Loading...
HomeMy WebLinkAbout0103494-Building (platforms)OSHKOSH ON THE WATER Job Address 919 CHERRY ST Designer Catego~J Type Zoning 14-2 - Decks, Patios, Ramps CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD Owner TRI STAR iNVESTMENTS INC Create Date Contractor READY BUILDERS INC Plan · Building (~ Sign O Canopy (~ Fence (~) Raze Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq, Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete (~ Floating Slab (~) Concrete Block (~) Post Occupancy Permit Required Park Dedication No 103494 08/13/2003 Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 (~) Pier (~) Other (~ Treated Wood Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Size [] Projection I Canopies Signs 0 0 Use/Nature of Work RENTAL/Constructing a 4'x8' jump platform for the upper unit and a 4'x8' platform and steps for the lower unit. 10" piers will be installed ~nd 48" of frost protection will be provided in addition to code compliant handrails and guardrails. HVAC Contractor Electric Contractor Fees: Valuation Issued $3,500.00 Plan Approval Plumbing Contractor $0.00 Permit Fee Paid $35.00 Park Dedication $0.00 Date 08/13/2003 Final/O.P. 00/00/0000 [] Permit Voided J In the performance of this work I agree to perform all work pursuant to roles goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permi, t,~ication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ¢~cJ~, ~e~ss'~'~provals before starting such activity. ae, - Address W2734 HOBSON I~ '""VC~UPACA WI 54981 - ~426 Telephone Number 233-0461 PAGER 44 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.