Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
04. 22-384
SEPTEMBER 27, 2022 22-384 RESOLUTION (CARRIED___6-0___LOST________LAID OVER________WITHDRAWN________) PURPOSE: AMEND CIP AND AWARD BID FOR PUBLIC WORKS CONTRACT NO. 22-18 TO VINTON CONSTRUCTION COMPANY FOR PRATT TRAIL RECONSTRUCTION ($1,128,741.90) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for Pratt Trail Reconstruction; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: VINTON CONSTRUCTION COMPANY 1322 33rd Street Two Rivers, WI 54241 Total Bid: $1,128,741.90 WHEREAS, the Common Council has adopted the 2022 Capital Improvement Program and Budget, which is on file in the Office of the City Clerk and available for public inspection; and WHEREAS, it is necessary to amend the 2022 Capital Improvement Program Budget to add additional funding for this purpose. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the 2022 Capital Improvements Budget, on file in the City Clerk’s Office, is hereby amended as follows: Transfer $65,000 from Account No. 03210410-6804-04005 (Contract Control-Storm Sewer- 20-05 Oregon Street Reconstruction) to Account No. 03210410-6804-04218 (Contract Control-Storm Sewer-Pratt Trail Reconst) SEPTEMBER 27, 2022 22-384 RESOLUTION CONT’D BE IT FURTHER RESOLVED that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Account No. 03250610-7216-62010 Parks Improvement-Land Improvement- Menominee Park 05221040-7216 TIF #14 - Mercy Medical Center-Land Improvement I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Correspondence\Memo\22-18 Memo for Bid Award & Amend CIP_9- 22-22.docx Page 1 of 2 TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer DATE: September 22, 2022 RE: Approve CIP Amendment and Award Bid for Public Works Contract No. 22-18 to Vinton Construction Company for Pratt Trail Reconstruction ($1,128,741.90) BACKGROUND The purpose of this Project is to reconstruct Pratt Trail, from Merritt Avenue to Siewert Trail. Storm sewers were inspected and will be repaired/replaced, as necessary. ANALYSIS Engineering staff reviewed three (3) bids. The low Bid was received from Vinton Construction Company of Two Rivers, Wisconsin. The total bid is $1,128,741.90 FISCAL IMPACT Funding for the Pratt Trail portion of the Project is in the 2022 Capital Improvement Program (CIP) (Account No. 03250610-7216-62010/Parks Improvement-Land Improvement-Menominee Park and 05221040-7216/TIF #14 - Mercy Medical Center-Land Improvement). Additional funding for storm water portion of the Project is available from CIP Projects which have come in under budget: $65,000 will be transferred from Account No. 03210410-6804-04005 (Contract Control- Storm Sewer-20-05 Oregon Street Reconstruction) to Account No. 03210410-6804- 04218 (Contract Control-Storm Sewer-Pratt Trail Reconst). Following is a summary of the available funds (after the transfers) and the estimated total construction cost, including ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction-related expenses. I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Correspondence\Memo\22-18 Memo for Bid Award & Amend CIP_9- 22-22.docx Page 2 of 2 CIP Section CIP Funds Budgeted Estimated Total Construction Cost Storm Sewer $65,000 $48,985 Park Improvements $821,478 $821,478 TID #14 $428,522 $401,543 Totals $1,315,000 $1,272,006 RECOMMENDATIONS I recommend award to the low bidder, Vinton Construction Company, in the amount of $1,128,741.90. Approved: Mark A. Rohloff City Manager JLG/tlt Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionSection 1$1,128,741.90$1,139,501.501011Clearing; complete as specifiedInch Diameter 100.00 $35.00 $3,500.00 $31.20 $3,120.001021Grubbing; complete as specifiedInch Diameter 120.00 $35.00 $4,200.00 $20.80 $2,496.001050Mobilization; complete as specifiedLump Sum 1.00 $78,500.00 $78,500.00 $34,000.00 $34,000.001100Removing pavement; complete as specifiedSquare Yards 650.00 $9.00 $5,850.00 $1.60 $1,040.001110Removing curb and gutter; complete as specifiedLinear Feet 900.00 $6.00 $5,400.00 $2.50 $2,250.001120Removing concrete and asphalt sidewalk and driveway; complete as specifiedSquare Feet 120.00 $2.50 $300.00 $2.10 $252.001150Remove; salvage; and replace chain link fence; complete as specifiedLinear Feet 225.00 $52.00 $11,700.00 $52.00 $11,700.001200Unclassified excavation; complete as specifiedCubic Yards 8,200.00 $0.01 $82.00 $13.80 $113,160.001220Excavation special (paving); complete as specifiedTons 120.00 $20.00 $2,400.00 $16.40 $1,968.0013017" concrete pavement; with 5" CABC and grading; complete as specifiedSquare Yards 110.00 $70.00 $7,700.00 $78.80 $8,668.0013338" concrete pavement speed table; with 6" CABC and grading; complete as specifiedEach 3.00 $8,150.00 $24,450.00 $8,270.00 $24,810.001370Turf restoration; complete as specifiedSquare Yards 2,500.00 $9.63 $24,075.00 $9.20 $23,000.00141012" radius curb with 6" CABC and grading; complete as specifiedLinear Feet 60.00 $48.00 $2,880.00 $52.60 $3,156.00144030" curb and gutter; 7"; with 5" CABC and grading; complete as specifiedLinear Feet 775.00 $51.00 $39,525.00 $54.40 $42,160.00Vinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 54241I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 1 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionVinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 5424115004" concrete sidewalk with 3" CABC and grading; complete as specifiedSquare Feet 3,000.00 $7.65 $22,950.00 $6.40 $19,200.0015106" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 2,500.00 $8.40 $21,000.00 $7.10 $17,750.001540Curb ramp detectable warning field (natural/non-painted); complete as specifiedSquare Feet 200.00 $35.00 $7,000.00 $36.40 $7,280.001550No. 4 reinforcing rods - deformed; epoxy-coated; complete as specifiedLinear Feet 150.00 $2.50 $375.00 $2.60 $390.001560Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specifiedEach 40.00 $6.00 $240.00 $6.20 $248.001580Cold weather covering (sidewalk) - single visquine; complete as specifiedSquare Feet 250.00 $0.01 $2.50 $1.00 $250.001582Cold weather covering (sidewalk) - double visquine; complete as specifiedSquare Feet 250.00 $0.01 $2.50 $1.80 $450.001584Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specifiedSquare Feet 250.00 $0.01 $2.50 $3.60 $900.001590Up-charge for late season cold weather concrete sidewalk; complete as specifiedCubic Yards 100.00 $0.01 $1.00 $20.80 $2,080.001650Locate existing property monuments; complete as specifiedEach 2.00 $200.00 $400.00 $520.00 $1,040.001652Replace existing property monuments; complete as specifiedEach 2.00 $200.00 $400.00 $52.00 $104.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 2 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionVinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 542411700Sawing existing pavement; complete as specifiedLinear Feet 600.00 $2.50 $1,500.00 $2.10 $1,260.001801Base aggregate dense; 1-1/4"; complete as specifiedTons 3,750.00 $20.05 $75,187.50 $9.90 $37,125.001802Base aggregate dense; 3"; complete as specifiedTons 6,100.00 $25.55 $155,855.00 $16.00 $97,600.001900Tack coat; complete as specifiedGallons 1,200.00 $3.94 $4,728.00 $4.10 $4,920.001901HMA Pavement LT; complete as specifiedTons 4,150.00 $90.50 $375,575.00 $93.20 $386,780.001903HMA cold weather paving; complete as specifiedTons 200.00 $0.01 $2.00 $93.20 $18,640.001960Prepare foundation for asphaltic paving; complete as specifiedLump Sum 1.00 $27,139.00 $27,139.00 $27,955.00 $27,955.001974Pavement markings; epoxy; 4" (white); complete as specifiedLinear Feet 1,250.00 $4.00 $5,000.00 $4.20 $5,250.001975Pavement markings; epoxy; 4" (yellow); complete as specifiedLinear Feet 325.00 $2.50 $812.50 $2.60 $845.001976Pavement markings; epoxy; 8" (white); complete as specifiedLinear Feet 60.00 $7.30 $438.00 $7.60 $456.001977Pavement markings; cross-walk epoxy; 6" (white); complete as specifiedLinear Feet 675.00 $9.50 $6,412.50 $9.90 $6,682.501978Pavement markings; stop-line epoxy; 18" (white); complete as specifiedLinear Feet 800.00 $10.50 $8,400.00 $10.90 $8,720.001980Pavement markings; arrow epoxy; Type 2 (white); complete as specifiedEach 4.00 $225.00 $900.00 $234.10 $936.40I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 3 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionVinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 542411981Pavement markings; arrow epoxy; Type 3 (white); complete as specifiedEach 1.00 $250.00 $250.00 $260.10 $260.101983Pavement markings; word; epoxy (white); complete as specifiedEach 2.00 $150.00 $300.00 $156.00 $312.001984Pavement markings; symbol; epoxy (white); complete as specifiedEach 7.00 $215.00 $1,505.00 $223.70 $1,565.902001Furnish and install 8" storm sewer; complete as specifiedLinear Feet 10.00 $76.00 $760.00 $156.00 $1,560.002002Furnish and install 10" storm sewer; complete as specifiedLinear Feet 5.00 $86.00 $430.00 $266.00 $1,330.002004Furnish and install 12" RCP Class III storm sewer; complete as specifiedLinear Feet 700.00 $73.10 $51,170.00 $75.00 $52,500.002007Furnish and install 15" RCP Class III storm sewer; complete as specifiedLinear Feet 390.00 $78.90 $30,771.00 $80.00 $31,200.002010Furnish and install 18" RCP Class III storm sewer; complete as specifiedLinear Feet 45.00 $83.80 $3,771.00 $100.00 $4,500.002013Furnish and install 21" RCP Class III storm sewer; complete as specifiedLinear Feet 8.00 $126.00 $1,008.00 $203.00 $1,624.002016Furnish and install 24" RCP Class III storm sewer; complete as specifiedLinear Feet 7.00 $142.00 $994.00 $233.40 $1,633.802201Furnish and install standard storm sewer manhole (4' diameter); complete as specifiedVertical Feet 13.00 $919.00 $11,947.00 $969.00 $12,597.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 4 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionVinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 542412203Furnish and install standard storm sewer manhole (6' diameter); complete as specifiedVertical Feet 2.90 $1,139.00 $3,303.10 $2,210.00 $6,409.002213Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specifiedVertical Feet 14.90 $1,059.00 $15,779.10 $472.00 $7,032.802237Furnish and install Type 3 inlet (with 18" sump); complete as specifiedEach 18.00 $2,989.00 $53,802.00 $3,500.00 $63,000.002508Furnish; install; maintain; and remove Type D modified inlet protection; complete as specifiedEach 46.00 $108.32 $4,982.72 $125.00 $5,750.002510Sediment removal - Type D modified inlet protection; complete as specifiedEach 46.00 $9.88 $454.48 $20.00 $920.002516Furnish; install; maintain; and remove stone bag; complete as specifiedEach 20.00 $18.10 $362.00 $20.00 $400.002800Abandon 8" - 12" storm sewer; complete as specifiedLinear Feet 35.00 $10.00 $350.00 $10.00 $350.002850Connect to existing storm sewer main; complete as specifiedEach 9.00 $475.00 $4,275.00 $680.00 $6,120.002856Connect to existing storm sewer manhole; complete as specifiedEach 2.00 $525.00 $1,050.00 $650.00 $1,300.002914Storm sewer utility line opening (ULO); complete as specifiedEach 2.00 $500.00 $1,000.00 $650.00 $1,300.002950Excavation special (storm); complete as specifiedTons 150.00 $15.00 $2,250.00 $14.80 $2,220.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 5 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionVinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 542413113Furnish and install standard sanitary sewer manhole (2' diameter); complete as specifiedEach 2.50 $743.00 $1,857.50 $1,144.00 $2,860.003114Furnish and install sanitary sewer external manhole chimney seal; complete as specifiedEach 2.00 $610.00 $1,220.00 $375.00 $750.003116Furnish and install sanitary sewer external manhole chimney seal extension; complete as specifiedEach 1.00 $415.00 $415.00 $325.00 $325.003250Furnish and install 4"/6" Schedule 80 sanitary sewer lateral (relay); complete as specifiedLinear Feet 100.00 $95.00 $9,500.00 $120.00 $12,000.003710Closed circuit televising - using push camera; complete as specifiedEach 1.00 $350.00 $350.00 $1,040.00 $1,040.00Bid Total:$1,128,741.90$1,139,501.50I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 6 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantitySection 11011Clearing; complete as specifiedInch Diameter 100.001021Grubbing; complete as specifiedInch Diameter 120.001050Mobilization; complete as specifiedLump Sum 1.001100Removing pavement; complete as specifiedSquare Yards 650.001110Removing curb and gutter; complete as specifiedLinear Feet 900.001120Removing concrete and asphalt sidewalk and driveway; complete as specifiedSquare Feet 120.001150Remove; salvage; and replace chain link fence; complete as specifiedLinear Feet 225.001200Unclassified excavation; complete as specifiedCubic Yards 8,200.001220Excavation special (paving); complete as specifiedTons 120.0013017" concrete pavement; with 5" CABC and grading; complete as specifiedSquare Yards 110.0013338" concrete pavement speed table; with 6" CABC and grading; complete as specifiedEach 3.001370Turf restoration; complete as specifiedSquare Yards 2,500.00141012" radius curb with 6" CABC and grading; complete as specifiedLinear Feet 60.00144030" curb and gutter; 7"; with 5" CABC and grading; complete as specifiedLinear Feet 775.00Unit PriceExtension$1,173,114.25$24.00 $2,400.00$24.00 $2,880.00$24,000.00 $24,000.00$4.40 $2,860.00$5.40 $4,860.00$1.00 $120.00$50.00 $11,250.00$13.00 $106,600.00$9.90 $1,188.00$75.00 $8,250.00$8,000.00 $24,000.00$9.00 $22,500.00$51.00 $3,060.00$53.00 $41,075.00Advance Construction Inc.I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 7 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantity15004" concrete sidewalk with 3" CABC and grading; complete as specifiedSquare Feet 3,000.0015106" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 2,500.001540Curb ramp detectable warning field (natural/non-painted); complete as specifiedSquare Feet 200.001550No. 4 reinforcing rods - deformed; epoxy-coated; complete as specifiedLinear Feet 150.001560Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specifiedEach 40.001580Cold weather covering (sidewalk) - single visquine; complete as specifiedSquare Feet 250.001582Cold weather covering (sidewalk) - double visquine; complete as specifiedSquare Feet 250.001584Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specifiedSquare Feet 250.001590Up-charge for late season cold weather concrete sidewalk; complete as specifiedCubic Yards 100.001650Locate existing property monuments; complete as specifiedEach 2.001652Replace existing property monuments; complete as specifiedEach 2.00Unit PriceExtensionAdvance Construction Inc.$6.20 $18,600.00$6.95 $17,375.00$35.00 $7,000.00$2.50 $375.00$6.00 $240.00$0.01 $2.50$0.01 $2.50$0.01 $2.50$0.01 $1.00$500.00 $1,000.00$50.00 $100.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 8 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantity1700Sawing existing pavement; complete as specifiedLinear Feet 600.001801Base aggregate dense; 1-1/4"; complete as specifiedTons 3,750.001802Base aggregate dense; 3"; complete as specifiedTons 6,100.001900Tack coat; complete as specifiedGallons 1,200.001901HMA Pavement LT; complete as specifiedTons 4,150.001903HMA cold weather paving; complete as specifiedTons 200.001960Prepare foundation for asphaltic paving; complete as specifiedLump Sum 1.001974Pavement markings; epoxy; 4" (white); complete as specifiedLinear Feet 1,250.001975Pavement markings; epoxy; 4" (yellow); complete as specifiedLinear Feet 325.001976Pavement markings; epoxy; 8" (white); complete as specifiedLinear Feet 60.001977Pavement markings; cross-walk epoxy; 6" (white); complete as specifiedLinear Feet 675.001978Pavement markings; stop-line epoxy; 18" (white); complete as specifiedLinear Feet 800.001980Pavement markings; arrow epoxy; Type 2 (white); complete as specifiedEach 4.00Unit PriceExtensionAdvance Construction Inc.$3.50 $2,100.00$17.50 $65,625.00$17.50 $106,750.00$3.90 $4,680.00$89.60 $371,840.00$89.60 $17,920.00$26,870.00 $26,870.00$5.25 $6,562.50$0.65 $211.25$0.94 $56.40$7.40 $4,995.00$14.10 $11,280.00$310.00 $1,240.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 9 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantity1981Pavement markings; arrow epoxy; Type 3 (white); complete as specifiedEach 1.001983Pavement markings; word; epoxy (white); complete as specifiedEach 2.001984Pavement markings; symbol; epoxy (white); complete as specifiedEach 7.002001Furnish and install 8" storm sewer; complete as specifiedLinear Feet 10.002002Furnish and install 10" storm sewer; complete as specifiedLinear Feet 5.002004Furnish and install 12" RCP Class III storm sewer; complete as specifiedLinear Feet 700.002007Furnish and install 15" RCP Class III storm sewer; complete as specifiedLinear Feet 390.002010Furnish and install 18" RCP Class III storm sewer; complete as specifiedLinear Feet 45.002013Furnish and install 21" RCP Class III storm sewer; complete as specifiedLinear Feet 8.002016Furnish and install 24" RCP Class III storm sewer; complete as specifiedLinear Feet 7.002201Furnish and install standard storm sewer manhole (4' diameter); complete as specifiedVertical Feet 13.00Unit PriceExtensionAdvance Construction Inc.$380.00 $380.00$340.00 $680.00$175.00 $1,225.00$95.00 $950.00$110.00 $550.00$90.00 $63,000.00$95.00 $37,050.00$100.00 $4,500.00$150.00 $1,200.00$200.00 $1,400.00$875.00 $11,375.