HomeMy WebLinkAboutItem II
PLAN COMMISSION STAFF REPORT FEBRUARY 15, 2022
ITEM II: GENERAL DEVELOPMENT PLAN AND SPECIFIC IMPLEMENTATION
PLAN FOR A COMMERCIAL DEVELOPMENT AT THE 200 BLOCK OF OHIO
STREET
GENERAL INFORMATION
Applicant: Forward Real Estate Services: Mark Johnson
Property Owner: Excel Properties LLC: Randy Schmiedel
Action(s) Requested:
The applicant requests approval of a General Development Plan and Specific Implementation
Plan to allow a drive-thru coffee shop development at the 200 block Ohio Street.
Applicable Ordinance Provisions:
Planned Development standards are found in Section 30-387 of the Zoning Ordinance.
Property Location and Background Information:
The subject site is an irregularly shaped 0.85 acre vacant lot, with frontage on Ohio St., east of the
Witzel Ave. intersection. The property is zoned Riverfront Mixed Use District with a Planned
Development Overlay (RMU-PD). The surrounding area consists primarily of commercial uses
and the Fox River to the north. The 2040 Comprehensive Land Use Plan recommends Center City
use for the subject area.
Subject Site
Existing Land Use Zoning
Vacant Commercial RMU-PD
Recognized Neighborhood Organizations
N/A
Adjacent Land Use and Zoning
Existing Uses Zoning
North Commercial RMU-PD-RFO
South Commercial RMU-PD
East Commercial RMU-PD
West Public Right-of-Way/Commercial I
Comprehensive Plan Land Use Recommendation Land Use
2040 Land Use Recommendation Center City
Page 1
ITEM II: GDP.SIP 200 Block Ohio St. 2
ANALYSIS
Use
The applicant is proposing development of a 605 sq. ft. drive-thru coffee shop with 10-stall
parking lot. The site will also include a patio and walk-up service window.
Drive-thru & in-vehicle sales or service is a conditional use in the RMU district. Staff is
supportive of the proposed use as it is compatible surrounding commercial land uses as
consistent with the 2040 Comprehensive Land Use recommendation of Center City for area.
A Plan Commission workshop was held on December 7, 2021. Plan Commission voiced support
for the proposed use, but had concerns of the drive-thru lane along Ohio St. and circulation of the
drive-thru lane and parking lot. The applicant has revised their plans to address these concerns.
Site Design/Access
The site will utilize an existing shared access from Ohio Street. A cross access agreement will be
required for use of the shared driveway.
Required Provided
Parking Spaces Minimum: 3
Maximum: 25 10
Impervious Surface Maximum: 80% of lot 28.91% of lot
Page 2
ITEM II: GDP.SIP 200 Block Ohio St. 3
Proposed parking and impervious surface for the site are compliant with standards for the RMU
District and drive-thru/in-vehicle sales uses.
Minimum Provided
Front Setback (Ohio St.) 10 ft. 7.9 ft. (pavement)
Side Setback (north) 10 ft. 57 ft.+/- (pavement)
Side Setback (south) 10 ft. 10.6 ft. (pavement)
Rear Setback (east) 25 ft. 39 ft.+/- (pavement)
The applicant is requesting a BSM to allow reduced front yard setback to 7.9 ft., where code
requires a 10 ft. setback. Staff is supportive of the requested BSM as a water easement runs
through the property, restricting the ability to move the drive-thru further east. To buffer the
view of the drive-thru lane along the street, the applicant has provided a combination of
evergreen shrubs and medium deciduous trees between the right-of-way and drive-thru lane.
The applicant is also requesting a BSM to reduce the stacking length of the drive-thru lane from
100 ft. in front of the order station to 80 feet. The applicant states that stacking of 8 total vehicles
in the drive-thru, with 4 in front of the pick-up window, provides the proper onsite vehicle
stacking with the typical two and a half minute wait time. Staff is also supportive of this BSM
due to the site constraints related to the water main easement.
