Loading...
HomeMy WebLinkAbout09. 22-163APRIL 26, 2022 22-163 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID TO RJN GROUP INC. FOR 2022 FLOW MONITORING SERVICES: SANITARY SEWER COLLECTION SYSTEM FOR ENGINEERING DIVISION ($104,900.00) INITIATED BY: PURCHASING DIVISION WHEREAS, the City of Oshkosh has heretofore advertised for bids for 2022 flow monitoring collection services for Wastewater Division; and WHEREAS, upon the opening and tabulation of bids, the following was the only bid received: RJN GROUP INC 200 W. Front Street Wheaton, IL 60187 Total Bid: $104,900.00 WHEREAS, staff has reviewed the bid and determined that it meets minimum bid specifications and is competitive; and WHEREAS, RJN Group is the current provider and their performance has been satisfactory for these services under the current agreement. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 05511920 6417 Admin/Engineering Fee VENDOR INFORMATION BID INFORMATION RJN Group Inc 200 W Front Street Wheaton IL 60187 BID $104,900.00 PREQUAL YES BID BOND YES BIDS OPENED APRIL 19, 2022 CITY OF OSHKOSH BID TAB FLOW MONITORING SERVICES SANITARY COLLECTION SYSTEM City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: April 18, 2022 RE: Award Bid to RJN Group Inc. for 2022 Flow Monitoring Services: Sanitary Sewer Collection System for Engineering Division ($104,900.00) BACKGROUND For the past nine years, the City has utilized a contractor to conduct flow monitoring services to collect sanitary sewer flow data used to identify areas of high inflow and infiltration of clear water into the sanitary sewer system. Clear water entering the sanitary system can be a significant problem. The sanitary system is not designed to handle these clear water flows, which may result in sanitary backups into residents’ homes. This project will install flow monitoring at approximately 10 locations in the sewer system. This data is used to identify areas of high inflow and infiltration of clear water into the sanitary sewer system and to calibrate and verify the sanitary collection system model. ANALYSIS Working with Public Works staff, Purchasing prepared bid specifications for this project. The bid was advertised in the local newspaper, posted on DemandStar and sent to known firms that provide these services. Bids were due April 19, 2022. The bid tab is attached. Based on the bid review, it was the consensus of City staff that the sole bid received from RJN Group, Inc. met the minimum bid requirements and was competitive. RJN Group, Inc. is the current provider for these services and staff have been pleased with their performance. FISCAL IMPACT The total fiscal impact of this bid is $104,900.00. The 2022 Wastewater Division Operating Budget allocated $130,000.00 for this project. This project will be charged to A/N# 05511920 6417 (Admin/Engineering Fee). RECOMMENDATION Purchasing recommends the Common Council award this bid to RJN Group, Inc. for $104,900.00. Please contact me or Public Works Director James Rabe for any questions pertaining to this bid. Respectfully Submitted, Approved: Jon G. Urben, General Services Manager Mark A. Rohloff, City Manager