provided increased Class I materials on the street facing facades. Staff feels that the overall site is complimentary to the surrounding area. FISCAL IMPACT Approval of this project will result in an increase in the assessed property value for the site. The applicant is anticipating spending approximately $650,000 on the proposed project. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us RECOMMENDATION The Plan Commission recommended approval of the Specific Implementation Plan with findings and conditions on October 18, 2022. Please see the attached staff report and meeting minutes for more information. Respectfully Submitted, Approved: Mark Lyons John Fitzpatrick Planning Services Manager Assistant City Manager / Director of Administrative Services ITEM: SPECIFIC IMPLEMENTATION PLAN FOR A COMMERCIAL DEVELOPMENT AT 2101 W 9TH AVENUE Plan Commission meeting of October 18, 2022. GENERAL INFORMATION Applicant: Bravehart Development – Mau & Associates Property Owner: Associate Bank NA Action(s) Requested: The applicant requests approval of a Specific Implementation Plan for a commercial development at 2101 W 9th Avenue. Applicable Ordinance Provisions: Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Background Information: The subject site is located at the southwest corner of W. 9th Ave. and S. Washburn St. and consists of a bank with drive-thru window and associated parking. The site is zoned Suburban Mixed Use District (SMU). The surrounding area consists of residential uses to the west along W 9th Ave. and commercial uses to the north, south, and east. The 2040 Comprehensive Land Use Plans recommends Interstate Commercial use for the subject area. On October 11, 2022, a zone change was approved to add a Planned Development overlay along with a General Development Plan for commercial development (drive-thru coffee shop) on the subject site. Subject Site Existing Land Use Zoning Commercial SMU Recognized Neighborhood Organizations None Adjacent Land Use and Zoning Existing Uses Zoning North Commercial SMU South Commercial SMU East Commercial SMU West Residential SR-5 ITEM II: SIP 2101 W 9th Ave. 2 Comprehensive Plan Land Use Recommendation Land Use 2040 Comprehensive Land Use Recommendation Interstate Commercial ANALYSIS Use The applicant is proposing development of a drive-thru restaurant/coffee shop (Scooter’s). The proposed development is a permitted use in the SMU district and is consistent with the approved GDP for a drive-thru commercial use on the subject site. This proposal was discussed at a Plan Commission workshop on July 19, 2022. Plan Commission voiced support for the concept plans and recommended that the drive-thru pick up window not be on the street side of the building and that cross access drives be provided to the neighboring properties if possible. Site Design/Access The applicant is proposing a drive-thru restaurant including patio area on the south side of the building and 15 parking stalls, utilizing access from W. 9th Avenue and S. Washburn Street. ITEM II: SIP 2101 W 9th Ave. 3 Required Provided Parking Spaces Minimum: 6 Maximum: 25 15 Impervious Surface Maximum: 70% of lot 67.6% of lot Minimum Provided Front Setback (W. 9th Ave.) 25 ft. 1.52 ft. (drive aisle) Street Side Setback (S. Washburn St.) 25 ft. 4.41 ft. (drive aisle) Side Setback (west) 10 ft. 7.26 ft. (drive aisle) Rear Setback (south) 25 ft. 1.66 ft. (drive aisle/refuse enclosure) The site will have 15 parking stalls, which is within the allowable parking total for the site. The total impervious surface ratio for the site is under the maximum of 70% for the SMU district. A small patio area is included on the plan on the rear (south) side of the building. The applicant is requesting base standard modifications (BSMs) for reduced front setback along W. 9th Avenue to 1.52’ and along S. Washburn Street to 4.41’ for the parking lot/drive-lane, where code requires a 25’ front setback. The applicant is also requesting BSMs to allow a drive- thru lane with a 7.26’ side (west) setback and 1.66’ side (south) setback for a dumpster enclosure, where code requires a 10’ side yard setback. Staff is supportive of the requested BSMs for reduced setbacks as the unique lot configuration and abnormally wide public right-of- way inhibit the ability to meet the setback requirements. A BSM is also being requested for reduced drive-thru lane length in front of the order station. The plan shows 40’ of stacking length in front of the order stations, where code requires 100’ in front of each order station. Staff does not have concerns with the stacking length reduction as two order stations are provided to allow for a total of 4 vehicles stacked in front of the order stations. Also, the drive-thru lane entrance is to the rear of the building and will not result in vehicles waiting near the entrance to the site. The proposed refuse enclosure is 6’ tall and has a concrete masonry unit (CMU) exterior. The applicant is requesting a BSM for the proposed CMU exterior as code requires refuse enclosures to be constructed of wood or material(s) used on the building. The applicant has stated the CMU exterior was chosen as it is sturdier than wood and will require less maintenance. Staff is not supportive of this BSM request as there does not appear to be a hardship preventing the applicant from utilizing the code required material options. Refuse enclosure ITEM II: SIP 2101 W 9th Ave. 4 Signage The applicant is proposing a 30’ tall, 140 sq. ft. monument sign with a 14’ setback from the front property line. A BSM is required for reduced setback as code requires a 25’ setback for ground signage. Staff is supportive of the BSM for reduced setback as site constraints limit the ability to meet the setback requirement. Also, as previously noted, there is an unusually wide public right-of-way fronting the property (approximately 25’). The sign will be under the maximum allowable ground sign area (200 s.f.) for the SMU district. The proposed building elevations include wall signage on all building elevations. These signs will be within the code maximum of 1 sq. ft. per linear foot of building frontage. Signage will be addressed under a separate building permit. ITEM II: SIP 2101 W 9th Ave. 5 Landscaping Points Required Points Provided Building Foundation 74 (37 street side) 75.9 (41.7 street side) Paved Areas 87 (26.1 tall trees, 34.8 shrubs) 131 (50 tall trees, 45 shrubs) Street Frontage 310 (155 medium trees) 12 (0 medium trees) Yards 33 128 TOTAL 504 346.9 ITEM II: SIP 2101 W 9th Ave. 6 Building Foundation The building foundation landscaping point requirement of 40 landscaping points per 100 linear feet of building foundation is being met for the proposed building. The plan is also meeting the requirement that 50% of the required points be on the street facing side of the building. Paved Area The paved area requirement of 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area is being met. The code further specifies 30% of all points will be devoted to tall trees and 40% will be devoted to shrubs. Both of these requirements are being met. The plan is also meeting the requirement that a deciduous tree be planted at all parking row end, but will also need to provide an additional tree at each of the drive entrances. This can be addressed during the site plan review process. Street Frontage Code requires 100 points per 100 feet of street frontage. The landscaping ordinance also specifies that 50% of the required points must be devoted to medium trees. The landscaping plan initially included tall trees to meet the street frontage point requirement, however staff had concerns with the proposed tall trees along the front property line as the landscape area between the front property line and drive lane ranges from 1.52’ to 4.41’. This is likely insufficient space for tall trees to grow without extending into the public right-of-way. The applicant re-submitted a landscape plan with the tall trees removed from the frontage and bushes placed within the street frontage area. Staff is recommending a BSM to allow some of the street frontage landscaping to be placed further than 10’ from the public right-of-way as insufficient space exists along the frontage to meet the point requirement. While the 310 street frontage points will need to be provided, staff will work with the applicant to include smaller plantings along the front property line, with the remainder of the required street frontage points being moved to other locations on the site. Yards Code requires 20 landscaping points per 1,000 sq. ft. of gross floor area. The provided yard landscaping points exceed this requirement. Storm Water Management/Utilities The Department of Public Works has reviewed the plans and noted that final submitted plans are required to be in full compliance with the requirements of the City of Oshkosh Municipal Code Chapter 14 for storm water management. Site Lighting The applicant submitted a photometric plan for the site. The lighting levels meet the .4 foot- candle minimum requirement for parking areas, while not exceeding the maximum of .5 foot- candles of light trespass at the side/rear property lines and 1.0 foot-candle at the right-of-way line. ITEM II: SIP 2101 W 9th Ave. 7 The proposed 20’ light poles are under the maximum light fixture mounting height of 23’ (including 3’ base) for the SMU district and will have full cut-off fixtures per lighting code requirements. Building Facades Section 30-243 of the zoning ordinance requires commercial buildings to be clad in 50% Class I materials. The petitioner has provided elevations for the building. The applicant has provided a material list and material breakdown for the building for each facade. The specific elevations breakdown is as follows: North (W. 9th Avenue): Class I – 83% Class III – 17% East (S. Washburn Street): Class I – 56% Class III – 44% West (side): Class I – 35% Class III – 65% South (rear): Class I – 0% Class III – 100% ITEM II: SIP 2101 W 9th Ave. 8 Stone and glazing will be utilized on the front facades to meet the 50% Class I requirement. The side (west) façade will be short of the 50% class I material requirement, which will require a Base Standard Modification. The rear (south) façade is exempt from the requirement. Staff is supportive of the requested BSM to allow 35% Class I materials on the side (west) façade as the street facing facades exceed the 50% requirement, resulting in a total of 53% percent Class I materials on the front and side facades. This serves to offset the requested BSM. Overall Site The applicant is requesting base standard modifications related to reduced setbacks, drive-thru stacking, a specific landscaping requirement, and reduced Class I materials on a building facade. Staff feels that the applicant can sufficiently offset these BSMs by increasing the provided overall landscaping points to 125% the code requirement (630 points). The applicant has also provided increased Class I materials on the street facing facades. Staff feels that the overall site is complimentary to the surrounding area. ITEM II: SIP 2101 W 9th Ave. 9 FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission consider findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. Staff recommends approval of the Specific Implementation Plan with the findings listed above with the proposed following conditions: 1. Base Standard Modification for reduced front yard setback (W. 9th Ave.) to 1.52’, where code requires a 25’ front yard setback. 2. Base Standard Modification for reduced front yard setback (S. Washburn St.) to 4.41’, where code requires a 25’ front yard setback. 3. Base Standard Modification for reduced side yard (west) setback to 7.26’, where code requires a 10’ side yard setback. 4. Base Standard Modification for reduced rear yard setback to 1.66’, where code requires a 25’ rear yard setback. 5. Base Standard Modification for reduced drive thru lane length in front of order station to 40’, where code requires 100’ in front of each order station. 6. Base Standard Modification for reduced sign setback to 14’, where code requires a 25’ front setback. ITEM II: SIP 2101 W 9th Ave. 10 7. Base Standard Modification to allow street frontage landscaping with the drip line not located within 10 feet of the public street right-of-way. 8. Base Standard Modification for reduced Class I materials on the west façade to 35%, where code requires 50% of the façade devoted to Class I materials. 9. The applicant shall provide a minimum of 630 landscaping points for the site. 10. Final landscaping, lighting, and signage plans shall be reviewed and approved by the Department of Community Development. The Plan Commission recommended approval of the Specific Implementation Plan with findings and conditions on October 18, 2022. The following is their discussion on the item. Site Inspections Report: Mr. Mitchell, Ms. Davey, Mr. Loewenstein, Mr. Kiefer and Ms. Scheuermann reported visiting the site. Staff report accepted as part of the record. The applicant requests approval of a Specific Implementation Plan for a commercial development at 2101 W 9th Avenue. Mr. Slusarek presented the item and reviewed the site and surrounding area as well as the land use and zoning classifications in this area. The applicant is proposing development of a drive- thru restaurant/coffee shop (Scooter’s). The proposed development is a permitted use in the SMU district and is consistent with the approved GDP for a drive-thru commercial use on the subject site. This proposal was discussed at a Plan Commission workshop on July 19, 2022. Plan Commission voiced support for the concept plans and recommended that the drive-thru pick up window not be on the street side of the building and that cross access drives be provided to the neighboring properties if possible. Staff recommends approval with the findings and conditions as stated in the staff report. Mr. Perry opened up technical questions to staff. Mr. Kiefer asked where the dumpster is located and what materials are acceptable. Mr. Slusarek said it has to be wood or a material used on the exterior of the building. Mr. Lyons said they are looking for consistency with the design of the building. Mr. Mitchell asked if there was any concerns about a left turn from the southern entrance to the site. Mr. Lyons said it is just past the roundabout. Mr. Perry asked for any public comments and asked if the applicant wanted to make any statements. ITEM II: SIP 2101 W 9th Ave. 11 There were no public comments on this item. Mr. Perry closed public comments and asked if the applicant wanted to make any closing statements. There were no closing statements from the applicant. Motion by Ford to adopt the findings and recommendation as stated in the staff report. Seconded by Kiefer. Mr. Perry asked if there was any discussion on the motion. Motion carried 9-0. Site Implementation Plan (SIP) Parcel: 91311930000 2101 West 9th Avenue BraveHart Development -Scooters Coffee Consultant: Mau and Associates September 19, 2022 Statement describing the general character of the intended development. BraveHart Development is seeking a rezone request from SMU (suburban mixed use) to SMU with PD (Planned Development) at 2101 West 9th Avenue. The purpose of the request is to allow for a new Scooters Coffee to be constructed at parcel 91311930000. The site is currently a vacant bank. The bank building would be demolished to allow for a new building to be constructed. The existing bank site currently is non-conforming. The pavement (parking area) is not compliant with the side and rear yard setbacks. The impervious surface area is above the allowable amount and the driveway entrance is within 50 feet of the residential zoning. Additional Site Implementation Items The drive-thru length before the menu board does not meet the 100 feet length. Length for the drive- thru has been split into two lanes, each roughly 40 feet in length. Landscaping requirements not met include building foundation points not met, paved areas require 40% to shrubs, and 50% of street frontage devoted to medium trees. Medium trees are proposed to provide some shade for the parking lot causing shrubs to account for approximately 20% of the points. Street frontage point requirements have been met with all shade trees. There are concerns with low hanging branches from medium trees due to minimal distance from the edge of pavement to the property lines. Parcel Notes: Existing zoning: SMU – suburban mixed use Proposed: SMU with PD (planned development) All contemplated land uses within the tract Scooters Coffee to be built on the parcel. Proposed circulation systems Traffic to enter through existing access points off West 9th Avenue and South Washburn Street. Customer and employee parking to be located in the front and side of building. Existing rights-of-way and easements which may affect the rezone None General landscape treatment The site is currently a vacant bank building. Any existing trees which would not be disturbed as part of the new development will stay. Landscaping around the building and parking lot will come with the new build. A full landscape plan will be submitted with site plan review for the coffee shop pending rezone approvals. Legal Description: Lot 1, Certified Survey Map Number 2082, in the Northeast ¼ of the Northeast ¼ of Section 28, T18N-R16E, in the City of Oshkosh, Winnebago County, Wisconsin US MAIL West 9th Avenue South Washburn Street -----------------------------------------------------DO NOT ENTERDRIVETHRUONLYDRIVETHRUONLYB C D E F G 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10 DATA FILE DESIGNED BY NumberDateCommentsDATE Legend MCL L1.0---------------A PROJECT NO. SHEET NO. DRAWING NO.File: B-10622Eng 092722.dwgCIVIL & WATER RESOURCE ENGINEERINGLAND SURVEYING & PLANNINGMau & AssociatesPhone: 920-434-9670 Fax: 920-434-9672LANDSCAPE PLANB-10622.txt 09/29/22 B-10622 S-3633SCOOTER'S COFFEE 2101 WEST 9TH AVE0 20 40 60 80 100 Graphic Scale: 1" = 20' LANDSCAPING NOTES: 1.ZONING IS SUBURBAN MIXED USE (SMU) 2.BUILDING FOUNDATION LANDSCAPE REQUIREMENTS 2.1.40 LANDSCAPE POINTS PER 100 LF OF BUILDING 2.2.185 LF OF BUILDING FOUNDATION = 74 LANDSCAPE POINTS 2.3.1 WINTER KING HAWTHORN + 1 JAPANESE LILAC + 7 BUSH HONEYSUCKLE + 4 BOXWOOD + 6 POTENTILLA = 75.9 POINTS 3.YARDS LANDSCAPE REQUIREMENTS 3.1.100 POINTS PER 1,000 SQ.FT OF GROSS FLOOR AREA 3.2.1649 SQ.FT. OF FLOOR AREA = 33 LANDSCAPE POINTS 3.3.1 EXISTING DECIDUOUS TREE + 1 LITTLE LEAF LINDEN + 2 CHANTICLEER PEAR + 1 NINEBARK = 128 POINTS 4.STREET FRONTAGE LANDSCAPING REQUIREMENTS 4.1.100 POINTS PER 100 LINEAR FEET OF STREET FRONTAGE 4.2.310 LF OF STREET FRONTAGE = 310 LANDSCAPE POINTS 4.3.4 JUNIPER = 12 POINTS 5.PAVED AREA LANDSCAPING REQUIREMENTS 5.1.50 POINTS PER 10,000 SQ.FT. OF PAVED AREA 5.2.17,300 SQ.FT. OF PAVEMENT = 87 LANDSCAPE POINTS 5.3.1 CHANTICLEER PEAR + 2 WINTER KING HAWTHORN + 2 JAPANESE LILAC + 2 NINEBARK + 9 JUNIPER = 131 POINTS 6.TOTAL LANDSCAPE POINTS 6.1.LANDSCAPING POINTS REQUIRED = 74 BUILDING + 33 YARD + 310 FRONTAGE + 87 PAVED AREA = 504 POINTS 6.2.BSM ADDITIONAL POINTS (25%) = 126 POINTS --> 126 + 504 = 630 POINTS REQUIRED 6.3.LANDSCAPING POINTS = 346.9 POINTS PROVIDED 2101 W 9TH AVE SIP PC: 10/18/2022 CITY OF OSHKOSH PO BOX 1130 OSHKOSH, WI 54903 STEVEN/REGINA SOBOJINSKI 909 S WASHBURN ST OSHKOSH, WI 54904 GAIL L DEMLER 2115 W 9TH AVE OSHKOSH, WI 54904 ASSOCIATED BANK NA 433 MAIN ST GREEN BAY, WI 54301 MAU & ASSOCIATES 400 SECURITY BLVD GREEN BAY, WI 54313 WW 99TTHHAAVV SS WWAA SS HH BB UU RR NN SS TT WW99TTHH AA VV C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 9/6/2022 1 in = 120 ft1 in = 0.02 mi¯2101 W 9TH AVE2101 W 9TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer SR-5 SMU I SMU-PD MR-12 MR-12 SR-5 SMU-PD I I DR-6 I-PD I-PD SMU-PDSR-5 SMU-PD DR-6 MR-12 MR-12 I I DR-6 SMU-PD NMU Westhaven Golf Course !"#$41 !"#$41 WW 99 TT HH AAVV SSWWAASSHHBBUURRNNSSTTSSKKOOEELLLLEERRSSTTGGRREEEENNFFIIEELLDDTTRRABBEY AVABBEY AV MM AA RR IICC OO PPAA DDRRHERITAGE TRHERITAGE TRGGRRAACCEELLAANNDDDDRRLILAC STLILAC STCCUUMMBBEERRLLAANNDDTTRRMORELAND STMORELAND STGOLDEN AVGOLDEN AV AARRDDMMOO RR EE TTRRHENNESSY STHENNESSY STCCAAMMDDEE NNL L A A DD II CC KKIINNSSOONN AAVV KKIINNGGSS TT OO NNPPLLWW77TT HH AAVV KATY CTKATY CT C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 9/6/2022 1 in = 500 ft1 in = 0.09 mi¯2101 W 9TH AVE2101 W 9TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 9/6/2022 1 in = 100 ft1 in = 0.02 mi¯2101 W 9TH AVE2101 W 9TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer