Loading...
HomeMy WebLinkAbout0117749-Building /�'� CITY OF OSHKOSH No 117749 GMINt� �� 6,� OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD ON THE WATER �� Job Address 800 S WASHBURN ST Owner INSURED INCOME PROPERTIES Create Date 01/04/2006 Designer Contractor DMIINC Category 232-Alteration Stores&Customer Service Plan R1-109-1105 Type � Building Q Sign 0 Canopy 0 Fence � Raze I Zoning Class of Const: Size Unfinished/Basement 0 Sq.Ft. Rooms 0 Height 0 Ft. ❑ Projection I Finished/Living 0 Sq.Ft. Bedrooms 0 Stories Canopies 0 Garage 0 Sq.Ft. Baths 0 Signs 0 Foundation � Poured Concrete � Floating Slab Q Pier � Other � Concrete Block � Post � Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication #Dwelling Units 0 #Structures 0 Use/Nature omm/Interior remodeling as per plans. of Work HVAC Contractor Plumbing Contractor • Electric Contractor Fees: Valuation 14.00 Plan Approval $0.00 Permit Fee Paid $643.00 Park Dedication $0.00 Issued By: Date 01/04/2006 Final/O.P. 00/00/0000 � Permit Voided� Parcel Id#0614650000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party,if you perform the work described in this permit application within an easement,the City strongly urges the permit applicant to contact the easement holder(s)and cure y necessary appro is before starting such activity. Sign � i �-�-,�_ Date ��" ! � O� AgenUOwner Address PO BOX 260 STURGEON BAY WI 54235 - 0260 Telephone Number 920-743-9253 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number,Type of Inspection(i.e. Footing,Service, Final,etc.),Access into Building if Secure(how do we gain entry),your Name and Phone Number. Unless specified otherwise,we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.