HomeMy WebLinkAboutItem IV
PLAN COMMISSION STAFF REPORT MARCH 1, 2022
ITEM IV: GENERAL DEVELOPMENT PLAN FOR MIXED USE DEVELOPMENT AT
PROPERTIES LOCATED ON THE EAST SIDE OF SOUTH MAIN STREET
GENERAL INFORMATION
Applicant: Jake Bunz: T. Wall Enterprises
Property Owner: Redevelopment Authority of Oshkosh
Action(s) Requested:
The applicant requests approval of General Development Plan for a mixed use development for
properties generally located on the east side of S. Main St., along E 7th Ave, E 8th Ave, E 9th Ave,
and Pioneer Drive.
Applicable Ordinance Provisions:
Planned Development standards are found in Section 30-387 of the Zoning Ordinance.
Property Location and Background Information:
The subject area consists of 11 parcels located on the east side of South Main Street, in the general
vicinity of E 7th Ave, E 8th Ave, E 9th Ave, and Pioneer Drive. The area is currently a mixture of
commercial/industrial uses along with vacant land and utility and railroad property. The area is
zoned Riverfront Mixed Use District (RMU) with some of the parcels having a Riverfront Overlay
designation (RFO). The surrounding area consists primarily of commercial, industrial, vacant
and mixed land uses, with the Fox River to the north and railroad to the east. The subject area is
located within the River North and Core sub areas of the redevelopment area identified as the
Sawdust District. The 2040 Comprehensive Land Use Plans recommends Center City use for the
subject area.
Subject Site
Existing Land Use Zoning
Commercial, Industrial, Vacant RMU & RMU-RFO
Recognized Neighborhood Organizations
None
Adjacent Land Use and Zoning
Existing Uses Zoning
North Commercial & Fox River RMU-RFO
South Industrial HI
East Railroad & Fox River RMU-PD
West Vacant & Approved Multi-family residential CMU-PD & UMU-PD
Page 1
ITEM III: GDP E Side S Main St.. 2
Comprehensive Plan Land Use Recommendation Land Use
2040 Comprehensive Land Use Recommendation Center City
ANALYSIS
Use/Site Design
The applicant is proposing to reconfigure the subject parcels for a mixed use development. As
proposed, this will also include vacation of E 8th Avenue and extension of E 9th Avenue. A
Certified Survey Maps (CSM) will be required for the lot reconfiguration and public right-of-way
changes.
The proposed development will include three 5-story buildings and a private clubhouse. The two
buildings with frontage along S. Main St. (Buildings A1, A2) will be mixed use buildings with
first floor commercial space and multi-family units above. The eastern building (A3), with
frontage along E 9th Ave., will be a multi-family building with potential for future commercial
space. Commercial space shown on the plan includes ground floor retail space along S. Main St.
as well as a two-story waterfront restaurant at the northeast corner of the site. Other amenities
include a small outdoor amphitheater, potential skating rink, public and private boat slips,
walking paths, pool, pickleball court, and public dog park across E 9th Ave.
The plan meets the goals of the Sawdust District Core Subarea (Main St. frontage) as mixed use
and parks/open space are listed as desired land uses. The site design with buildings near the
sidewalks is consistent with the design and development guidelines and the increased public
right-of-way width is consistent with transportation goals to accommodate wider sidewalks, on-
street parking, and bike lane improvement.
Page 2
ITEM III: GDP E Side S Main St.. 3
The plan also meets goals for the River North Subarea (eastern portion of site) as both multi-
family and parks/open space uses are considered desired land uses within the subarea. The plan
also accomplishes a key goal for the subarea by vacating the Pioneer Drive right-of-way for
riverfront access. The proposed vacation of E. 8th Ave. for a campus style development is
consistent with transportation guidelines.
All three buildings will have both underground and surface parking. Below is a breakdown of
the residential units, commercial space, and parking.
The three buildings will include 1-bedroom, 1-bedroom plus den, 2-bedroom, 2-bedroom plus
den, and 3-bedroom units. Below is a conceptual breakdown of the units provided for each
building.
Page 3
ITEM III: GDP E Side S Main St.. 4
The residential units for the site have a total of 1.55 bedrooms per unit. The code requirement of
two spaces per dwelling unit plus 1 guest space for every 3 dwellings units results in a minimum
parking requirement of 679 spaces. The code requirement of 1 space per 300 sq. ft. of commercial
area results in a minimum parking requirement of 72 spaces, for a total requirement of 751
parking spaces for the site.
The plan includes 458 on-site parking spaces. The site will have a total of 451 bedrooms,
resulting in slightly more than 1 parking space per bedroom. This should meet the parking needs
of the residential units. Although the site is not currently located within the Parking Requirement
Exemption Overlay, staff anticipates future on-street parking (as shown on the plan) and shared
public parking areas around the development in addition to on-site parking will meet the parking
needs of the commercial spaces. Base standard modifications required for parking will be
addressed as part of the SIP request.
The plan appears to be meeting the 10’ street back, 45’ waterfront setback, and 10’ side setback,
with the exception of the parking areas shown at the northeast and southeast corners of the site.
Any BSM’s needed for reduced setbacks will be addressed during the SIP phase. The site appears
to be under the maximum 80% impervious surface ratio for the RMU district. This will also be
reviewed during the SIP phase.
The applicant has noted that the development will have conduits and transformers sized to
provide electric vehicle charging stations for 100% of the covered parking stalls, but will initially
install charging stations at 30% of the covered parking stalls. They anticipate that this will cover
the electric vehicle needs for the next 5-10 years with the option to add more charging stations as
electric vehicles become more prevalent in the future.
Signage
Sign renderings were not included with this request. The preliminary building elevations show
wall signage for the ground floor commercial spaces and building name at the southwest corner
of the building. Final signage plans will be submitted and reviewed as part of the SIP request.
Page 4
ITEM III: GDP E Side S Main St.. 5
Landscaping
A landscape plan was not included with the submittal. The SIP submittal will need to include a
final landscape plan including building foundation, paved area, street frontage, and yard
landscaping points. The applicant will need to meet all landscaping requirements or apply for
base standard modifications as part of the SIP process.
Storm Water Management/Utilities
The Department of Public Works has reviewed the plans and noted that storm water treatment
requirements shall be met onsite. This will be addressed during the SIP and Site Plan Review
processes.
Site Lighting
A photometric lighting plan has not been submitted with this request, and will be required as
part of the SIP request.
Building Facades
Preliminary color renderings of the building elevations were submitted with this request. The
applicant notes that the building exteriors will consist of brick, stone, and accents of hardiplank
siding, with specific siding plank and colors to be selected for the SIP phase. They also note that
each of the buildings are designed to produce a historical, old-town Main Street feel, with a
modern touch, achieving Sawdust District goals.
The preliminary plans appear to be consistent with Core Subarea design guidelines of modern
industrial style architecture and inviting storefronts with large windows/displays, prominent
entrances, and attractive architectural detail. Final building elevations and materials will be
reviewed for consistency with Sawdust District architecture and design guidelines as part of the
SIP phase.
Page 5
ITEM III: GDP E Side S Main St.. 6
Page 6
ITEM III: GDP E Side S Main St.. 7
FINDINGS/RECOMMENDATION/CONDITIONS
In its review and recommendation to the Common Council on an application for a Planned
Development district, staff recommends the Plan Commission make the following findings based
on the criteria established by Chapter 30-387 (C)(6):
(a) The proposed Planned Development project is consistent with the overall purpose and
intent of this Chapter.
(b) The proposed Planned Development project is consistent with the City’s
Comprehensive Plan and other area plans. (It is the responsibility of the City to determine
such consistency.)
(c) The proposed Planned Development project would maintain the desired relationships
between land uses, land use densities and intensities, and land use impacts in the environs
of the subject site.
(d) Adequate public infrastructure is or will be available to accommodate the range of
uses being proposed for the Planned Development project, including but not limited to
public sewer and water and public roads.
(e) The proposed Planned Development project will incorporate appropriate and adequate
buffers and transitions between areas of different land uses and development
densities/intensities.
(g) The proposed architecture and character of the proposed Planned Development
project is compatible with adjacent/nearby development.
(h) The proposed Planned Development project will positively contribute to and not
detract from the physical appearance and functional arrangement of development in the
area.
(i) The proposed Planned Development project will produce significant benefits in terms
of environmental design and significant alternative approaches to addressing
development performance that relate to and more than compensate for any requested
exceptions/base standard modifications variation of any standard or regulation of this
Chapter.
Staff recommends approval of the General Development Plan with the findings listed above and
the following conditions:
1. All requested base standard modifications (BSM) will be addressed as part of the Specific
Implementation Plan (SIP) application.
Page 7
Sign_______ Staff ________ Date Rec’d ________
City of Oshkosh Application
Zoning Map Amendment (Rezoning)
**PLEASE TYPE OR PRINT USING BLACK INK**
APPLICANT INFORMATION
Petitioner: _________________________________________________________________________________ Date: ____________
Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________
Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email
Status of Petitioner (Please Check): Owner Representative Tenant Prospective Buyer
Petitioner’s Signature (required): _______________________________________________________________ Date: ____________
OWNER INFORMATION
Owner(s): __________________________________________________________________________________ Date: ____________
Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________
Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email
Ownership Status (Please Check): Individual Trust Partnership Corporation
Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative
and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons.
Property Owner’s Signature: ___________________________________________________________________ Date: ____________
ZONING AND DEVELOPMENT INFORMATION
Address/Location of Rezoning Request: _________________________________________________________________________
Tax Parcel Number(s): _________________________________________________________________________________________
Rezone property from: ___________________________________________ to ___________________________________________
Purpose for Rezoning:__________________________________________________________________________________________
____________________________________________________________________________________________________________
Describe existing property development and land use: ________________________________________________________________
____________________________________________________________________________________________________________
Describe proposed development and/or proposed land use: ____________________________________________________________
____________________________________________________________________________________________________________
Proposed time schedule for development and/or use of the property: ________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________
Zoning Adjacent to the Site: North: _________________________________________________________________________
South: _________________________________________________________________________
East: _________________________________________________________________________
West: _________________________________________________________________________
SUBMIT TO:
Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, Wisconsin 54903-1130
PHONE: (920) 236-5059
Jake Bunz 1/31/22
P.O. Box 620037 Middleton WI 53562
608 444-0850 jake@twallenterprises.com x
1/31/22
The Mill on Main, LLC 1/31/22
P.O. Box 620037 Middleton WI 53562
608 444-0850 jake@twallenterprises.com
1/31/22
43 E. 7th Avenue, Oshkosh, WI
0301330500, 0301390100, 0301380000, 0301420000, 0301490000, & 0301550100
RMU - PDRMU
Redevelopment of the 43 E. 7th Ave RFP Parcel.
Vacant, unused.
Mixed-Use development with approximately
291 units and 22,800 commercial sq. ft.
Breakground on Phase 1 in Oct. 2022 and
Breakground on Phase 1 in Oct. 2022. Phase 2 and 3 would start construction the following years or every other year depending on lease-up.
N/A
HI
RMU-PD
UMU-PD & CMU-PD
By: Jake Bunz, Project Manager, The Mill on Main, LLC
Page 8
2
SUBMITTAL REQUIREMENTS – Must accompany the application to be complete.
(Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy)
Map of the immediate area showing property involved. Area to be rezoned must be outlined in color
A site plan drawn to readable scale showing present status of property and proposed development
Street address, adjacent streets, intersections and any other information or landmarks to help identify the property
Location of existing uses, structures, fences and signs and location of proposed uses, structures, fences and signs
A narrative statement explaining the zone change and discussion of the project
Application fees are due at time of submittal. Make check payable to City of Oshkosh.
Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE
SUMMARY OF PROCESS
The City of Oshkosh Plan Commission and Common Council act on all amendments to the Official Zoning Map.
The petitioner or owner should be present at both the Plan Commission and Common Council meetings to
discuss and answer questions regarding the request.
The application package is reviewed by Planning Services staff to determine conformance with adopted city
plans, zoning requirements and development standards. A staff recommendation is prepared for consideration
by the Plan Commission and Common Council. The petitioner will be provided with a copy of the staff report
and meeting notice several days prior to the Plan Commission meeting. The staff report and meeting notice will
also be available on the City’s website. No notice is sent to the petitioner or owner regarding the Common
Council’s consideration of the request. Petitioners and owners are encouraged to contact Planning Services
staff to find out when the request will be sent to the Common Council for review.
Neighborhood opinion is an important factor in the decision-making process. If the proposed development is
expected to have significant impact on other properties, the petitioner may be required to conduct a
neighborhood meeting to solicit public input prior to action by the Plan Commission and City Council. Planning
Services staff is available to offer assistance in compiling a mailing list for the neighborhood meeting. If deemed
appropriate, notification by mail informing the property owners within 100 feet of the subject property of the
proposal may substitute for the public meeting. Please note that a meeting notice will be mailed to all abutting
property owners regarding your request.
Within 90 days of filing a complete application, Plan Commission shall hold a public hearing to consider the
request. Within 60 days of the public hearing, the Plan Commission may make a written report to the Common
Council with recommendations regarding the proposal. The Plan Commission’s report is advisory only. The
Common Council will make the final decision regarding all zone change requests. The Plan Commission may lay
over requests to subsequent meetings if incomplete information is provided or additional questions or concerns
are raised at the meeting.
After the Plan Commission makes its recommendation, the request will be forwarded to the Common Council for
consideration. This generally occurs three weeks after the Plan Commission meeting depending on the date the
Council meeting is scheduled (the Council meets on the 2nd and 4th Tuesday of every month) and on the
availability of a legal description for the zone change. Wisconsin State Statutes require a zone change to be
published as Class II notice in the local newspaper, the City takes care of this publication requirement prior to
the Council meeting.
The Common Council may approve the Official Zoning Map amendment as originally proposed, may approve
the proposed amendment with modifications, or may deny approval of the proposed amendment. If the
Official Zoning Map amendment is approved, the Ordinance is published in the newspaper on the following
Saturday and will be effective on Sunday. City administrative offices are notified of the effective date of the
Ordinance and will make changes to the Official Zoning Map accordingly.
For more information please visit the City’s website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm
Page 9
Sign_______ Staff ________ Date Rec’d ________
City of Oshkosh
Planned Development Application
For General Development Plan or Specific Implementation Plan
**PLEASE TYPE OR PRINT USING BLACK INK**
APPLICANT INFORMATION
Petitioner: _________________________________________________________________________________ Date: ____________
Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________
Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email
Status of Petitioner (Please Check): Owner Representative Tenant Prospective Buyer
Petitioner’s Signature (required): _______________________________________________________________ Date: ____________
OWNER INFORMATION
Owner(s): __________________________________________________________________________________ Date: ____________
Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________
Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email
Ownership Status (Please Check): Individual Trust Partnership Corporation
Property Owner Consent: (required)
By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter
upon the property to inspect or gather other information necessary to process this application. I also understand that all
meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other
administrative reasons.
Property Owner’s Signature: ___________________________________________________________________ Date: ____________
TYPE OF REQUEST:
General Development Plan (GDP) General Development Plan (GDP) Amendment
Specific Implementation Plan (SIP) Specific Implementation Plan (SIP) Amendment
SITE INFORMATION
Address/Location of Proposed Project: __________________________________________________________________________
Proposed Project Type: ________________________________________________________________________________________
Current Use of Property: ________________________________________________________________Zoning: ________________
Land Uses Surrounding Your Site: North: _________________________________________________________________________
South: _________________________________________________________________________
East: _________________________________________________________________________
West: _________________________________________________________________________
It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal.
Application fees are due at time of submittal. Make check payable to City of Oshkosh.
Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE
For more information please visit the City’s website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm
SUBMIT TO: Dept. of Community Development
215 Church Ave., P.O. Box 1130 Oshkosh, WI 54901
PHONE: (920) 236-5059
Jake Bunz 1/31/22
P.O. Box 620037 Middleton WI 53562
608 444-0850 jake@twallenterprises.com
The Mill on Main, LLC 1/31/22
P.O. Box 620037 Middleton WI 53562
608 444-0850 jake@twallenterprises.com
1/31/22
43 E. 7th Avenue, Oshkosh, WI
Mixed-Use/Multi-Family Development
Vacant/unused Current: RMU. Proposed: RMU-PD
River
Heavy Industrial
Commercial
Vacant
By: Jake Bunz, Project Manager, The Mill on Main, LLC
1/31/22
Page 10
2
SUBMITTAL REQUIREMENTS – Must accompany the application to be complete.
(Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy)
The following information must be provided in order for the application to be considered complete and able to
be scheduled for Plan Commission Review. Please use the checklist below to determine the required information
to be submitted at the time of application. If all information below cannot be provided at the time of application,
please request a waiver in writing to the Division’s Director or designee.
A General Development Plan (GDP) submittal, per Section 30-387(C)(4), shall include the following items
(Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy):
General location map of the subject site depicting:
All lands for which the Planned Development is proposed and other lands within 100 feet of the
boundaries of the subject property.
Current zoning of the subject site and abutting properties, and the jurisdiction(s) that maintains that
control.
A graphic scale and north arrow.
Generalized site plan showing the pattern or proposed land uses, including:
General size, shape, and arrangement of lots and specific use areas.
Basic street pattern and pattern of internal drives.
General site grading plan showing preliminary road grades.
Basic storm drainage pattern, including proposed on-site stormwater detention.
General location of recreational and open space areas, including designation of any such areas to
be classified as common open space.
Statistical data, including:
Minimum lot sizes in the development.
Approximate areas of all lots.
Density/intensity of various parts of the development.
Building coverage.
Landscaping surface area ratio of all land uses.
Expected staging.
Conceptual landscaping plan.
General signage plan.
General outline of property owners association, covenants, easements, and deed restrictions.
A written description of the proposed Planned Development, including:
General project themes and images.
The general mix of dwelling unit types and/or land uses.
Approximate residential densities and nonresidential intensities.
General treatment of natural features.
General relationship to nearby properties and public streets.
General relationship of the project to the Comprehensive Plan or other area plans.
Proposed exceptions from the requirements of the Zoning Ordinance.
Estimated project cost
Traffic Impact Analysis (TIA), if deemed necessary by the Director of Planning Services, or designee.
A Specific Implementation Plan (SIP) submittal, per Section 30-387(C)(5), shall include the following items.
Note that the area included in an SIP may be only a portion of the area included in a previously approved GDP
(Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy):
An existing conditions map of the subject site depicting the following:
All lands for which the Planned Development is proposed and other lands within 100 feet of the
boundaries of the subject site.
Current zoning of the subject property and all abutting properties, and the jurisdiction(s) that
maintains that control.
Existing utilities and recorded easements.
All lot dimensions of the subject site.
A graphic scale and a north arrow.
An SIP map of the proposed site showing at least the following:
Lot layout and the arrangements of buildings.
Public and private roads, driveways, walkways, and parking facilities.
Specific treatment and location of recreational and open space areas, including designation of
any such areas to be classified as common open space.
Page 11
3
Proposed grading plan.
Specific landscaping plan for the subject site, specifying the location, species, and installation size of
plantings. The landscaping plans shall include a table summarizing all proposed species.
Architectural plans for any nonresidential buildings, multi-family structures, or building clusters, other than
conventional single-family or two-family homes on individual lots, in sufficient detail to indicate the floor
area, bulk, and visual character of such buildings.
Engineering plans for all water and sewer systems, stormwater systems, roads, parking areas, and
walkways.
