Loading...
HomeMy WebLinkAbout0103501-Plumbing (laterals)OSHKOSH ON THE WATER 5Ob Addrees 1714 SOUTHLAND AVE Contractor KIENAST L G UTILITY CONSTRUCTION CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner STEVEN/KATHLEEN MILLER Category 402 - Residential-Exterior (other) Bathtub 0 Shower 0 Ejector/Grind 0 Dip Well 0 F Prep Sink __ Whirlpool 0 Floor Drain 0 Water Softner 0 Drink Ftn 0 Serv Sink Lavatory 0 LndryTray 0 Local Waste 0 Wait. St. 0 Shamp Sink __ Toilet 0 Lndry Stndp 0 Clothes Wshr 0 Ice Chest 0 FIr/Wst Sink __ Res. Sink 0 Disposal 0 Bidet 0 Exam Sink 0 Catch Basin __ Bar Sink 0 Dishwasher 0 Beer Tap 0 Sculry Sink 0 Wash Ftn Water Heater 0 Sump Pump 0 Dent. Oper. 0 Hand Sink 0 Urinal Site Drain 0 Classrm Sink 0 Lab Sink 0 Plaster Sink 0 Standp Rec Roof Drain 0 Breakrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker No 103501 Create Date 08/13/2003 Plan 0 Gar Drain 0 0 Soda Disp 0 0 Coffee Maker 0 0 Int Grease Trap 0 0 Ext Grease Trap 0 0 RPZ Valve 0 0 Eye Wash Statn 0 0 0 Use/Nature of Work REPAIR DAMAGED SANITARY SEWER LATERAL Sanitary Sewer Storm Sewer Water Service Size Material Type # Conn. Type 0 0 0 0 0 0 0 Valuation $500.00 Plan Approval $0.00 Permit Fees $20.00 [] PermitVoided Issued By Date 08/13/2003 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant ta contact the easement holder(s)~J3~ to;.s~oTe aJ3~ne~es~ary approvals before starting such activity. Signature ~/'~ /I¢¢/~,,~ Date / ~. (, Agent/Owner Addreee 765 N WASHBURN OSHKOSH WI 54904 - 0000 Telephone Number 414-231-0898 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.