Staff received concerns from a tenant of the neighboring office park regarding safety of the shared
access to the site. Specifically, they noted that the existing shared driveway to access to the office
park currently has difficulties meeting the level of traffic entering from Ohio Street in the
morning and are concerned that a coffee shop with peak morning hours utilizing the same
driveway may result in further traffic/safety problems. Planning staff has forwarded these
concerns to Transportation Director, Jim Collins and Engineering Division Manager, Justin
Gierach, and are awaiting comment at the time of this report. A copy of the correspondence is
included in the staff report packet.
Storm Water Management/Utilities
The Department of Public Works has reviewed the plans and noted that finalized storm water
management plans will need to be submitted and approved as part of the Site Plan Review
processes.
Landscaping
The applicant has provided a landscaping plan including points for building foundation, paved
areas, street frontage, and yards.
Page 3
ITEM II: GDP.SIP 200 Block Ohio St. 4
Points Required Points Provided
Building Foundation
86.4 (21.6 street side, 43.2 main
entrance side)
87.7 (0 street side, 58 main
entrance side)
Paved Area 50 (15 tall trees, 20 shrubs) 53.5 (33 tall trees, 20.5 shrubs)
Street Frontage 287 (143.5 medium trees) 400 (150 medium trees)
Yards 12.1 16.5
Total 435.5 498.7
Building Foundation
The plan meets the total point requirement of 80 points per 100 linear feet of building foundation.
The plan also meets the requirement that 50% of the required points shall be placed on the side of
the main entrance. The applicant is requesting a BSM to allow 0 points on the street facing side,
where code requires 25% of the points (21.6 points).
Staff is supportive the requested BSM as the patio area and on the front side of the building
restricts usable area and visibility of landscaping along the front building foundation. The
applicant has significantly exceeded street frontage landscaping and is also exceeding the
Page 4
ITEM II: GDP.SIP 200 Block Ohio St. 5
landscaping point requirement for the main entrance side to compensate for the lack of building
foundation plantings on the front side of the building.
Paved Area
The paved area requirement of 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of
paved area is being met. The code further specifies 30% of all points will be devoted to medium
or tall trees and 40% will be devoted to shrubs, which is also being met.
Street Frontage
Code requires 100 points per 100 feet of street frontage. The landscaping ordinance also specifies
that 50% of the required points must be devoted to medium trees. The proposed landscaping
significantly exceeds this requirement, providing 139% of the required point total, which will
serve to offset the BSM for reduced drive-thru setback. The plan also meets the medium tree
requirement.
Yards
Code requires 20 landscaping points per 1,000 sq. ft. of gross floor area. The plan exceeds this
requirement.
Signage
Signage plans have been included with this request. The plan includes wall signage on the front
and rear facades and roof-mounted signage and wall logo on the side facades. There is an
existing shared ground sign on the site, which will continue to be utilized by several businesses
within the “Bridgeview Centre” office park and will include a tenant panel for the applicant.
Page 5
ITEM II: GDP.SIP 200 Block Ohio St. 6
A BSM is required for the proposed roof signage on the side (north and south) building elevations
as roof signs are prohibited under the Signage ordinance. The applicant states that the proposed
roof signage is needed as the small building footprint limits available area for wall signage.
Although the building is relatively small in size, limiting available wall signage area, staff feels
that the applicant could further utilize the wall area (where the logo is shown) to identify the
business.
Code allows a maximim of 1 sq. ft. of signage per linear foot of building frontage for on-building
signs. The proposed signage on the front and rear (north and south) facades exceed the maximim
area with 20.8 sq. ft. of wall signage area on a 16.5 linear foot facade. The applicant is requesting
a BSM to allow the additional signage on both of these facades. The applicant notes that this
increase is necessary to increase visibility of the signage. Staff is supportive of the slight increase
in wall signage area on these facades due to the minimal linear footage. Also, the building
exceeds setback requirements, resulting in the building being further from the street and wall
signage being less visible.
The applicant is also requesting a BSM to allow a pre-menu board sign in addition to the menu
board, as code allows a maximum of one daily notice sign per business. According to the
applicant, the pre-menu board is a 11.5 sq. ft., 7.3’ tall, freestanding menu sign that is intended to
display seasonal or special menu options for the customer before they reach the full menu to
place their order.
The proposed primary menu board sign will exceed be 32 sq. ft. in area, exceeding the maximum
size of 24 sq. ft. According to the applicant, this BSM for additional drive-thru sign area is needed
to effectively display Caribou’s products.
Staff is supportive of the second drive-thru sign (pre-menu board) as it is needed to accommodate
the full menu and support efficient use of the drive thru. Staff is also supportive of the increased
drive-thru sign area as both the menu board and pre-menu board will be facing east, away from
the public right-of-way, and will also have shrubs around them to further break up the view from
Ohio St.
Lighting
Page 6
ITEM II: GDP.SIP 200 Block Ohio St. 7
The applicant submitted a photometric plan for the site. The lighting levels meet the .4 foot-
candle minimum requirement for parking areas, with no more than .5 foot-candles of light
trespass at the property lines, with the exception of along the right-of-way line. Staff is
supportive a BSM as the increased lighting level (0.8 fc) will only slightly exceed the maximum
and only at one relatively small area along the public sidewalk. The proposed light fixtures will
be full cut-offs and the light poles will be 23’ tall, which is the maximum light fixture mounting
height (including base) in the RMU district.
Building Facades
Building Materials
Section 30-243 of the zoning ordinance requires commercial buildings to be clad in 50% Class I
materials, with the exception of rear facades not facing a public street. The petitioner has
provided elevations for the building as well as a material list and material breakdown for the
building for each building facade. The specific elevations breakdown is as follows:
North (side): Class I – 50.3% Class III – 49.7%
South (side): Class I – 50.3% Class III – 49.7%
East (rear): Class I – 14.3% Class III – 85.7%
Page 7
ITEM II: GDP.SIP 200 Block Ohio St. 8
West (front): Class I – 51% Class III – 49%
The proposed building elevations meet the 50% Class I requirement for the front and side facades,
meeting design standard requirements for commercial buildings.
Overall Site
The applicant is requesting BSMs related to front setback, drive-thru stacking, a specific
landscaping requirement, signage, and lighting. To offset these requested code exceptions, the
applicant has exceeded street frontage landscaping, overall landscaping, and increased the side
(north) and rear (east) setbacks. Staff is comfortable that the applicant has adequately offset the
requested BSMs and the overall site is compatible with the surrounding area.
FINDINGS/RECOMMENDATION/CONDITIONS
In its review and recommendation to the Common Council on an application for a Planned
Development district, staff recommends the Plan Commission make the following findings based
on the criteria established by Chapter 30-387 (C)(6):
(a) The proposed Planned Development project is consistent with the overall purpose and
intent of this Chapter.
(b) The proposed Planned Development project is consistent with the City’s
Comprehensive Plan and other area plans. (It is the responsibility of the City to determine
such consistency.)
(c) The proposed Planned Development project would maintain the desired relationships
between land uses, land use densities and intensities, and land use impacts in the environs
of the subject site.
(d) Adequate public infrastructure is or will be available to accommodate the range of
uses being proposed for the Planned Development project, including but not limited to
public sewer and water and public roads.
(e) The proposed Planned Development project will incorporate appropriate and adequate
buffers and transitions between areas of different land uses and development
densities/intensities.
(g) The proposed architecture and character of the proposed Planned Development
project is compatible with adjacent/nearby development.
(h) The proposed Planned Development project will positively contribute to and not
detract from the physical appearance and functional arrangement of development in the
area.
(i) The proposed Planned Development project will produce significant benefits in terms
of environmental design and significant alternative approaches to addressing
development performance that relate to and more than compensate for any requested
exceptions/base standard modifications variation of any standard or regulation of this
Chapter.
