HomeMy WebLinkAbout12. 22-143APRIL 12, 2022 22-143 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: APPROVE CHANGE ORDER NO. 2 (FINAL) FOR PUBLIC WORKS CONTRACT NO. 21-06 CONCRETE SIDEWALK (NEW AND REHABILITATION) /AL DIX CONCRETE, INC. (-$122,376.92) INITIATED BY: PUBLIC WORKS DEPARTMENT BE IT RESOLVED by the Common Council of the City of Oshkosh that the following change Order, a copy of which is attached, is hereby approved: AL DIX CONCRETE, INC. 401 Gertrude Street Kaukauna, WI 54130 Net Decrease to Contract: (-$122,376.92) PURPOSE: See attached Change Order. Acct. Nos. 03210410-6810-04006 Contract Control-Sidewalk-Annual – Concrete Sidewalks 03210410-6806-04126 Contract Control-Sidewalk-Annual – New Sidewalk Ordered In) 05411867-6401-08673 Water Distribution Maintenance-Contractual Services-Maint-Mains 05411867-6401-08675 Water Distribution Maintenance-Contractual Services-Maint-Services 03230740-7216-63016 Planning Division-Land Improvement-Great Neighborhoods Initiative I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-06 Sidewalk Rehab\Project_Information\Correspondence\Memo\21-06 Memo for CO #2 (Final)_4-7-22.docx Page 1 of 2 TO: Honorable Mayor and Members of the Common Council FROM: Justin Gierach, Engineering Division Manager / City Engineer DATE: April 7, 2022 RE: Approve Change Order No. 2 (Final) for Public Works Contract No. 21-06 Concrete Sidewalk (New and Rehabilitation) / Al Dix Concrete, Inc. (-$122,376.92) BACKGROUND Change Order No. 2 for Contract 21-06 is scheduled for consideration by the Common Council at the April 12, 2022 meeting. The Contract was originally awarded to Al Dix Concrete, Inc. in January of 2021 and Change Order No. 1 was awarded in September of 2021. This change order adjusts quantities to match the necessary installation in the field. ANALYSIS Following is a summary of the significant changes to each section of the CIP/Operating Budget:  Sidewalk – Final quantities were adjusted to match field conditions.  Water Utility Operating Budget – Final quantities were adjusted to match field conditions. FISCAL IMPACT Contract Section Change Order Amount Estimated Total Construction Costs CIP Budget Amount CIP - Sidewalk -$71,694.04 $843,908.58 $918,029 CIP - Sidewalk (New Walk Ordered In -$6,340.81 $33,471.29 $70,000 Water Utility Operating Budget -$44,342.07 $238,092.66 $238,200 Property Improvements - Jackson Street Road Diet $0.00 $26,113.91 $26,114 Total -$122,376.92 $1,141,586.44 $1,252,343 Note: Water Utility Operating Budget contains $395,000 for maintenance of Mains and Services. Only the amount needed for repairing concrete pavement is shown as the funds are used for all maintenance items. I:\Engineering\2021 - 2030 Contracts\2021 CONTRACTS\21-06 Sidewalk Rehab\Project_Information\Correspondence\Memo\21-06 Memo for CO #2 (Final)_4-7-22.docx Page 2 of 2 Funding for the sidewalk rehabilitation portion of the Project is in the 2021 Capital Improvements Program (CIP) Sidewalk Section, (Account No. 03210410-6806-04006/Contract Control-Sidewalk-Annual – Concrete Sidewalks and 03210410-6806-04126/Contract Control- Sidewalk-Annual – New Sidewalk Ordered In). Funding for the Water Utility Operating Budget is included in the 2021 Water Utility Operating Budget (Account No. 05411867-6401- 08673/Water Distribution Maintenance-Contractual Services-Maint-Mains and 05411867-6401- 08675/Water Distribution Maintenance-Contractual Services-Maint-Services). Funding for the Property Improvements – Jackson Street Road Diet portion of this Project is in the 2021 Capital Improvement Program (Account No. 03230740-7216-63016/Planning Division-Land Improvement-Great Neighborhoods Initiative). RECOMMENDATIONS I recommend approval of Change Order No. 2 (Final) to Contact No. 21-06 in the amount of -$122,386.92 to Al Dix Concrete, Inc. Approved: Mark A. Rohloff City Manager JLG/tlt TO: AL DIX CONCRETE, INC. CHANGE ORDER #2 (FINAL) 401 GERTRUDE STREET KAUKAUNA, WI 54130 Your present contract with the City of Oshkosh, Contract No. 21-06, awarded January 26, 2021, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($122,376.92) NET INCREASE TO ADDITIONAL WORK:$0.00 NET DECREASE TO CONTRACT ($122,376.92) SECTION I TOTALS BID TOTAL $1,179,423.50 $1,179,423.50 CO #1 $24,635.76 $24,635.76 PREVIOUS $1,204,059.26 $1,204,059.26 CO #2 ($122,376.92)($122,376.92) CONTRACT TOTAL $1,081,682.34 $1,081,682.34 CITY OF OSHKOSH BY: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. Approved as to form: City Attorney DATE: MARCH 24, 2022 ______________________________ Comptroller ______________________________ Contractor ______________________________ Approved and accepted: ______________________________ City Manager City Clerk ______________________________ CONTRACT 21-06 CHANGE ORDER #2 (FINAL) 21-06 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1011 Clearing; complete as specified Inch Diameter 8.00 0.00 -8.00 $30.00 ($240.00) 1021 Grubbing; complete as specified Inch Diameter 8.00 0.00 -8.00 $25.00 ($200.00) 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 79,605.00 83,711.93 4106.93 $1.75 $7,187.13 1308 7" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 200.00 2,193.65 1993.65 $70.00 $139,555.50 1318 8" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 2,000.00 363.76 -1,636.24 $79.00 ($129,262.96) 1319 8" concrete pavement HES removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 500.00 46.82 -453.18 $85.00 ($38,520.30) 1328 9" concrete pavement removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Square Yards 200.00 0.00 -200.00 $90.00 ($18,000.00) 1360 Adjust manholes and inlets; complete as specified Each 10.00 6.00 -4.00 $400.00 ($1,600.00) 1370 Turf restoration; complete as specified Square Yards 400.00 221.19 -178.81 $12.00 ($2,145.72) 1372 Restore gravel driveway/apron; complete as specified Square Yards 275.00 0.00 -275.00 $18.00 ($4,950.00) 1380 Cold weather covering (concrete pavement) - single visquine; complete as specified Square Yards 400.00 290.97 -109.03 $1.00 ($109.03) 1382 Cold weather covering (concrete pavement) - double visquine; complete as specified Square Yards 400.00 0.00 -400.00 $1.00 ($400.00) Page 2 of 5 CONTRACT 21-06 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1384 Cold weather covering (concrete pavement) - double visquine with 6" hay; complete as specified Square Yards 100.00 0.00 -100.00 $1.00 ($100.00) 1390 Up-charge for late season cold weather concrete pavement; complete as specified Cubic Yards 500.00 0.00 -500.00 $9.00 ($4,500.00) 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 250.00 15.00 -235.00 $12.00 ($2,820.00) 1428 18" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 100.00 697.60 597.60 $70.00 $41,832.00 1438 24" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 1,000.00 76.90 -923.10 $70.00 ($64,617.00) 1448 30" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 225.00 27.00 -198.00 $70.00 ($13,860.00) 1460 Sidewalk curb; complete as specified Linear Feet 100.00 8.70 -91.30 $70.00 ($6,391.00) 1500 4" concrete sidewalk with 3" CABC and grading; complete as specified Square Feet 55,000.00 55,930.74 930.74 $5.00 $4,653.70 1500A 4" concrete sidewalk with 3" CABC and grading; in existing subdivisions and new walk ordered in; complete as specified Square Feet 2,917.00 2,959.50 42.50 $5.50 $233.75 1502 4" concrete sidewalk with 3" CABC and grading; water dept. locations; complete as specified Square Feet 2,000.00 2,158.03 158.03 $9.00 $1,422.27 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 24,000.00 30,889.65 6889.65 $5.75 $39,615.49 Page 3 of 5 CONTRACT 21-06 CHANGE ORDER #2 (FINAL) ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1510A 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; in existing subdivisions and new walk ordered in; complete as specified Square Feet 1,693.00 2,113.60 420.60 $6.25 $2,628.75 1512 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; water dept. locations; complete as specified Square Feet 1,500.00 1,834.73 334.73 $10.00 $3,347.30 1520 8" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 500.00 0.00 -500.00 $8.50 ($4,250.00) 1540 Curb ramp detectable warning field (natural/non- painted); complete as specified Square Feet 510.00 429.00 -81.00 $40.00 ($3,240.00) 1550 No. 4 reinforcing rods - deformed; epoxy-coated; complete as specified Linear Feet 1,480.00 34.00 -1,446.00 $3.00 ($4,338.00) 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy-coated; complete as specified Each 7,000.00 6,624.00 -376.00 $10.00 ($3,760.00) 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 500.00 0.00 -500.00 $9.00 ($4,500.00) 1700 Sawing existing pavement; complete as specified Linear Feet 2,045.00 298.40 -1,746.60 $8.00 ($13,972.80) 1720 Profile saw cut concrete curb; complete as specified Linear Feet 150.00 0.00 -150.00 $70.00 ($10,500.00) 1800 Base aggregate dense; 3/4"; complete as specified Tons 200.00 0.00 -200.00 $15.00 ($3,000.00) 1915 5" asphaltic surface MT with 6" CABC and grading; complete as specified Square Yards 250.00 0.00 -250.00 $80.00 ($20,000.00) 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 510.00 645.30 135.30 $80.00 $10,824.00 1990 Break bottom of vault; complete as specified Square Feet 1,000.00 0.00 -1,000.00 $14.00 ($14,000.00) 1991 Removal of vault wall; complete as specified Linear Feet 100.00 0.00 -100.00 $44.00 ($4,400.00) SECTION I (BID ITEMS 1011 - 1991) - SUBTOTAL: $251,299.89 ($373,676.81) NET DECREASE TO SECTION I: ($122,376.92) Page 4 of 5 CONTRACT 21-06 CHANGE ORDER #2 (FINAL) ADDITIONAL WORK REQUIRED: CO #1 ITEM NUMBER DESCRIPTION UNIT CONTRACT QUANTITY INSTALLED QUANTITIES NET INCREASE NET DECREASE UNIT PRICE INCREASE IN CONTRACT PRICE DECREASE IN CONTRACT PRICE 1-10000 Washington Avenue; remove and replace concrete sidewalk; complete as specified Lump Sum 1.00 1.00 $1,615.63 1-10001 Concrete work for Jackson road diet; complete as specified Lump Sum 1.00 1.00 $23,020.13 $0.00 $0.00 $0.00 ($122,376.92) $0.00 ($122,376.92) NET INCREASE TO ADDITIONAL WORK: ADDITIONAL WORK REQUIRED CO #1 (ITEMS 1-10000 - 1-10001) SUBTOTAL: NET INCREASE TO ADDITIONAL WORK: NET DECREASE TO SECTION I: NET DECREASE TO CONTRACT: Page 5 of 5