HomeMy WebLinkAbout08. 22-340AUGUST 10, 2022 22-340 RESOLUTION (CARRIED___6-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 22-08 TO VINTON CONSTRUCTION COMPANY, INC. FOR NORTH MAIN STREET 300 BLOCK EAST AND FIRE STATION 19 PARKING LOT CONSTRUCTION ($429,929.75) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for parking lot construction for the Department of Public Works; and WHEREAS, upon the opening and tabulation of bids, the following is the only bid: VINTON CONSTRUCTION COMPANY 1322 33rd Street Two Rivers, WI 54241 Total Bid: $429,929.75 WHEREAS, this bid meets the minimum specifications and staff has reviewed the bid and recommends its acceptance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. Nos. 03231717-7216-63001 Parking Lot Improvements-Land Improvement- Parking Lot Improvements 02240230-7216-15131 ARPA - Fire-Land Improvement-ARPA - Loss Revenue/CIP - 2021 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Correspondence\Memo\22-08 Memo for Bid Award_8-4-22.docx Page 1 of 2 TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer DATE: August 4, 2022 RE: Award Bid for Public Works Contract No. 22-08 to Vinton Construction Company, Inc. for North Main Street 300 Block East and Fire Station 19 Parking Lots Construction ($429,929.75) BACKGROUND The purpose of this Project is to reconstruct the parking lot and install a dumpster enclosure at the City-owned parking lot at 17 Washington Avenue and to do some preventative maintenance asphalt patching at the Fire Station No. 19 parking lot (1000 West Snell Road). Funding for the Fire Station parking lot is available in the ARPA funding the City has received. ANALYSIS Engineering staff reviewed one (1) bid. The low Bid was received from Vinton Construction Company, Inc. of Two Rivers, Wisconsin. The total bid is $429,929.75. FISCAL IMPACT Funding for the Parking Lot Construction Project is in the 2022 Capital Improvement Program (CIP) (Account No. 03231717-7216-63001/Parking Lot Improvements-Land Improvement- Parking Lot Improvements and Account No. 02240230-7216-15131/ARPA – Fire-Land Improvement-ARPA – Loss Revenue/CIP – 2021). Following is a summary of the available funds and the estimated total construction cost, including ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction-related expenses. CIP Section CIP Funds Budgeted Estimated Total Construction Cost Property Improvements - Parking Lot Reconstruction $826,579 $458,074 ARPA Funds - Fire Station No. 19 Parking Lot $36,500 $35,947 Totals $863,079 $494,021 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Correspondence\Memo\22-08 Memo for Bid Award_8-4-22.docx Page 2 of 2 RECOMMENDATIONS I recommend award to the low bidder, Vinton Construction Company, Inc. in the amount of $429,929.75. Approved: Mark A. Rohloff City Manager JLG/tlt Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Section 1: Base Bid $429,929.75 1050 Mobilization; complete as specified Lump Sum 1.00 $61,000.00 $61,000.00 1103 Removing building foundations; complete as specified Linear Feet 525.00 $5.00 $2,625.00 1110 Removing curb and gutter; complete as specified Linear Feet 250.00 $3.00 $750.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 1,000.00 $0.85 $850.00 1200 Unclassified excavation; complete as specified Cubic Yards 725.00 $33.76 $24,476.00 1220 Excavation special (paving); complete as specified Tons 110.00 $23.91 $2,630.10 1250 Furnish and install dumpster enclosure (includes foundation; concrrete slab; walls; gates; and all associated materials and labor); complete as specified Lump Sum 1.00 $66,169.00 $66,169.00 Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 1 of 11 8/1/2022 Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 85.00 $96.00 $8,160.00 1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 450.00 $105.00 $47,250.00 1340 Crushed aggregate base course; complete as specified Tons 400.00 $18.75 $7,500.00 1350 Pavement ties; complete as specified Each 12.00 $10.00 $120.00 1360 Adjust manholes and inlets; complete as specified Each 5.00 $470.00 $2,350.00 1370 Turf restoration; complete as specified Square Yards 250.00 $18.00 $4,500.00 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 150.00 $1.50 $225.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 2 of 11 8/1/2022 Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 150.00 $3.00 $450.00 1384 Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as specified Square Yards 150.00 $12.00 $1,800.00 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 35.00 $15.00 $525.00 1440 30" curb and gutter; 7"; with 5" CABC and grading; complete as specified Linear Feet 100.00 $60.00 $6,000.00 1441 30" curb and gutter; plain; 7"; with 5" CABC and grading; complete as specified Linear Feet 225.00 $60.00 $13,500.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 3 of 11 8/1/2022 Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 1448 30" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 70.00 $70.00 $4,900.00 1460 Sidewalk curb; complete as specified Linear Feet 25.00 $35.00 $875.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 310.00 $10.50 $3,255.00 1506 4" concrete sidewalk with false curb; 3" CABC; and grading; complete as specified Square Feet 300.00 $15.00 $4,500.00 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 300.00 $10.50 $3,150.00 1516 6" concrete sidewalk/ driveway/ramp with false curb; 3" CABC; and grading; complete as specified Square Feet 90.00 $16.00 $1,440.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 4 of 11 8/1/2022 Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 1526 6" concrete sidewalk with 3" CABC and grading; London Paver pattern; complete as specified Square Feet 120.00 $14.50 $1,740.00 1540 Curb ramp detectable warning field (natural/non- painted); complete as specified Square Feet 12.00 $45.00 $540.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 60.00 $2.00 $120.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 35.00 $7.00 $245.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 300.00 $0.50 $150.00 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 300.00 $1.00 $300.00 1584 Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specified Square Feet 300.00 $2.00 $600.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 5 of 11 8/1/2022 Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 4.50 $15.00 $67.50 1650 Locate existing property monuments; complete as specified Each 4.00 $125.00 $500.00 1652 Replace existing property monuments; complete as specified Each 4.00 $125.00 $500.00 1700 Sawing existing pavement; complete as specified Linear Feet 630.00 $3.00 $1,890.00 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 125.00 $3.00 $375.00 1801 Base aggregate dense; 1- 1/4"; complete as specified Tons 310.00 $15.00 $4,650.00 1802 Base aggregate dense; 3"; complete as specified Tons 520.00 $15.00 $7,800.00 1900 Tack coat; complete as specified Gallons 120.00 $2.73 $327.60 1901 HMA Pavement LT; complete as specified Tons 350.00 $80.09 $28,031.50 1903 HMA cold weather paving; complete as specified Tons 105.00 $102.21 $10,732.05 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 6 of 11 8/1/2022 Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 1905 5" asphaltic pavement MT with 10" CABC and grading; complete as specified Square Yards 315.00 $71.77 $22,607.55 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 7.50 $137.87 $1,034.03 1918 Asphaltic cold weather paving; complete as specified Square Yards 95.00 $17.57 $1,669.15 1960 Prepare foundation for asphaltic paving; complete as specified Lump Sum 1.00 $6,666.00 $6,666.00 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 1,100.00 $5.50 $6,050.00 1979 Pavement markings; arrow epoxy; Type 1 (white); complete as specified Each 1.00 $250.00 $250.00 1980 Pavement markings; arrow epoxy; Type 2 (white); complete as specified Each 4.00 $275.00 $1,100.00 1984 Pavement markings; symbol; epoxy (white); complete as specified Each 2.00 $250.00 $500.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 7 of 11 8/1/2022 Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 1985 Temporary pavement markings; paint; 4" (white); complete as specified Linear Feet 275.00 $15.00 $4,125.00 2001 Furnish and install 8" storm sewer; complete as specified Linear Feet 35.00 $83.30 $2,915.50 2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 90.00 $112.00 $10,080.00 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 110.00 $155.70 $17,127.00 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 9.00 $442.00 $3,978.00 2235 Furnish and install Type 1 inlet (with 18" sump); complete as specified Each 3.00 $2,717.00 $8,151.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 12.00 $150.00 $1,800.00 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 12.00 $40.00 $480.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 8 of 11 8/1/2022 Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 2.00 $0.01 $0.02 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 8.00 $25.00 $200.00 2522 Furnish; install; maintain; and remove ditch check; complete as specified Each 4.00 $150.00 $600.00 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 70.00 $10.00 $700.00 2810 Abandon storm sewer manholes and inlets; complete as specified Each 1.00 $400.00 $400.00 2812 Remove storm sewer manholes and inlets; complete as specified Each 1.00 $400.00 $400.00 2850 Connect to existing storm sewer main; complete as specified Each 1.00 $300.00 $300.00 2856 Connect to existing storm sewer manhole; complete as specified Each 1.00 $425.00 $425.00 2914 Storm sewer utility line opening (ULO); complete as specified Each 1.00 $1,250.00 $1,250.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 9 of 11 8/1/2022 Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 2950 Excavation special (storm); complete as specified Tons 25.00 $23.91 $597.75 5025 Adjust pull box; complete as specified Each 1.00 $5.00 $5.00 5027 Remove concrete base; complete as specified Each 1.00 $500.00 $500.00 5120 Furnish and install 2" Schedule 40 PVC; complete as specified Linear Feet 70.00 $15.00 $1,050.00 5180 Connect to existing pull box; complete as specified Each 1.00 $250.00 $250.00 5250 Furnish and install 8 gauge red-coated wire; complete as specified Linear Feet 100.00 $2.50 $250.00 5251 Furnish and install 8 gauge black-coated wire; complete as specified Linear Feet 100.00 $2.50 $250.00 5262 Furnish and install 10 gauge green-coated wire; complete as specified Linear Feet 100.00 $1.20 $120.00 5270 Furnish and install 12 gauge red-coated wire; complete as specified Linear Feet 60.00 $1.00 $60.00 5271 Furnish and install 12 gauge black-coated wire; complete as specified Linear Feet 60.00 $1.00 $60.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 10 of 11 8/1/2022 Contract 22-08 - Parking Lot Construction (#8258673) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 08/01/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Vinton Construction Company 1322 33rd Street Two Rivers, WI 54241 5272 Furnish and install 12 gauge green-coated wire; complete as specified Linear Feet 30.00 $1.00 $30.00 5380 Furnish and install fuse holder; complete as specified Each 4.00 $75.00 $300.00 5392 Furnish and install 5A fuse; complete as specified Each 4.00 $20.00 $80.00 5402 Install CITY-supplied double head structure; complete as specified Each 1.00 $1,750.00 $1,750.00 5425 Install CITY-supplied 20' 5" square pole; complete as specified Each 1.00 $1,500.00 $1,500.00 5502 Furnish and install Type 2 base; complete as specified Each 1.00 $2,750.00 $2,750.00 Bid Total:$429,929.75 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-08 Parking Lots\Project_Information\Contract Info\22-08 Bid Tab_8-1-22 Page 11 of 11 8/1/2022