HomeMy WebLinkAbout04. 22-311JULY 26, 2022 22-311 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID FOR PUBLIC WORKS CONTRACT NO. 22-02 TO ADVANCE CONSTRUCTION, INC. FOR EAST 9TH AVENUE RECONSTRUCTION ($2,468,231.85) INITIATED BY: DEPARTMENT OF PUBLIC WORKS WHEREAS, the City of Oshkosh has heretofore advertised for bids for East 9th Avenue reconstruction in the City of Oshkosh; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: ADVANCE CONSTRUCTION, INC. 2141 Woodale Avenue Green Bay, WI 54313 Total Bid: $2,468,231.85 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. Nos. 03210410-6801-04202 Contract Control - Paving-22-02 East 9th Ave Reconstruction 03210410-6802-04202 Contract Control - Sanitary Sewer-22-02 East 9th Ave Reconstruction 03210410-6803-04202 Contract Control - Water Main-22-02 East 9th Ave Reconstruction 03210410-6804-04202 Contract Control - Storm Sewer-22-02 East 9th Ave Reconstruction 03210410-6806-04202 Contract Control - Sidewalk-22-02 East 9th Ave Reconstruction JULY 26, 2022 22-311 RESOLUTION CONT’D 03210410-6809-04202 Contract Control - Traffic-22-02 East 9th Ave Reconstruction 03210410-6810-04202 Contract Control - Admin-22-02 East 9th Ave Reconstruction I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Correspondence\Memo\22-02 Memo for Bid Award_7-21-22.docx Page 1 of 2 TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer DATE: July 21, 2022 RE: Award Bid for Public Works Contract No. 22-02 to Advance Construction, Inc. for East 9th Avenue Reconstruction ($2,468,231.85) BACKGROUND The purpose of this Project is to reconstruct East 9th Avenue, from South Main Street to the railroad tracks. Sanitary sewer and laterals, water main and laterals, and storm sewer and laterals will be installed, replaced, or repaired, as needed, prior to placing the concrete pavement patch. Defective sidewalk squares, including those that do not meet the Americans with Disabilities Act (ADA) requirements, will be repaired during the Project, and new concrete driveway aprons will be constructed where needed, provided property owners have returned the Construction Access Agreement the City mailed to them. Sidewalks and drive aprons abutting properties whose property owners have not returned the Construction Access Agreement will have partial sidewalk sections removed and patched. In 2023, property owners will be responsible for repairing drive aprons and all patched and non-ADA compliant sidewalks that cannot be constructed with this Project. ANALYSIS Engineering staff reviewed five (5) bids. The low Bid was received from Advance Construction, Inc. of Green Bay, Wisconsin. The total bid is $2,468,231.85. FISCAL IMPACT Funding for the East 9th Avenue Reconstruction Project is in the 2022 Capital Improvement Program (CIP) (Account No. 03210410-6801-04202/Contract Control- Paving-22-02 East 9th Ave Reconstruction, 03210410-6802-04202/Contract Control- Sanitary Sewer-22-02 East 9th Ave Reconstruction, 03210410-6803-04202/Contract Control-Water Main-22-02 East 9th Ave Reconstruction, 03210410-6804-04202/Contract Control-Storm Sewer-22-02 East 9th Ave Reconstruction, 03210410-6806-04202/Contract I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Correspondence\Memo\22-02 Memo for Bid Award_7-21-22.docx Page 2 of 2 Control-Sidewalk-22-02 East 9th Ave Reconstruction, 03210410-6809-04202/Contract Control-Traffic-22-02 East 9th Ave Reconstruction, and 03210410-6810-04202-Contract Control-Admin-22-02 East 9th Ave Reconstruction). $58,210.88 will be transferred from Account No. 03210410-6803-04912 (Contract Control-Water Main-Miscellaneous Utility Improvements) to Account No. 03210410-6803-04207/ Contract Control-Water Main-22- 07 Oregon St Interceptor Sewer. Following is a summary of the available funds and the estimated total construction cost, including ancillary costs such as engineering fees, landfill tipping fees, construction materials testing fees, and other construction-related expenses. Special Assessments will be levied to adjoining property owners per the City’s Special Assessment Policy. CIP Section CIP Funds Budgeted Estimated Total Construction Cost Street $1,605,100 $945,159 Storm Sewer $2,542,300 $1,226,309 Sanitary Sewer $441,300 $131,625 Water Main $801,900 $277,560 Sidewalk $88,000 $63,964 Traffic $500,000 $343,618 Admin $6,000 $6,000 Totals $5,984,600 $2,994,236 RECOMMENDATIONS I recommend award to the low bidder, Advance Construction, Inc. in the amount of $2,468,231.85. Approved: Mark A. Rohloff City Manager JLG/tlt Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Section 1: Base Bid $2,468,231.85 $2,597,938.81 500 Salvaged crushed concrete credit; complete as specified Tons 13,400.00 ($8.50) ($113,900.00) ($7.60) ($101,840.00) 1010 Clearing; complete as specified Stations 3.50 $600.00 $2,100.00 $715.00 $2,502.50 1020 Grubbing; complete as specified Stations 3.50 $400.00 $1,400.00 $715.00 $2,502.50 1050 Mobilization; complete as specified Lump Sum 1.00 $148,500.00 $148,500.00 $238,500.00 $238,500.00 1100 Removing pavement; complete as specified Square Yards 1,440.00 $7.70 $11,088.00 $1.00 $1,440.00 1101 Removing railroad rails; complete as specified Linear Feet 800.00 $24.00 $19,200.00 $5.00 $4,000.00 1102 Removing railroad ties; complete as specified Tons 50.00 $100.00 $5,000.00 $52.00 $2,600.00 1103 Removing building foundations; complete as specified Linear Feet 500.00 $40.00 $20,000.00 $2.50 $1,250.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 3,900.00 $0.88 $3,432.00 $0.50 $1,950.00 1200 Unclassified excavation; complete as specified Cubic Yards 6,550.00 $8.00 $52,400.00 $8.70 $56,985.00 1220 Excavation special (paving); complete as specified Tons 3,625.00 $10.30 $37,337.50 $18.04 $65,395.00 1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 1,050.00 $62.44 $65,562.00 $60.57 $63,598.50 1314A 8" concrete pavement doweled; with 6" CABC and grading; complete as specified Square Yards 4,625.00 $54.44 $251,785.00 $62.57 $289,386.25 1315 8" concrete pavement doweled; HES; with 6" CABC and grading; complete as specified Square Yards 570.00 $68.45 $39,016.50 $66.57 $37,944.90 1334 Concrete pavement gaps; complete as specified Each 2.00 $1,500.00 $3,000.00 $1,500.00 $3,000.00 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 1 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 1340 Crushed aggregate base course; complete as specified Tons 7,950.00 $15.00 $119,250.00 $13.90 $110,505.00 1350 Pavement ties; complete as specified Each 70.00 $9.00 $630.00 $9.00 $630.00 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 160.00 $14.00 $2,240.00 $14.00 $2,240.00 1360 Adjust manholes and inlets; complete as specified Each 20.00 $350.00 $7,000.00 $350.00 $7,000.00 1370 Turf restoration; complete as specified Square Yards 3,290.00 $7.50 $24,675.00 $10.50 $34,545.00 1372 Restore gravel driveway/apron; complete as specified Square Yards 385.00 $7.00 $2,695.00 $8.32 $3,203.20 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 900.00 $0.01 $9.00 $0.01 $9.00 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 900.00 $0.01 $9.00 $0.01 $9.00 1384 Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as specified Square Yards 900.00 $0.01 $9.00 $0.01 $9.00 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 200.00 $10.00 $2,000.00 $10.00 $2,000.00 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 120.00 $17.00 $2,040.00 $15.00 $1,800.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 9,400.00 $5.85 $54,990.00 $6.97 $65,518.00 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 1,550.00 $6.70 $10,385.00 $7.82 $12,121.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 2 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 1520 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 2,820.00 $7.75 $21,855.00 $8.87 $25,013.40 1524 8" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 880.00 $8.35 $7,348.00 $9.47 $8,333.60 1540 Curb ramp detectable warning field (natural/non-painted); complete as specified Square Feet 120.00 $35.00 $4,200.00 $35.00 $4,200.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 200.00 $2.25 $450.00 $2.25 $450.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 20.00 $5.00 $100.00 $5.00 $100.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 2,150.00 $0.01 $21.50 $0.01 $21.50 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 2,150.00 $0.01 $21.50 $0.01 $21.50 1584 Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specified Square Feet 2,150.00 $0.01 $21.50 $0.01 $21.50 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 32.00 $20.00 $640.00 $20.00 $640.00 1650 Locate existing property monuments; complete as specified Each 5.00 $150.00 $750.00 $150.00 $750.00 1652 Replace existing property monuments; complete as specified Each 5.00 $50.00 $250.00 $50.00 $250.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 3 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 1700 Sawing existing pavement; complete as specified Linear Feet 110.00 $3.80 $418.00 $3.00 $330.00 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 340.00 $3.80 $1,292.00 $3.00 $1,020.00 1900 Tack coat; complete as specified Gallons 3.00 $2.95 $8.85 $2.98 $8.94 1915 5" asphaltic surface MT with 6" CABC and grading; complete as specified Square Yards 50.00 $77.00 $3,850.00 $73.03 $3,651.50 1917 2" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 100.00 $23.00 $2,300.00 $18.99 $1,899.00 1918 Asphaltic cold weather paving; complete as specified Square Yards 20.00 $12.30 $246.00 $12.43 $248.60 1971 Furnish and install collapsible bollards; complete as specified Lump Sum 1.00 $2,500.00 $2,500.00 $500.00 $500.00 1972 Furnish and install chain link fence; complete as specified Linear Feet 320.00 $80.00 $25,600.00 $80.00 $25,600.00 1973 Furnish and install chain link fence gate; complete as specified Each 1.00 $6,300.00 $6,300.00 $6,800.00 $6,800.00 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 660.00 $3.50 $2,310.00 $3.50 $2,310.00 1975 Pavement markings; epoxy; 4" (yellow); complete as specified Linear Feet 2,240.00 $1.75 $3,920.00 $1.75 $3,920.00 1976 Pavement markings; epoxy; 8" (white); complete as specified Linear Feet 390.00 $2.90 $1,131.00 $2.90 $1,131.00 1977 Pavement markings; cross- walk epoxy; 6" (white); complete as specified Linear Feet 430.00 $11.00 $4,730.00 $11.00 $4,730.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 4 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 1978 Pavement markings; stop- line epoxy; 18" (white); complete as specified Linear Feet 140.00 $13.00 $1,820.00 $13.00 $1,820.00 1979 Pavement markings; arrow epoxy; Type 1 (white); complete as specified Each 1.00 $215.00 $215.00 $215.00 $215.00 1980 Pavement markings; arrow epoxy; Type 2 (white); complete as specified Each 3.00 $225.00 $675.00 $225.00 $675.00 1983 Pavement markings; word; epoxy (white); complete as specified Each 1.00 $250.00 $250.00 $250.00 $250.00 1984 Pavement markings; symbol; epoxy (white); complete as specified Each 1.00 $225.00 $225.00 $225.00 $225.00 1985 Temporary pavement markings; paint; 4" (white); complete as specified Linear Feet 1,000.00 $1.00 $1,000.00 $2.60 $2,600.00 1986 Remove pavement markings; complete as specified Linear Feet 100.00 $2.00 $200.00 $2.00 $200.00 1988 Pavement markings; railroad crossing; epoxy (white); complete as specified Lump Sum 1.00 $1,100.00 $1,100.00 $1,100.00 $1,100.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 219.00 $89.00 $19,491.00 $93.85 $20,553.15 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 88.00 $96.00 $8,448.00 $112.50 $9,900.00 2015 Furnish and install 24" storm sewer; complete as specified Linear Feet 6.00 $131.00 $786.00 $230.00 $1,380.00 2021 Furnish and install 30" storm sewer; complete as specified Linear Feet 200.00 $160.00 $32,000.00 $212.80 $42,560.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 5 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 2072 Furnish and install 4' x 6' box culvert storm sewer; complete as specified Linear Feet 580.00 $880.00 $510,400.00 $888.80 $515,504.00 2078 Furnish and install 4' x 8' box culvert storm sewer; complete as specified Linear Feet 347.00 $1,165.00 $404,255.00 $1,201.80 $417,024.60 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 36.00 $644.00 $23,184.00 $614.00 $22,104.00 2225A Furnish and install storm sewer junction chamber E- 6; complete as specified Each 1.00 $24,000.00 $24,000.00 $31,718.00 $31,718.00 2225B Furnish and install storm sewer junction chamber E- 9; complete as specified Each 1.00 $29,000.00 $29,000.00 $40,994.00 $40,994.00 2227 Furnish and install standard storm sewer manhole riser (4' diameter); complete as specified Vertical Feet 13.00 $400.00 $5,200.00 $0.01 $0.13 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 6.00 $3,500.00 $21,000.00 $3,058.00 $18,348.00 2404 Furnish and install storm sewer marker balls; complete as specified Each 2.00 $60.00 $120.00 $68.00 $136.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 20.00 $100.00 $2,000.00 $150.00 $3,000.00 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 6.00 $60.00 $360.00 $25.00 $150.00 2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 230.00 $3.00 $690.00 $3.00 $690.00 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 15.00 $15.00 $225.00 $20.00 $300.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 6 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 40.00 $30.00 $1,200.00 $15.00 $600.00 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 328.00 $13.00 $4,264.00 $6.78 $2,223.84 2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 73.00 $18.00 $1,314.00 $48.00 $3,504.00 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 195.00 $44.00 $8,580.00 $40.00 $7,800.00 2812 Remove storm sewer manholes and inlets; complete as specified Each 6.00 $600.00 $3,600.00 $400.00 $2,400.00 2850 Connect to existing storm sewer main; complete as specified Each 4.00 $550.00 $2,200.00 $580.00 $2,320.00 2950 Excavation special (storm); complete as specified Tons 400.00 $14.45 $5,780.00 $17.04 $6,816.00 2952 Bentonite slurry dam (storm); complete as specified Each 6.00 $350.00 $2,100.00 $1,200.00 $7,200.00 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 15.00 $240.00 $3,600.00 $130.00 $1,950.00 3032 Furnish and install 10" sanitary sewer (new); complete as specified Linear Feet 565.00 $128.00 $72,320.00 $93.10 $52,601.50 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 20.00 $550.00 $11,000.00 $714.00 $14,280.00 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 3.00 $590.00 $1,770.00 $763.00 $2,289.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 7 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 3116 Furnish and install sanitary sewer external manhole chimney seal extension; complete as specified Each 1.00 $450.00 $450.00 $378.00 $378.00 3118 Furnish and install sanitary sewer internal manhole chimney seal; complete as specified Each 1.00 $450.00 $450.00 $602.00 $602.00 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 2.00 $1,000.00 $2,000.00 $450.00 $900.00 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 1.00 $1,000.00 $1,000.00 $625.00 $625.00 3700 Closed circuit televising; complete as specified Linear Feet 580.00 $5.00 $2,900.00 $7.00 $4,060.00 3710 Closed circuit televising - using push camera; complete as specified Each 2.00 $1,500.00 $3,000.00 $500.00 $1,000.00 3892 Excavation special (sanitary); complete as specified Tons 230.00 $14.45 $3,323.50 $17.04 $3,919.20 3894 Bentonite slurry dam (sanitary); complete as specified Each 4.00 $300.00 $1,200.00 $1,200.00 $4,800.00 4002 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 90.00 $176.00 $15,840.00 $120.00 $10,800.00 4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 980.00 $176.00 $172,480.00 $127.80 $125,244.00 4060 Furnish and install connections to existing 8" water main; complete as specified Each 1.00 $2,500.00 $2,500.00 $2,450.00 $2,450.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 8 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 4110 Furnish and install 8" x 6" water main tee; complete as specified Each 2.00 $630.00 $1,260.00 $800.00 $1,600.00 4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 4.00 $310.00 $1,240.00 $316.00 $1,264.00 4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 4.00 $410.00 $1,640.00 $414.00 $1,656.00 4254 Furnish and install 6" water main cap; complete as specified Each 1.00 $300.00 $300.00 $182.00 $182.00 4352 Cut and cap existing 6" water main; complete as specified Each 1.00 $540.00 $540.00 $1,727.00 $1,727.00 4354 Cut and cap existing 8" water main; complete as specified Each 1.00 $600.00 $600.00 $1,785.00 $1,785.00 4401 Furnish and install 6" water main gate valve; complete as specified Each 2.00 $1,655.00 $3,310.00 $1,914.00 $3,828.00 4402 Furnish and install 8" water main gate valve; complete as specified Each 4.00 $2,295.00 $9,180.00 $2,618.00 $10,472.00 4438 Furnish and install 10" x 8" tapping valve and sleeve; complete as specified Each 1.00 $4,500.00 $4,500.00 $5,589.00 $5,589.00 4500 Furnish and install hydrant; complete as specified Each 2.00 $5,300.00 $10,600.00 $6,262.00 $12,524.00 4900 Abandon water main on E. 9TH AVENUE; complete as specified Lump Sum 1.00 $4,000.00 $4,000.00 $1,800.00 $1,800.00 4920 Remove water main; complete as specified Linear Feet 57.00 $40.00 $2,280.00 $53.00 $3,021.00 4990 Excavation special (water); complete as specified Tons 300.00 $14.45 $4,335.00 $17.04 $5,112.00 4992 Bentonite slurry dam (water); complete as specified Each 4.00 $300.00 $1,200.00 $1,200.00 $4,800.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 9 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 5013 Furnish and install pull box (non-conductive); 18" x 36"; complete as specified Each 8.00 $1,650.00 $13,200.00 $1,650.00 $13,200.00 5017 Furnish and install pull box - non-conductive, 24" x 36"; complete as specified Each 9.00 $1,750.00 $15,750.00 $1,750.00 $15,750.00 5025 Adjust pull box; complete as specified Each 16.00 $275.00 $4,400.00 $275.00 $4,400.00 5026 Remove pull box; complete as specified Each 7.00 $125.00 $875.00 $125.00 $875.00 5027 Remove concrete base; complete as specified Each 7.00 $200.00 $1,400.00 $200.00 $1,400.00 5051 Install CITY-supplied lighting control cabinet; complete as specified Each 1.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 5053 Install CITY-supplied fully-actuated 8-phase traffic signal control cabinet; complete as specified Each 1.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 5054 Install electrical service; complete as specified Each 1.00 $1,750.00 $1,750.00 $1,750.00 $1,750.00 5100 Furnish and install 1" Schedule 40 PVC; complete as specified Linear Feet 30.00 $8.00 $240.00 $8.00 $240.00 5120 Furnish and install 2" Schedule 40 PVC; complete as specified Linear Feet 170.00 $10.00 $1,700.00 $10.00 $1,700.00 5124 Furnish and install 2.5" Schedule 40 PVC; complete as specified Linear Feet 40.00 $15.00 $600.00 $15.00 $600.00 5130 Furnish and install 3" Schedule 40 PVC; complete as specified Linear Feet 2,440.00 $14.00 $34,160.00 $14.00 $34,160.00 5180 Connect to existing pull box; complete as specified Each 2.00 $250.00 $500.00 $250.00 $500.00 5181 Connect to existing conduit; complete as specified Each 9.00 $200.00 $1,800.00 $200.00 $1,800.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 10 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 5230 Furnish and install 4 gauge red-coated wire; complete as specified Linear Feet 2,310.00 $2.50 $5,775.00 $2.50 $5,775.00 5231 Furnish and install 4 gauge black-coated wire; complete as specified Linear Feet 2,310.00 $2.50 $5,775.00 $2.50 $5,775.00 5252 Furnish and install 8 gauge green-coated wire; complete as specified Linear Feet 1,740.00 $1.50 $2,610.00 $1.50 $2,610.00 5260 Furnish and install 10 gauge red-coated wire; complete as specified Linear Feet 250.00 $0.90 $225.00 $0.90 $225.00 5261 Furnish and install 10 gauge black-coated wire; complete as specified Linear Feet 250.00 $0.90 $225.00 $0.90 $225.00 5262 Furnish and install 10 gauge green-coated wire; complete as specified Linear Feet 610.00 $0.90 $549.00 $0.90 $549.00 5270 Furnish and install 12 gauge red-coated wire; complete as specified Linear Feet 230.00 $0.85 $195.50 $0.85 $195.50 5271 Furnish and install 12 gauge black-coated wire; complete as specified Linear Feet 230.00 $0.85 $195.50 $0.85 $195.50 5272 Furnish and install 12 gauge green-coated wire; complete as specified Linear Feet 230.00 $0.85 $195.50 $0.85 $195.50 5282 Furnish and install 14 gauge green-coated wire; complete as specified Linear Feet 230.00 $0.85 $195.50 $0.85 $195.50 5356 Furnish and install 14 gauge stranded single pair twisted with shield; complete as specified Linear Feet 720.00 $2.00 $1,440.00 $2.00 $1,440.00 5360 Furnish and install 14 AWG solid 3 conductor; complete as specified Linear Feet 110.00 $1.90 $209.00 $1.90 $209.00 5362 Furnish and install 14 AWG solid 5 conductor; complete as specified Linear Feet 120.00 $2.00 $240.00 $2.00 $240.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 11 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 5364 Furnish and install 14 AWG solid 7 conductor; complete as specified Linear Feet 240.00 $2.50 $600.00 $2.50 $600.00 5366 Furnish and install 14 AWG solid 9 conductor; complete as specified Linear Feet 140.00 $3.25 $455.00 $3.25 $455.00 5372 Furnish and install 14 AWG solid 21 conductor; complete as specified Linear Feet 1,180.00 $4.75 $5,605.00 $4.75 $5,605.00 5380 Furnish and install fuse holder; complete as specified Each 20.00 $50.00 $1,000.00 $50.00 $1,000.00 5386 Furnish and install 2A fuse; complete as specified Each 20.00 $5.00 $100.00 $5.00 $100.00 5410 Install CITY-supplied decorative pole and pole top light structure; complete as specified Each 8.00 $750.00 $6,000.00 $750.00 $6,000.00 5412 Install CITY-supplied inverted acorn structure; complete as specified Each 1.00 $750.00 $750.00 $750.00 $750.00 5420 Install CITY-supplied 10' traffic signal pole with a pedestal base, complete as specified Each 2.00 $250.00 $500.00 $250.00 $500.00 5422 Install CITY-supplied 15' traffic signal pole with a pedestal base; complete as specified Each 4.00 $250.00 $1,000.00 $250.00 $1,000.00 5424 Install CITY-supplied 20' traffic signal pole with a pedestal base; complete as specified Each 3.00 $550.00 $1,650.00 $550.00 $1,650.00 5426 Install CITY-supplied 30' traffic signal pole with a transformer base; complete as specified Each 2.00 $750.00 $1,500.00 $750.00 $1,500.00 5431 Install CITY-supplied 25' trombone arm; complete as specified Each 4.00 $750.00 $3,000.00 $750.00 $3,000.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 12 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension 2141 Woodale Avenue Green Bay, WI 54313 Advance Construction, Inc.Vinton Construction Company 5434 Install CITY-supplied three-section traffic signal head; back plate; and LED modules; complete as specified Each 5.00 $550.00 $2,750.00 $550.00 $2,750.00 5436 Install CITY-supplied five- section traffic signal head; back plate; and LED modules; complete as specified Each 8.00 $650.00 $5,200.00 $650.00 $5,200.00 5438 Install CITY-supplied pedestrian signal head with countdown timer; complete as specified Each 9.00 $350.00 $3,150.00 $350.00 $3,150.00 5440 Install CITY-supplied pedestrian push button; complete as specified Each 10.00 $200.00 $2,000.00 $200.00 $2,000.00 5458 Install CITY-supplied 10' truss-type luminaire arm with 4" clamp; complete as specified Each 2.00 $250.00 $500.00 $250.00 $500.00 5502 Furnish and install Type 2 base; complete as specified Each 15.00 $1,050.00 $15,750.00 $1,050.00 $15,750.00 5506 Furnish and install Type 9 base; complete as specified Each 2.00 $200.00 $400.00 $200.00 $400.00 5508 Furnish and install Type 2 Modified base; complete as specified Each 1.00 $1,500.00 $1,500.00 $1,500.00 $1,500.00 Bid Total:$2,468,231.85 $2,597,938.81 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 13 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Section 1: Base Bid 500 Salvaged crushed concrete credit; complete as specified Tons 13,400.00 1010 Clearing; complete as specified Stations 3.50 1020 Grubbing; complete as specified Stations 3.50 1050 Mobilization; complete as specified Lump Sum 1.00 1100 Removing pavement; complete as specified Square Yards 1,440.00 1101 Removing railroad rails; complete as specified Linear Feet 800.00 1102 Removing railroad ties; complete as specified Tons 50.00 1103 Removing building foundations; complete as specified Linear Feet 500.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 3,900.00 1200 Unclassified excavation; complete as specified Cubic Yards 6,550.00 1220 Excavation special (paving); complete as specified Tons 3,625.00 1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 1,050.00 1314A 8" concrete pavement doweled; with 6" CABC and grading; complete as specified Square Yards 4,625.00 1315 8" concrete pavement doweled; HES; with 6" CABC and grading; complete as specified Square Yards 570.00 1334 Concrete pavement gaps; complete as specified Each 2.00 Unit Price Extension Unit Price Extension $2,621,189.30 $2,867,114.50 ($7.60) ($101,840.00) ($7.50) ($100,500.00) $612.00 $2,142.00 $650.00 $2,275.00 $408.00 $1,428.00 $450.00 $1,575.00 $200,578.00 $200,578.00 $295,000.00 $295,000.00 $1.02 $1,468.80 $8.00 $11,520.00 $5.10 $4,080.00 $20.00 $16,000.00 $53.00 $2,650.00 $300.00 $15,000.00 $2.60 $1,300.00 $20.00 $10,000.00 $0.50 $1,950.00 $1.00 $3,900.00 $8.90 $58,295.00 $20.00 $131,000.00 $18.40 $66,700.00 $5.00 $18,125.00 $61.80 $64,890.00 $58.00 $60,900.00 $63.80 $295,075.00 $60.00 $277,500.00 $67.90 $38,703.00 $64.00 $36,480.00 $1,530.00 $3,060.00 $1,500.00 $3,000.00 Dorner Inc.Carl Bowers & Sons Const Co. Inc. I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 14 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 1340 Crushed aggregate base course; complete as specified Tons 7,950.00 1350 Pavement ties; complete as specified Each 70.00 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 160.00 1360 Adjust manholes and inlets; complete as specified Each 20.00 1370 Turf restoration; complete as specified Square Yards 3,290.00 1372 Restore gravel driveway/apron; complete as specified Square Yards 385.00 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 900.00 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 900.00 1384 Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as specified Square Yards 900.00 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 200.00 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 120.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 9,400.00 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 1,550.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $14.20 $112,890.00 $12.00 $95,400.00 $9.20 $644.00 $9.00 $630.00 $14.30 $2,288.00 $14.00 $2,240.00 $625.00 $12,500.00 $350.00 $7,000.00 $8.20 $26,978.00 $10.00 $32,900.00 $8.50 $3,272.50 $25.00 $9,625.00 $0.01 $9.00 $0.01 $9.00 $0.01 $9.00 $0.01 $9.00 $0.01 $9.00 $0.01 $9.00 $10.20 $2,040.00 $10.00 $2,000.00 $15.30 $1,836.00 $15.00 $1,800.00 $11.90 $111,860.00 $11.00 $103,400.00 $12.90 $19,995.00 $12.00 $18,600.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 15 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 1520 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 2,820.00 1524 8" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 880.00 1540 Curb ramp detectable warning field (natural/non-painted); complete as specified Square Feet 120.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 200.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 20.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 2,150.00 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 2,150.00 1584 Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specified Square Feet 2,150.00 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 32.00 1650 Locate existing property monuments; complete as specified Each 5.00 1652 Replace existing property monuments; complete as specified Each 5.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $13.90 $39,198.00 $13.00 $36,660.00 $14.90 $13,112.00 $14.00 $12,320.00 $45.90 $5,508.00 $50.00 $6,000.00 $2.00 $400.00 $3.00 $600.00 $10.20 $204.00 $11.00 $220.00 $1.02 $2,193.00 $0.01 $21.50 $2.04 $4,386.00 $0.01 $21.50 $3.06 $6,579.00 $0.01 $21.50 $20.00 $640.00 $10.00 $320.00 $153.00 $765.00 $100.00 $500.00 $51.00 $255.00 $50.00 $250.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 16 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 1700 Sawing existing pavement; complete as specified Linear Feet 110.00 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 340.00 1900 Tack coat; complete as specified Gallons 3.00 1915 5" asphaltic surface MT with 6" CABC and grading; complete as specified Square Yards 50.00 1917 2" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 100.00 1918 Asphaltic cold weather paving; complete as specified Square Yards 20.00 1971 Furnish and install collapsible bollards; complete as specified Lump Sum 1.00 1972 Furnish and install chain link fence; complete as specified Linear Feet 320.00 1973 Furnish and install chain link fence gate; complete as specified Each 1.00 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 660.00 1975 Pavement markings; epoxy; 4" (yellow); complete as specified Linear Feet 2,240.00 1976 Pavement markings; epoxy; 8" (white); complete as specified Linear Feet 390.00 1977 Pavement markings; cross- walk epoxy; 6" (white); complete as specified Linear Feet 430.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $3.10 $341.00 $3.00 $330.00 $4.60 $1,564.00 $5.00 $1,700.00 $3.00 $9.00 $3.00 $9.00 $83.30 $4,165.00 $73.00 $3,650.00 $28.80 $2,880.00 $20.00 $2,000.00 $12.50 $250.00 $12.50 $250.00 $1,530.00 $1,530.00 $2,500.00 $2,500.00 $82.00 $26,240.00 $55.00 $17,600.00 $6,936.00 $6,936.00 $7,000.00 $7,000.00 $3.60 $2,376.00 $3.50 $2,310.00 $1.80 $4,032.00 $1.75 $3,920.00 $3.00 $1,170.00 $2.90 $1,131.00 $11.20 $4,816.00 $11.00 $4,730.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 17 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 1978 Pavement markings; stop- line epoxy; 18" (white); complete as specified Linear Feet 140.00 1979 Pavement markings; arrow epoxy; Type 1 (white); complete as specified Each 1.00 1980 Pavement markings; arrow epoxy; Type 2 (white); complete as specified Each 3.00 1983 Pavement markings; word; epoxy (white); complete as specified Each 1.00 1984 Pavement markings; symbol; epoxy (white); complete as specified Each 1.00 1985 Temporary pavement markings; paint; 4" (white); complete as specified Linear Feet 1,000.00 1986 Remove pavement markings; complete as specified Linear Feet 100.00 1988 Pavement markings; railroad crossing; epoxy (white); complete as specified Lump Sum 1.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 219.00 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 88.00 2015 Furnish and install 24" storm sewer; complete as specified Linear Feet 6.00 2021 Furnish and install 30" storm sewer; complete as specified Linear Feet 200.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $13.30 $1,862.00 $13.00 $1,820.00 $219.00 $219.00 $215.00 $215.00 $230.00 $690.00 $225.00 $675.00 $255.00 $255.00 $250.00 $250.00 $230.00 $230.00 $225.00 $225.00 $2.70 $2,700.00 $2.60 $2,600.00 $2.00 $200.00 $2.00 $200.00 $1,122.00 $1,122.00 $1,100.00 $1,100.00 $68.00 $14,892.00 $122.00 $26,718.00 $74.00 $6,512.00 $127.00 $11,176.00 $288.00 $1,728.00 $149.00 $894.00 $195.00 $39,000.00 $260.00 $52,000.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 18 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 2072 Furnish and install 4' x 6' box culvert storm sewer; complete as specified Linear Feet 580.00 2078 Furnish and install 4' x 8' box culvert storm sewer; complete as specified Linear Feet 347.00 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 36.00 2225A Furnish and install storm sewer junction chamber E- 6; complete as specified Each 1.00 2225B Furnish and install storm sewer junction chamber E- 9; complete as specified Each 1.00 2227 Furnish and install standard storm sewer manhole riser (4' diameter); complete as specified Vertical Feet 13.00 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 6.00 2404 Furnish and install storm sewer marker balls; complete as specified Each 2.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 20.00 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 6.00 2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 230.00 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 15.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $884.00 $512,720.00 $950.00 $551,000.00 $1,260.00 $437,220.00 $1,235.00 $428,545.00 $563.00 $20,268.00 $700.00 $25,200.00 $28,045.00 $28,045.00 $39,000.00 $39,000.00 $34,409.00 $34,409.00 $43,000.00 $43,000.00 $378.00 $4,914.00 $700.00 $9,100.00 $3,213.00 $19,278.00 $3,300.00 $19,800.00 $43.00 $86.00 $40.00 $80.00 $102.00 $2,040.00 $100.00 $2,000.00 $5.00 $30.00 $25.00 $150.00 $3.00 $690.00 $5.00 $1,150.00 $15.00 $225.00 $20.00 $300.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 19 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 40.00 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 328.00 2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 73.00 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 195.00 2812 Remove storm sewer manholes and inlets; complete as specified Each 6.00 2850 Connect to existing storm sewer main; complete as specified Each 4.00 2950 Excavation special (storm); complete as specified Tons 400.00 2952 Bentonite slurry dam (storm); complete as specified Each 6.00 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 15.00 3032 Furnish and install 10" sanitary sewer (new); complete as specified Linear Feet 565.00 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 20.00 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 3.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $12.00 $480.00 $15.00 $600.00 $9.00 $2,952.00 $20.00 $6,560.00 $29.00 $2,117.00 $35.00 $2,555.00 $29.00 $5,655.00 $50.00 $9,750.00 $324.00 $1,944.00 $1,000.00 $6,000.00 $995.00 $3,980.00 $1,000.00 $4,000.00 $20.00 $8,000.00 $15.00 $6,000.00 $775.00 $4,650.00 $1,000.00 $6,000.00 $162.00 $2,430.00 $120.00 $1,800.00 $82.00 $46,330.00 $115.00 $64,975.00 $579.00 $11,580.00 $500.00 $10,000.00 $602.00 $1,806.00 $590.00 $1,770.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 20 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 3116 Furnish and install sanitary sewer external manhole chimney seal extension; complete as specified Each 1.00 3118 Furnish and install sanitary sewer internal manhole chimney seal; complete as specified Each 1.00 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 2.00 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 1.00 3700 Closed circuit televising; complete as specified Linear Feet 580.00 3710 Closed circuit televising - using push camera; complete as specified Each 2.00 3892 Excavation special (sanitary); complete as specified Tons 230.00 3894 Bentonite slurry dam (sanitary); complete as specified Each 4.00 4002 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 90.00 4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 980.00 4060 Furnish and install connections to existing 8" water main; complete as specified Each 1.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $459.00 $459.00 $450.00 $450.00 $459.00 $459.00 $450.00 $450.00 $1,031.00 $2,062.00 $1,500.00 $3,000.00 $574.00 $574.00 $800.00 $800.00 $2.50 $1,450.00 $3.00 $1,740.00 $117.00 $234.00 $500.00 $1,000.00 $20.00 $4,600.00 $15.00 $3,450.00 $508.00 $2,032.00 $1,500.00 $6,000.00 $94.00 $8,460.00 $122.00 $10,980.00 $112.00 $109,760.00 $135.00 $132,300.00 $2,176.00 $2,176.00 $2,500.00 $2,500.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 21 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 4110 Furnish and install 8" x 6" water main tee; complete as specified Each 2.00 4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 4.00 4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 4.00 4254 Furnish and install 6" water main cap; complete as specified Each 1.00 4352 Cut and cap existing 6" water main; complete as specified Each 1.00 4354 Cut and cap existing 8" water main; complete as specified Each 1.00 4401 Furnish and install 6" water main gate valve; complete as specified Each 2.00 4402 Furnish and install 8" water main gate valve; complete as specified Each 4.00 4438 Furnish and install 10" x 8" tapping valve and sleeve; complete as specified Each 1.00 4500 Furnish and install hydrant; complete as specified Each 2.00 4900 Abandon water main on E. 9TH AVENUE; complete as specified Lump Sum 1.00 4920 Remove water main; complete as specified Linear Feet 57.00 4990 Excavation special (water); complete as specified Tons 300.00 4992 Bentonite slurry dam (water); complete as specified Each 4.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $752.00 $1,504.00 $700.00 $1,400.00 $357.00 $1,428.00 $400.00 $1,600.00 $486.00 $1,944.00 $500.00 $2,000.00 $189.00 $189.00 $250.00 $250.00 $789.00 $789.00 $1,000.00 $1,000.00 $923.00 $923.00 $1,200.00 $1,200.00 $1,932.00 $3,864.00 $2,100.00 $4,200.00 $2,683.00 $10,732.00 $2,900.00 $11,600.00 $5,273.00 $5,273.00 $6,500.00 $6,500.00 $5,865.00 $11,730.00 $6,100.00 $12,200.00 $600.00 $600.00 $4,000.00 $4,000.00 $26.00 $1,482.00 $30.00 $1,710.00 $20.00 $6,000.00 $15.00 $4,500.00 $508.00 $2,032.00 $1,000.00 $4,000.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 22 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 5013 Furnish and install pull box (non-conductive); 18" x 36"; complete as specified Each 8.00 5017 Furnish and install pull box - non-conductive, 24" x 36"; complete as specified Each 9.00 5025 Adjust pull box; complete as specified Each 16.00 5026 Remove pull box; complete as specified Each 7.00 5027 Remove concrete base; complete as specified Each 7.00 5051 Install CITY-supplied lighting control cabinet; complete as specified Each 1.00 5053 Install CITY-supplied fully-actuated 8-phase traffic signal control cabinet; complete as specified Each 1.00 5054 Install electrical service; complete as specified Each 1.00 5100 Furnish and install 1" Schedule 40 PVC; complete as specified Linear Feet 30.00 5120 Furnish and install 2" Schedule 40 PVC; complete as specified Linear Feet 170.00 5124 Furnish and install 2.5" Schedule 40 PVC; complete as specified Linear Feet 40.00 5130 Furnish and install 3" Schedule 40 PVC; complete as specified Linear Feet 2,440.00 5180 Connect to existing pull box; complete as specified Each 2.00 5181 Connect to existing conduit; complete as specified Each 9.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $1,683.00 $13,464.00 $1,650.00 $13,200.00 $1,785.00 $16,065.00 $1,750.00 $15,750.00 $281.00 $4,496.00 $275.00 $4,400.00 $128.00 $896.00 $125.00 $875.00 $204.00 $1,428.00 $200.00 $1,400.00 $2,040.00 $2,040.00 $2,000.00 $2,000.00 $2,040.00 $2,040.00 $2,000.00 $2,000.00 $1,785.00 $1,785.00 $1,750.00 $1,750.00 $8.20 $246.00 $8.00 $240.00 $10.20 $1,734.00 $10.00 $1,700.00 $15.30 $612.00 $15.00 $600.00 $14.30 $34,892.00 $14.00 $34,160.00 $255.00 $510.00 $250.00 $500.00 $204.00 $1,836.00 $200.00 $1,800.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 23 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 5230 Furnish and install 4 gauge red-coated wire; complete as specified Linear Feet 2,310.00 5231 Furnish and install 4 gauge black-coated wire; complete as specified Linear Feet 2,310.00 5252 Furnish and install 8 gauge green-coated wire; complete as specified Linear Feet 1,740.00 5260 Furnish and install 10 gauge red-coated wire; complete as specified Linear Feet 250.00 5261 Furnish and install 10 gauge black-coated wire; complete as specified Linear Feet 250.00 5262 Furnish and install 10 gauge green-coated wire; complete as specified Linear Feet 610.00 5270 Furnish and install 12 gauge red-coated wire; complete as specified Linear Feet 230.00 5271 Furnish and install 12 gauge black-coated wire; complete as specified Linear Feet 230.00 5272 Furnish and install 12 gauge green-coated wire; complete as specified Linear Feet 230.00 5282 Furnish and install 14 gauge green-coated wire; complete as specified Linear Feet 230.00 5356 Furnish and install 14 gauge stranded single pair twisted with shield; complete as specified Linear Feet 720.00 5360 Furnish and install 14 AWG solid 3 conductor; complete as specified Linear Feet 110.00 5362 Furnish and install 14 AWG solid 5 conductor; complete as specified Linear Feet 120.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $2.60 $6,006.00 $2.50 $5,775.00 $2.60 $6,006.00 $2.50 $5,775.00 $1.50 $2,610.00 $1.50 $2,610.00 $0.90 $225.00 $0.90 $225.00 $0.90 $225.00 $0.90 $225.00 $0.90 $549.00 $0.90 $549.00 $0.90 $207.00 $0.85 $195.50 $0.90 $207.00 $0.85 $195.50 $0.90 $207.00 $0.85 $195.50 $0.90 $207.00 $0.85 $195.50 $2.00 $1,440.00 $2.00 $1,440.00 $1.90 $209.00 $1.90 $209.00 $2.00 $240.00 $2.00 $240.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 24 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 5364 Furnish and install 14 AWG solid 7 conductor; complete as specified Linear Feet 240.00 5366 Furnish and install 14 AWG solid 9 conductor; complete as specified Linear Feet 140.00 5372 Furnish and install 14 AWG solid 21 conductor; complete as specified Linear Feet 1,180.00 5380 Furnish and install fuse holder; complete as specified Each 20.00 5386 Furnish and install 2A fuse; complete as specified Each 20.00 5410 Install CITY-supplied decorative pole and pole top light structure; complete as specified Each 8.00 5412 Install CITY-supplied inverted acorn structure; complete as specified Each 1.00 5420 Install CITY-supplied 10' traffic signal pole with a pedestal base, complete as specified Each 2.00 5422 Install CITY-supplied 15' traffic signal pole with a pedestal base; complete as specified Each 4.00 5424 Install CITY-supplied 20' traffic signal pole with a pedestal base; complete as specified Each 3.00 5426 Install CITY-supplied 30' traffic signal pole with a transformer base; complete as specified Each 2.00 5431 Install CITY-supplied 25' trombone arm; complete as specified Each 4.00 Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $2.60 $624.00 $2.50 $600.00 $3.30 $462.00 $3.25 $455.00 $4.80 $5,664.00 $4.75 $5,605.00 $51.00 $1,020.00 $50.00 $1,000.00 $5.00 $100.00 $5.00 $100.00 $765.00 $6,120.00 $750.00 $6,000.00 $765.00 $765.00 $750.00 $750.00 $255.00 $510.00 $250.00 $500.00 $255.00 $1,020.00 $250.00 $1,000.00 $561.00 $1,683.00 $550.00 $1,650.00 $765.00 $1,530.00 $750.00 $1,500.00 $765.00 $3,060.00 $750.00 $3,000.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 25 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 5434 Install CITY-supplied three-section traffic signal head; back plate; and LED modules; complete as specified Each 5.00 5436 Install CITY-supplied five- section traffic signal head; back plate; and LED modules; complete as specified Each 8.00 5438 Install CITY-supplied pedestrian signal head with countdown timer; complete as specified Each 9.00 5440 Install CITY-supplied pedestrian push button; complete as specified Each 10.00 5458 Install CITY-supplied 10' truss-type luminaire arm with 4" clamp; complete as specified Each 2.00 5502 Furnish and install Type 2 base; complete as specified Each 15.00 5506 Furnish and install Type 9 base; complete as specified Each 2.00 5508 Furnish and install Type 2 Modified base; complete as specified Each 1.00 Bid Total: Unit Price Extension Unit Price Extension Dorner Inc.Carl Bowers & Sons Const Co. Inc. $561.00 $2,805.00 $550.00 $2,750.00 $663.00 $5,304.00 $650.00 $5,200.00 $357.00 $3,213.00 $350.00 $3,150.00 $204.00 $2,040.00 $200.00 $2,000.00 $255.00 $510.00 $250.00 $500.00 $1,071.00 $16,065.00 $1,050.00 $15,750.00 $204.00 $408.00 $200.00 $400.00 $1,530.00 $1,530.00 $1,500.00 $1,500.00 $2,621,189.30 $2,867,114.50 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 26 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity Section 1: Base Bid 500 Salvaged crushed concrete credit; complete as specified Tons 13,400.00 1010 Clearing; complete as specified Stations 3.50 1020 Grubbing; complete as specified Stations 3.50 1050 Mobilization; complete as specified Lump Sum 1.00 1100 Removing pavement; complete as specified Square Yards 1,440.00 1101 Removing railroad rails; complete as specified Linear Feet 800.00 1102 Removing railroad ties; complete as specified Tons 50.00 1103 Removing building foundations; complete as specified Linear Feet 500.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 3,900.00 1200 Unclassified excavation; complete as specified Cubic Yards 6,550.00 1220 Excavation special (paving); complete as specified Tons 3,625.00 1313 8" concrete pavement HES; with 6" CABC and grading; complete as specified Square Yards 1,050.00 1314A 8" concrete pavement doweled; with 6" CABC and grading; complete as specified Square Yards 4,625.00 1315 8" concrete pavement doweled; HES; with 6" CABC and grading; complete as specified Square Yards 570.00 1334 Concrete pavement gaps; complete as specified Each 2.00 Unit Price Extension $2,895,000.00 ($7.60) ($101,840.00) $1,945.00 $6,807.50 $1,945.00 $6,807.50 $345,678.65 $345,678.65 $5.80 $8,352.00 $5.20 $4,160.00 $54.00 $2,700.00 $2.60 $1,300.00 $0.55 $2,145.00 $9.00 $58,950.00 $18.75 $67,968.75 $62.90 $66,045.00 $64.95 $300,393.75 $69.10 $39,387.00 $1,555.00 $3,110.00 PTS Contractors, Inc I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 27 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 1340 Crushed aggregate base course; complete as specified Tons 7,950.00 1350 Pavement ties; complete as specified Each 70.00 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 160.00 1360 Adjust manholes and inlets; complete as specified Each 20.00 1370 Turf restoration; complete as specified Square Yards 3,290.00 1372 Restore gravel driveway/apron; complete as specified Square Yards 385.00 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 900.00 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 900.00 1384 Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as specified Square Yards 900.00 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 200.00 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 120.00 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 9,400.00 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 1,550.00 Unit Price Extension PTS Contractors, Inc $14.40 $114,480.00 $9.50 $665.00 $14.50 $2,320.00 $365.00 $7,300.00 $8.30 $27,307.00 $8.65 $3,330.25 $0.01 $9.00 $0.01 $9.00 $0.01 $9.00 $10.40 $2,080.00 $15.50 $1,860.00 $12.00 $112,800.00 $13.00 $20,150.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 28 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 1520 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 2,820.00 1524 8" concrete sidewalk/ driveway/ramp (HES) with 3" CABC and grading; complete as specified Square Feet 880.00 1540 Curb ramp detectable warning field (natural/non-painted); complete as specified Square Feet 120.00 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 200.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 20.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 2,150.00 1582 Cold weather covering (sidewalk) - double visquine; complete as specified Square Feet 2,150.00 1584 Cold weather covering (sidewalk) - double visquine with 6" hay; complete as specified Square Feet 2,150.00 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 32.00 1650 Locate existing property monuments; complete as specified Each 5.00 1652 Replace existing property monuments; complete as specified Each 5.00 Unit Price Extension PTS Contractors, Inc $14.00 $39,480.00 $15.00 $13,200.00 $46.00 $5,520.00 $2.10 $420.00 $10.50 $210.00 $1.00 $2,150.00 $2.00 $4,300.00 $3.00 $6,450.00 $20.00 $640.00 $155.00 $775.00 $52.00 $260.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 29 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 1700 Sawing existing pavement; complete as specified Linear Feet 110.00 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 340.00 1900 Tack coat; complete as specified Gallons 3.00 1915 5" asphaltic surface MT with 6" CABC and grading; complete as specified Square Yards 50.00 1917 2" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 100.00 1918 Asphaltic cold weather paving; complete as specified Square Yards 20.00 1971 Furnish and install collapsible bollards; complete as specified Lump Sum 1.00 1972 Furnish and install chain link fence; complete as specified Linear Feet 320.00 1973 Furnish and install chain link fence gate; complete as specified Each 1.00 1974 Pavement markings; epoxy; 4" (white); complete as specified Linear Feet 660.00 1975 Pavement markings; epoxy; 4" (yellow); complete as specified Linear Feet 2,240.00 1976 Pavement markings; epoxy; 8" (white); complete as specified Linear Feet 390.00 1977 Pavement markings; cross- walk epoxy; 6" (white); complete as specified Linear Feet 430.00 Unit Price Extension PTS Contractors, Inc $5.00 $550.00 $5.00 $1,700.00 $3.00 $9.00 $85.00 $4,250.00 $29.00 $2,900.00 $13.00 $260.00 $1,050.00 $1,050.00 $54.00 $17,280.00 $6,385.00 $6,385.00 $3.60 $2,376.00 $1.80 $4,032.00 $3.00 $1,170.00 $11.40 $4,902.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 30 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 1978 Pavement markings; stop- line epoxy; 18" (white); complete as specified Linear Feet 140.00 1979 Pavement markings; arrow epoxy; Type 1 (white); complete as specified Each 1.00 1980 Pavement markings; arrow epoxy; Type 2 (white); complete as specified Each 3.00 1983 Pavement markings; word; epoxy (white); complete as specified Each 1.00 1984 Pavement markings; symbol; epoxy (white); complete as specified Each 1.00 1985 Temporary pavement markings; paint; 4" (white); complete as specified Linear Feet 1,000.00 1986 Remove pavement markings; complete as specified Linear Feet 100.00 1988 Pavement markings; railroad crossing; epoxy (white); complete as specified Lump Sum 1.00 2003 Furnish and install 12" storm sewer; complete as specified Linear Feet 219.00 2006 Furnish and install 15" storm sewer; complete as specified Linear Feet 88.00 2015 Furnish and install 24" storm sewer; complete as specified Linear Feet 6.00 2021 Furnish and install 30" storm sewer; complete as specified Linear Feet 200.00 Unit Price Extension PTS Contractors, Inc $13.50 $1,890.00 $225.00 $225.00 $265.00 $795.00 $260.00 $260.00 $235.00 $235.00 $2.70 $2,700.00 $2.10 $210.00 $1,140.00 $1,140.00 $80.00 $17,520.00 $92.00 $8,096.00 $340.00 $2,040.00 $190.00 $38,000.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 31 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 2072 Furnish and install 4' x 6' box culvert storm sewer; complete as specified Linear Feet 580.00 2078 Furnish and install 4' x 8' box culvert storm sewer; complete as specified Linear Feet 347.00 2201 Furnish and install standard storm sewer manhole (4' diameter); complete as specified Vertical Feet 36.00 2225A Furnish and install storm sewer junction chamber E- 6; complete as specified Each 1.00 2225B Furnish and install storm sewer junction chamber E- 9; complete as specified Each 1.00 2227 Furnish and install standard storm sewer manhole riser (4' diameter); complete as specified Vertical Feet 13.00 2237 Furnish and install Type 3 inlet (with 18" sump); complete as specified Each 6.00 2404 Furnish and install storm sewer marker balls; complete as specified Each 2.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 20.00 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 6.00 2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 230.00 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 15.00 Unit Price Extension PTS Contractors, Inc $935.00 $542,300.00 $1,260.00 $437,220.00 $465.00 $16,740.00 $36,675.00 $36,675.00 $40,945.00 $40,945.00 $350.00 $4,550.00 $3,070.00 $18,420.00 $135.00 $270.00 $72.00 $1,440.00 $1.00 $6.00 $4.00 $920.00 $10.50 $157.50 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 32 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 40.00 2800 Abandon 8" - 12" storm sewer; complete as specified Linear Feet 328.00 2802 Abandon 15" and larger storm sewer; complete as specified Linear Feet 73.00 2804 Remove 30" and smaller storm sewer; complete as specified Linear Feet 195.00 2812 Remove storm sewer manholes and inlets; complete as specified Each 6.00 2850 Connect to existing storm sewer main; complete as specified Each 4.00 2950 Excavation special (storm); complete as specified Tons 400.00 2952 Bentonite slurry dam (storm); complete as specified Each 6.00 3000 Furnish and install 8" sanitary sewer (relay); complete as specified Linear Feet 15.00 3032 Furnish and install 10" sanitary sewer (new); complete as specified Linear Feet 565.00 3100 Furnish and install standard sanitary sewer manhole (4' diameter); complete as specified Vertical Feet 20.00 3114 Furnish and install sanitary sewer external manhole chimney seal; complete as specified Each 3.00 Unit Price Extension PTS Contractors, Inc $10.50 $420.00 $10.50 $3,444.00 $108.00 $7,884.00 $48.00 $9,360.00 $405.00 $2,430.00 $1,080.00 $4,320.00 $17.30 $6,920.00 $250.00 $1,500.00 $414.00 $6,210.00 $114.00 $64,410.00 $575.00 $11,500.00 $610.00 $1,830.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 33 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 3116 Furnish and install sanitary sewer external manhole chimney seal extension; complete as specified Each 1.00 3118 Furnish and install sanitary sewer internal manhole chimney seal; complete as specified Each 1.00 3300 Furnish and install connection to existing 8" sanitary sewer mains; complete as specified Each 2.00 3330 Furnish and install sanitary sewer concrete collars; complete as specified Each 1.00 3700 Closed circuit televising; complete as specified Linear Feet 580.00 3710 Closed circuit televising - using push camera; complete as specified Each 2.00 3892 Excavation special (sanitary); complete as specified Tons 230.00 3894 Bentonite slurry dam (sanitary); complete as specified Each 4.00 4002 Furnish and install 6" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 90.00 4004 Furnish and install 8" ductile iron water main (relay) with polywrap; complete as specified Linear Feet 980.00 4060 Furnish and install connections to existing 8" water main; complete as specified Each 1.00 Unit Price Extension PTS Contractors, Inc $465.00 $465.00 $465.00 $465.00 $680.00 $1,360.00 $1.00 $1.00 $3.00 $1,740.00 $580.00 $1,160.00 $17.40 $4,002.00 $250.00 $1,000.00 $178.00 $16,020.00 $148.00 $145,040.00 $3,255.00 $3,255.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 34 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 4110 Furnish and install 8" x 6" water main tee; complete as specified Each 2.00 4236 Furnish and install 6" 45 degree water main bend; complete as specified Each 4.00 4237 Furnish and install 8" 45 degree water main bend; complete as specified Each 4.00 4254 Furnish and install 6" water main cap; complete as specified Each 1.00 4352 Cut and cap existing 6" water main; complete as specified Each 1.00 4354 Cut and cap existing 8" water main; complete as specified Each 1.00 4401 Furnish and install 6" water main gate valve; complete as specified Each 2.00 4402 Furnish and install 8" water main gate valve; complete as specified Each 4.00 4438 Furnish and install 10" x 8" tapping valve and sleeve; complete as specified Each 1.00 4500 Furnish and install hydrant; complete as specified Each 2.00 4900 Abandon water main on E. 9TH AVENUE; complete as specified Lump Sum 1.00 4920 Remove water main; complete as specified Linear Feet 57.00 4990 Excavation special (water); complete as specified Tons 300.00 4992 Bentonite slurry dam (water); complete as specified Each 4.00 Unit Price Extension PTS Contractors, Inc $680.00 $1,360.00 $325.00 $1,300.00 $425.00 $1,700.00 $190.00 $190.00 $1,870.00 $1,870.00 $1,870.00 $1,870.00 $1,900.00 $3,800.00 $2,585.00 $10,340.00 $5,055.00 $5,055.00 $5,575.00 $11,150.00 $1,600.00 $1,600.00 $66.00 $3,762.00 $17.40 $5,220.00 $250.00 $1,000.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 35 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 5013 Furnish and install pull box (non-conductive); 18" x 36"; complete as specified Each 8.00 5017 Furnish and install pull box - non-conductive, 24" x 36"; complete as specified Each 9.00 5025 Adjust pull box; complete as specified Each 16.00 5026 Remove pull box; complete as specified Each 7.00 5027 Remove concrete base; complete as specified Each 7.00 5051 Install CITY-supplied lighting control cabinet; complete as specified Each 1.00 5053 Install CITY-supplied fully-actuated 8-phase traffic signal control cabinet; complete as specified Each 1.00 5054 Install electrical service; complete as specified Each 1.00 5100 Furnish and install 1" Schedule 40 PVC; complete as specified Linear Feet 30.00 5120 Furnish and install 2" Schedule 40 PVC; complete as specified Linear Feet 170.00 5124 Furnish and install 2.5" Schedule 40 PVC; complete as specified Linear Feet 40.00 5130 Furnish and install 3" Schedule 40 PVC; complete as specified Linear Feet 2,440.00 5180 Connect to existing pull box; complete as specified Each 2.00 5181 Connect to existing conduit; complete as specified Each 9.00 Unit Price Extension PTS Contractors, Inc $1,710.00 $13,680.00 $1,810.00 $16,290.00 $1.00 $16.00 $130.00 $910.00 $205.00 $1,435.00 $2,075.00 $2,075.00 $2,075.00 $2,075.00 $1,815.00 $1,815.00 $9.00 $270.00 $10.40 $1,768.00 $15.50 $620.00 $14.50 $35,380.00 $260.00 $520.00 $210.00 $1,890.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 36 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 5230 Furnish and install 4 gauge red-coated wire; complete as specified Linear Feet 2,310.00 5231 Furnish and install 4 gauge black-coated wire; complete as specified Linear Feet 2,310.00 5252 Furnish and install 8 gauge green-coated wire; complete as specified Linear Feet 1,740.00 5260 Furnish and install 10 gauge red-coated wire; complete as specified Linear Feet 250.00 5261 Furnish and install 10 gauge black-coated wire; complete as specified Linear Feet 250.00 5262 Furnish and install 10 gauge green-coated wire; complete as specified Linear Feet 610.00 5270 Furnish and install 12 gauge red-coated wire; complete as specified Linear Feet 230.00 5271 Furnish and install 12 gauge black-coated wire; complete as specified Linear Feet 230.00 5272 Furnish and install 12 gauge green-coated wire; complete as specified Linear Feet 230.00 5282 Furnish and install 14 gauge green-coated wire; complete as specified Linear Feet 230.00 5356 Furnish and install 14 gauge stranded single pair twisted with shield; complete as specified Linear Feet 720.00 5360 Furnish and install 14 AWG solid 3 conductor; complete as specified Linear Feet 110.00 5362 Furnish and install 14 AWG solid 5 conductor; complete as specified Linear Feet 120.00 Unit Price Extension PTS Contractors, Inc $2.60 $6,006.00 $2.60 $6,006.00 $1.55 $2,697.00 $0.95 $237.50 $0.95 $237.50 $0.95 $579.50 $0.88 $202.40 $0.88 $202.40 $0.88 $202.40 $0.88 $202.40 $2.10 $1,512.00 $2.00 $220.00 $2.10 $252.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 37 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 5364 Furnish and install 14 AWG solid 7 conductor; complete as specified Linear Feet 240.00 5366 Furnish and install 14 AWG solid 9 conductor; complete as specified Linear Feet 140.00 5372 Furnish and install 14 AWG solid 21 conductor; complete as specified Linear Feet 1,180.00 5380 Furnish and install fuse holder; complete as specified Each 20.00 5386 Furnish and install 2A fuse; complete as specified Each 20.00 5410 Install CITY-supplied decorative pole and pole top light structure; complete as specified Each 8.00 5412 Install CITY-supplied inverted acorn structure; complete as specified Each 1.00 5420 Install CITY-supplied 10' traffic signal pole with a pedestal base, complete as specified Each 2.00 5422 Install CITY-supplied 15' traffic signal pole with a pedestal base; complete as specified Each 4.00 5424 Install CITY-supplied 20' traffic signal pole with a pedestal base; complete as specified Each 3.00 5426 Install CITY-supplied 30' traffic signal pole with a transformer base; complete as specified Each 2.00 5431 Install CITY-supplied 25' trombone arm; complete as specified Each 4.00 Unit Price Extension PTS Contractors, Inc $2.60 $624.00 $3.35 $469.00 $4.95 $5,841.00 $52.00 $1,040.00 $5.20 $104.00 $780.00 $6,240.00 $780.00 $780.00 $260.00 $520.00 $260.00 $1,040.00 $570.00 $1,710.00 $775.00 $1,550.00 $775.00 $3,100.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 38 of 39 7/18/2022 Contract 22-02 - East 9th Avenue Reconstruction (#8242226) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 07/18/2022 11:00 AM CDT Section Title Item Code Item Description UofM Quantity 5434 Install CITY-supplied three-section traffic signal head; back plate; and LED modules; complete as specified Each 5.00 5436 Install CITY-supplied five- section traffic signal head; back plate; and LED modules; complete as specified Each 8.00 5438 Install CITY-supplied pedestrian signal head with countdown timer; complete as specified Each 9.00 5440 Install CITY-supplied pedestrian push button; complete as specified Each 10.00 5458 Install CITY-supplied 10' truss-type luminaire arm with 4" clamp; complete as specified Each 2.00 5502 Furnish and install Type 2 base; complete as specified Each 15.00 5506 Furnish and install Type 9 base; complete as specified Each 2.00 5508 Furnish and install Type 2 Modified base; complete as specified Each 1.00 Bid Total: Unit Price Extension PTS Contractors, Inc $570.00 $2,850.00 $675.00 $5,400.00 $365.00 $3,285.00 $205.00 $2,050.00 $260.00 $520.00 $1,090.00 $16,350.00 $205.00 $410.00 $1,555.00 $1,555.00 $2,895,000.00 I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-02 E 9th Ave\Project_Information\Contract Info\22-02 Bid Tab_7-18-22 Page 39 of 39 7/18/2022