Loading...
HomeMy WebLinkAboutItem VI PLAN COMMISSION STAFF REPORT JULY 5, 2022 ITEM IV: SPECIFIC IMPLEMENTATION PLAN FOR MIXED USE DEVELOPMENT AT PROPERTIES LOCATED ON THE EAST SIDE OF SOUTH MAIN STREET GENERAL INFORMATION Applicant: Jake Bunz: T. Wall Enterprises Property Owner: Redevelopment Authority of Oshkosh Action(s) Requested: The applicant requests approval of Specific Implementation Plan for a mixed use development for properties generally located on the east side of S. Main St., along E. 7th Ave, E. 8th Ave, E. 9th Ave, and Pioneer Riverwalk. Applicable Ordinance Provisions: Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Background Information: The subject area consists of 11 parcels located on the east side of South Main Street, in the general vicinity of E. 7th Ave, E. 8th Ave, E. 9th Ave, and Pioneer Riverwalk. The area is currently a mixture of commercial/industrial uses along with vacant land, utility and railroad property. The area is zoned Riverfront Mixed Use District with a Planned Development Overlay (RMU-PD). The surrounding area consists primarily of commercial, industrial, vacant and mixed land uses, with the Fox River to the north and railroad to the east. The subject area is located within the River North and Core sub areas of the redevelopment area identified as the Sawdust District. The 2040 Comprehensive Land Use Plans recommends Center City use for the subject area. On March 22, 2022, a zone change was approved to have all subject properties zoned Riverfront Mixed Use District with a Planned Development Overlay (RMU-PD). A General Development Plan was also approved for a mixed use development. Subject Site Existing Land Use Zoning Commercial, Industrial, Vacant RMU - PD Recognized Neighborhood Organizations None Adjacent Land Use and Zoning Existing Uses Zoning North Commercial & Fox River RMU-RFO Page 1 ITEM IV: SIP E Side S Main St.. 2 South Industrial HI East Railroad & Fox River RMU-PD West Vacant & Approved Multi-family residential CMU-PD & UMU-PD Comprehensive Plan Land Use Recommendation Land Use 2040 Comprehensive Land Use Recommendation Center City ANALYSIS Use The proposed use of the site was approved with the General Development Plan (3/22/22). The development will include three 5-story buildings and a private clubhouse. The two buildings with frontage along S. Main St. (Buildings A1, A2) will be mixed use buildings with first floor commercial space and multi-family units above. The eastern building (A3), with frontage along E. 9th Ave., will be a multi-family building with potential for future commercial space. Commercial space shown on the plan includes ground floor retail space along S. Main St. as well as a two-story waterfront restaurant at the northeast corner of the site. Other amenities include a small outdoor amphitheater, potential skating rink, walking paths, pool, pickle ball court, and Dog Park across E. 9th Ave. Page 2 ITEM IV: SIP E Side S Main St.. 3 Site Design/Access The proposed site will have access from the end of E. 7th Avenue, S. Main St. (vacated E. 8th Ave.), and E. 9th Avenue. All three buildings will have both underground and surface parking. Below is a breakdown of the residential units, commercial space, and parking, which includes 4 additional residential units, 575 sq. ft. of commercial area, and 45 parking spaces (includes 36 new on-street parking spaces to be created with additional right-of-way) as compared to the approved GDP. * Commercial building space for Building A3 to be determined based off market demands at time of construction. Page 3 ITEM IV: SIP E Side S Main St.. 4 The residential units for the site have an average of 1.55 bedrooms per unit. The code requirement of two spaces per dwelling unit plus 1 guest space for every 3 dwellings units results in a minimum parking requirement of 688 spaces. The code requirement of 1 space per 300 sq. ft. of commercial area results in a minimum parking requirement of 75 spaces, for a total requirement of 763 parking spaces for the site. The applicant is requesting a BSM for reduced parking as the plan includes a total of 503 parking spaces, with 467 on-site (36 on-street). The site will have a total of 447 bedrooms, resulting in slightly more than 1 parking space per bedroom. Staff feels that this will meet the parking needs of the residential units and is supportive of the requested BSM for reduced parking. Although the site is not currently located within the Parking Requirement Exemption Overlay, staff anticipates future on-street parking (as shown on the plan) and shared public parking areas around the development in addition to on-site parking will meet the parking needs of the commercial spaces. A total of 468 bicycle parking stalls have been provided, substantially exceeding the minimum of 20 spaces. This will serve to offset the requested BSM for reduced parking. As noted in the GDP, electric vehicle charging stations will be provided for 30% of the covered parking stalls, with all of the covered stalls wired to accommodate charging stations in the future. Required Provided Parking Spaces Minimum: 763 467 (additional 36 on-street) Impervious Surface Maximum: 80% of lot 68% of lot Minimum Provided Front Setback (E. 7th Ave.) 10 ft. 0 ft. (plaza/walkway) Front Setback (S. Main St.) 10 ft. 0 ft. (patio/walkway) Front Setback (E. 9th Ave.) 10 ft. 0 ft. (plaza/walkway) Side Setback (northwest) 10 ft. 3.1 ft. (parking lot) Side Setback (northeast) 10 ft. 3.9 ft. (parking lot) The applicant is requesting reduced front yard setbacks along E. 7th Ave., S. Main St., and E. 9th Ave. to 0’ for entrance plaza/walkway, where code requires a 10’ front yard setback. The applicant is also requesting reduced side yard setbacks to 3.1’ (northwest) and 3.9’ (northeast), where code requires a 10’ setback. According to the applicant, the reduced front setbacks are intended to create a Main Street with an activated retail-focused atmosphere. The buildings will meet the 10’ setback requirement. They also note that the reduced setbacks along the northwest and southeast property lines are needed to maximize parking for the riverfront restaurant, park, retail, and Riverwalk users. Staff is supportive of the reduced front setbacks as it will serve to provide a pedestrian-oriented use of the site. Although the site is zoned RMU, the site will function similar to properties within the Central Mixed Use district (CMU), which would have a 0’ front setback requirement. Staff is also supportive of the side yard setback reductions as they are necessary to allow for the needed parking on the site. The reduced parking setbacks should not negatively impact neighboring Page 4 ITEM IV: SIP E Side S Main St.. 5 properties as the parking areas will be abutting an existing parking lot (northeast) and the Riverwalk (southeast). However, staff is recommending the southeast setback be increased to 5.9’ along the southeast parking lot by reducing the drive aisle width to the code minimum of 24’. Staff is also recommending a BSM to allow 0’ setbacks for future internal property lines for potential certified survey maps as may be needed to separate project phases. The applicant is requesting a BSM to allow structures to be placed within the required 30’ X 30’ vision clearance triangle at the corner of S. Main St. and E. 7th Avenue. Staff does not have concerns with the building/patio being constructed within the vision triangle as E. 7th Avenue will only be utilized for parking lot access to the site. Also, as previously noted, the site is in a downtown area and will function similar to a CMU zoned property, which would typically be exempt from corner vision clearance requirements. The proposed dog park on the south side of E. 9th Ave. will be enclosed with chain link fencing and have a wrought iron fenced entrance/exit vestibule. The vestibule will have a concrete pad with a 5’ front setback off of E. 9th Ave. A BSM is needed for the vestibule pavement setback. Staff does not have concerns with a BSM for the reduced setback to 5’, as it will only be used as pedestrian/dog entrance area to the dog park and should prevent damage/mud to the entrance area from foot traffic. The wrought iron fencing will be limited to 4’ in height. Fencing located outside of the 10’ setback may be up to 6’ tall. Signage The proposed building elevations include wall signage, a projecting sign, canopy signs, and a roof sign. Total on-building sign area falls under the maximum of 1 sq. ft. of signage per linear foot of building frontage for each building façade, with the exception of the northeast façade on Building A1 which shows a wall sign and roof sign totaling 295 sq. ft. on a 65 foot façade length. A BSM will also be required for the roof sign type as code prohibits roof signs. The plan also shows a mural area on the northwest façade of Building A1. This will be addressed under a separate mural permit. Page 5 ITEM IV: SIP E Side S Main St.. 6 According to the applicant, the large roof sign and overall increased sign area on this façade is being proposed because it is the most prominent building façade, facing downtown and the Fox River, providing way-finding for boaters and drivers. They also note that the overall wall signage for the site is 1,664 sq. ft., well under the total façade frontage of 2,942 linear feet. Staff is supportive of the requested BSM for increased on-building signage on the northeast building façade as the BSM is being offset by providing substantially less signage on the remainder of the building than allowed by code. Staff is also supportive of the roof sign as it is on a uniquely prominent façade and will incorporate the Sawdust District logo, serving as placemaking for the Sawdust District. The proposed corner projecting sign on the northwest corner of Building A2 also requires a BSM as the top of a projecting sign will be at 58’ 4”, where code prohibits projecting signs from being installed above the second story window sill or 18 ft., whichever is less. The applicant states that the sign is intended to mark the entrance to the development and district and to be an icon to all users on S. Main Street. Page 6 ITEM IV: SIP E Side S Main St.. 7 Staff is supportive of the increased sign height as it will serve to identify the entirety of the site and will again incorporate the Sawdust District, providing placemaking for the area. Landscaping Page 7 ITEM IV: SIP E Side S Main St.. 8 Points Required Points Provided Building Foundation A1 832 (208 street side) 1,354 (265 street side) Building Foundation A2 696 (174 street side) 875 (58 street side) Building Foundation A3 696 (174 street side) 1,000 (99 street side) Building Foundation Clubhouse 176 203 Paved Areas 565 (282.5 tall trees, 226 shrubs) 1,638 (1,250 tall trees, 384 shrubs) Street Frontage (E. 7th Ave.) 201 (100.5 medium trees) 150 (0 medium trees) Street Frontage (S. Main St.) 421 (210.5 medium trees) 0 (0 medium trees) Street Frontage (E. 9th Ave.) 706 (353 medium trees) 772 (522 medium trees) Street Frontage (Dog Park) 63 (31.5 medium trees) 100 (0 medium trees) Yards 1,667 2,092 TOTAL 6,023 8,184 Building Foundation The building foundation landscaping point requirement of 80 landscaping points per 100 linear feet of building foundation is being met for all proposed buildings. Code further specifies that 25% of the required points must be on the street-facing side of the building. The applicant is meeting this requirement with shrubs along the north elevation (E. 7th Ave.) for Building A1. They are requesting BSMs for reduced street side foundation landscaping for Buildings A2 and A3. Staff is supportive of the reduced foundation landscaping along these frontages as the plan exceeds the overall foundation landscaping requirement for the buildings. Also, the foundation landscaping on the interior side of the site provides enhanced appearance from the Riverwalk and water front access. Paved Area The paved area requirement of 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area is being met. The code further specifies 30% of all points will be devoted to tall trees and 40% will be devoted to shrubs. Both of these requirements are being met. The plan is also meeting the requirement that a deciduous tree be planted at all parking row ends with the exception of 4 parking row ends along the west sides of the Building A1 and A2 parking lots. Staff is supportive of a BSM to allow these trees to be relocated to interior parking lot islands, as shown on the plan, as the western parking row ends are adjacent to a building and may be less suitable for tree growth. Page 8 ITEM IV: SIP E Side S Main St.. 9 Street Frontage Code requires 100 points per 100 feet of street frontage. The landscaping ordinance also specifies that 50% of the required points must be devoted to medium trees. The landscaping plan is meeting this requirement for the E. 9th Ave. frontage. The plan shows no street frontage landscaping along the S. Main St. frontage. However, 10 tall deciduous trees are shown along the street frontage within the public right-of-way. Staff is supportive of a BSM to waive the street frontage requirement along this frontage as street trees provided by the applicant will meet the intent of the requirement. Also, due to the downtown setting and reduced front setback, providing street trees in lieu of trees within the property is appropriate. The applicant will be required to coordinate right-of-way street-tree plantings with the Department of Public Works. Staff is supportive of the reduced E. 7th Ave. street frontage landscaping as the patio/walk area reduces the useable area for tree plantings. Also, E. 7th Ave. only provides access to the restaurant parking lot and will not receive vehicle/pedestrian traffic of a typical street. The total street frontage point requirement for the dog park frontage on the south side of E. 9th Ave. is being met with two tall deciduous trees along the entrance to the park. Staff is supportive of using the tall trees to meet this requirement rather than providing the required 50% medium trees as the tall trees will serve to provide shade and “break up” the entrance to the site. Yards Code requires 20 landscaping points per 1,000 sq. ft. of gross floor area. The provided yard landscaping points exceed this requirement. Storm Water Management/Utilities The Department of Public Works has reviewed the plans and noted that the exact easement for the sanitary sewer will need to be finalized. All driveway to the public right-of-way will need to follow City specifications regarding size and style. A cul-de-sac will need to be installed in the E. 7th Ave. right-of-way. Parking on S. Main St. will not happen as shown until the street is reconstructed. Site utilities will need to be revised to minimize the number to the sanitary sewer easement. Easements will need to be obtained for the storm sewer discharges that run under/through the Riverwalk. Site Lighting The applicant submitted a photometric plan for the site. The lighting levels meet the .4 foot- candle minimum requirement for parking areas, but exceed the maximum of .5 foot-candles of light trespass at the right-of-way lines along E. 7th Ave. (1.4 fc), S. Main St. (5.5 fc), and E. 9th Ave. 3.5 fc) as well as the property line shared with the Riverwalk (0.7 fc) for lighted greenspace. The plan appears to show light poles installed within the public right-of-way along E. 7th Ave. These will need to be placed within the site. This will be verified during Site Plan Review. Page 9 ITEM IV: SIP E Side S Main St.. 10 Staff is supportive the BSM to allow the increased lighting along these property lines as it only it will only be providing increased lighting in public access areas and should not negatively affect neighboring properties. The proposed 20’ light poles are under the maximum light fixture mounting height of 23’ (including 3’ base) for the RMU district and will have full cut-off fixtures per lighting code requirements. The buildings will also include decorative building-mounted light fixtures. Building Facades Although the property is not located with the Riverfront Overlay District (RF-O), the site will function as a riverfront property. Staff has reviewed the provided elevations for comparison with RF-O design standards (Section 30-245(B)) which exceed the commercial design standards requirements. These standards require buildings to be clad on all sides with at least 70% Class I materials. They also require residential uses to include windows and doors areas at a minimum of 15% of the ground floor façade area. For upper floors, the total area of windows and doors shall comprise a minimum of 15% of the total façade area above the ground floor. The Riverfront Overlay District also specifies that a patio or balcony shall be provided for each unit facing the waterfront. The provided elevations (below) utilize a combination of glazing, masonry brick, and masonry stone to meet the Class I and glazing requirements, with the exception of the east façade of Building A1 and the southeast façade of the clubhouse, which includes 67% and 60% Class I materials, respectively. Staff does not have concerns with this as the overall building façade Class I material allotment for the site is about 87%, well over the 70% minimum. Staff feels that the Class II/III material used on the remainder of the facade areas (Hardie Plank) will be complementary to the building design. A balcony has been provided for each unit. Staff feels that the building designs are consistent with the Sawdust District Core Subarea design guidelines of modern industrial style architecture and inviting storefronts with large windows/displays, prominent entrances, and attractive architectural detail. Page 10 ITEM IV: SIP E Side S Main St.. 11 Building A1 Page 11 ITEM IV: SIP E Side S Main St.. 12 Page 12 ITEM IV: SIP E Side S Main St.. 13 Building A2 Page 13 ITEM IV: SIP E Side S Main St.. 14 Page 14 ITEM IV: SIP E Side S Main St.. 15 Building A3 Page 15 ITEM IV: SIP E Side S Main St.. 16 Page 16 ITEM IV: SIP E Side S Main St.. 17 Clubhouse Page 17 ITEM IV: SIP E Side S Main St.. 18 Overall Site The applicant is requesting base standard modifications related to reduced parking, setbacks, landscaping, specific signage requirements, and increased lighting. Staff feels that the applicant has sufficiently offset these BSMs by significantly increasing the provided overall landscaping points, providing off-site landscaping (street trees) and overall enhanced building materials beyond the code requirement. The applicant has substantially exceeded the bicycle parking requirement and has incorporated Sawdust District signage to contribute to the identity of the area. Staff feels that the overall site is complimentary to the surrounding area and consistent with the General Development Plan and Sawdust District guidelines. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission consider findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. Page 18 ITEM IV: SIP E Side S Main St.. 19 (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. Staff recommends approval of the Specific Implementation Plan with the findings listed above with the proposed following conditions: 1. Base Standard Modification to allow reduced parking to 467 spaces, where code requires a minimum of 763 spaces. 2. Base Standard Modification for reduced front yard setback (E. 7th Ave.) to 0’, where code requires a 10’ front yard setback. 3. Base Standard Modification for reduced front yard setback (S. Main St.) to 0’, where code requires a 10’ front yard setback. 4. Base Standard Modification for reduced front yard setback (E. 9th Ave.) to 0’, where code requires a 10’ front yard setback. 5. Base Standard Modification for reduced side yard setback (northwest) to 3.1’, where code requires a 10’ side yard setback. 6. Base Standard Modification for reduced side yard setback (northeast) to 5.9’, where code requires a 10’ side yard setback. 7. Base Standard Modification for reduced side yard setback to 0’ for internal property lines, where code requires a 10’ side yard setback. 8. Base Standard Modification for reduced front yard setback (south side of E. 9th Ave.) to 5’ for entrance vestibule, where code requires a 10’ setback. 9. Base Standard Modification to allow building and patio within 30’ X 30’ vision triangle at intersection of S. Main St. and E. 7th Ave. 10. Base Standard Modification to allow 295 sq. ft. of wall signage on the northeast façade of Building A1, where code allows a maximum of 65 sq. ft. 11. Base Standard Modification to allow a roof sign which includes a Sawdust District logo. 12. Base Standard Modification to allow projecting sign mounted (top) at 58’4”, where code limits mounting height of projecting signs to 18’ which includes a Sawdust District. 13. Base Standard Modification to allow reduced building foundation landscaping points on street side of Building A2 to 58 points, where code requires a minimum of 174 points. Page 19 ITEM IV: SIP E Side S Main St.. 20 14. Base Standard Modification to allow reduced building foundation landscaping points on street side of Building A3 to 99 points, where code requires a minimum of 174 points. 15. Base Standard Modification to allow reduced street frontage landscaping along E. 7th Ave. to 150 points with 0 points devoted to medium trees, where code requires 201 street frontage points with 100.5 points devoted to medium trees. 16. Base Standard Modification to allow reduced street frontage landscaping along south side of E. 9th Ave. (Dog Park) to 0 medium tree points, where code requires 31.5 street frontage points devoted to medium trees. 17. Base Standard Modification to allow reduced street frontage landscaping along S. Main St. to 0 points, where code requires 421 street frontage points with 210.5 points devoted to medium trees. 18. The applicant shall coordinate planting of street trees in public right-of-way with the Department of Public Works. 19. Base standard modification to allow four parking row end islands without a deciduous tree planted. 20. Base Standard Modification for increased lighting along the front property lines and side property line to 1.4 fc (E. 7th Ave.), 5.5 fc (S. Main St.), 3.5 fc (E. 9th Ave.) and 0.7 fc (east property line), where code allows a maximum of 0.5 fc lighting level at the property line. 21. Final landscaping, lighting, and signage plans shall be reviewed and approved by the Department of Community Development. Page 20 Sign_______ Staff ________ Date Rec’d ________ City of Oshkosh Planned Development Application For General Development Plan or Specific Implementation Plan **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: _________________________________________________________________________________ Date: ____________ Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference:  Phone  Email Status of Petitioner (Please Check):  Owner  Representative  Tenant  Prospective Buyer Petitioner’s Signature (required): _______________________________________________________________ Date: ____________ OWNER INFORMATION Owner(s): __________________________________________________________________________________ Date: ____________ Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference:  Phone  Email Ownership Status (Please Check):  Individual  Trust  Partnership  Corporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner’s Signature: ___________________________________________________________________ Date: ____________ TYPE OF REQUEST:  General Development Plan (GDP)  General Development Plan (GDP) Amendment  Specific Implementation Plan (SIP)  Specific Implementation Plan (SIP) Amendment SITE INFORMATION Address/Location of Proposed Project: __________________________________________________________________________ Proposed Project Type: ________________________________________________________________________________________ Estimated Cost: _______________________________________________________________________________________________ Current Use of Property: ________________________________________________________________Zoning: ________________ Land Uses Surrounding Your Site: North: _________________________________________________________________________ South: _________________________________________________________________________ East: _________________________________________________________________________ West: _________________________________________________________________________  It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal.  Application fees are due at time of submittal. Make check payable to City of Oshkosh.  Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE For more information please visit the City’s website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm SUBMIT TO: Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, WI 54901 PHONE: (920) 236-5059 P.O. Box 620037 Middleton WI 53562 608 444-0850 jake@twallenterprises.com The Mill on Main, LLC P.O. Box 620037 Middleton WI 53562 608 444-0850 jake@twallenterprises.com Jake Bunz; The Mill on Main, LLC 43 E 9th Ave Oshkosh, WI $70-$90m Vacant RMU-PD Mixed-Use Development/Multi-Family Development River Heavy Industrial Vacant Commercial 6/6/22 6/6/22 6/6/22 6/6/22 Page 21 2 SUBMITTAL REQUIREMENTS – Must accompany the application to be complete. (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy) The following information must be provided in order for the application to be considered complete and able to be scheduled for Plan Commission Review. Please use the checklist below to determine the required information to be submitted at the time of application. If all information below cannot be provided at the time of application, please request a waiver in writing to the Division’s Director or designee.  A General Development Plan (GDP) submittal, per Section 30-387(C)(4), shall include the following items (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy):  General location map of the subject site depicting:  All lands for which the Planned Development is proposed and other lands within 100 feet of the boundaries of the subject property.  Current zoning of the subject site and abutting properties, and the jurisdiction(s) that maintains that control.  A graphic scale and north arrow.  Generalized site plan showing the pattern or proposed land uses, including:  General size, shape, and arrangement of lots and specific use areas.  Basic street pattern and pattern of internal drives.  General site grading plan showing preliminary road grades.  Basic storm drainage pattern, including proposed on-site stormwater detention.  General location of recreational and open space areas, including designation of any such areas to be classified as common open space.  Statistical data, including:  Minimum lot sizes in the development.  Approximate areas of all lots.  Density/intensity of various parts of the development.  Building coverage.  Landscaping surface area ratio of all land uses.  Expected staging.  Conceptual landscaping plan.  General signage plan.  General outline of property owners association, covenants, easements, and deed restrictions.  A written description of the proposed Planned Development, including:  General project themes and images.  The general mix of dwelling unit types and/or land uses.  Approximate residential densities and nonresidential intensities.  General treatment of natural features.  General relationship to nearby properties and public streets.  General relationship of the project to the Comprehensive Plan or other area plans.  Proposed exceptions from the requirements of the Zoning Ordinance.  Traffic Impact Analysis (TIA), if deemed necessary by the Director of Planning Services, or designee.  A Specific Implementation Plan (SIP) submittal, per Section 30-387(C)(5), shall include the following items. Note that the area included in an SIP may be only a portion of the area included in a previously approved GDP (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy):  An existing conditions map of the subject site depicting the following:  All lands for which the Planned Development is proposed and other lands within 100 feet of the boundaries of the subject site.  Current zoning of the subject property and all abutting properties, and the jurisdiction(s) that maintains that control.  Existing utilities and recorded easements.  All lot dimensions of the subject site.  A graphic scale and a north arrow.  An SIP map of the proposed site showing at least the following:  Lot layout and the arrangements of buildings.  Public and private roads, driveways, walkways, and parking facilities.  Specific treatment and location of recreational and open space areas, including designation of any such areas to be classified as common open space. Page 22 3  Proposed grading plan.  Specific landscaping plan for the subject site, specifying the location, species, and installation size of plantings. The landscaping plans shall include a table summarizing all proposed species.  Architectural plans for any nonresidential buildings, multi-family structures, or building clusters, other than conventional single-family or two-family homes on individual lots, in sufficient detail to indicate the floor area, bulk, and visual character of such buildings.  Engineering plans for all water and sewer systems, stormwater systems, roads, parking areas, and walkways.  Signage plan for the project, including all project identification signs, concepts for public fixtures and signs, and group development signage themes that may or may not vary from City standards or common practices.  Specific written description of the proposed SIP including:  Specific project themes and images.  Specific mix of dwelling unit types and/or land uses.  Specific residential densities and nonresidential intensities as described by dwelling units per acre, and landscaping surface area ratio and/or other appropriate measures of density and intensity.  Specific treatment of natural features, including parkland.  Specific relationship to nearby properties and public streets.  Statistical data on minimum lot sizes in the development, the precise areas of all development lots and pads; density/intensity of various parts of the development; building coverage, and landscaping surface area ratio of all land uses; proposed staging; and any other plans required by Plan Commission.  A statement of rationale as to why PD zoning is proposed. This statement shall list the standard zoning requirements that, in the applicant’s opinion, would inhibit the development project and the opportunities for community betterment that are available through the proposed PD project.  A complete list of zoning standards that would not be met by the proposed SIP and the location(s) in which such exceptions/base standard modifications would occur.  Phasing schedule, if more than one development phase is intended.  Agreements, bylaws, covenants, and other documents relative to the operational regulations of the development and particularly providing for the permanent preservation and maintenance of common open areas and amenities.  A written description that demonstrates how the SIP is consistent with the approved GDP and any and all differences between the requirements of the approved GDP and the proposed SIP. I hereby certify that to the best of my knowledge all required application materials are included with this application. I am aware that failure to submit the required completed application materials may result in denial or delay of the application request. Applicant’s Signature (required): _________________________________ Date: _____________________ Jake Bunz, Project Manager,The Mill on Main, LLC 6/6/22 Page 23 P.O. Box 620037 Middleton, WI 53562 June 6, 2022 City of Oshkosh Planning Department 215 Church Ave Oshkosh, WI 54903 Re: The Mill on Main Development – Specific Implementation Plan To Whom It May Concern: Introduction The Mill on Main, LLC is seeking Specific Implementation Plan approval for the redevelopment of 43 E. 7th Ave (and all other associated parcels). The Mill on Main was selected as the winner of the 43 E 7th Ave Request for Proposals due to its community centered plan that encompasses the goals of the City, the Sawdust District Plan and the RFP. Specific Implementation Plan The Mill on Main, LLC is proposing an $70-90 million, mixed-use development with multi- family and commercial uses. This development will be located at 43 E. 7th Ave located along the Fox River, in the Sawdust District that is currently vacant. The development plan consists of three buildings and a private clubhouse. Buildings A1 and A2, located along South Main Street, are mixed-use buildings with first floor commercial space and multi- family units above. Building A3 is a multi-family building with the potential for future commercial space (to be determined based off market demands at the time of construction*). All three buildings would be 5 stories high with parking underground and at grade. Once completed, The Mill on Main will have 295 apartment units on 9.22 total acres (approximately 32 units/acre), 22,375 square feet of commercial space, and 503 parking stalls. Phase Building Units Commercial Sq Ft Covered Parking Surface Parking 1 A1 109 11,575 110 66 2 A2 95 7,800 96 52 3 A3 91 3,000* 114 65 Total 295 22,375 320 183 The proposed SIP is consistent with the approved GDP with exception to slight changes in the unit counts, commercial sq ft and parking counts. These small modifications are due to Page 24 P.O. Box 620037 Middleton, WI 53562 changes in unit layouts and sizes along with further refined building plans. The approved GDP called for 291 units, 21,800 commercial sq ft, and 458 total parking stalls. The three buildings will include studio, 1-bedroom, 1-bedroom plus den, 2-bedroom, 2- bedroom plus den and 3-bedroom units (unit mix included in enclosed proposal). Standard T. Wall Enterprises units feature: high-quality finishes and fixtures including granite or solid- surface countertop kitchen islands, stainless steel appliances, large windows, wider than standard hallways, 1-foot taller than standard ceilings, faucet sprayers, glass stove-tops, and in-unit washer and dryers. The quality finishes and materials make our apartments the resident’s home. The site plan design was focused on complimenting the future Riverwalk, capturing Fox River and Lake Winnebago views, and taking advantage of the high visibility for retail and commercial uses along South Main Street. The Mill on Main’s site layout connects the Riverwalk with the development’s park, green space and walking paths provided on site. This will activate the river front. The design situated the buildings to protect the waterfront aesthetics while accommodating a wide variety of outdoor land uses. Building Design The 43 E. 7th Avenue Request for Proposals asked for all new construction to be brick or a comparable masonry. As shown in the renderings and on the material boards, The Mill on Main development will be constructed mainly with brick, brandywine and champagne colors. That will be complimented with alabaster cordova stone and arctic white and iron grey colored James Hardie plank. The Mill feature on building A1 will feature shadow rock, crescent peak stone, and a Peruvian teak composite wood plank, to accomplish a historic mill aesthetic. The Clubhouse will utilize the same stone, Hardie plank, and wood plank with carriagehouse colored brick, instead of brandywine. The Mill on Main buildings are designed to produce a historical, old-town Main Street feel, with a modern touch, achieving Sawdust District goals. Each of the three buildings has an architectural design feature located on the exterior corner. These design features are a tribute to The Sawdust District, The City of Oshkosh and its history. Page 25 P.O. Box 620037 Middleton, WI 53562 Building Design Feature Description A1 Sawmill Designed after the Sawmill District A2 Airport Control Tower Designed after the EAA AirVenture and the Wittman Regional Airport A3 Lighthouse Tribute to the proximity of the Fox River and Lake Winnebago Development Schedule The development schedule below shows The Mill on Main’s proposed timeline. Construction is broken down into 3 phases, starting with building A1 to provide a gateway from Downtown Oshkosh into the Sawdust District. The Mill on Main will aim to start construction on each phase to allow enough time so that the phase opens at the start of leasing season, in Spring. This leaves enough time to lease up each individual phase before opening the next phase. Phase Construction Construction Start Occupancy Phase 1 Building A1 and *Clubhouse Early 2023 Spring 2024 Phase 2 Building A2 Fall 2023 or 2024 Spring 2025 or 2026 Phase 3 Building A3 Fall 2025 or 2026 Spring 2027 or 2028 Development Timeline (*Clubhouse construction timeline TBD) Site Amenities The Mill on Main features many high-quality amenities that benefit both the residents and the community members. The proposal includes a small outdoor amphitheater, with two small pavilions for gathering, open green space, potential ice-skating rink during the winter season, public and private Fox River boat slips, a river-front restaurant, and walking paths throughout the site. Also included is a private pickle ball court for residents and a public dog walk located across 7th Avenue. The site plan will include ample indoor bike parking stalls for residents and outdoor bike parking for Riverwalk users and retail customers. Page 26 P.O. Box 620037 Middleton, WI 53562 User Amenity Private • Clubhouse including fitness center, yoga room, club/community room (kitchen, lounge seating fireplace, etc.), game room (billiards, darts, etc.), golf simulator, pool, hot tub, grilling area. • Dog run • Pickle ball courts • Private boat slips • Indoor and outdoor bike parking Public/Private • Riverside green space/park • Small outdoor bandshell • Potential skating rink • Walking paths • Pavilion areas • Public boat slips • River-front restaurant • Bike parking stalls • Dog park Art The Mill on Main will include creative buildings and an architecturally pleasing design, they will be complimented with art throughout the site. As shown on the renderings, The Mill on Main is also planning to add decorative murals/historic photos of Oshkosh along stretches of the 1st floor of Building A1. These photos and murals should break up the façade and highlight the elaborate history of Oshkosh and the Sawdust District as pedestrians and residents walk past the building. The Mill on Main is also planning a large 10’ diameter water wheel statue as the centerpiece of the development and a tribute to the Fox River and Sawdust District. Example pictures below: Page 27 P.O. Box 620037 Middleton, WI 53562 Green/Sustainable Features T. Wall Enterprises strives to design, construct and manage buildings with a forward thinking, green/sustainable features. Like all T. Wall Enterprises developments, The Mill on Main will feature: • Electric Vehicle Charging Stations. o 30% of our covered parking stalls will have electric vehicle charging stations while 100% of our covered parking stalls will be wired to accommodate electric vehicle charging stations in the future. • From the outset, our architects will design these buildings to be Focus on Energy Certified. • Energy efficient appliances. • LED lighting. • Low-flow faucets. • Double-paned, energy efficient windows. • Double-insulated exterior walls and roof. • Ample public and private bike parking Planned Development – Statement of Rationale The purpose of the Mill on Main’s use of a Planned Development Zoning is to provide for relaxation of the certain development standards pertaining to the underlying standard zoning district. In exchange, this development reflects the City’s planning policies as set forth in the Sawdust District Neighborhood plan and the City’s comprehensive plan by creating a mixed-use community with multi-family, commercial, and recreational uses for private and public users. Zoning Exceptions Zoning Ordinance Section Ordinance Variance 30-75(G)(1) – Residential Land Uses Minimum required parking: two spaces per dwelling unit containing zero, on or two bedrooms, plus 0.5 space per additional bedroom over two bedrooms per unit. One guest parking space shall be provided for every three dwelling units. Per this ordinance, The Mill on Main would require 1,135 parking stalls, of which we are proposing 503 total stalls. At all T. Wall Enterprises developments, we shoot for a 1:1.1 parking ratio (1.1 stalls for every unit). Here we are achieving that 1:1.1 ratio, without including surface or street parking stalls. Additional surface stalls can be used for residents with more than one car, resident’s guests, retail/commercial customers and employees, park, and Riverwalk users, etc. Residents use the Page 28 P.O. Box 620037 Middleton, WI 53562 surface stalls during non-work hours (5pm- 9am), whereas retail customers use the surface stalls during the day (10am- 5pm). This parking ratio has been successful at our other mixed-use developments, Middleton Center, Peloton Residences, Watermark Lofts, etc. The relaxed parking standard also helps achieve the density that is desired on site by both the City and the Developer. Density is bound by parking. 30-79(B)(1)(b) – Multiple Use Buildings In the Riverfront Overlay, at least 70 percent of the building’s ground floor area shall consist of commercial uses. Per this ordinance, The Mill on Main would require 58,344 sq ft of commercial space. This proposal includes a total of 22,375 commercial sq ft, 27% of the buildings ground floor area. This proposal includes less commercial area so that there’s more green/recreational park space and ground level, covered parking to accommodate the density. Also, given the state of commercial and retail space due to COVID, there’s no reason to overburden this development and district with more commercial space than it can absorb. 30-86(A)(2) – Accessory Land Uses and Structures A combined total of 1,200 of gross floor area for all accessory structures on the property is permitted by right. For lots larger than 1 acre, the maximum permitted combined total of gross floor area of all accessory structures on the property shall be increased by one square foot for every 100 square feet of lot area over one acre Per this ordinance, The Mill on Main clubhouse could not exceed 4,780 sq ft. The proposed Mill on Main clubhouse is approximately 6,000 sq ft. This increase will accommodate all 295 units and the quality amenities and resources that the residents look for when living in a luxury T. Wall property. The clubhouse must also be spacious enough to accommodate T. Wall’s in-house property management and maintenance team needed to properly care for both residents and the property. Section 30- 242(G)(2) - Wall or Roof-Mounted Lighting Full cutoff light fixtures are required Due to the prominent location of The Mill on Main near downtown, on the Fox River and at the entryway to the Sawdust District, we are proposing the use of direct/indirect (up/down) light fixtures on Page 29 P.O. Box 620037 Middleton, WI 53562 the façade. Previous T. Wall Enterprises developments have used this lighting in downtown areas (pictures attached below) and it has been extremely well received within those respective communities. Section 30- 271(B)(3)(c)(iv) – Sign Groups, Categories, and Types The top of the Projecting Sign shall not be installed above the windowsill of the second story or 18 feet, whichever is less The projecting sign shown on the renderings on the northwest corner of building A2 is a tall, narrow sign that extends from the bottom of the second story to just under the top of the building. Vertically, it reads “Mill on Main” to mark the entrance to the development and be an icon for South Main Street. Example pictures below. Section 30- 271(B)(3)(e)(ii) – Sign Groups, Categories, and Types The top of the sign shall not extend above the top edge of the vertical wall or above the lowest edge of a roof line of the portion of the building to which it is mounted As shown in the renderings on the northern end of building A1, this proposal includes a large roof-mounted sign on top of the building facing downtown Oshkosh and the Fox River that reads “Mill on Main”. This will be a iconic sign for the development and weigh-finding sign for boaters and drivers. Example pictures below. Building façade lighting example Page 30 P.O. Box 620037 Middleton, WI 53562 Projecting sign example Roof mounted sign example Page 31 P.O. Box 620037 Middleton, WI 53562 Conclusion We thank you for your consideration for The Mill on Main’s proposed Specific Implementation Plan. We know our team’s proposal will help Oshkosh achieve their goals for the Sawdust District by providing high-density, mixed-use development that engages the community, activates South Main Street, and provides connectivity to the Riverwalk. We seek to add to the high-quality development that this community is experiencing now and desires for the future. To reiterate our submittal from the Redevelopment Authority’s RFP, “We want to ensure that Oshkosh remains a successful place to live, work, shop, and play.” Thank you for your consideration. Sincerely, The Mill on Main, LLC By:________________________________ Terrence R. Wall, President of T. Wall Enterprises Manager, LLC, Its Manager & By:________________________________ Jake Bunz, Project Manager Page 32 Page 33 SIP MILL ON MAIN PC: 07/05/2022 RIVERFRONT DEVELOPMENT LLC 55 E JACKSON BLVD 500 CHICAGO, IL 60604 BAGO LOFTS INC 3731 SHANGRI LA POINT RD OSHKOSH, WI 54904 6TH WARD LLC 45 W 6TH AVE OSHKOSH, WI 54902 MILES KIMBALL LLC 1425 MEMORIAL DR MANITOWOC, WI 54220 BERGSTROM CORP 1 NEENAH CENTER FL 7 NEENAH, WI 54956 GD/RL KORTHALS TRUST/KP&D SCHROEDER 600 S MAIN ST OSHKOSH, WI 54902 BROOKLYN CONDOMINIUM ASSOC 600 S MAIN ST STE 105 OSHKOSH, WI 54902 ERDMANN CLINIC LLC 497 E CALIFORNIA BLVD APT 314 PASADENA, CA 91106 JAMES LARSON ARCHITECT LLC 1369 RAHR AVE OSHKOSH, WI 54901 WOHLT INVESTMENTS LLC 911 W 18TH AVE OSHKOSH, WI 54902 901 SOUTH MAIN LLC 907 S MAIN ST OSHKOSH, WI 54902 G REINKE & CO INC 900 S MAIN ST OSHKOSH, WI 54902 EVERETT IND BLDG CO PO BOX 1138 FOND DU LAC, WI 54936 WIS PUBLIC SERVICE CORP PO BOX 19001 GREEN BAY, WI 54307 BOLDTFAB LLC 1110 N DR MARTIN LUTHER KING JR DR MILWAUKEE, WI 53203 REDEVELOPMENT AUTH CITY OF OSHKOSH PO BOX 1130 OSHKOSH, WI 54903 FOX VALLEY & WESTERN LTD 17641 S ASHLAND AVE HOMEWOOD, IL 60430 THE MILL ON MAIN LLC PO BOX 620037 MIDDLETON, WI 53562 Page 34 Riverside Park S MAIN ST S MAIN ST W 9TH AVW 9TH AV S MAIN ST BRIDGE S MAIN ST BRIDGE PPIIOONNEEEERRDDRR EE 1100TTHH AAVV E 8TH AVE 8TH AV E 9TH AVE 9TH AV W 7TH AVW 7TH AV W 6TH AVW 6TH AV W 8TH AVW 8TH AV W 10TH AVW 10TH AV E 7TH AVE 7TH AV C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 6/17/2022 1 in = 220 ft1 in = 0.04 mi¯MILL ON MAINMILL ON MAIN City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 35 HI TR-10 TR-10 I CMU CMU I RMU-PD CMU-PD CMU-RFO UMU I-PD-RFO UMU RMU-PD-RFO UMU UMU I UMU-RFO RMU-PD-RFO I I-PD I I-PD I I I TR-10 I I CMU-PD UMU-PD I I-PD I UMU-PD UMU-PD RMU-PD-RFO I CMU RMU-PD-RFO UMU CMU UMU RMU-PD I-RFO CMU-PD-RFO RMU-PD CMU-RFO RMU-RFO CMU-PD I-PD-RFO MR-20 MR-36 CMU Oshkosh City Limit Oshkosh City Limit OREGON ST OREGON ST S MAIN ST S MAIN ST CEAPE AVCEAPE AV W 9TH AVW 9TH AV N MAIN ST N MAIN ST W SOUTH PARK AVW SOUTH PARK AV BAY ST BAY ST OTTER AVOTTER AV PPIIOONNEEEERRDDRR NEBRASKA ST NEBRASKA ST WAUGOO AVWAUGOO AV BROAD ST BROAD ST W 7TH AVW 7TH AV W 6TH AVW 6TH AV W 8TH AVW 8TH AV W 11TH AVW 11TH AV W 10TH AVW 10TH AV W 12TH AVW 12TH AV W 14TH AVW 14TH AV E 10TH AVE 10TH AV COURT ST COURT ST POPLAR AV POPLAR AV STATE ST STATE ST BAY SHORE DR BAY SHORE DR E 9TH AVE 9TH AV SCHOOL AVSCHOOL AV E 14TH AVE 14TH AV COMMERCE ST COMMERCE ST E 11TH AVE 11TH AV E 7TH AVE 7TH AV MULTIPLE C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 6/17/2022 1 in = 500 ft1 in = 0.09 mi¯MILL ON MAINMILL ON MAIN City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 36 C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 6/17/2022 1 in = 200 ft1 in = 0.04 mi¯MILL ON MAINMILL ON MAIN City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 37