HomeMy WebLinkAbout15. 22-289JULY 12, 2022 22-289 RESOLUTION CARRIED___6-0____LOST_______LAID OVER_______WITHDRAWN_______) PURPOSE: APPROVE SPECIFIC IMPLEMENTATION PLAN AMENDMENT FOR A REFUSE ENCLOSURE AT 240 WEST 9TH AVENUE INITIATED BY: PEACE LUTHERAN CHURCH PLAN COMMISSION RECOMMENDATION: Approved w/ findings and conditions WHEREAS, the applicant would like to amend the previously approved Specific Implementation Plan allowing for the creation of a new lot for the property located at 240 West 9th Avenue; and WHEREAS, the Plan Commission finds that the amendment to the Specific Implementation Plan for a refuse enclosure at 240 West 9th Avenue is consistent with the criteria established in Section 30-387 of the Oshkosh Zoning Ordinance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the amendment to the Specific Implementation Plan for a refuse enclosure at 240 West 9th Avenue is hereby approved, per the attached, with the following findings: 1. The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. 2. The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) 3. The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. 4. Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. 5. The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. JULY 12, 2022 22-289 RESOLUTION CONT’D 6. The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. 7. The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. 8. The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. BE IT FURTHER RESOLVED that the following are conditions of approval for the amendment to the Specific Implementation Plan for a refuse enclosure at 240 West 9th Avenue: 1. Base Standard Modification to allow a 5 ft. side yard setback for the refuse enclosure, where code requires a 7.5 ft. side yard setback. 2. Base Standard Modification to allow a refuse enclosure between a building and a public street. 3. Base Standard Modification to allow simulated stonework solid vinyl privacy fencing for exterior of refuse enclosure. 4. Base Standard Modification to allow parking reduction to 59 spaces, where code requires minimum of 60 parking spaces. 5. Minimum 40 evergreen tree landscaping points shall be provided on the south side of the refuse enclosure. 6. Except as specifically modified by this Specific Implementation Plan Amendment, the terms and conditions of the original Specific Implementation Plan dated August 10, 2021 (Resolution 21-406) remains in full force and effect. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Mark Lyons, Planning Services Manager DATE: July 7, 2022 RE: Approve Specific Implementation Plan Amendment for a Refuse Enclosure at 240 West 9th Avenue BACKGROUND The petitioner requests approval of a Specific Implementation Plan (SIP) amendment to allow for relocation of a refuse enclosure. The subject area consists of a single lot, totaling 1.61 acres in size, bounded by West 9th Avenue to the south, Minnesota Street to the west, and West 8th Avenue to the north. The site contains Peace Lutheran Church. The surrounding area consists primarily of single and two-family residential uses to the north, south, and west and the Oregon Street commercial corridor to the east. The 2040 Comprehensive Land Use Plan recommends institutional uses for the subject site. The subject site was rezoned to Institutional District with a Planned Development Overlay (I- PD) in 2021. The request also included a General Development Plan (GDP)/SIP for the house located to the southwest of the church, which was formerly used as the church parsonage, to be split off the church site to be sold to Clarity Care. The approved GDP/SIP included relocation of the refuse enclosure from the parsonage site to the alcove at the northwest corner of the church building. ANALYSIS The only proposed change to the site is the relocation of the dumpster enclosure from the approved location within an alcove at the northwest corner of the church building to the parking lot west of the building. The applicant has noted that the proposed location is more suitable as it will provide straight access from West 8th Avenue for truck access to the enclosure. The applicant is requesting Base Standard Modifications (BSMs) for placement of the dumpster enclosure within 2’ setback from the side property line, where code requires a 7.5’ setback, and for placement closer to the street (Minnesota Street) than the principal structure, where code prohibits exterior trash storage or dumpsters from being located between a building and a public street. Staff is supportive of a setback reduction along the side property line, however staff is recommending a minimum 5’ setback to allow for installation of landscaping to buffer the refuse enclosure from the neighboring property. Staff is also supportive of the BSM for placement of the enclosure closer to the street than the principal building as the site contains minimal areas that would meet the code requirement. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us The applicant has also proposed that the refuse enclosure be constructed of 6’ tall “simulated stonework” solid vinyl privacy fencing. This will require a BSM as code requires refuse enclosures to be constructed of solid wood or a material used on the main building. Staff does not have concerns with the proposed material as it will be solid and provide a relatively compatible appearance with stone on the church facades. RECOMMENDATION The Plan Commission recommended approval of the Specific Implementation Plan amendment with findings and conditions on July 5, 2022. Please see the attached staff report and meeting minutes for more information. Respectfully Submitted, Approved: Mark Lyons Mark A. Rohloff Planning Services Manager City Manager ITEM V: SPECIFIC IMPLEMENTATION PLAN AMENDMENT FOR REFUSE ENCLOSURE AT 240 W 9th AVENUE Plan Commission meeting of July 5, 2022. GENERAL INFORMATION Owner/Applicant: Peace Lutheran Church Action(s) Requested: The petitioner requests approval of a Specific Implementation Plan (SIP) amendment to allow for relocation of a refuse enclosure. Applicable Ordinance Provisions: Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Background Information Property Location and Type: The subject area consists of a single lot, totaling 1.61 acres in size, bounded by W. 9th Avenue to the south, Minnesota Street to the west and W. 8th Avenue to the north. The site contains Peace Lutheran Church. The surrounding area consists primarily of single and two-family residential uses to the north, south and west and Oregon Street commercial corridor to the east. The 2040 Comprehensive Land Use Plan recommends institutional uses for the subject site. In 2021, the subject site was rezoned to Institutional District with a Planned Development Overlay (I-PD). The request also included a GDP/SIP for the house located to the southwest of the church, which was formerly used as the church parsonage, to be split off the church site to be sold to Clarity Care. The approved GDP/SIP included relocation of the refuse enclosure from the parsonage site to the alcove at the northwest corner of the church building. Subject Site Existing Land Use Zoning Institutional I-PD Recognized Neighborhood Organizations N/A Adjacent Land Use and Zoning Existing Uses Zoning North Single & Two-Family Residential TR-10 South Single & Two-Family Residential TR-10 East Commercial CMU West Single & Two-Family Residential TR-10 ITEM V - SIP Amendment – 240 W 9th Ave. 2 Comprehensive Plan Land Use Recommendation Land Use 2040 Comprehensive Land Use Recommendation Institutional ANALYSIS Use There is no change being proposed to the existing use of the site. Site Design The only proposed change to the site is relocation of the dumpster enclosure from the approved location within an alcove at the northwest corner of the church building to the parking lot west of the building. The applicant is requesting Base Standard Modifications (BSM) for placement of the dumpster enclosure within 2’ setback from the side property line, where code requires a 7.5’ setback and closer to the street (Minnesota St.) than the principal structure, where code prohibits exterior trash storage or dumpsters from being located between a building and a public street. ITEM V - SIP Amendment – 240 W 9th Ave. 3 Staff is supportive of a setback reduction along the side property line, however staff is recommending a minimum 5’ setback to allow for installation of landscaping to buffer the refuse enclosure from the neighboring property. Staff is also supportive of a BSM for placement of the enclosure closer to the street (Minnesota St.) than the principal building as the site contains minimal areas that would meet the code requirement. The applicant has noted that the originally approved location within the alcove at the northwest corner of the building would result in nuisances related to the enclosure (odors, bees, etc.) near the building entrance. Proposed Refuse Enclosure Minimum Provided Front Setback (Minnesota St.) 30 ft. and no closer than principal structure 79 ft. and closer than principal structure Street Side Setback (W 8th Ave.) 25 ft. and no closer than principal structure 77.75’ and behind principal structure Side Setback 7.5 ft. 2 ft. Parking stalls 60 stalls 59 stalls ITEM V - SIP Amendment – 240 W 9th Ave. 4 The applicant has also noted that the proposed location is more suitable as it will provide straight access from W 8th Avenue for truck access to the enclosure. The proposed enclosure location will result in the loss of 4 vehicle parking spaces. Increasing the setback from 2’ to 5’ will not result in further loss of parking spaces. The dumpster enclosure placement will result in a slight reduction in impervious surface area for the site. The loss of these parking spaces will leave 50 remaining parking stalls with 9 additional reserved handicap stalls, with the church having a maximum capacity of 300 people. This is slightly short of the code minimum of one space per 5 seats at maximum capacity for a church. The applicant has noted that church attendance has not resulted in use of all parking stalls recently. Staff does not have concerns with the slight parking reduction as it should still meet the needs of the church and on-street parking is available nearby on W 8th Ave., Minnesota St., and Oregon St., if needed. The applicant is proposing the refuse enclosure be constructed of 6’ tall “simulated stonework” solid vinyl privacy fencing. This will require a BSM as code requires refuse enclosures to be constructed of solid wood or a material used on the main building. Staff is does not have concerns with the proposed material as it will be solid and provide a relatively compatible appearance with stone on the church facades. Proposed refuse enclosure fencing ITEM V - SIP Amendment – 240 W 9th Ave. 5 Google Streetview (2017) of existing church Lighting No changes to the exterior lighting have been included with this request. Signage This request does not include changes to signage for the site. Landscaping A landscaping plan has not been provided. No additional landscaping is required by code as no new buildings or pavement are being added to the site. Staff is recommending 66 evergreen tree landscaping points (two arborvitae) be added along the south side of the refuse enclosure to offset the requested BSMs for the placement of the enclosure. Storm Water Management The Department of Public Works has reviewed the request and noted that final plans shall comply with Chapter 14 Municipal Code Storm water Management requirements. Building Facades No changes are being proposed for the building facades. ITEM V - SIP Amendment – 240 W 9th Ave. 6 FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. Staff recommends approval of the Specific Implementation Plan amendment as proposed with the findings listed above and the following conditions: 1. Base Standard Modification to allow a 5 ft. side yard setback for the refuse enclosure, where code requires a 7.5 ft. side yard setback. 2. Base Standard Modification to allow a refuse enclosure between a building and a public street. 3. Base Standard Modification to allow simulated stonework solid vinyl privacy fencing for exterior of refuse enclosure. 4. Base Standard Modification to allow parking reduction to 59 spaces, where code requires minimum of 60 parking spaces. 5. Minimum 66 evergreen tree landscaping points shall be provided on the south side of the refuse enclosure. 6. Except as specifically modified by this Specific Implementation Plan Amendment, the terms and conditions of the original Specific Implementation Plan dated August 10, 2021 (Resolution 21-406) remains in full force and effect. ITEM V - SIP Amendment – 240 W 9th Ave. 7 The Plan Commission recommended approval of the Specific Implementation Plan amendment on July 5, 2022. The following is their discussion on the item. Site Inspections Report: Ms. Propp and Mr. Perry reported visiting the site. Staff report accepted as part of the record. The petitioner requests approval of a Specific Implementation Plan (SIP) amendment to allow for relocation of a refuse enclosure. Mr. Slusarek presented the item and reviewed the site and surrounding area as well as the land use and zoning classifications in this area. The only proposed change to the site is relocation of the dumpster enclosure from the approved location within an alcove at the northwest corner of the church building to the parking lot west of the building. The applicant is requesting Base Standard Modifications (BSM) for placement of the dumpster enclosure within 2’ setback from the side property line, where code requires a 7.5’ setback and closer to the street (Minnesota St.) than the principal structure, where code prohibits exterior trash storage or dumpsters from being located between a building and a public street. Staff is supportive of a setback reduction along the side property line, however staff is recommending a minimum 5’ setback to allow for installation of landscaping to buffer the refuse enclosure from the neighboring property. Staff is also supportive of a BSM for placement of the enclosure closer to the street (Minnesota St.) than the principal building as the site contains minimal areas that would meet the code requirement. The applicant has noted that the originally approved location within the alcove at the northwest corner of the building would result in nuisances related to the enclosure (odors, bees, etc.) near the building entrance. Staff recommends approval with the findings and conditions as listed in the staff report. Mr. Perry opened up technical questions to staff. Council Member Ford asked if they have seen the materials for the enclosure. Mr. Lyons said they have seen examples but not have not seen an in-person structure. It’s a tricky situation because the stone is great but understanding it’s not financially feasible for a nonprofit to do a full stone enclosure. This is a decent compromise and adding landscaping will soften it. Mr. Perry asked for any public comments and asked if the applicant wanted to make any statements. There was no statement from the applicant. Mr. Perry closed public comments. There were no closing statements from the applicant. Motion by Propp to adopt the findings and recommendation as stated in the staff report. Seconded by Kiefer. ITEM V - SIP Amendment – 240 W 9th Ave. 8 Mr. Perry asked if there was any discussion on the motion. Motion carried 6-0. SIP AMENDMENT 240 W 9TH AVE PC: 07-05-2022 ROBERT GONZALEZ 256 W 8TH AVE OSHKOSH, WI 54902 D ANN L MILLER 240 W 8TH AVE OSHKOSH, WI 54902 JASON BILBREY 442 WADLEIGH ST STEVENS POINT, WI 54481 DAVEY BARTLETT N5644 HIGHWAY G SAINT CLOUD, WI 53079 JENNIFER KETTNER 222 W 8TH AVE OSHKOSH, WI 54902 CBC PROPERTY MANAGEMENT LLC 912 WINDWARD CT OSHKOSH, WI 54901 DIVERSIFIED REAL ESTATE LLC 12900 BLYTHE RD BROOKFIELD, WI 53005 MTOXINS VENOM LAB LLC 717 OREGON ST OSHKOSH, WI 54902 COVEY INC 1930 ALGOMA BLVD OSHKOSH, WI 54901 DANUTA SWIECICKI 225 E DIVISION ST FOND DU LAC, WI 54935 ROBERT J MAZZA 1558 COUNTY ROAD I OSHKOSH, WI 54902 GJK PROPERTIES LLC 2934 SHOREWOOD DR OSHKOSH, WI 54901 FABULOUS FINDS LLC 428 FOREST VIEW RD OSHKOSH, WI 54904 ANN E ELMER 257 W 9TH AVE OSHKOSH, WI 54902 CMB HOLDINGS LLC 253 W 9TH AVE OSHKOSH, WI 54902 JAMES/JUDY L MARTINEZ 247 W 9TH AVE OSHKOSH, WI 54902 JOSEPH T ERD/ALLISON CRIVELLO 241 W 9TH AVE OSHKOSH, WI 54902 ABIGAIL W BASTIAN 237 W 9TH AVE OSHKOSH, WI 54902 KEVIN J/MARY B GABRIEL 233 W 9TH AVE OSHKOSH, WI 54902 BURNS OREGON STREET LLC 905 OREGON ST OSHKOSH, WI 54902 SCOTT A/LORI A BERHOLTZ 1804 N OAKWOOD RD OSHKOSH, WI 54904 RAYMANN PROPERTIES LLC 823 MOUNT VERNON ST OSHKOSH, WI 54901 ELMER/ELSIE BRAGG 807 MINNESOTA ST OSHKOSH, WI 54902 ROBERT/KRISTALEE WILCOX 1009 OTTER AVE OSHKOSH, WI 54901 PEACE LUTHERAN CHURCH 240 W 9TH AVE OSHKOSH, WI 54902 W 9TH AVW 9TH AV OREGON ST OREGON ST W 8TH AVW 8TH AV W 7TH AVW 7TH AV W 10TH AVW 10TH AV MINNESOTA ST MINNESOTA ST C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 6/21/2022 1 in = 120 ft1 in = 0.02 mi¯240 W 9TH AVE240 W 9TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer TR-10 I CMU RMU-PD-RFO I HI I UMU I UMU CMU-RFO CMU-PD UMU CMU I RMU-PD I-PD IRMU-PD-RFO I-PD I TR-10 I I CMU-PD I I I UMU-PD RMU-PD I I-PD-RFO CMU RMU-PD RMU-PD UMU I-RFO I-PD-RFO CMU-PD-RFO RMU RMU-PD RMU-RFO UMUI-PD-RFO UMU-PD I-PD CMU-PD RMU-PD W 9TH AVW 9TH AV OREGON ST OREGON ST S MAIN ST S MAIN ST W SOUTH PARK AVW SOUTH PARK AV N MAIN ST N MAIN ST JACKSON ST JACKSON ST IOWA ST IOWA ST W 7TH AVW 7TH AV W 6TH AVW 6TH AV W 8TH AVW 8TH AV W 11TH AVW 11TH AV W 10TH AVW 10TH AV W 12TH AVW 12TH AV W 14TH AVW 14TH AV MICHIGAN ST MICHIGAN ST NEBRASKA ST NEBRASKA ST MINNESOTA ST MINNESOTA ST W 5TH AVW 5TH AV W 4TH AVW 4TH AV COMMERCE ST COMMERCE ST E 8TH AVE 8TH AV E 9TH AVE 9TH AV E 14TH AVE 14TH AV EE 1100TTHH AAVV E 11TH AVE 11TH AV E 7TH AVE 7TH AV RMU C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 6/21/2022 1 in = 500 ft1 in = 0.09 mi¯240 W 9TH AVE240 W 9TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 6/21/2022 1 in = 100 ft1 in = 0.02 mi¯240 W 9TH AVE240 W 9TH AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer