Loading...
HomeMy WebLinkAbout22. 22-153APRIL 12, 2022 22-153 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID TO SMA CONSTRUCTION SERVICES, LLC. FOR PARKS ADMINISTRATION/OPERATIONS BUILDING ($8,943,500.00) INITIATED BY: PARKS DEPARTMENT WHEREAS, the City of Oshkosh has heretofore advertised for bids for Parks Administration/Operations Building for the Parks Department; and WHEREAS, upon the opening and tabulation of bids, it appears that the following is the most advantageous bid: SMA CONSTRUCTION SERVICES, LLC 201 West Walnut St, Ste 301 Green Bay WI 54303 Total Bid: $8,943,500.00 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0323-0610-7214-63115 – Equipment Funds, Parks Administration - Buildings City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Ray Maurer, Parks Director DATE: April 7, 2022 RE: Award Bid to SMA Construction Services, LLC. for Parks Administration/Operations Building ($8,943,500.00) BACKGROUND The Parks Department 2021/2022 CIPs included a total allocation of $6,600,000 for the new Parks Administration/Operations Building. This included acquisition of one adjacent property, demolition of that property, new building design, bid specifications, office/shop equipment, inspection fees, contingency and construction management. The city entered into an agreement with Kueny Architects, LLC. for the design, bid specifications, bidding and construction management for the project. ANALYSIS The bid was advertised in the Oshkosh Northwestern and posted on Quest. Bids were due March 10, 2022 and the bids are good for 60 days. The bid tab is attached. Based on the bid review, it was the consensus of Kueny Architects staff and City staff that the low bid received from SMA Construction Services, LLC. met all the bid requirements. FISCAL IMPACT The total fiscal impact of this bid is $8,943,500.00 and will be funded in Account #0323-0610- 7214-63115 Equipment Funds, Parks Administration - Buildings. The anticipated total project cost, including all the items listed in the Background section above, is estimated at $10,200,000.00. The additional funding necessary for this project will be discussed and considered by the Common Council in the previous agenda item. RECOMMENDATION Staff recommends the Common Council award this bid to SMA Construction Services, LLC. for $8,943,500.00. Respectfully Submitted, Approved, Ray Maurer, Parks Director Mark A. Rohloff, City Manager VENDOR INFORMATIONBIDSMA Construction Services, LLC201 West Walnut St, Ste 301$8,943,500.00Green Bay WI 54303Mike Koenig Construction Co, Inc3502 Behrens Pkwy$9,016,490.00Sheboygan WI 53081Miron Construction Co Inc1471 McMahon Drive$9,789,343.00Neenah WI 54956NEW PARKS FACILITYBIDS OPENED MARCH 10, 2022CITY OF OSHKOSHBID TAB Contract 22-12 - New Parks Facility (#8108050)Owner: Oshkosh WI, City ofSolicitor: Kueny Architects, LLCBid Opening: 03/10/2022 02:00 PM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionSection 1: Base Bid$8,728,500.00$8,748,450.001All labor; materials; services; and equipment necessary for completion of the Work required for the New Parks Facility; complete as specifiedLump Sum 1.00 $8,700,000.00 $8,700,000.00 $8,720,700.00 $8,720,700.001APrice per cubic yard of soil excavated; for additional depth required to reach good bearing soil for site pavement areas (asphalt or concrete); complete as specifiedCubic Yards 750.00 $16.00 $12,000.00 $15.00 $11,250.001BPrice per cubic yard of compacted backfill; in place; for site pavement areas (asphalt or concrete); complete as specifiedCubic Yards 750.00 $22.00 $16,500.00 $22.00 $16,500.00Section 2: Alternate 1 (To Be Awarded)$200,000.00$254,250.00A-1Add to the Base Bid amount all labor; materials; services; and equipment necessary for Bin Storage for the New Parks Facility; complete as specifiedLump Sum 1.00 $200,000.00 $200,000.00 $254,250.00 $254,250.00SMA Construction Services, LLCMIKE KOENIG CONSTRUCTION CO., INC.201 West Walnut Street, Suite 301Green Bay, WI 54303I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-12 New Parks Fac\Project_Information\Contract Info\22-12 Bid Tab_3-11-22Page 1 of 64/7/2022 Contract 22-12 - New Parks Facility (#8108050)Owner: Oshkosh WI, City ofSolicitor: Kueny Architects, LLCBid Opening: 03/10/2022 02:00 PM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionSMA Construction Services, LLCMIKE KOENIG CONSTRUCTION CO., INC.201 West Walnut Street, Suite 301Green Bay, WI 54303Section 3: Alternate 2 (To Be Awarded)$0.00$0.00A-2Add to the Base Bid amount all labor; materials; services; and equipment necessary for the integration of the BAS system provided under the Base Bid to tie in with the Citywide Siemens Desigo CC Building Management Software Platform. This alternate to include all work associated with providing and installing the Bacnet system for full Citywide system integration for the New Parks Facility; complete as specified.Lump Sum 1.00 $0.00 $0.00 $0.00 $0.00Section 4: Alternate 3 (To Be Awarded)$15,000.00$13,790.00A-3Add to the Base Bid amount all labor; materials; services; and equipment necessary for the required building Bacnet BAS front end to be Siemens. Integrate building BAS with Citywide Siemens Desigo CC Building Management Software Platform for the New Parks Facility; complete as specifiedLump Sum 1.00 $15,000.00 $15,000.00 $13,790.00 $13,790.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-12 New Parks Fac\Project_Information\Contract Info\22-12 Bid Tab_3-11-22Page 2 of 64/7/2022 Contract 22-12 - New Parks Facility (#8108050)Owner: Oshkosh WI, City ofSolicitor: Kueny Architects, LLCBid Opening: 03/10/2022 02:00 PM CSTSection TitleItem CodeItem DescriptionUofMQuantityUnit PriceExtensionUnit PriceExtensionSMA Construction Services, LLCMIKE KOENIG CONSTRUCTION CO., INC.201 West Walnut Street, Suite 301Green Bay, WI 54303Section 5: Substitutions (Not Accepted)$0.00(245,000.00)03 41 00 - Structural Precast Concrete - Wells*Use Wells in lieu of Stonecast Prodicts, however an extended completion date would be necessary to utilitze this, new completion date of August 31, 2023Lump Sum 1.00 $0.00 $0.00 (245,000.00) (245,000.00)Bid Total:$8,943,500.00$9,016,490.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-12 New Parks Fac\Project_Information\Contract Info\22-12 Bid Tab_3-11-22Page 3 of 64/7/2022 Contract 22-12 - New Parks Facility (#8108050)Owner: Oshkosh WI, City ofSolicitor: Kueny Architects, LLCBid Opening: 03/10/2022 02:00 PM CSTSection TitleItem CodeItem DescriptionUofMQuantitySection 1: Base Bid1All labor; materials; services; and equipment necessary for completion of the Work required for the New Parks Facility; complete as specifiedLump Sum 1.001APrice per cubic yard of soil excavated; for additional depth required to reach good bearing soil for site pavement areas (asphalt or concrete); complete as specifiedCubic Yards 750.001BPrice per cubic yard of compacted backfill; in place; for site pavement areas (asphalt or concrete); complete as specifiedCubic Yards 750.00Section 2: Alternate 1 (To Be Awarded)A-1Add to the Base Bid amount all labor; materials; services; and equipment necessary for Bin Storage for the New Parks Facility; complete as specifiedLump Sum 1.00Unit PriceExtension$9,481,149.00$9,442,149.00 $9,442,149.00$18.50 $13,875.00$33.50 $25,125.00$270,458.00$270,458.00 $270,458.00Miron Construction Co., Inc.I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-12 New Parks Fac\Project_Information\Contract Info\22-12 Bid Tab_3-11-22Page 4 of 64/7/2022 Contract 22-12 - New Parks Facility (#8108050)Owner: Oshkosh WI, City ofSolicitor: Kueny Architects, LLCBid Opening: 03/10/2022 02:00 PM CSTSection TitleItem CodeItem DescriptionUofMQuantitySection 3: Alternate 2 (To Be Awarded)A-2Add to the Base Bid amount all labor; materials; services; and equipment necessary for the integration of the BAS system provided under the Base Bid to tie in with the Citywide Siemens Desigo CC Building Management Software Platform. This alternate to include all work associated with providing and installing the Bacnet system for full Citywide system integration for the New Parks Facility; complete as specified.Lump Sum 1.00Section 4: Alternate 3 (To Be Awarded)A-3Add to the Base Bid amount all labor; materials; services; and equipment necessary for the required building Bacnet BAS front end to be Siemens. Integrate building BAS with Citywide Siemens Desigo CC Building Management Software Platform for the New Parks Facility; complete as specifiedLump Sum 1.00Unit PriceExtensionMiron Construction Co., Inc.$23,573.00$23,573.00 $23,573.00$14,163.00$14,163.00 $14,163.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-12 New Parks Fac\Project_Information\Contract Info\22-12 Bid Tab_3-11-22Page 5 of 64/7/2022 Contract 22-12 - New Parks Facility (#8108050)Owner: Oshkosh WI, City ofSolicitor: Kueny Architects, LLCBid Opening: 03/10/2022 02:00 PM CSTSection TitleItem CodeItem DescriptionUofMQuantitySection 5: Substitutions (Not Accepted)03 41 00 - Structural Precast Concrete - Wells*Use Wells in lieu of Stonecast Prodicts, however an extended completion date would be necessary to utilitze this, new completion date of August 31, 2023Lump Sum 1.00Bid Total:Unit PriceExtensionMiron Construction Co., Inc.$0.00$0.00 $0.00$9,789,343.00I:\Engineering\2021 - 2030 Contracts\2022 CONTRACTS\22-12 New Parks Fac\Project_Information\Contract Info\22-12 Bid Tab_3-11-22Page 6 of 64/7/2022