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 10 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantity2203Furnish and install standard storm sewer manhole (6' diameter); complete as specifiedVertical Feet 2.902213Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specifiedVertical Feet 14.902237Furnish and install Type 3 inlet (with 18" sump); complete as specifiedEach 18.002508Furnish; install; maintain; and remove Type D modified inlet protection; complete as specifiedEach 46.002510Sediment removal - Type D modified inlet protection; complete as specifiedEach 46.002516Furnish; install; maintain; and remove stone bag; complete as specifiedEach 20.002800Abandon 8" - 12" storm sewer; complete as specifiedLinear Feet 35.002850Connect to existing storm sewer main; complete as specifiedEach 9.002856Connect to existing storm sewer manhole; complete as specifiedEach 2.002914Storm sewer utility line opening (ULO); complete as specifiedEach 2.002950Excavation special (storm); complete as specifiedTons 150.00Unit PriceExtensionAdvance Construction Inc.$2,044.00 $5,927.60$1,000.00 $14,900.00$4,000.00 $72,000.00$100.00 $4,600.00$5.00 $230.00$20.00 $400.00$13.00 $455.00$800.00 $7,200.00$800.00 $1,600.00$700.00 $1,400.00$20.00 $3,000.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 11 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantity3113Furnish and install standard sanitary sewer manhole (2' diameter); complete as specifiedEach 2.503114Furnish and install sanitary sewer external manhole chimney seal; complete as specifiedEach 2.003116Furnish and install sanitary sewer external manhole chimney seal extension; complete as specifiedEach 1.003250Furnish and install 4"/6" Schedule 80 sanitary sewer lateral (relay); complete as specifiedLinear Feet 100.003710Closed circuit televising - using push camera; complete as specifiedEach 1.00Bid Total:Unit PriceExtensionAdvance Construction Inc.$1,000.00 $2,500.00$860.00 $1,720.00$500.00 $500.00$120.00 $12,000.00$2,500.00 $2,500.00$1,173,114.25I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 12 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionSection 1$1,128,741.90$1,139,501.501011Clearing; complete as specifiedInch Diameter 100.00 $35.00 $3,500.00 $31.20 $3,120.001021Grubbing; complete as specifiedInch Diameter 120.00 $35.00 $4,200.00 $20.80 $2,496.001050Mobilization; complete as specifiedLump Sum 1.00 $78,500.00 $78,500.00 $34,000.00 $34,000.001100Removing pavement; complete as specifiedSquare Yards 650.00 $9.00 $5,850.00 $1.60 $1,040.001110Removing curb and gutter; complete as specifiedLinear Feet 900.00 $6.00 $5,400.00 $2.50 $2,250.001120Removing concrete and asphalt sidewalk and driveway; complete as specifiedSquare Feet 120.00 $2.50 $300.00 $2.10 $252.001150Remove; salvage; and replace chain link fence; complete as specifiedLinear Feet 225.00 $52.00 $11,700.00 $52.00 $11,700.001200Unclassified excavation; complete as specifiedCubic Yards 8,200.00 $0.01 $82.00 $13.80 $113,160.001220Excavation special (paving); complete as specifiedTons 120.00 $20.00 $2,400.00 $16.40 $1,968.0013017" concrete pavement; with 5" CABC and grading; complete as specifiedSquare Yards 110.00 $70.00 $7,700.00 $78.80 $8,668.0013338" concrete pavement speed table; with 6" CABC and grading; complete as specifiedEach 3.00 $8,150.00 $24,450.00 $8,270.00 $24,810.001370Turf restoration; complete as specifiedSquare Yards 2,500.00 $9.63 $24,075.00 $9.20 $23,000.00141012" radius curb with 6" CABC and grading; complete as specifiedLinear Feet 60.00 $48.00 $2,880.00 $52.60 $3,156.00144030" curb and gutter; 7"; with 5" CABC and grading; complete as specifiedLinear Feet 775.00 $51.00 $39,525.00 $54.40 $42,160.00Vinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 54241I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 1 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionVinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 5424115004" concrete sidewalk with 3" CABC and grading; complete as specifiedSquare Feet 3,000.00 $7.65 $22,950.00 $6.40 $19,200.0015106" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 2,500.00 $8.40 $21,000.00 $7.10 $17,750.001540Curb ramp detectable warning field (natural/non-painted); complete as specifiedSquare Feet 200.00 $35.00 $7,000.00 $36.40 $7,280.001550No. 4 reinforcing rods - deformed; epoxy-coated; complete as specifiedLinear Feet 150.00 $2.50 $375.00 $2.60 $390.001560Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specifiedEach 40.00 $6.00 $240.00 $6.20 $248.001580Cold weather covering (sidewalk) - single visquine; complete as specifiedSquare Feet 250.00 $0.01 $2.50 $1.00 $250.001582Cold weather covering (sidewalk) - double visquine; complete as specifiedSquare Feet 250.00 $0.01 $2.50 $1.80 $450.001584Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specifiedSquare Feet 250.00 $0.01 $2.50 $3.60 $900.001590Up-charge for late season cold weather concrete sidewalk; complete as specifiedCubic Yards 100.00 $0.01 $1.00 $20.80 $2,080.001650Locate existing property monuments; complete as specifiedEach 2.00 $200.00 $400.00 $520.00 $1,040.001652Replace existing property monuments; complete as specifiedEach 2.00 $200.00 $400.00 $52.00 $104.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 2 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionVinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 542411700Sawing existing pavement; complete as specifiedLinear Feet 600.00 $2.50 $1,500.00 $2.10 $1,260.001801Base aggregate dense; 1-1/4"; complete as specifiedTons 3,750.00 $20.05 $75,187.50 $9.90 $37,125.001802Base aggregate dense; 3"; complete as specifiedTons 6,100.00 $25.55 $155,855.00 $16.00 $97,600.001900Tack coat; complete as specifiedGallons 1,200.00 $3.94 $4,728.00 $4.10 $4,920.001901HMA Pavement LT; complete as specifiedTons 4,150.00 $90.50 $375,575.00 $93.20 $386,780.001903HMA cold weather paving; complete as specifiedTons 200.00 $0.01 $2.00 $93.20 $18,640.001960Prepare foundation for asphaltic paving; complete as specifiedLump Sum 1.00 $27,139.00 $27,139.00 $27,955.00 $27,955.001974Pavement markings; epoxy; 4" (white); complete as specifiedLinear Feet 1,250.00 $4.00 $5,000.00 $4.20 $5,250.001975Pavement markings; epoxy; 4" (yellow); complete as specifiedLinear Feet 325.00 $2.50 $812.50 $2.60 $845.001976Pavement markings; epoxy; 8" (white); complete as specifiedLinear Feet 60.00 $7.30 $438.00 $7.60 $456.001977Pavement markings; cross-walk epoxy; 6" (white); complete as specifiedLinear Feet 675.00 $9.50 $6,412.50 $9.90 $6,682.501978Pavement markings; stop-line epoxy; 18" (white); complete as specifiedLinear Feet 800.00 $10.50 $8,400.00 $10.90 $8,720.001980Pavement markings; arrow epoxy; Type 2 (white); complete as specifiedEach 4.00 $225.00 $900.00 $234.10 $936.40I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 3 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionVinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 542411981Pavement markings; arrow epoxy; Type 3 (white); complete as specifiedEach 1.00 $250.00 $250.00 $260.10 $260.101983Pavement markings; word; epoxy (white); complete as specifiedEach 2.00 $150.00 $300.00 $156.00 $312.001984Pavement markings; symbol; epoxy (white); complete as specifiedEach 7.00 $215.00 $1,505.00 $223.70 $1,565.902001Furnish and install 8" storm sewer; complete as specifiedLinear Feet 10.00 $76.00 $760.00 $156.00 $1,560.002002Furnish and install 10" storm sewer; complete as specifiedLinear Feet 5.00 $86.00 $430.00 $266.00 $1,330.002004Furnish and install 12" RCP Class III storm sewer; complete as specifiedLinear Feet 700.00 $73.10 $51,170.00 $75.00 $52,500.002007Furnish and install 15" RCP Class III storm sewer; complete as specifiedLinear Feet 390.00 $78.90 $30,771.00 $80.00 $31,200.002010Furnish and install 18" RCP Class III storm sewer; complete as specifiedLinear Feet 45.00 $83.80 $3,771.00 $100.00 $4,500.002013Furnish and install 21" RCP Class III storm sewer; complete as specifiedLinear Feet 8.00 $126.00 $1,008.00 $203.00 $1,624.002016Furnish and install 24" RCP Class III storm sewer; complete as specifiedLinear Feet 7.00 $142.00 $994.00 $233.40 $1,633.802201Furnish and install standard storm sewer manhole (4' diameter); complete as specifiedVertical Feet 13.00 $919.00 $11,947.00 $969.00 $12,597.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 4 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionVinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 542412203Furnish and install standard storm sewer manhole (6' diameter); complete as specifiedVertical Feet 2.90 $1,139.00 $3,303.10 $2,210.00 $6,409.002213Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specifiedVertical Feet 14.90 $1,059.00 $15,779.10 $472.00 $7,032.802237Furnish and install Type 3 inlet (with 18" sump); complete as specifiedEach 18.00 $2,989.00 $53,802.00 $3,500.00 $63,000.002508Furnish; install; maintain; and remove Type D modified inlet protection; complete as specifiedEach 46.00 $108.32 $4,982.72 $125.00 $5,750.002510Sediment removal - Type D modified inlet protection; complete as specifiedEach 46.00 $9.88 $454.48 $20.00 $920.002516Furnish; install; maintain; and remove stone bag; complete as specifiedEach 20.00 $18.10 $362.00 $20.00 $400.002800Abandon 8" - 12" storm sewer; complete as specifiedLinear Feet 35.00 $10.00 $350.00 $10.00 $350.002850Connect to existing storm sewer main; complete as specifiedEach 9.00 $475.00 $4,275.00 $680.00 $6,120.002856Connect to existing storm sewer manhole; complete as specifiedEach 2.00 $525.00 $1,050.00 $650.00 $1,300.002914Storm sewer utility line opening (ULO); complete as specifiedEach 2.00 $500.00 $1,000.00 $650.00 $1,300.002950Excavation special (storm); complete as specifiedTons 150.00 $15.00 $2,250.00 $14.80 $2,220.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 5 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionVinton Construction CompanyDorner Inc.1322 33rd StreetTwo Rivers, WI 542413113Furnish and install standard sanitary sewer manhole (2' diameter); complete as specifiedEach 2.50 $743.00 $1,857.50 $1,144.00 $2,860.003114Furnish and install sanitary sewer external manhole chimney seal; complete as specifiedEach 2.00 $610.00 $1,220.00 $375.00 $750.003116Furnish and install sanitary sewer external manhole chimney seal extension; complete as specifiedEach 1.00 $415.00 $415.00 $325.00 $325.003250Furnish and install 4"/6" Schedule 80 sanitary sewer lateral (relay); complete as specifiedLinear Feet 100.00 $95.00 $9,500.00 $120.00 $12,000.003710Closed circuit televising - using push camera; complete as specifiedEach 1.00 $350.00 $350.00 $1,040.00 $1,040.00Bid Total:$1,128,741.90$1,139,501.50I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 6 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantitySection 11011Clearing; complete as specifiedInch Diameter 100.001021Grubbing; complete as specifiedInch Diameter 120.001050Mobilization; complete as specifiedLump Sum 1.001100Removing pavement; complete as specifiedSquare Yards 650.001110Removing curb and gutter; complete as specifiedLinear Feet 900.001120Removing concrete and asphalt sidewalk and driveway; complete as specifiedSquare Feet 120.001150Remove; salvage; and replace chain link fence; complete as specifiedLinear Feet 225.001200Unclassified excavation; complete as specifiedCubic Yards 8,200.001220Excavation special (paving); complete as specifiedTons 120.0013017" concrete pavement; with 5" CABC and grading; complete as specifiedSquare Yards 110.0013338" concrete pavement speed table; with 6" CABC and grading; complete as specifiedEach 3.001370Turf restoration; complete as specifiedSquare Yards 2,500.00141012" radius curb with 6" CABC and grading; complete as specifiedLinear Feet 60.00144030" curb and gutter; 7"; with 5" CABC and grading; complete as specifiedLinear Feet 775.00Unit PriceExtension$1,173,114.25$24.00 $2,400.00$24.00 $2,880.00$24,000.00 $24,000.00$4.40 $2,860.00$5.40 $4,860.00$1.00 $120.00$50.00 $11,250.00$13.00 $106,600.00$9.90 $1,188.00$75.00 $8,250.00$8,000.00 $24,000.00$9.00 $22,500.00$51.00 $3,060.00$53.00 $41,075.00Advance Construction Inc.I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 7 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantity15004" concrete sidewalk with 3" CABC and grading; complete as specifiedSquare Feet 3,000.0015106" concrete sidewalk/driveway/ramp with 3" CABC and grading; complete as specifiedSquare Feet 2,500.001540Curb ramp detectable warning field (natural/non-painted); complete as specifiedSquare Feet 200.001550No. 4 reinforcing rods - deformed; epoxy-coated; complete as specifiedLinear Feet 150.001560Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specifiedEach 40.001580Cold weather covering (sidewalk) - single visquine; complete as specifiedSquare Feet 250.001582Cold weather covering (sidewalk) - double visquine; complete as specifiedSquare Feet 250.001584Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specifiedSquare Feet 250.001590Up-charge for late season cold weather concrete sidewalk; complete as specifiedCubic Yards 100.001650Locate existing property monuments; complete as specifiedEach 2.001652Replace existing property monuments; complete as specifiedEach 2.00Unit PriceExtensionAdvance Construction Inc.$6.20 $18,600.00$6.95 $17,375.00$35.00 $7,000.00$2.50 $375.00$6.00 $240.00$0.01 $2.50$0.01 $2.50$0.01 $2.50$0.01 $1.00$500.00 $1,000.00$50.00 $100.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 8 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantity1700Sawing existing pavement; complete as specifiedLinear Feet 600.001801Base aggregate dense; 1-1/4"; complete as specifiedTons 3,750.001802Base aggregate dense; 3"; complete as specifiedTons 6,100.001900Tack coat; complete as specifiedGallons 1,200.001901HMA Pavement LT; complete as specifiedTons 4,150.001903HMA cold weather paving; complete as specifiedTons 200.001960Prepare foundation for asphaltic paving; complete as specifiedLump Sum 1.001974Pavement markings; epoxy; 4" (white); complete as specifiedLinear Feet 1,250.001975Pavement markings; epoxy; 4" (yellow); complete as specifiedLinear Feet 325.001976Pavement markings; epoxy; 8" (white); complete as specifiedLinear Feet 60.001977Pavement markings; cross-walk epoxy; 6" (white); complete as specifiedLinear Feet 675.001978Pavement markings; stop-line epoxy; 18" (white); complete as specifiedLinear Feet 800.001980Pavement markings; arrow epoxy; Type 2 (white); complete as specifiedEach 4.00Unit PriceExtensionAdvance Construction Inc.$3.50 $2,100.00$17.50 $65,625.00$17.50 $106,750.00$3.90 $4,680.00$89.60 $371,840.00$89.60 $17,920.00$26,870.00 $26,870.00$5.25 $6,562.50$0.65 $211.25$0.94 $56.40$7.40 $4,995.00$14.10 $11,280.00$310.00 $1,240.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 9 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantity1981Pavement markings; arrow epoxy; Type 3 (white); complete as specifiedEach 1.001983Pavement markings; word; epoxy (white); complete as specifiedEach 2.001984Pavement markings; symbol; epoxy (white); complete as specifiedEach 7.002001Furnish and install 8" storm sewer; complete as specifiedLinear Feet 10.002002Furnish and install 10" storm sewer; complete as specifiedLinear Feet 5.002004Furnish and install 12" RCP Class III storm sewer; complete as specifiedLinear Feet 700.002007Furnish and install 15" RCP Class III storm sewer; complete as specifiedLinear Feet 390.002010Furnish and install 18" RCP Class III storm sewer; complete as specifiedLinear Feet 45.002013Furnish and install 21" RCP Class III storm sewer; complete as specifiedLinear Feet 8.002016Furnish and install 24" RCP Class III storm sewer; complete as specifiedLinear Feet 7.002201Furnish and install standard storm sewer manhole (4' diameter); complete as specifiedVertical Feet 13.00Unit PriceExtensionAdvance Construction Inc.$380.00 $380.00$340.00 $680.00$175.00 $1,225.00$95.00 $950.00$110.00 $550.00$90.00 $63,000.00$95.00 $37,050.00$100.00 $4,500.00$150.00 $1,200.00$200.00 $1,400.00$875.00 $11,375.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 10 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantity2203Furnish and install standard storm sewer manhole (6' diameter); complete as specifiedVertical Feet 2.902213Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specifiedVertical Feet 14.902237Furnish and install Type 3 inlet (with 18" sump); complete as specifiedEach 18.002508Furnish; install; maintain; and remove Type D modified inlet protection; complete as specifiedEach 46.002510Sediment removal - Type D modified inlet protection; complete as specifiedEach 46.002516Furnish; install; maintain; and remove stone bag; complete as specifiedEach 20.002800Abandon 8" - 12" storm sewer; complete as specifiedLinear Feet 35.002850Connect to existing storm sewer main; complete as specifiedEach 9.002856Connect to existing storm sewer manhole; complete as specifiedEach 2.002914Storm sewer utility line opening (ULO); complete as specifiedEach 2.002950Excavation special (storm); complete as specifiedTons 150.00Unit PriceExtensionAdvance Construction Inc.$2,044.00 $5,927.60$1,000.00 $14,900.00$4,000.00 $72,000.00$100.00 $4,600.00$5.00 $230.00$20.00 $400.00$13.00 $455.00$800.00 $7,200.00$800.00 $1,600.00$700.00 $1,400.00$20.00 $3,000.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 11 of 129/19/2022 Contract 22-18 - Pratt Trail Reconstruction (#8277939)Owner: Oshkosh WI, City ofSolicitor: Oshkosh WI, City ofBid Opening: 09/19/2022 11:00 AM CDTSection TitleItem CodeItem DescriptionUofMQuantity3113Furnish and install standard sanitary sewer manhole (2' diameter); complete as specifiedEach 2.503114Furnish and install sanitary sewer external manhole chimney seal; complete as specifiedEach 2.003116Furnish and install sanitary sewer external manhole chimney seal extension; complete as specifiedEach 1.003250Furnish and install 4"/6" Schedule 80 sanitary sewer lateral (relay); complete as specifiedLinear Feet 100.003710Closed circuit televising - using push camera; complete as specifiedEach 1.00Bid Total:Unit PriceExtensionAdvance Construction Inc.$1,000.00 $2,500.00$860.00 $1,720.00$500.00 $500.00$120.00 $12,000.00$2,500.00 $2,500.00$1,173,114.25I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-18 Pratt Trail Reconst\Project_Information\Contract Info\22-18 Bid Tab_9-19-22Page 12 of 129/19/2022