HomeMy WebLinkAbout0103390-Building (garage addition)OSHKOSH
ON THE WATER
Job Address 1252 BAY SHORE DR
Designer
Category
Type
Zoning
CITY OF OSHKOSH
BUILDING PERMIT -APPLICATION AND RECORD
Owner THOMAS J TRINKO
Contractor OWNER
111 - Single Family Addition
· Building ~_ Sign
Q Canopy (~) Fence (~__ Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Unfinished/Basement 0 Sq. Ft.
Finished/Living 0 Sq. Ft.
Garage 0 Sq. Ft.
Foundation · Poured Concrete (~ Floating Slab
(~ Concrete Block C) Post
occupancy Permit
Park Dedication
Baths 0
C) Pier C) Other
(~ Treated Wood
Flood Plain
# Dwelling Units 0
No 103390
Create Date 08/07/2003
Plan
Size
[] Projection ]
Canopies
Signs
Height Permit
# Structures
Use/Nature ~FPJ Construct a 2 car attached garage addition to an existing non-cenforming structure.
of Work
HVAC Contractor
Electric Contractor
Fees: Valuation $12,000.00 Plan Approval
Issued By: ~
$0.00 Permit Fee Paid
[] Permit VoidedI
Plumbing Contractor
$71.00 Park Dedication $0.00
Date 08/07/2003 Finat/O.P. 00/00/0000
In the performance of~ s,,~ I agr~ o~rm
all work pursuant to rules governing the described construction.
Date ~ ~/~
Agent/Owner
Oshkosh WI 54901 - 0000 Telephone Number ~'"Z~"~0
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
While the City of Oshkosh has no authority to enfome easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
ZONING/LAND USE COMPUANCE CHECKUST
JOB LOCATION: ~'~ ~'~-
PROPERTY OWNER/CONTRACTOR:
ZONING
CONSTRUCTION DATA: New Construction ~.
· TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.)
COMPLIANCE CHECKLIST
Addition Alteration
'~ \%,,000
DEFICIENT
COMMENTS
Use
Lot Width
Lot Area
Lot Area Per Family
Floodplain
Front Yard
Front Yard Side Street
Rear Yard
Side Yards
Building Area
Parking Standards
Off-Street Loading Standards
Vision Clearance
Transitional Yard Standards
Landscape Standards
Height
Conditions of Approval
Compliance with P.C. or
BZA Conditions of Approval
Signage Standards
Drainage Plan
REVIEW AUTHORITY
As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or
designee, must approval all plans, except the following: (1) Alterations or interior work when the use is
conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows; etc.,
when the use is conforming and when no change is proposed.
APPROVED DENIED
Plan Commission Action Required
Variance(s) Required
REVIEWED BY:
DATE: