Loading...
HomeMy WebLinkAbout04. 22-351AUGUST 23, 2022 22-351 RESOLUTION (CARRIED____7-0___ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID TO B&P MECHANICAL INC. FOR TRANSIT GARAGE HVAC EQUIPMENT REPLACEMENT FOR TRANSPORTATION DEPARTMENT ($121,825.00) INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for Transit Garage HVAC Equipment Replacement for Transportation Department; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: B&P MECHANICAL INC. 3200 W Highview Dr Appleton, WI 54914 Total: $121,825.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 05111728-7204-11107 Bus Support, Equipment and Facilities City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: August 15, 2022 RE: Award Bid to B&P Mechanical Inc. for Transit Garage HVAC Equipment Replacement for Transportation Department ($121,825.00) BACKGROUND The Facilities Maintenance Division works closely with our HVAC engineer consultant to regularly monitor, update and prioritize the annual replacement schedule for our building’s HVAC systems and equipment. The next recommended priority is to update various HVAC equipment and components within the Transit Garage Facility. The equipment to be replaced includes aged infrared heaters and water convectors that are no longer cost efficient to maintain/repair. This project also includes the installation of two new hot water unit heaters to provide heat to the back of the garage repair area. This project is expected to improve overall heating equipment performance by at least 10% due to the replacement of old equipment with new. ANALYSIS Working with our engineer consultant and Transit staff, Purchasing prepared bid specifications for this project. The bid was advertised in the local newspaper and posted on Demandstar. Bids were due August 11, 2022. The bid tab is attached. It was the consensus of our consultant and City staff that the low bid from B&P Mechanical Inc. bid met all the minimum bid requirements. FISCAL IMPACT The fiscal impact of this bid is $121,825.00. This bid, added to consultant’s engineering fee of $10,000.00 brings the total fiscal impact of this project to $131,825.00. This bid award will be charged to A/N#: 05111728-7204-11107 (Bus Support, Equipment and Facilities). RECOMMENDATION Purchasing recommends the Common Council award this bid to B&P Mechanical Inc. for $121,825.00. Respectfully Submitted, Approved: Jon G. Urben, General Services Manager John M. Fitzpatrick, Assistant City Manager VENDOR INFORMATION BID PREQUAL BID BOND FEDERAL FORMS B&P Mechanical Inc 3200 W Highview Dr $121,825.00 X X X Appleton WI 54914 Best Mechanical Business 2125 W 20th Ave $220,585.00 X X X PO Box 2504 Oshkosh WI 54903 GMS Inc 520 W South Park Ave $191,890.00 X X X Oshkosh WI 54902 Hurckman Mechanical Industries Inc 1450 Velp Ave $198,000.00 X X X Green Bay WI 54303 Sure-Fire Inc 617 Washington St $144,800.00 X X X PO Box 191 Horicon WI 53032 CITY OF OSHKOSH TRANSIT GARAGE HVAC EQUIPMENT REPLACEMENT BIDS OPENED AUGUST 11, 2022 BID TAB