Loading...
HomeMy WebLinkAbout0103390-Building (garage addition)OSHKOSH ON THE WATER Job Address 1252 BAY SHORE DR Designer Category Type Zoning CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD Owner THOMAS J TRINKO Contractor OWNER 111 - Single Family Addition · Building ~_ Sign Q Canopy (~) Fence (~__ Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Unfinished/Basement 0 Sq. Ft. Finished/Living 0 Sq. Ft. Garage 0 Sq. Ft. Foundation · Poured Concrete (~ Floating Slab (~ Concrete Block C) Post occupancy Permit Park Dedication Baths 0 C) Pier C) Other (~ Treated Wood Flood Plain # Dwelling Units 0 No 103390 Create Date 08/07/2003 Plan Size [] Projection ] Canopies Signs Height Permit # Structures Use/Nature ~FPJ Construct a 2 car attached garage addition to an existing non-cenforming structure. of Work HVAC Contractor Electric Contractor Fees: Valuation $12,000.00 Plan Approval Issued By: ~ $0.00 Permit Fee Paid [] Permit VoidedI Plumbing Contractor $71.00 Park Dedication $0.00 Date 08/07/2003 Finat/O.P. 00/00/0000 In the performance of~ s,,~ I agr~ o~rm all work pursuant to rules governing the described construction. Date ~ ~/~ Agent/Owner Oshkosh WI 54901 - 0000 Telephone Number ~'"Z~"~0 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. While the City of Oshkosh has no authority to enfome easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. ZONING/LAND USE COMPUANCE CHECKUST JOB LOCATION: ~'~ ~'~- PROPERTY OWNER/CONTRACTOR: ZONING CONSTRUCTION DATA: New Construction ~. · TYPE OF CONSTRUCTION: (i.e. fence, pool, parking lot, sign, etc.) COMPLIANCE CHECKLIST Addition Alteration '~ \%,,000 DEFICIENT COMMENTS Use Lot Width Lot Area Lot Area Per Family Floodplain Front Yard Front Yard Side Street Rear Yard Side Yards Building Area Parking Standards Off-Street Loading Standards Vision Clearance Transitional Yard Standards Landscape Standards Height Conditions of Approval Compliance with P.C. or BZA Conditions of Approval Signage Standards Drainage Plan REVIEW AUTHORITY As per Section 30-5 Enforcement of the City Zoning Ordinance, the Director of Community Development, or designee, must approval all plans, except the following: (1) Alterations or interior work when the use is conforming and when no change in use is proposed. (2) Maintenance items, e.g. siding, windows; etc., when the use is conforming and when no change is proposed. APPROVED DENIED Plan Commission Action Required Variance(s) Required REVIEWED BY: DATE: