Loading...
HomeMy WebLinkAbout0103517-Building (awning & canopy)OSHKOSH OH THE WATER ,lob.address 110 E FERNAU AVE Designer CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner OSHKOSH TENT AND AWNING CO INC Create Date Contractor OWNER No 103517 08/14/2003 Category 211 - Alteration Industhal Plan Type · Building (~) Sign (~ Canopy (~ Fence O Raze Zoning Class of Const: Size Unfinished/Basement 0 Sq. Ft. Rooms 0 Height 0 Ft. [] Projection Finished/Living 0 Sq. Ft. Bedrooms 0 Stories Canopies Garage 0 Sq. Ft. Baths 0 Signs Foundation (~ Poured Concrete (~ Floating Slab (~) Pier · Other O Concrete Block C) Post C) Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ;ontractor Shop/ins[all a 17'W x 5"T x 3'D awning on front facade, install a 5'x19' entrance canopy at the front entrance.* No signage. of Work HVAC Contractor Electric Contractor Fees: Valuatiok~ Issued By: ~ $1,400.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $25.00 Park Dedication $0.00 Date 08/14/2003 Final/O.P. 00/00/0000 [] Permit VoidedI In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restdctions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure aj~necessary approvals ~;~efore starting such activity. Signature ~ Date ~--/~-~-~!~ f,/ v ~ · · Agent~Owner Address 110 E F~NAU AVE OSHKOSH WI 54901 - 1238 Telephone Number 235-3170 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.