Loading...
HomeMy WebLinkAbout07. 22-314JULY 26, 2022 22-314 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 21-11 TO WOOD SEWER & EXCAVATING FOR SANITARY MANHOLE REHABILITATION / INFLOW / INFILTRATION REDUCTION PROGRAM ($533,527.50) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids to repair and upgrade existing sanitary sewer manholes to reduce the amount of inflow and infiltration entering the sanitary sewer system in the City of Oshkosh; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: WOOD SEWER & EXCAVATING E9238 County Road X New London, WI 54961 Total Bid: $533,527.50 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 03210410-6802-04011 Contract Control-Sanitary Sewer-Annual – I & I Sanitary Swr Rehab I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Correspondence\Memo\22-11 Memo for Bid Award_7-21-22.docx Page 1 of 2 TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer DATE: July 21, 2022 RE: Award Bid for Public Works Contract No. 21-11 to Wood Sewer & Excavating for Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program ($533,527.50) BACKGROUND The purpose of this Project is to repair and upgrade existing sanitary sewer manholes to reduce the amount of inflow and infiltration entering the sanitary sewer system. Engineering staff have previously inspected sanitary manholes to identify any defects. This Contract will perform necessary repairs to approximately 90 of the approximately 5,800 public sanitary sewer manholes. This work will begin in the fall of 2022 and be completed by the spring of 2023. Upon completion of this Project, approximately 1,900 manholes will have been rehabilitated since 2010. ANALYSIS Engineering staff reviewed three (3) bids. The low bid was received from Wood Sewer & Excavating of New London, Wisconsin. The total bid is $533,527.50. FISCAL IMPACT Funding for this Project is in the 2022 Capital Improvement Program (CIP) (Account No. 03210410-6802-04011/Contract Control-Sanitary Sewer-Annual – I & I Sanitary Swr Rehab). This Contract only uses a portion of the allocated funds in the CIP. Other projects are also funded from this source, including emergency sanitary sewer repairs. Following is a summary of the available funds and the estimated total construction cost, including ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction-related expenses. I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Correspondence\Memo\22-11 Memo for Bid Award_7-21-22.docx Page 2 of 2 CIP Section CIP Funds Budgeted Estimated Total Construction Cost Sanitary Sewer $675,000 $631,069 Totals $675,000 $631,069 RECOMMENDATIONS I recommend award to the low bidder, Wood Sewer & Excavating, in the amount of $533,527.50. Approved: Mark A. Rohloff City Manager JLG/tlt Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1: Base Bid $533,527.50 $654,950.50 1050 Mobilization; complete as specified Lump Sum 1.00 $24,500.00 $24,500.00 $55,000.00 $55,000.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 750.00 $1.75 $1,312.50 $2.00 $1,500.00 1308 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 800.00 $88.00 $70,400.00 $118.00 $94,400.00 1309 7" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 50.00 $108.00 $5,400.00 $123.00 $6,150.00 1318 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 50.00 $99.00 $4,950.00 $122.00 $6,100.00 Wood Sewer & Excavating Vinton Construction Company E9238 County Road X New London, WI 54961 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 1 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Wood Sewer & Excavating Vinton Construction Company E9238 County Road X New London, WI 54961 1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 450.00 $115.00 $51,750.00 $126.00 $56,700.00 1370 Turf restoration; complete as specified Square Yards 100.00 $18.00 $1,800.00 $20.00 $2,000.00 1373 Replace and set CITY- supplied manhole castings and frames; complete as specified Each 88.00 $410.00 $36,080.00 $220.00 $19,360.00 1374 Furnish and install concrete adjustment rings; complete as specified Vertical Feet 45.00 $360.00 $16,200.00 $684.00 $30,780.00 1375 Furnish and install rubber adjustment rings; complete as specified Vertical Feet 5.00 $890.00 $4,450.00 $1,050.00 $5,250.00 1376 Tuck point manholes; complete as specified Each 15.00 $189.00 $2,835.00 $195.00 $2,925.00 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 150.00 $1.00 $150.00 $5.00 $750.00 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 50.00 $2.00 $100.00 $5.00 $250.00 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 200.00 $12.00 $2,400.00 $10.00 $2,000.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 250.00 $12.50 $3,125.00 $10.00 $2,500.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 2 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Wood Sewer & Excavating Vinton Construction Company E9238 County Road X New London, WI 54961 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 500.00 $13.50 $6,750.00 $11.00 $5,500.00 1540 Curb ramp detectable warning field (natural/non-painted); complete as specified Square Feet 16.00 $50.00 $800.00 $40.00 $640.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 30.00 $5.00 $150.00 $2.00 $60.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 10.00 $15.00 $150.00 $6.00 $60.00 1904 Remove and replace HMA pavement; including sawing; fine grading; turf restoration; and traffic control; complete as specified Square Yards 275.00 $80.00 $22,000.00 $75.00 $20,625.00 1918 Asphaltic cold weather paving; complete as specified Square Yards 100.00 $10.00 $1,000.00 $13.00 $1,300.00 1930 Temporary cold mix asphaltic patch; complete as specified Square Yards 200.00 $0.01 $2.00 $0.01 $2.00 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 25.00 $90.00 $2,250.00 $249.00 $6,225.00 3002 Furnish and install 10" sanitary sewer (relay); complete as specified Linear Feet 10.00 $135.00 $1,350.00 $256.00 $2,560.00 3008 Furnish and install 18" sanitary sewer (relay); complete as specified Linear Feet 10.00 $188.00 $1,880.00 $398.00 $3,980.00 3010 Furnish and install 21" sanitary sewer (relay); complete as specified Linear Feet 25.00 $212.00 $5,300.00 $440.00 $11,000.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 3 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Wood Sewer & Excavating Vinton Construction Company E9238 County Road X New London, WI 54961 3012 Furnish and install 24" sanitary sewer (relay); complete as specified Linear Feet 10.00 $252.00 $2,520.00 $469.00 $4,690.00 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 6.00 $1,050.00 $6,300.00 $1,358.00 $8,148.00 3101 Furnish and install standard sanitary sewer manhole (4' diameter) with slurry backfill; complete as specified Vertical Feet 18.00 $1,500.00 $27,000.00 $2,155.00 $38,790.00 3103 Furnish and install standard sanitary sewer manhole (5' diameter) with slurry backfill; complete as specified Vertical Feet 1.00 $1,900.00 $1,900.00 $2,340.00 $2,340.00 3105 Furnish and install standard sanitary sewer manhole (6' diameter) with slurry backfill; complete as specified Vertical Feet 8.50 $2,600.00 $22,100.00 $2,526.00 $21,471.00 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 85.00 $780.00 $66,300.00 $863.00 $73,355.00 3116 Furnish and install sanitary sewer external manhole chimney seal extension; complete as specified Each 13.00 $420.00 $5,460.00 $378.00 $4,914.00 3118 Furnish and install sanitary sewer internal manhole chimney seal; complete as specified Each 5.00 $510.00 $2,550.00 $735.00 $3,675.00 3120 Furnish and install internal sanitary sewer manhole chimney seal extension; complete as specified Each 1.00 $460.00 $460.00 $426.00 $426.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 4 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Wood Sewer & Excavating Vinton Construction Company E9238 County Road X New London, WI 54961 3123 Reconstruct sanitary sewer manhole (4' diameter) with slurry backfill; complete as specified Vertical Feet 105.00 $900.00 $94,500.00 $1,166.00 $122,430.00 3160 Pour and reshape manhole bench; complete as specified Each 6.00 $1,113.00 $6,678.00 $540.00 $3,240.00 3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specified Each 1.00 $500.00 $500.00 $416.00 $416.00 3222 Furnish and install 6" sanitary sewer "Insert-A- Tee" or "Kor-N-Tee"; complete as specified Each 1.00 $600.00 $600.00 $343.00 $343.00 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 20.00 $75.00 $1,500.00 $262.00 $5,240.00 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 5.00 $93.00 $465.00 $262.00 $1,310.00 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 3.00 $55.00 $165.00 $45.00 $135.00 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 2.00 $1,000.00 $2,000.00 $577.00 $1,154.00 3302 Furnish and install connection to existing 10" sanitary sewer mains; complete as specified Each 1.00 $1,120.00 $1,120.00 $586.00 $586.00 3308 Furnish and install connection to existing 18" sanitary sewer mains; complete as specified Each 1.00 $1,190.00 $1,190.00 $1,270.00 $1,270.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 5 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Wood Sewer & Excavating Vinton Construction Company E9238 County Road X New London, WI 54961 3310 Furnish and install connection to existing 21" sanitary sewer mains; complete as specified Each 3.00 $1,320.00 $3,960.00 $1,709.00 $5,127.00 3312 Furnish and install connection to existing 24" sanitary sewer mains; complete as specified Each 1.00 $1,650.00 $1,650.00 $1,761.00 $1,761.00 3892 Excavation special (sanitary); complete as specified Tons 10.00 $50.00 $500.00 $35.00 $350.00 3974 Furnish sanitary sewer manhole grouting setup; complete as specified Each 7.00 $1,600.00 $11,200.00 $1,550.00 $10,850.00 3975 Furnish and install sanitary sewer manhole grouting; complete as specified Gallons 50.00 $10.50 $525.00 $9.25 $462.50 3976 Furnish sanitary sewer manhole cementitious liner setup Each 2.00 $1,600.00 $3,200.00 $1,500.00 $3,000.00 3977 Furnish and install sanitary sewer structural cementitious liner- PERMACAST by AP/M PERMAFORM; complete as specified Vertical Feet 10.00 $210.00 $2,100.00 $185.00 $1,850.00 Bid Total:$533,527.50 $654,950.50 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 6 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Section 1: Base Bid 1050 Mobilization; complete as specified Lump Sum 1.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 750.00 1308 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 800.00 1309 7" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 50.00 1318 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 50.00 Unit Price Extension $729,860.00 $53,989.00 $53,989.00 $1.00 $750.00 $181.00 $144,800.00 $192.00 $9,600.00 $202.00 $10,100.00 Dorner Inc. I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 7 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 450.00 1370 Turf restoration; complete as specified Square Yards 100.00 1373 Replace and set CITY- supplied manhole castings and frames; complete as specified Each 88.00 1374 Furnish and install concrete adjustment rings; complete as specified Vertical Feet 45.00 1375 Furnish and install rubber adjustment rings; complete as specified Vertical Feet 5.00 1376 Tuck point manholes; complete as specified Each 15.00 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 150.00 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 50.00 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 200.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 250.00 Unit Price Extension Dorner Inc. $207.00 $93,150.00 $12.00 $1,200.00 $600.00 $52,800.00 $497.00 $22,365.00 $497.00 $2,485.00 $226.00 $3,390.00 $6.00 $900.00 $7.00 $350.00 $11.00 $2,200.00 $10.00 $2,500.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 8 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 500.00 1540 Curb ramp detectable warning field (natural/non-painted); complete as specified Square Feet 16.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 30.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 10.00 1904 Remove and replace HMA pavement; including sawing; fine grading; turf restoration; and traffic control; complete as specified Square Yards 275.00 1918 Asphaltic cold weather paving; complete as specified Square Yards 100.00 1930 Temporary cold mix asphaltic patch; complete as specified Square Yards 200.00 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 25.00 3002 Furnish and install 10" sanitary sewer (relay); complete as specified Linear Feet 10.00 3008 Furnish and install 18" sanitary sewer (relay); complete as specified Linear Feet 10.00 3010 Furnish and install 21" sanitary sewer (relay); complete as specified Linear Feet 25.00 Unit Price Extension Dorner Inc. $12.00 $6,000.00 $42.00 $672.00 $2.00 $60.00 $11.00 $110.00 $75.00 $20,625.00 $13.00 $1,300.00 $37.00 $7,400.00 $123.00 $3,075.00 $130.00 $1,300.00 $192.00 $1,920.00 $296.00 $7,400.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 9 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 3012 Furnish and install 24" sanitary sewer (relay); complete as specified Linear Feet 10.00 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 6.00 3101 Furnish and install standard sanitary sewer manhole (4' diameter) with slurry backfill; complete as specified Vertical Feet 18.00 3103 Furnish and install standard sanitary sewer manhole (5' diameter) with slurry backfill; complete as specified Vertical Feet 1.00 3105 Furnish and install standard sanitary sewer manhole (6' diameter) with slurry backfill; complete as specified Vertical Feet 8.50 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 85.00 3116 Furnish and install sanitary sewer external manhole chimney seal extension; complete as specified Each 13.00 3118 Furnish and install sanitary sewer internal manhole chimney seal; complete as specified Each 5.00 3120 Furnish and install internal sanitary sewer manhole chimney seal extension; complete as specified Each 1.00 Unit Price Extension Dorner Inc. $252.00 $2,520.00 $696.00 $4,176.00 $993.00 $17,874.00 $1,279.00 $1,279.00 $1,524.00 $12,954.00 $670.00 $56,950.00 $346.00 $4,498.00 $588.00 $2,940.00 $315.00 $315.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 10 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 3123 Reconstruct sanitary sewer manhole (4' diameter) with slurry backfill; complete as specified Vertical Feet 105.00 3160 Pour and reshape manhole bench; complete as specified Each 6.00 3210 Furnish and install 8" x 6" sanitary sewer factory wyes or tees; complete as specified Each 1.00 3222 Furnish and install 6" sanitary sewer "Insert-A- Tee" or "Kor-N-Tee"; complete as specified Each 1.00 3234 Furnish and install 4"/6" sanitary sewer lateral (relay); complete as specified Linear Feet 20.00 3235 Furnish and install 4"/6" sanitary sewer riser (relay); complete as specified Linear Feet 5.00 3236 Furnish and install sanitary sewer lateral marker balls; complete as specified Each 3.00 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 2.00 3302 Furnish and install connection to existing 10" sanitary sewer mains; complete as specified Each 1.00 3308 Furnish and install connection to existing 18" sanitary sewer mains; complete as specified Each 1.00 Unit Price Extension Dorner Inc. $1,141.00 $119,805.00 $1,056.00 $6,336.00 $234.00 $234.00 $347.00 $347.00 $107.00 $2,140.00 $141.00 $705.00 $44.00 $132.00 $1,773.00 $3,546.00 $2,578.00 $2,578.00 $3,464.00 $3,464.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 11 of 12 7/18/2022 Contract 22-11 - Sanitary Manhole Rehabilitation / Inflow/Infiltration Reduction Program (#8242227) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 3310 Furnish and install connection to existing 21" sanitary sewer mains; complete as specified Each 3.00 3312 Furnish and install connection to existing 24" sanitary sewer mains; complete as specified Each 1.00 3892 Excavation special (sanitary); complete as specified Tons 10.00 3974 Furnish sanitary sewer manhole grouting setup; complete as specified Each 7.00 3975 Furnish and install sanitary sewer manhole grouting; complete as specified Gallons 50.00 3976 Furnish sanitary sewer manhole cementitious liner setup Each 2.00 3977 Furnish and install sanitary sewer structural cementitious liner- PERMACAST by AP/M PERMAFORM; complete as specified Vertical Feet 10.00 Bid Total: Unit Price Extension Dorner Inc. $4,626.00 $13,878.00 $5,428.00 $5,428.00 $25.00 $250.00 $1,636.00 $11,452.00 $10.00 $500.00 $1,584.00 $3,168.00 $195.00 $1,950.00 $729,860.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-11 San MH Rehab\Project_Information\Contract Info\22-11 Bid Tab_7-18-22 Page 12 of 12 7/18/2022