Loading...
HomeMy WebLinkAboutAdvance Construction 18-01 Change Order #1 (final) 4.1.2022TO: ADVANCE CONSTRUCTION 2141 WOODALE AVENUE GREEN BAY, WI 54313 Your present contract with the City of Oshkosh, Contract No. 18-01, awarded December 10, 2019, is hereby amended and changed as follows: ($61,213.37) $15,891.36 ($14,948.36) ($11,416.40) NET DECREASE TO CONTRACT ($71,686.77) TOTALS BID TOTAL $848,673.00 $848,673.00 CO #1 ($71,686.77)($71,686.77) CONTRACT TOTAL $776,986.23 $776,986.23 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney NET INCREASE TO ALTERNATE 1: NET DECREASE TO ALTERNATE 3: DATE: APRIL 1, 2022 NET DECREASE TO ADDITIONAL WORK: CHANGE ORDER #1 (FINAL): NET DECREASE TO SECTION I: ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ DocuSign Envelope ID: E32DB210-5C60-426B-9E8E-AF047FF032AC CONTRACT 18-01 CHANGE ORDER #1 (FINAL) 18-01 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1005 Installation of gas collection trench and collection/header piping; including all backfill and capping materials; complete as specified (see Trench Section Detail) Linear Feet 1,145.00 995.00 -150.00 $110.00 ($16,500.00) 1012 Installation of well head manholes; control valves; and sampling ports; including all associated piping and connections; complete as specified (see Trench Section at Manhole Detail; and SDR- 17 perforated landfill gas collector pipe; Valve Vault/Manhole Details) Each 7.00 6.00 -1.00 $9,700.00 ($9,700.00) 1015 Installation of passive venting and valve; including tie-into gas collection piping; complete as specified (see Passive Vent Detail)Each 5.00 4.00 -1.00 $6,000.00 ($6,000.00) 1022 Installation of blower system; including electrical and control system and venting pipe; complete as specified (see Blower and Electrical Details) Lump Sum 1.00 1.00 $117,850.00 1025 Start-up and demonstration of landfill gas system; complete as specified Lump Sum 1.00 1.00 $8,000.00 1050 Mobilization; complete as specified Lump Sum 1.00 1.00 $88,000.00 1311 8" concrete pavement; with 6" CABC and grading; complete as specified Square Yards 290.00 0.00 -290.00 $80.00 ($23,200.00) 1350 Pavement ties; complete as specified Each 25.00 0.00 -25.00 $10.00 ($250.00) 1354 Drilled dowel bars; 1 1/4"; complete as specified Each 41.00 0.00 -41.00 $13.00 ($533.00) 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 115.00 0.00 -115.00 $9.00 ($1,035.00) 1710 Sawing concrete pavement full depth; complete as specified Linear Feet 160.00 20.00 -140.00 $4.00 ($560.00) 2002 Furnish and install 10" storm sewer; complete as specified Linear Feet 105.00 101.50 -3.50 $100.00 ($350.00) 2213 Furnish and install standard storm sewer inlet manhole (4' diameter); complete as specified Veritcal Feet 12.00 7.62 -4.38 $240.00 ($1,051.20) 2404 Furnish and install storm sewer marker balls; complete as specified Each 2.00 0.00 -2.00 $700.00 ($1,400.00) Page 2 of 5 DocuSign Envelope ID: E32DB210-5C60-426B-9E8E-AF047FF032AC CONTRACT 18-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2406 Furnish and install storm sewer clay dams; complete as specified Each 3.00 2.00 -1.00 $400.00 ($400.00) 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 12.00 10.00 -2.00 $125.00 ($250.00) 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 24.00 0.00 -24.00 $70.00 ($1,680.00) 2512 Furnish; install; maintain; and remove stone tracking pad; complete as specified Each 1.00 1.00 $2,400.00 2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 1,980.00 1,646.78 -333.22 $3.00 ($999.66) 2620 Furnish and install turf grass; complete as specified Square Yards 18,700.00 15,696.78 -3,003.22 $1.00 ($3,003.22) 2624 Furnish and install annual cover crop; complete as specified Square Yards 18,700.00 15,696.78 -3,003.22 $0.30 ($900.97) 2634 Furnish and install Class II; Type B erosion control mat; complete as specified Square Yards 800.00 800.00 $3.00 2640 Furnish and install reinforced grass pavement system; complete as specified Square Yards 555.00 481.64 -73.36 $93.00 ($6,822.47) 2644 Furnish and install hydraulically-applied erosion control product; complete as specified Square Yards 17,900.00 15,696.78 -2,203.22 $1.30 ($2,864.19) 2856 Connect to existing storm sewer manhole; complete as specified Each 2.00 1.00 -1.00 $1,000.00 ($1,000.00) 2858 Connect to existing storm sewer inlet; complete as specified Each 2.00 1.00 -1.00 $1,000.00 ($1,000.00) 2906 Clear trees; complete as specified Lump Sum 1.00 1.00 $7,500.00 2908 Clear shrubs; complete as specified Lump Sum 1.00 1.00 $7,500.00 2912 Grub stumps; complete as specified Lump Sum 1.00 1.00 $7,500.00 2914 Storm sewer utility line opening (ULO); complete as specified Each 2.00 0.00 -2.00 $1,000.00 ($2,000.00) 2946 Furnish and install 6' high temporary metal cyclone fence and associated gate; complete as specified Linear Feet 1,980.00 1,707.37 -272.63 $10.00 ($2,726.30) 2950 Excavation special (storm); complete as specified Tons 2,300.00 3,578.48 1,278.48 $18.00 $23,012.64 $23,012.64 ($84,226.01) ($61,213.37) SECTION I (ITEMS 1005 - 2950) - SUBTOTAL: NET DECREASE TO SECTION I: Page 3 of 5 DocuSign Envelope ID: E32DB210-5C60-426B-9E8E-AF047FF032AC CONTRACT 18-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1005-1 Installation of gas collection trench and collection/header piping; including all backfill and capping materials; complete as specified (see Trench Section Detail) Linear Feet 376.00 327.00 -49.00 $120.00 ($5,880.00) 1012-1 Installation of well head manholes; control valves; and sampling ports; including all associated piping and connections; complete as specified (see Trench Section at Manhole Detail; and SDR- 17 perforaated landfill gas collector pipe; Valve Vault/Manhole details) Each 1.00 1.00 $9,700.00 1015-1 Installation of passive venting and valve; including tie-into gas collection piping; complete as specified (see Passive Vent Detail)Each 1.00 1.00 $6,000.00 1025-1 Start-up and demonstration of landfill gas system; complete as specified Lump Sum 1.00 1.00 $4,000.00 2950-1 Excavation special (storm); complete as specified Tons 750.00 1,959.52 1,209.52 $18.00 $21,771.36 ALTERNATE 1 - (BID ITEMS 1005-1 - 2950-1) - SUBTOTAL: $21,771.36 ($5,880.00) $15,891.36 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 2601-3 Tree and stump removal; complete as specified Cubic Yards 6,300.00 5,232.26 -1,067.74 $14.00 ($14,948.36) SECTION 2: ALTERNATE 3 (ITEM 2601-3) - SUBTOTAL: $0.00 ($14,948.36) ($14,948.36) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-10000 Conduit for electrical service; complete as specified Lump Sum 0.00 1.00 1.00 $3,183.60 $3,183.60 ADDITIONAL WORK REQUIRED: CO #1 NET INCREASE TO ALTERNATE: NET DECREASE TO SECTION 2: ALTERNATE 3: SECTION 2: ALTERNATE 3 SECTION 2: ALTERNATE 1 Page 4 of 5 DocuSign Envelope ID: E32DB210-5C60-426B-9E8E-AF047FF032AC CONTRACT 18-01 CHANGE ORDER #1 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-10010 Top soil deduct for non pulverized; complete as specified Lump Sum 0.00 1.00 1.00 ($20,000.00) ($20,000.00) 1-10020 Well protection conduit for electrical service: complete as specified Lump Sum 0.00 1.00 1.00 $5,400.00 $5,400.00 ($11,416.40) $0.00 ($11,416.40) ($61,213.37) NET INCREASE TO ALTERNATE 1 $15,891.36 NET DECREASE TO ALTERNATE 3 ($14,948.36) ($11,416.40) NET DECREASE TO CONTRACT:($71,686.77) ADDITIONAL WORK REQUIRED: CO #1 - SUBTOTAL: NET DECREASE TO CO #1: NET DECREASE TO ADDITIONAL WORK NET DECREASE TO SECTION I Page 5 of 5 DocuSign Envelope ID: E32DB210-5C60-426B-9E8E-AF047FF032AC