Signage plan for the project, including all project identification signs, concepts for public fixtures and signs,
and group development signage themes that may or may not vary from City standards or common
practices.
Specific written description of the proposed SIP including:
Specific project themes and images.
Specific mix of dwelling unit types and/or land uses.
Specific residential densities and nonresidential intensities as described by dwelling units per acre,
and landscaping surface area ratio and/or other appropriate measures of density and intensity.
Specific treatment of natural features, including parkland.
Specific relationship to nearby properties and public streets.
Statistical data on minimum lot sizes in the development, the precise areas of all development lots
and pads; density/intensity of various parts of the development; building coverage, and
landscaping surface area ratio of all land uses; proposed staging; and any other plans required by
Plan Commission.
A statement of rationale as to why PD zoning is proposed. This statement shall list the standard
zoning requirements that, in the applicant’s opinion, would inhibit the development project and the
opportunities for community betterment that are available through the proposed PD project.
A complete list of zoning standards that would not be met by the proposed SIP and the location(s)
in which such exceptions/base standard modifications would occur.
Phasing schedule, if more than one development phase is intended.
Estimated project cost
Agreements, bylaws, covenants, and other documents relative to the operational regulations of the
development and particularly providing for the permanent preservation and maintenance of common
open areas and amenities.
A written description that demonstrates how the SIP is consistent with the approved GDP and any and all
differences between the requirements of the approved GDP and the proposed SIP.
I hereby certify that to the best of my knowledge all required application materials are included with this
application. I am aware that failure to submit the required completed application materials may result in denial or
delay of the application request.
Applicant’s Signature (required): _________________________________ Date: _____________________ 1/31/22
By: Jake Bunz, Project Manager, The Mill on Main, LLC
Page 12
P.O. Box 620037 Middleton, WI 53562 608-345-0701 terrence@twallenterprises.com
January 31, 2022
City of Oshkosh
Department of Community Development
215 Church Ave
Oshkosh, WI 54903
Re: The Mill on Main Development – Rezoning & General Development Plan
To Whom It May Concern:
Introduction
The Mill on Main, LLC is seeking approval for the rezoning of 43 E. 7th Ave (and all other
associated parcels listed in the Rezoning Application) from Riverfront Mixed-Use (RMU) to
Riverfront Mixed-Use - Planned Development (RMU-PD), as well as approval of the
proposed General Development Plan.
General Development Plan
The Mill on Main, LLC is proposing a mixed-use development with multi-family and
commercial uses. The plan consists of three buildings and a private clubhouse. Buildings A1
and A2, located along South Main Street, are mixed-use buildings with first floor
commercial space and multi-family units above. Building A3 is a multi-family building with
the potential for future commercial space (to be determined based off market demands at
the time of construction*). All three buildings would be 5 stories high with parking
underground and at grade.
The three buildings will include 1-bedroom, 1-bedroom plus den, 2-bedroom, 2-bedroom
plus den and 3-bedroom units (unit mix included in enclosed proposal). Standard T. Wall
Enterprises units feature: high-quality finishes and fixtures including granite countertop
kitchen islands, stainless steel appliances, large windows, wider hallways, 1-foot taller
ceilings, faucet sprayers, glass stove-tops, and in-unit washer and dryers. The quality
finishes and materials make our apartments the resident’s home.
Phase Building Units Commercial
Sq Ft
Covered
Parking
Surface
Parking
1 A1 105 11,000 111 47
2 A2 95 7,800 96 56
3 A3 91 3,000* 114 34
Total 291 21,800 321 137
Page 13
P.O. Box 620037 Middleton, WI 53562 608-345-0701 terrence@twallenterprises.com
Building Data Table – All values are informed estimates at this time and rounded to the nearest 100 square feet. Building size, unit counts,
and parking counts are subject to change as each phase develops.
The design of the site plan was focused on complimenting the future Riverwalk, capturing
Fox River and Lake Winnebago views, and taking advantage of the high visibility for retail
and commercial uses along South Main Street.
The Layout connects the Riverwalk with the interior living, green space and walking paths
provided on site. This will activate the river front. The design protects the waterfront
aesthetics while accommodating a wide variety of outdoor land uses.
The proposed General Development plan also includes a small outdoor amphitheater, open
green space, the potential for a skating rink during the winter season, public and private Fox
River boat slips, a river-front restaurant, and walking paths along the Riverwalk. Also
included is a private pickle ball court for residents and a public dog walk located across 7th
Avenue. The site plan will include ample indoor bike parking stalls for residents and outdoor
bike parking for Riverwalk users and retail customers.
Building Design
The 43 E. 7th Avenue Request for Proposals asked for all new construction to be brick or a
comparable masonry. As shown in the renderings, The Mill on Main development will
consist of red and tan brick, light tan and gray stone, along with accents of black Hardiplank
siding. Specific siding types and colors to be selected at the SIP level.
The Mill on Main buildings are designed to produce a historical, old-town Main Street feel,
with a modern touch, achieving Sawdust District goals.
Each of the three buildings has an architectural design feature located on it’s exterior
corner. These design features are a tribute to The Sawdust District, The City of Oshkosh and
its history.
Building Design Feature Description
A1 Sawmill Designed after the Sawmill District
A2 Airport Control Tower Designed after the EAA AirVenture and the
Wittman Regional Airport
A3 Lighthouse Tribute to the proximity of the Fox River and
Lake Winnebago
Page 14
P.O. Box 620037 Middleton, WI 53562 608-345-0701 terrence@twallenterprises.com
Development Schedule
The development schedule below shows The Mill on Main’s proposed timeline.
Construction is broken down into 3 phases, starting with building A1 to provide a gateway
from Downtown Oshkosh into the Sawdust District.
The Mill on Main will aim to start construction on each phase in the Fall to open in time for
the start of leasing season the following Spring. This allows enough time to lease up each
individual phase before opening the next phase.
Phase Construction Construction Start Occupancy
Phase 1 Building A1 and
Clubhouse
Fall 2022 Spring 2023
Phase 2 Building A2 Fall 2023 or 2024 Spring 2025 or 2026
Phase 3 Building A3 Fall 2025 or 2026 Spring 2027 or 2028
Development Timeline
Conclusion
We thank you for your consideration for The Mill on Main’s proposed rezoning and General
Development Plan. We know our team’s proposal will help Oshkosh achieve their goals for
the Sawdust District by providing high-density, mixed-use development that engages the
community, activates South Main Street and provides connectivity to the Riverwalk. We
seek to add to the high-quality development that this community is experiencing now and
desires for the future.
To reiterate our submittal from the Redevelopment Authority’s RFP, “We want to ensure
that Oshkosh remains a successful place to live, work, shop, and play.”
Thank you for your consideration.
Sincerely,
The Mill on Main, LLC
By:________________________________
Terrence R. Wall, President of
T. Wall Enterprises Manager, LLC, Its Manager
Page 15
RIVERFRONT MIXED USE-PLANNED
DEVELOPMENT (RMU-PD)Page 16
REZONE/GDP
43 E 7TH AVE
PC: 3-01-2022
6TH WARD LLC
45 W 6TH AVE
OSHKOSH, WI 54902
MILES KIMBALL LLC
1425 MEMORIAL DR
MANITOWOC, WI 54220
BERGSTROM CORP
1 NEENAH CENTER FL 7
NEENAH, WI 54956
CITY OF OSHKOSH
PO BOX 1130
OSHKOSH, WI 54903
ERDMANN CLINIC LLC
497 E CALIFORNIA BLVD APT 314
PASADENA, CA 91106
JAMES LARSON ARCHITECT LLC
1369 RAHR AVE
OSHKOSH, WI 54901
DUMKE & ASSOCIATES LLC
601 OREGON ST A
OSHKOSH, WI 54902
GD &RL KORTHALS TRUST/KP & D
SCHROEDER
600 S MAIN ST
OSHKOSH, WI 54902
KUETTNER FINANCIAL HOLDINGS
LLC
600 S MAIN ST 105
OSHKOSH, WI 54902
BROOKLYN ASSOC CONDO
OWNERS INC
600 S MAIN ST STE 105
OSHKOSH, WI 54902
901 SOUTH MAIN LLC
907 S MAIN ST
OSHKOSH, WI 54902
G REINKE & CO INC
900 S MAIN ST
OSHKOSH, WI 54902
EVERETT IND BLDG CO
PO BOX 1138
FOND DU LAC, WI 54936
WIS PUBLIC SERVICE CORP
PO BOX 19001
GREEN BAY, WI 54307
ALRO STEEL CORP
PO BOX 927
JACKSON, MI 49204
REDEVELOPMENT AUTH CITY OF
OSHKOSH
PO BOX 1130
OSHKOSH, WI 54903
FOX VALLEY & WESTERN LTD
17641 S ASHLAND AVE
HOMEWOOD, IL 60430
JAKE BUNZ
PO BOX 620037
MIDDLETON, WI 53562
Page 17
Riverside Park
S MAIN STS MAIN STW 9TH AVW 9TH AV S MAIN ST BRIDGES MAIN ST BRIDGEPPIIOONNEEEERRDDRR
EE 1100TTHH AAVV
E 8TH AVE 8TH AV
E 9TH AVE 9TH AV
E 11TH AVE 11TH AV
W 7TH AVW 7TH AV
W 6TH AVW 6TH AV
W 8TH AVW 8TH AV BBRROOAADDSSTTW 11TH AVW 11TH AV
W 10TH AVW 10TH AV
E 7TH AVE 7TH AV
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 2/17/2022
1 in = 220 ft1 in = 0.04 mi¯43 E 7TH AVE43 E 7TH AVE
City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer
Page 18
HI
TR-10
TR-10
I
CMU
CMU
CMU-PD
CMU-RFO
UMU
I-PD-RFO
I
UMU
RMU-RFO
RMU
UMU
UMURMU-PD-RFO
UMU-RFO
RMU-PD-RFO
I
I-PD
I
I-PD
I
UMU-PD
I
TR-10
I
I
CMU-PD
I
I
UMU-PD
RMU-PD-RFO
I
CMU
UMU
UMU
RMU-PD-RFO
CMU
MR-36
RMU-PD
I-RFO CMU-PD-RFO MR-20
RMU-PD
CMU-RFO
UMU-PD
I
CMU-PD
I-PD-RFO
RMU
CMU
RMU-RFO
Oshkosh City LimitOshkosh City LimitOREGON STOREGON STS MAIN STS MAIN STCEAPE AVCEAPE AV
W 9TH AVW 9TH AV
W SOUTH PARK AVW SOUTH PARK AV BAY STBAY STOTTER AVOTTER AV
PIONEER DRPIONEER DRNEBRASKA STNEBRASKA STWAUGOO AV
WAUGOO AV
BROAD STBROAD STW 7TH AVW 7TH AV
W 6TH AVW 6TH AV
W 8TH AVW 8TH AV
W 11TH AVW 11TH AV
W 10TH AVW 10TH AV
W 12TH AVW 12TH AV
W 14TH AVW 14TH AV
E 10TH AVE 10TH AV
POPLAR AVPOPLAR AVCOURT STCOURT STMILL STMILL STSTATE STSTATE STPPEEAARRLLAAVV
BAY SHORE DR
BAY SHORE DR
SCHOOL AVSCHOOL AV
E 9TH AVE 9TH AV
E 14TH AVE 14TH AV
E 11TH AVE 11TH AV
E 7TH AVE 7TH AV
CEAPE AVCEAPE AV
MULTIPLE
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 2/17/2022
1 in = 500 ft1 in = 0.09 mi¯43 E 7TH AVE43 E 7TH AVE
City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer
Page 19
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 2/17/2022
1 in = 200 ft1 in = 0.04 mi¯43 E 7TH AVE43 E 7TH AVE
City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer
Page 20