Loading...
HomeMy WebLinkAbout05. 22-337AUGUST 10, 2022 22-337 RESOLUTION CARRIED___6-0____LOST_______LAID OVER_______WITHDRAWN_______) PURPOSE: APPROVE SPECIFIC IMPLEMENTATION PLAN FOR A COMMERCIAL DEVELOPMENT AT 580 SOUTH KOELLER STREET INITIATED BY: GC OSHKOSH HOLDINGS, LLC PLAN COMMISSION RECOMMENDATION: Approved w/ findings and conditions WHEREAS, the Plan Commission finds that the Specific Implementation Plan for a commercial development at 580 South Koeller Street, is consistent with the criteria established in Section 30-387 of the Oshkosh Zoning Ordinance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that a Specific Implementation Plan for a commercial development at 580 South Koeller Street, per the attached, is hereby approved with the following findings: 1. The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. 2. The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) 3. The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. 4. Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. 5. The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. 6. The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. AUGUST 10, 2022 22-337 RESOLUTION CONT’D 7. The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. 8. The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. BE IT FURTHER RESOLVED by the Common Council of the City of Oshkosh that the following are conditions of approval for a commercial development at 580 South Koeller Street: 1. Base Standard Modification for increased parking to 40 spaces, where code allows a maximum of 25 spaces. 2. Base Standard Modification for reduced side yard (north) setback to 6.37’, where code requires a 10’ setback. 3. Base Standard Modification to allow a second drive-through sign. 4. Base Standard Modification to allow a parking row end without deciduous tree. 5. Base Standard Modification for increased lighting along the north property line to 1.9 fc, where code allows a maximum of 0.5 fc lighting level at the property line. 6. Base Standard Modification to allow front (west) façade with 45% Class I materials, where code requires a minimum of 50% Class I materials. 7. Final landscaping, lighting, and signage plans shall be reviewed and approved by the Department of Community Development. 8. An additional 180 points of arborvitae landscaping shall be installed along the east property line. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Mark Lyons, Planning Services Manager DATE: August 4, 2022 RE: Approve Specific Implementation Plan for a Commercial Development at 580 South Koeller Street BACKGROUND The applicant requests approval of a Specific Implementation Plan (SIP) for a commercial use at 580 South Koeller Street. The subject area consists of a commercial lot located on the east side of South Koeller Street, which includes a former restaurant (Golden Corral). The site is zoned Suburban Mixed Use District (SMU). The surrounding area consists of commercial uses to the north and south, residential and institutional uses to the east, and Interstate 41 to the west. The 2040 Comprehensive Land Use Plans recommends Interstate Commercial use for the subject area. Common Council approved a zone change of the subject property to Suburban Mixed Use with Planned Development Overlay (SMU-PD) on January 25, 2022. A General Development Plan (GDP) was also approved for two drive-thru restaurants at the subject site. ANALYSIS The applicant has submitted plans for development of a drive-thru restaurant (Panda Express) on the northern half of the subject site, which will serve as Phase 1 of the development. Phase 2 will be for a second drive-thru restaurant to the south of Panda Express, which will be addressed under a future SIP request. The proposed development is a permitted use in the SMU district and is consistent with the approved GDP for a drive-thru commercial use on the subject site. The applicant is requesting base standard modifications (BSMs) for the following: reduced rear yard (north) setback to 6.37’ where code requires a 10’ side setback, to allow for increased parking to 40 spaces where code allows a maximum of 25 stalls, a second drive-through sign for the double drive-through lane, a parking row end without deciduous tree, increased lighting along the north property line to 1.9 fc where code allows a maximum of 0.5 fc lighting level, and a front (west) façade with 45% Class I materials where code requires a minimum of 50% Class I materials. Staff is supportive of all of the requested BSMs. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us PLAN COMMISSION MEETING Neighbors of the adjacent condominium development were present and spoke regarding the project. Based on that discussion the Plan Commission recommended adding an 8th condition to the Planned Development approval. The condition was the following: Conditional 8: An additional 180 points of arborvitae landscaping shall be installed along the east property line. Since the August 2nd Plan Commission meeting, staff received a letter outlining a number of concerns from an adjacent condominium owner. A copy of the letter is attached within the Council packet. FISCAL IMPACT Approval of this project should result in an increase in the assessed property value for the site. The applicant is anticipating spending approximately $1,500,000 on the proposed project. RECOMMENDATION The Plan Commission recommended approval of the Specific Implementation Plan with findings and conditions as amended on August 2, 2022. Please see the attached staff report and meeting minutes for more information. Respectfully Submitted, Approved: Mark Lyons Mark A. Rohloff Planning Services Manager City Manager ITEM: SPECIFIC IMPLEMENTATION PLAN FOR A COMMERCIAL DEVELOPMENT AT 580 S KOELLER STREET Plan Commission meeting of August 2, 2022. GENERAL INFORMATION Applicant: Henry C. Klover Property Owner: GC Oshkosh Holdings, LLC Action(s) Requested: The applicant requests approval of a Specific Implementation Plan for a commercial use at 580 S. Koeller Street. Applicable Ordinance Provisions: Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Background Information: The subject area consists of a commercial lot located on the east side of S. Koeller St., which includes a former restaurant (Golden Coral). The site is zoned Suburban Mixed Use District (SMU). The surrounding area consists of commercial uses to the north and south, residential and institutional uses to the east, and Interstate 41 to the west. The 2040 Comprehensive Land Use Plans recommends Interstate Commercial use for the subject area. On January 25, 2022, Common Council approved a zone change of the subject property to Suburban Mixed Use with Planned Development Overlay (SMU-PD). A General Development Plan was also approved for two drive-thru restaurants at the subject site. Subject Site Existing Land Use Zoning Commercial SMU Recognized Neighborhood Organizations None Adjacent Land Use and Zoning Existing Uses Zoning North Commercial SMU South Commercial SMU East Residential & Institutional MR-12 West Interstate-41 SMU ITEM I: SIP 580 S Koeller St. 2 Comprehensive Plan Land Use Recommendation Land Use 2040 Comprehensive Land Use Recommendation Interstate Commercial ANALYSIS Use The applicant has submitted plans for development of a drive-thru restaurant (Panda Express) on the northern half of the subject site, which will serve as Phase 1 of the development. Phase 2 will be for a second drive-thru restaurant to the south of Panda Express, which will be addressed under a future SIP request. The proposed development is a permitted use in the SMU district and is consistent with the approved GDP for a drive-thru commercial use on the subject site. Site Design/Access The proposed site will utilize an existing shared access from S. Koeller Street. A cross access agreement for the shared driveway will need to be filed for the shared access, as noted in the approved GDP. Required Provided Parking Spaces Maximum: 25 40 Impervious Surface Maximum: 70% of lot 65.8% of lot ITEM I: SIP 580 S Koeller St. 3 Minimum Provided Front Setback (S. Koeller St.) 25 ft. 27.67 ft. (parking lot) Side Setback (north) 10 ft. 6.37 ft. (drive-thru lane) Side Setback (south) 10 ft. 122 ft. +/- (parking lot) Rear Setback (east) 25 ft. 30.21 ft. (drive-thru lane) The total impervious surface ratio for the site is under the maximum of 70% for the SMU district. The drive-thru lane is meeting the minimum stacking length for drive-thru restaurants. The applicant is requesting a BSM for reduced rear yard (north) setback to 6.37’, where code requires a 10’ side setback. Staff does not have concerns with the reduced setback as it is along a shared driveway only. The applicant is requesting a base standard modification (BSM) to allow 40 parking stalls, where code allows a maximum of 25 stalls. The General Development Plan included 50 parking stalls for the Panda Express site, with staff recommending that the final parking number be reduced. A Plan Commission workshop was held on February 1, 2022, with Plan Commission supporting the reduction from the originally proposed 50 parking stalls to 40 stalls. Staff recommends approval of the BSM to allow 40 parking stalls as it will accommodate customer parking, while not excessively exceeding the maximum of 25 stalls. Signage The applicant is proposing to modify the existing pylon sign on the site to include a shared sign cabinet with the future drive-thru restaurant site to the south. The proposed sign is at the maximum height for pylon signage of 35’ for the SMU district lots within 300’ of HWY 41, and is meeting the front and side setback requirements. The total sign area is within the maximum area of 1 sq. ft. per linear foot of public right-of-way frontage for the SMU district. ITEM I: SIP 580 S Koeller St. 4 West Elevation South Elevation North Elevation ITEM I: SIP 580 S Koeller St. 5 Wall sign plans have also been included for the proposed building elevations, which include signage on the front (west) and side (north and south) elevations. The proposed signs are under the maximum area of 1 sq. ft. per linear foot of building frontage for the SMU district. A BSM is being requested to allow two drive-through signs for the double drive-through lane. Staff does not have concerns with this as it is needed to allow efficient use of the double drive- through lane. Although code currently allows a maximum of one drive-through sign per site, a code revision is currently pending to allow a second drive-through sign by right. Landscaping Points Required Points Provided Building Foundation 80 (40 main entrance, 20 street side) 141 (56 main entrance, 85 street side) Paved Areas 200 (60 tall trees, 80 shrubs) 712 (330 tall trees, 382 shrubs) Street Frontage 250 (125 medium trees) 285 (135 medium trees) Yards 50 528 TOTAL 580 1,666 Building Foundation The building foundation landscaping point requirement of 40 landscaping points per 100 linear feet of building foundation is being met for the proposed building. The plan is meeting the requirement that 50% of the required points be on the main entrance side of the building and is also providing the required 25% of the points on the street-facing side of the building. Required landscape islands ITEM I: SIP 580 S Koeller St. 6 Paved Area The paved area requirement of 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area is being met. The code further specifies 30% of all points will be devoted to tall trees and 40% will be devoted to shrubs. Both of these requirements are being met. The plan will is missing curbed landscaping islands at the ends of the internal parking lot row to the west of the building (circled in red). These islands will need to include a shade tree. This can be addressed during the Site Plan Review process. The applicant is requesting a BSM to allow the parking row end at the southeast corner of the building to not include the required deciduous tree. Staff is supportive of this BSM as minimal space will be available between the refuse enclosure and building to support tree growth. The applicant has significantly exceeded the paved area point requirement to offset this. Street Frontage Code requires 100 points per 100 feet of street frontage. The landscaping ordinance also specifies that 50% of the required points must be devoted to medium trees. The landscaping plan is meeting these requirements. Yards Code requires 20 landscaping points per 1,000 sq. ft. of gross floor area. The provided yard landscaping points exceed this requirement. This serves to offset the requested BSM for increased parking and reduced side setback. Bufferyard A 0.3 opacity bufferyard is required along the east property line as the site is abutting an MR-12 zoning district. The plan shows 6’ tall solid wood fencing along this property line to meet the bufferyard requirement. Storm Water Management/Utilities The Department of Public Works has reviewed the plans and noted that final submitted plans are required to be in full compliance with the requirements of the City of Oshkosh Municipal Code Chapter 14 for storm water management. Site Lighting The applicant submitted a photometric plan for the site. The lighting levels meet the .4 foot- candle minimum requirement for parking areas, but exceed the maximum of .5 foot-candles of light trespass at the north property line. Staff is supportive the BSM to allow the increased lighting along the north property line to 1.9 fc as lighting will only exceed the maximum at the shared driveway. ITEM I: SIP 580 S Koeller St. 7 The proposed 22’ light poles are under the maximum light fixture mounting height of 23’ (including 3’ base) for the SMU district and will have full cut-off fixtures per lighting code requirements. Building Facades Section 30-243 of the zoning ordinance requires commercial buildings to be clad in 50% Class I materials, with the rear façade being exempt from this requirement. The petitioner has provided elevations for the building as well as a material list and material breakdown for each facade. The specific elevations breakdown is as follows: West (front): Class I – 45% Class II & III – 55% South (side): Class I – 54.26% Class II & III – 45.74% North (side): Class I – 65.56% Class II & III – 41.44% East (rear): Class I – 34.44% Class II & III – 65.56% West elevation ITEM I: SIP 580 S Koeller St. 8 South elevation North elevation East elevation Exterior materials consist of glazing, masonry, EIFS, composite wood, and decorative metal. The north and south side facades are meeting the 50% Class I requirement. The applicant is requesting a BSM to allow reduced Class I materials on the front (west) facade to 45%. ITEM I: SIP 580 S Koeller St. 9 According to the applicant, increasing Class I materials (brick) on the front elevation would require changing the EIFS in the tower element to brick or raising the 10’ canopy band, with either option requiring changes to other elevations. The applicant feels that both of these options would negatively impact the design of the building. Staff is supportive of the BSM for reduced Class I material on the west façade as the both the north and south facades exceed the 50% Class I requirement. The total class I material allotment of the front and side facades is about 55%, which serves to offset the slight reduction of Class I materials on the front façade. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission consider findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. Staff recommends approval of the Specific Implementation Plan with the findings listed above with the proposed following conditions: 1. Base Standard Modification for increased parking to 40 spaces, where code allows a maximum of 25 spaces. ITEM I: SIP 580 S Koeller St. 10 2. Base Standard Modification for reduced side yard (north) setback to 6.37’, where code requires a 10’ setback. 3. Base Standard Modification to allow a second drive-through sign. 4. Base Standard Modification to allow a parking row end without deciduous tree. 5. Base Standard Modification for increased lighting along the north property line to 1.9 fc, where code allows a maximum of 0.5 fc lighting level at the property line. 6. Base Standard Modification to allow front (west) façade with 45% Class I materials, where code requires a minimum of 50% Class I materials. 7. Final landscaping, lighting, and signage plans shall be reviewed and approved by the Department of Community Development. 8. An additional 180 points of arborvitae landscaping shall be installed along the east property line. The Plan Commission recommended approval of the Specific Implementation Plan with findings and conditions on August 2, 2022. The following is their discussion on the item. Site Inspections Report: Mr. Mitchell reported visiting the site. Staff report accepted as part of the record. The applicant requests approval of a Specific Implementation Plan for a commercial use at 580 S. Koeller Street. Mr. Slusarek presented the item and reviewed the site and surrounding area as well as the land use and zoning classifications in this area. The applicant has submitted plans for development of a drive-thru restaurant (Panda Express) on the northern half of the subject site, which will serve as Phase 1 of the development. Phase 2 will be for a second drive-thru restaurant to the south of Panda Express, which will be addressed under a future SIP request. The proposed development is a permitted use in the SMU district and is consistent with the approved GDP for a drive-thru commercial use on the subject site. Staff recommends approval with the findings and conditions as listed in the staff report. Mr. Perry opened up technical questions to staff. Council Member Ford asked if the fence is six feet tall and what type of materials it will be. Mr. Slusarek said it is six feet and wood fencing. Mr. Mitchell asked if the islands will be curbed and landscaped. Mr. Slusarek said they would need to be curbed and landscaped and it will reduce the impervious surface. Mr. Mitchell asked if when curbing is required, if there is leeway for a rainswall or a natural water filtration. ITEM I: SIP 580 S Koeller St. 11 Mr. Lyons said they do allow bioswales or rain gardens to be incorporated into the islands and it’s a design choice when they are doing their storm water management and if it makes sense. Council Member Ford asked for confirmation if the west façade is below the 50% threshold for class one materials but the entire building is well above. Mr. Slusarek said in the north and south elevations are over the 50% requirement because the front and sides have to meet the requirements. Mr. Lyons said that west is 45%, south is 54%, north is 65.5% and if you integrate them it’s over 50% on those three and on the east its 34% which 0% of the east is required. Overall the building concedes it by a significant amount. Mr. Perry said he noticed in the plan that there were double long parking spots. He asked if that was planned or purposeful. Mr. Lyons said he didn’t think they were double lots but they would double check. Mr. Perry asked for any public comments and asked if the applicant wanted to make any statements. Mr. Perry closed public comments and asked if the applicant wanted to make any closing statements. Henry Klover, 8813 Penrose Lane, Lenexa, KS; representing the applicant. He confirmed Mr. Perry’s question about the double lots and said they are 36 feet and it is purposeful considering the location off the highway. Susan Denning, 1777 W 5th Ave; she said her condo is directly behind the drive-thru. Some of the issues they had faced with the prior Golden Corral is the excessive snow that’s plowed up to the fence. In the spring when it melts they get swamps in the backyards. She is hoping that will be addressed with some drainage. She mentioned they had concerns about the dumpster location, but now it seems to be away from their condos. She asked what direction the speakers for the drive-thru will project sound and if there is a certain decibel they are allowed to be. Mr. Lyons said he doesn’t know of a noise ordinance related to speakers but they can check. There were no other public comments on this item. Mr. Klover said Panda Expresses use a sound attenuation speaker. If the outside noise is loud, the speaker will be loud, and if the noise is lower, so will the noise from the speaker. The sound from these speakers are not cumulative. The highway noise will dwarf any sound from the speaker. The speakers face north towards the vehicles. The sight lighting is new and will be better quality lighting than what there is there today. He said he’s unsure of snow since he hasn’t had much experience, but he knows that there is a stipulation in the staff report that they have to do the storm water study with the site review and they will have to control run-off. ITEM I: SIP 580 S Koeller St. 12 Mr. Mitchell asked what the width of the back side is. Mr. Lyons said their regular setback is 30 feet. Mr. Mitchell said there could be enough room for arborvitae and would be beneficial to the neighbors. He asked Mr. Klover if that would be something they would be willing to do. Mr. Klover said they would be happy to provide additional landscaping. Motion by Propp to adopt the findings and recommendation as stated in the staff report. Seconded by Davey. Motion by Mitchell to add conditional 8: require an additional 180 points of arborvitae landscaping along the east property line. Seconded by Davey. Mr. Perry asked if there was any discussion on the motion. Mr. Bowen said he will be voting present. Motion carried 6-0. Motion by Propp to adopt the findings and recommendation as stated in the staff report with the new amendment. Seconded by Davey. Motion carried 6-0. SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N SA N S K O E L L E R S T R E E T PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL U/E U/E U/E U/E U/E U/E U/E U/E R/ W U/E U/E U/E U/E U/E U/E U/E U/E U/E U/E PL PL PL PL PL PL PL PL PL PL U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/ E U/EU/E R/ W R/ W R / W R / W R/ W R/ W R/ W R/ W R/ W R / W PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL R/ W (P U B L I C R I G H T - O F - W A Y W I D T H V A R I E S ) D D DYH DYH T T PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL PL ARCH PROJECT #: PANDA PROJECT #: DRAWN BY: ISSUE DATE: REVISIONS: All ideas, designs, arrangement and plans indicated or represented by this drawing are the property of Panda Express Inc. and were created for use on this specific project. None of these ideas, designs, arrangements or plans may be used by or disclosed to any person, firm, or corporation without the written permission of Panda Express Inc. 1683 Walnut Grove Ave. Rosemead, California 91770 Telephone: 626.799.9898 Facsimile: 626.372.8288 PANDA EXPRESS, INC. PANDA STORE #: 8813 PENROSE LANE, SUITE 400 LENEXA, KS 66219 ph: 913.649.8181 • fx: 913.649.1275 7101 College Blvd., Suite 400 Overland Park, Kansas 66210 p. (913) 663-1900 BHC is a trademark of Brungardt Honomichl & Company, P.A. TRUE WARM & WELCOME 2300 R5 21044.016 - S8-21-D8662 OSHKOSH, WI 54902 9TH AVE. & KOELLER ST. TRUE WARM & WELCOME PANDA EXPRESS 10-22-211st 2-25-222nd CONDITIONAL USE SIP SUBMITTAL N 000 LOT 1 SITE DATA SITE SITE AREA:1.12 AC 48,898SF IMPERVIOUS AREA:29,757SF (60.9%) BUILDING BUILDING AREA:2,500 SF (5.1%) PARKING PARKING PROVIDED:37 STANDARD 2 HANDICAP (1 VAN) PARKING REQUIRED:8 (1 SPACE PER 300 SF) ZONING SMU (SUBURBAN MIXED-USE) SEE CONSTRUCTION DETAILS - SHEETS C7.0-C7.3 001 ASPHALT PAVEMENT 002 PCC PAVEMENT 003 CONCRETE SIDEWALK 004 CONCRETE CURB & GUTTER; RE. LEGEND FOR TYPE 007 (ADA) HANDICAP PARKING SIGNAGE 008 (ADA) HANDICAP PARKING STRIPING 010 CONCRETE FLUME DETAILS SITE LEGEND PARKING STALL COUNT STANDARD CURB & GUTTER DRY CURB & GUTTER STANDARD ZERO HEIGHT CURB TRANSITION CURB PROPOSED BUILDING ASPHALT PAVEMENT PCC PAVEMENT HEAVY DUTY PCC PAVEMENT CONCRETE SIDEWALK ACCESSIBLE ADA ROUTE>> # DRY ZERO HEIGHT CURB C2.0 SITE PLAN JLA 02 01 03 04 03 04 0506 07 09 10 11 11 11 11 11 12 07 08 00 CONSTRUCTION NOTES 01 LEAD FREE, WATER-BORNE EMULSION BASED WHITE TRAFFIC PAINT FOR PARKING LOT STALL STRIPING (TYP.). 02 DUMPSTER AND SCREENING ENCLOSURE. SEE ARCHITECT'S PLANS 03 MENU BOARD. SEE ARCHITECT'S PLANS 04 SPEAKER BOX. SEE ARCHITECT'S PLANS 05 DRIVE THRU CLEARANCE BAR. SEE ARCHITECT'S PLANS 06 ADA PARKING AREA. 2% MAXIMUM SLOPE IN ANY DIRECTION. 07 RUBBER WHEEL STOPS 08 CONCRETE SIDEWALK 09 SHARED PYLON SIGN 10 BIKE RACKS 11 LIGHT POLE 12 ELECTRICAL TRANSFORMER TO BE SCREENED WITH LANDSCAPING 13 INSTALL 6" RIPRAP BETWEEN FLUME AND AREA INLET. TOP OF RIPRAP IS TO BE BELOW THE LEVEL OF FLUME TO PREVENT PONDING ON PAVEMENT. 14 GREASE INTERCEPTOR 15 STORM STRUCTURE 16 CONCRETE PAVEMENT 17 ASPHALT PAVEMENT 24 . 0 0 ' 24.00' 9.00' TYP. 18 . 5 0 ' 11 12 . 0 0 ' 12 . 0 0 ' 1 2 . 0 0 ' 6. 3 7 ' 30.21' 1. 5 5 ' 19 . 7 1 ' 189.59' PROPOSED PANDA EXPRESS 2500 SF 004 004 004 003 008 3 6 4 15 08 003 55 . 0 4 ' 24 . 0 0 ' 24.00' 144.36' PROPO S E D LOT 2 PROPO S E D LOT 1 004 >>>>>>>> >> >> >> >> >> 010 13 14 16 16 17 17 17 15 17 01 01 >> >> >> >> SIP 580 S KOELLER ST 8/02/2022 SARA REIMER 1773 W 5TH AVE OSHKOSH, WI 54902 NOREEN KIRCHHOFF 1775 W 5TH AVE OSHKOSH, WI 54902 SUSAN M DENNING 1777 W 5TH AVE OSHKOSH, WI 54902 JOHANN KOPEINIG 1779 W 5TH AVE OSHKOSH, WI 54902 CFT NV DEVELOPMENTS LLC 1120 N TOWN CENTER DR STE 150 LAS VEGAS, NV 89144 600 S KOELLER STREET LLC PO BOX 52427 ATLANTA, GA 30355 PETER M FREDERIKSEN ETAL 691 S GREEN BAY RD #208 NEENAH, WI 54956 HENRY C KLOVER 8813 PENROSE LANE SUITE 400 LENEXA, KS 66219 CHRISTIAN COMMUNITY CHILD CENTER INC 3870 JACKSON ST OSHKOSH, WI 54901 GC OSHKOSH HOLDINGS LLC 1621 CONGRESS AVE OSHKOSH, WI 54901 !"#$41!"#$41 SS KK OO EE LL LL EE RR SS TT WW 77TTHH AAVV W 5TH AVW 5TH AV C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 7/8/2022 1 in = 120 ft1 in = 0.02 mi¯580 S KOELLER ST580 S KOELLER ST City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer SMU I SR-5 I I I SMU-PD DR-6 I MR-12 SMU-PD I MR-12 MR-12 SR-5 SMU-PD I-PD SR-5 SMU-PD DR-6 DR-6 MR-12 MR-12 SMU-PD NMU SMU-PD DR-6 !"#$41 !"#$41 WITZEL AVWITZEL AV SS KK OO EELLLLEERRSSTT WW 99 TT HH AAVV SS WWAASSHHBBUURRNN SSTT REICHOW ST REICHOW ST W 5TH AVW 5TH AV S WESTFIELD ST S WESTFIELD ST LILAC ST LILAC ST ARMORY PL ARMORY PL ABBEY AVABBEY AV MMOORREELLAANNDD SS TT W 7TH AVW 7TH AV W 6TH AVW 6TH AV WINDSOR ST WINDSOR ST CUMBERLAND TR CUMBERLAND TR CRYSTAL SPRINGS AVCRYSTAL SPRINGS AV BISMARCK AVBISMARCK AV S WESTFIELD ST S WESTFIELD ST C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 7/8/2022 1 in = 500 ft1 in = 0.09 mi¯580 S KOELLER ST580 S KOELLER ST City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 7/8/2022 1 in = 100 ft1 in = 0.02 mi¯580 S KOELLER ST580 S KOELLER ST City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer