HomeMy WebLinkAbout07. 22-314JULY 26, 2022 22-314 RESOLUTION
(CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______)
PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 21-11 TO
WOOD SEWER & EXCAVATING FOR SANITARY MANHOLE
REHABILITATION / INFLOW / INFILTRATION REDUCTION
PROGRAM ($533,527.50)
INITIATED BY: DEPARTMENT OF PUBLIC WORKS
WHEREAS, the City of Oshkosh has heretofore advertised for bids to repair and
upgrade existing sanitary sewer manholes to reduce the amount of inflow and infiltration
entering the sanitary sewer system in the City of Oshkosh; and
WHEREAS, upon the opening and tabulation of bids, it appears that the following
is the most advantageous bid:
WOOD SEWER & EXCAVATING
E9238 County Road X
New London, WI 54961
Total Bid: $533,527.50
NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of
Oshkosh that the said bid is hereby accepted and the proper City officials are hereby
authorized and directed to enter into an appropriate agreement for the purpose of same,
all according to plans, specifications, and bid on file. Money for this purpose is hereby
appropriated from:
Acct. No. 03210410-6802-04011 Contract Control-Sanitary Sewer-Annual – I &
I Sanitary Swr Rehab
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH
Rehab\Project_Information\Correspondence\Memo\22-11 Memo for Bid Award_7-21-22.docx Page 1 of 2
TO: Honorable Mayor and Members of the Common Council
FROM: Justin Gierach, Engineering Division Manager / City Engineer
DATE: July 21, 2022
RE: Award Bid for Public Works Contract No. 21-11 to Wood Sewer &
Excavating for Sanitary Manhole Rehabilitation / Inflow/Infiltration
Reduction Program ($533,527.50)
BACKGROUND
The purpose of this Project is to repair and upgrade existing sanitary sewer manholes to
reduce the amount of inflow and infiltration entering the sanitary sewer system.
Engineering staff have previously inspected sanitary manholes to identify any defects.
This Contract will perform necessary repairs to approximately 90 of the approximately
5,800 public sanitary sewer manholes. This work will begin in the fall of 2022 and be
completed by the spring of 2023. Upon completion of this Project, approximately 1,900
manholes will have been rehabilitated since 2010.
ANALYSIS
Engineering staff reviewed three (3) bids. The low bid was received from Wood Sewer
& Excavating of New London, Wisconsin. The total bid is $533,527.50.
FISCAL IMPACT
Funding for this Project is in the 2022 Capital Improvement Program (CIP) (Account No.
03210410-6802-04011/Contract Control-Sanitary Sewer-Annual – I & I Sanitary Swr
Rehab). This Contract only uses a portion of the allocated funds in the CIP. Other projects
are also funded from this source, including emergency sanitary sewer repairs.
Following is a summary of the available funds and the estimated total construction cost,
including ancillary costs such as engineering fees, landfill tipping fees, construction
materials testing fees, and other construction-related expenses.
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH
Rehab\Project_Information\Correspondence\Memo\22-11 Memo for Bid Award_7-21-22.docx Page 2 of 2
CIP Section CIP Funds Budgeted
Estimated Total Construction
Cost
Sanitary Sewer $675,000 $631,069
Totals $675,000 $631,069
RECOMMENDATIONS
I recommend award to the low bidder, Wood Sewer & Excavating, in the amount of
$533,527.50.
Approved:
Mark A. Rohloff
City Manager
JLG/tlt
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Section 1: Base Bid $533,527.50 $654,950.50
1050
Mobilization; complete as
specified Lump Sum 1.00 $24,500.00 $24,500.00 $55,000.00 $55,000.00
1120
Removing concrete and
asphalt sidewalk and
driveway; complete as
specified Square Feet 750.00 $1.75 $1,312.50 $2.00 $1,500.00
1308
7" concrete pavement
removal and replacement;
including sawing;
pavement ties; dowel
bars; bond breaker;
integral curb and fine
grading; turf restoration;
and traffic control;
complete as specified Square Yards 800.00 $88.00 $70,400.00 $118.00 $94,400.00
1309
7" concrete pavement
HES removal and
replacement; including
sawing; pavement ties;
dowel bars; bond breaker;
integral curb and fine
grading; turf restoration;
and traffic control;
complete as specified Square Yards 50.00 $108.00 $5,400.00 $123.00 $6,150.00
1318
8" concrete pavement
removal and replacement;
including sawing;
pavement ties; dowel
bars; bond breaker;
integral curb and fine
grading; turf restoration;
and traffic control;
complete as specified Square Yards 50.00 $99.00 $4,950.00 $122.00 $6,100.00
Wood Sewer & Excavating Vinton Construction Company
E9238 County Road X
New London, WI 54961
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 1 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Wood Sewer & Excavating Vinton Construction Company
E9238 County Road X
New London, WI 54961
1319
8" concrete pavement
HES removal and
replacement; including
sawing; pavement ties;
dowel bars; bond breaker;
integral curb and fine
grading; turf restoration;
and traffic control;
complete as specified Square Yards 450.00 $115.00 $51,750.00 $126.00 $56,700.00
1370
Turf restoration;
complete as specified Square Yards 100.00 $18.00 $1,800.00 $20.00 $2,000.00
1373
Replace and set CITY-
supplied manhole
castings and frames;
complete as specified Each 88.00 $410.00 $36,080.00 $220.00 $19,360.00
1374
Furnish and install
concrete adjustment
rings; complete as
specified Vertical Feet 45.00 $360.00 $16,200.00 $684.00 $30,780.00
1375
Furnish and install rubber
adjustment rings;
complete as specified Vertical Feet 5.00 $890.00 $4,450.00 $1,050.00 $5,250.00
1376
Tuck point manholes;
complete as specified Each 15.00 $189.00 $2,835.00 $195.00 $2,925.00
1380
Cold weather covering
(concrete pavement) -
single visquine; complete
as specified Square Yards 150.00 $1.00 $150.00 $5.00 $750.00
1382
Cold weather covering
(concrete pavement) -
double visquine;
complete as specified Square Yards 50.00 $2.00 $100.00 $5.00 $250.00
1390
Up-charge for late season
cold weather concrete
pavement; complete as
specified Cubic Yards 200.00 $12.00 $2,400.00 $10.00 $2,000.00
1500
4" concrete sidewalk with
3" CABC and grading;
complete as specified Square Feet 250.00 $12.50 $3,125.00 $10.00 $2,500.00
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 2 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Wood Sewer & Excavating Vinton Construction Company
E9238 County Road X
New London, WI 54961
1510
6" concrete sidewalk/
driveway/ramp with 3"
CABC and grading;
complete as specified Square Feet 500.00 $13.50 $6,750.00 $11.00 $5,500.00
1540
Curb ramp detectable
warning field
(natural/non-painted);
complete as specified Square Feet 16.00 $50.00 $800.00 $40.00 $640.00
1550
No. 4 reinforcing rods -
deformed; epoxy-coated;
complete as specified Linear Feet 30.00 $5.00 $150.00 $2.00 $60.00
1560
Drilled No. 4 sidewalk tie
bars - deformed; epoxy-
coated; complete as
specified Each 10.00 $15.00 $150.00 $6.00 $60.00
1904
Remove and replace
HMA pavement;
including sawing; fine
grading; turf restoration;
and traffic control;
complete as specified Square Yards 275.00 $80.00 $22,000.00 $75.00 $20,625.00
1918
Asphaltic cold weather
paving; complete as
specified Square Yards 100.00 $10.00 $1,000.00 $13.00 $1,300.00
1930
Temporary cold mix
asphaltic patch; complete
as specified Square Yards 200.00 $0.01 $2.00 $0.01 $2.00
3000
Furnish and install 8"
sanitary sewer (relay);
complete as specified Linear Feet 25.00 $90.00 $2,250.00 $249.00 $6,225.00
3002
Furnish and install 10"
sanitary sewer (relay);
complete as specified Linear Feet 10.00 $135.00 $1,350.00 $256.00 $2,560.00
3008
Furnish and install 18"
sanitary sewer (relay);
complete as specified Linear Feet 10.00 $188.00 $1,880.00 $398.00 $3,980.00
3010
Furnish and install 21"
sanitary sewer (relay);
complete as specified Linear Feet 25.00 $212.00 $5,300.00 $440.00 $11,000.00
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 3 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Wood Sewer & Excavating Vinton Construction Company
E9238 County Road X
New London, WI 54961
3012
Furnish and install 24"
sanitary sewer (relay);
complete as specified Linear Feet 10.00 $252.00 $2,520.00 $469.00 $4,690.00
3100
Furnish and install
standard sanitary sewer
manhole (4' diameter);
complete as specified Vertical Feet 6.00 $1,050.00 $6,300.00 $1,358.00 $8,148.00
3101
Furnish and install
standard sanitary sewer
manhole (4' diameter)
with slurry backfill;
complete as specified Vertical Feet 18.00 $1,500.00 $27,000.00 $2,155.00 $38,790.00
3103
Furnish and install
standard sanitary sewer
manhole (5' diameter)
with slurry backfill;
complete as specified Vertical Feet 1.00 $1,900.00 $1,900.00 $2,340.00 $2,340.00
3105
Furnish and install
standard sanitary sewer
manhole (6' diameter)
with slurry backfill;
complete as specified Vertical Feet 8.50 $2,600.00 $22,100.00 $2,526.00 $21,471.00
3114
Furnish and install
sanitary sewer external
manhole chimney seal;
complete as specified Each 85.00 $780.00 $66,300.00 $863.00 $73,355.00
3116
Furnish and install
sanitary sewer external
manhole chimney seal
extension; complete as
specified Each 13.00 $420.00 $5,460.00 $378.00 $4,914.00
3118
Furnish and install
sanitary sewer internal
manhole chimney seal;
complete as specified Each 5.00 $510.00 $2,550.00 $735.00 $3,675.00
3120
Furnish and install
internal sanitary sewer
manhole chimney seal
extension; complete as
specified Each 1.00 $460.00 $460.00 $426.00 $426.00
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 4 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Wood Sewer & Excavating Vinton Construction Company
E9238 County Road X
New London, WI 54961
3123
Reconstruct sanitary
sewer manhole (4'
diameter) with slurry
backfill; complete as
specified Vertical Feet 105.00 $900.00 $94,500.00 $1,166.00 $122,430.00
3160
Pour and reshape
manhole bench; complete
as specified Each 6.00 $1,113.00 $6,678.00 $540.00 $3,240.00
3210
Furnish and install 8" x 6"
sanitary sewer factory
wyes or tees; complete as
specified Each 1.00 $500.00 $500.00 $416.00 $416.00
3222
Furnish and install 6"
sanitary sewer "Insert-A-
Tee" or "Kor-N-Tee";
complete as specified Each 1.00 $600.00 $600.00 $343.00 $343.00
3234
Furnish and install 4"/6"
sanitary sewer lateral
(relay); complete as
specified Linear Feet 20.00 $75.00 $1,500.00 $262.00 $5,240.00
3235
Furnish and install 4"/6"
sanitary sewer riser
(relay); complete as
specified Linear Feet 5.00 $93.00 $465.00 $262.00 $1,310.00
3236
Furnish and install
sanitary sewer lateral
marker balls; complete as
specified Each 3.00 $55.00 $165.00 $45.00 $135.00
3300
Furnish and install
connection to existing 8"
sanitary sewer mains;
complete as specified Each 2.00 $1,000.00 $2,000.00 $577.00 $1,154.00
3302
Furnish and install
connection to existing 10"
sanitary sewer mains;
complete as specified Each 1.00 $1,120.00 $1,120.00 $586.00 $586.00
3308
Furnish and install
connection to existing 18"
sanitary sewer mains;
complete as specified Each 1.00 $1,190.00 $1,190.00 $1,270.00 $1,270.00
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 5 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension
Wood Sewer & Excavating Vinton Construction Company
E9238 County Road X
New London, WI 54961
3310
Furnish and install
connection to existing 21"
sanitary sewer mains;
complete as specified Each 3.00 $1,320.00 $3,960.00 $1,709.00 $5,127.00
3312
Furnish and install
connection to existing 24"
sanitary sewer mains;
complete as specified Each 1.00 $1,650.00 $1,650.00 $1,761.00 $1,761.00
3892
Excavation special
(sanitary); complete as
specified Tons 10.00 $50.00 $500.00 $35.00 $350.00
3974
Furnish sanitary sewer
manhole grouting setup;
complete as specified Each 7.00 $1,600.00 $11,200.00 $1,550.00 $10,850.00
3975
Furnish and install
sanitary sewer manhole
grouting; complete as
specified Gallons 50.00 $10.50 $525.00 $9.25 $462.50
3976
Furnish sanitary sewer
manhole cementitious
liner setup Each 2.00 $1,600.00 $3,200.00 $1,500.00 $3,000.00
3977
Furnish and install
sanitary sewer structural
cementitious liner-
PERMACAST by AP/M
PERMAFORM; complete
as specified Vertical Feet 10.00 $210.00 $2,100.00 $185.00 $1,850.00
Bid Total:$533,527.50 $654,950.50
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 6 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity
Section 1: Base Bid
1050
Mobilization; complete as
specified Lump Sum 1.00
1120
Removing concrete and
asphalt sidewalk and
driveway; complete as
specified Square Feet 750.00
1308
7" concrete pavement
removal and replacement;
including sawing;
pavement ties; dowel
bars; bond breaker;
integral curb and fine
grading; turf restoration;
and traffic control;
complete as specified Square Yards 800.00
1309
7" concrete pavement
HES removal and
replacement; including
sawing; pavement ties;
dowel bars; bond breaker;
integral curb and fine
grading; turf restoration;
and traffic control;
complete as specified Square Yards 50.00
1318
8" concrete pavement
removal and replacement;
including sawing;
pavement ties; dowel
bars; bond breaker;
integral curb and fine
grading; turf restoration;
and traffic control;
complete as specified Square Yards 50.00
Unit Price Extension
$729,860.00
$53,989.00 $53,989.00
$1.00 $750.00
$181.00 $144,800.00
$192.00 $9,600.00
$202.00 $10,100.00
Dorner Inc.
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 7 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity
1319
8" concrete pavement
HES removal and
replacement; including
sawing; pavement ties;
dowel bars; bond breaker;
integral curb and fine
grading; turf restoration;
and traffic control;
complete as specified Square Yards 450.00
1370
Turf restoration;
complete as specified Square Yards 100.00
1373
Replace and set CITY-
supplied manhole
castings and frames;
complete as specified Each 88.00
1374
Furnish and install
concrete adjustment
rings; complete as
specified Vertical Feet 45.00
1375
Furnish and install rubber
adjustment rings;
complete as specified Vertical Feet 5.00
1376
Tuck point manholes;
complete as specified Each 15.00
1380
Cold weather covering
(concrete pavement) -
single visquine; complete
as specified Square Yards 150.00
1382
Cold weather covering
(concrete pavement) -
double visquine;
complete as specified Square Yards 50.00
1390
Up-charge for late season
cold weather concrete
pavement; complete as
specified Cubic Yards 200.00
1500
4" concrete sidewalk with
3" CABC and grading;
complete as specified Square Feet 250.00
Unit Price Extension
Dorner Inc.
$207.00 $93,150.00
$12.00 $1,200.00
$600.00 $52,800.00
$497.00 $22,365.00
$497.00 $2,485.00
$226.00 $3,390.00
$6.00 $900.00
$7.00 $350.00
$11.00 $2,200.00
$10.00 $2,500.00
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 8 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity
1510
6" concrete sidewalk/
driveway/ramp with 3"
CABC and grading;
complete as specified Square Feet 500.00
1540
Curb ramp detectable
warning field
(natural/non-painted);
complete as specified Square Feet 16.00
1550
No. 4 reinforcing rods -
deformed; epoxy-coated;
complete as specified Linear Feet 30.00
1560
Drilled No. 4 sidewalk tie
bars - deformed; epoxy-
coated; complete as
specified Each 10.00
1904
Remove and replace
HMA pavement;
including sawing; fine
grading; turf restoration;
and traffic control;
complete as specified Square Yards 275.00
1918
Asphaltic cold weather
paving; complete as
specified Square Yards 100.00
1930
Temporary cold mix
asphaltic patch; complete
as specified Square Yards 200.00
3000
Furnish and install 8"
sanitary sewer (relay);
complete as specified Linear Feet 25.00
3002
Furnish and install 10"
sanitary sewer (relay);
complete as specified Linear Feet 10.00
3008
Furnish and install 18"
sanitary sewer (relay);
complete as specified Linear Feet 10.00
3010
Furnish and install 21"
sanitary sewer (relay);
complete as specified Linear Feet 25.00
Unit Price Extension
Dorner Inc.
$12.00 $6,000.00
$42.00 $672.00
$2.00 $60.00
$11.00 $110.00
$75.00 $20,625.00
$13.00 $1,300.00
$37.00 $7,400.00
$123.00 $3,075.00
$130.00 $1,300.00
$192.00 $1,920.00
$296.00 $7,400.00
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 9 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity
3012
Furnish and install 24"
sanitary sewer (relay);
complete as specified Linear Feet 10.00
3100
Furnish and install
standard sanitary sewer
manhole (4' diameter);
complete as specified Vertical Feet 6.00
3101
Furnish and install
standard sanitary sewer
manhole (4' diameter)
with slurry backfill;
complete as specified Vertical Feet 18.00
3103
Furnish and install
standard sanitary sewer
manhole (5' diameter)
with slurry backfill;
complete as specified Vertical Feet 1.00
3105
Furnish and install
standard sanitary sewer
manhole (6' diameter)
with slurry backfill;
complete as specified Vertical Feet 8.50
3114
Furnish and install
sanitary sewer external
manhole chimney seal;
complete as specified Each 85.00
3116
Furnish and install
sanitary sewer external
manhole chimney seal
extension; complete as
specified Each 13.00
3118
Furnish and install
sanitary sewer internal
manhole chimney seal;
complete as specified Each 5.00
3120
Furnish and install
internal sanitary sewer
manhole chimney seal
extension; complete as
specified Each 1.00
Unit Price Extension
Dorner Inc.
$252.00 $2,520.00
$696.00 $4,176.00
$993.00 $17,874.00
$1,279.00 $1,279.00
$1,524.00 $12,954.00
$670.00 $56,950.00
$346.00 $4,498.00
$588.00 $2,940.00
$315.00 $315.00
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 10 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity
3123
Reconstruct sanitary
sewer manhole (4'
diameter) with slurry
backfill; complete as
specified Vertical Feet 105.00
3160
Pour and reshape
manhole bench; complete
as specified Each 6.00
3210
Furnish and install 8" x 6"
sanitary sewer factory
wyes or tees; complete as
specified Each 1.00
3222
Furnish and install 6"
sanitary sewer "Insert-A-
Tee" or "Kor-N-Tee";
complete as specified Each 1.00
3234
Furnish and install 4"/6"
sanitary sewer lateral
(relay); complete as
specified Linear Feet 20.00
3235
Furnish and install 4"/6"
sanitary sewer riser
(relay); complete as
specified Linear Feet 5.00
3236
Furnish and install
sanitary sewer lateral
marker balls; complete as
specified Each 3.00
3300
Furnish and install
connection to existing 8"
sanitary sewer mains;
complete as specified Each 2.00
3302
Furnish and install
connection to existing 10"
sanitary sewer mains;
complete as specified Each 1.00
3308
Furnish and install
connection to existing 18"
sanitary sewer mains;
complete as specified Each 1.00
Unit Price Extension
Dorner Inc.
$1,141.00 $119,805.00
$1,056.00 $6,336.00
$234.00 $234.00
$347.00 $347.00
$107.00 $2,140.00
$141.00 $705.00
$44.00 $132.00
$1,773.00 $3,546.00
$2,578.00 $2,578.00
$3,464.00 $3,464.00
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 11 of 12 7/18/2022
Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227)
Owner: Oshkosh WI, City of
Solicitor: Oshkosh WI, City of
Bid Opening: 07/18/2022 11:00 AM CDT
Section Title Item Code Item Description UofM Quantity
3310
Furnish and install
connection to existing 21"
sanitary sewer mains;
complete as specified Each 3.00
3312
Furnish and install
connection to existing 24"
sanitary sewer mains;
complete as specified Each 1.00
3892
Excavation special
(sanitary); complete as
specified Tons 10.00
3974
Furnish sanitary sewer
manhole grouting setup;
complete as specified Each 7.00
3975
Furnish and install
sanitary sewer manhole
grouting; complete as
specified Gallons 50.00
3976
Furnish sanitary sewer
manhole cementitious
liner setup Each 2.00
3977
Furnish and install
sanitary sewer structural
cementitious liner-
PERMACAST by AP/M
PERMAFORM; complete
as specified Vertical Feet 10.00
Bid Total:
Unit Price Extension
Dorner Inc.
$4,626.00 $13,878.00
$5,428.00 $5,428.00
$25.00 $250.00
$1,636.00 $11,452.00
$10.00 $500.00
$1,584.00 $3,168.00
$195.00 $1,950.00
$729,860.00
I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 12 of 12 7/18/2022