CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
Owner TRI STAR iNVESTMENTS INC Create Date
Contractor READY BUILDERS INC
Plan
· Building (~ Sign O Canopy (~ Fence (~) Raze
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq, Ft.
Garage 0 Sq. Ft.
Foundation · Poured Concrete (~ Floating Slab
(~) Concrete Block (~) Post
Occupancy Permit Required
Park Dedication
No 103494
08/13/2003
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
(~) Pier (~) Other
(~ Treated Wood
Flood Plain Height Permit
# Dwelling Units 0 # Structures 0
Size
[] Projection I
Canopies
Signs
0
0
Use/Nature
of Work
RENTAL/Constructing a 4'x8' jump platform for the upper unit and a 4'x8' platform and steps for the lower unit. 10" piers will be installed
~nd 48" of frost protection will be provided in addition to code compliant handrails and guardrails.
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued
$3,500.00 Plan Approval
Plumbing Contractor
$0.00 Permit Fee Paid $35.00 Park Dedication $0.00
Date 08/13/2003 Final/O.P. 00/00/0000
[] Permit Voided J
In the performance of this work I agree to perform all work pursuant to roles goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permi, t,~ication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ¢~cJ~, ~e~ss'~'~provals before starting such activity.
ae, -
Address W2734 HOBSON I~ '""VC~UPACA WI 54981 - ~426 Telephone Number 233-0461 PAGER 44
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.