Staff recommends approval of the General Development Plan and Specific Implementation Plan
with the findings listed above and the proposed following conditions:
Page 8
ITEM II: GDP.SIP 200 Block Ohio St. 9
1. Cross access agreement for shared driveway shall be filed with the Winnebago County
Register of Deeds.
2. BSM to allow reduced front yard setback 7.9 ft., where code requires a minimum 10’ front
yard setback.
3. BSM to allow decreased drive-thru length in front of order station to 80 ft., where code
requires a minimum of 100 ft.
4. BSM to allow reduced street facing building foundation landscaping to 0 points, where
code requires 21.6 points
5. BSM to allow increased wall signage area on the north and south facades to 20.8 sq. ft.,
where code allows a maximum of 16.5 sq. ft.
6. BSM to allow a second drive thru sign, where code allows a maximum of one daily notice
sign.
7. BSM to allow increased drive-thru sign area to 32 sq. ft., where code allows a maximum
area of 24 sq. ft.
8. BSM to allow increased lighting level at west property line to 0.8 fc, where code allows a
maximum of 0.5 fc.
9. Final landscaping plans shall be approved by the Department of Community
Development.
Page 9
Page 10
PN 6958
DAVEL ENGINEERING & ENVIRONMENTAL, INC. PAGE 1 OF 1
Project Narrative:
Caribou Coffee – Witzel Avenue & Ohio Street
City of Oshkosh
Winnebago County, Wisconsin
Lot 2 of certified survey map number 7423, being part of the Government Lot 3, Section 23, Township 18
North, Range 16 East, 6th Ward, City of Oshkosh, Winnebago County, Wisconsin is along Ohio Street (East
side), near the intersection with Witzel Avenue. The property is a redevelopment site with onsite pavements
removed in 2013.
The development is Caribou Coffee with drive-thru or walk-up service. The site will access the private drive
serving the adjacent office park properties. Parking includes a 10-stall lot including a single handicap parking
space. The business can have up to 5 employees. The existing office park sign shall remain with the additional
of Caribou per signage plan.
The drive-thru distance from entrance to order station is 80-feet with base standard modification request for
less than code minimum of 100-feet. Additionally, site constraints have reduced the Ohio Street pavement
setback to a little more than 7-feet in lieu of the code minimum of 10-feet.
There are no known environmental hazards (spills, contaminants, etc) or environmental sensitive areas
(wetlands, stream, etc) located onsite. Easements and underground utilities are present onsite for existing
sanitary sewer, watermain, and storm sewers.
Landscape Requirements (A) Building Foundations: A code exception is required for the placement of plant
required along building foundation fronting the Public Street Due to the proposed Patio. The required plants
have been located on west side of drive-thru lane.
Landscape Requirements (C) Street Frontage: Additional evergreen shrubs have been added between the
drive-thru lane and Ohio Street right of way.
Page 11
290 292
212
222
226
230228230 OHIO STUNIT 100
292 OHIO ST290 OHIO ST
226 OHIO ST
222 OHIO ST
212 OHIO ST
296 OHIO STOHIO STL:\GIS_Production\Engineering\Addresses_EngProd.mxd User: jeffn
Prepared by: City of Oshkosh, WI
Printing Date: 1/17/2022
1 in = 50 ft1 in = 0.01 mi¯C a r i b o u Co ff e eCaribou C o f f ee228 O h i o St re e t228 O h i o S t r e et
The City of Oshkosh creates and maintains GIS maps and data for its own use. They may show theapproximate relative location of property, boundaries and other feature from a variety of sources.These map(s)/datasets are provided for information purposes only and may not be sufficient orappropriate for legal, engineering, or surveying purposes. They are provided “AS-IS” withoutwarranties of any kind and the City of Oshkosh assumes no liability for use or misuse.
Page 12
GDP/SIP
228 OHIO ST
PC: 2-15-2022
IAM PROPERTIES LLC
212 OHIO ST
OSHKOSH, WI 54902
MLJ HANSEN LLC
5285 CHESAPEAKE CT
OSHKOSH, WI 54901
DAVID R HARRY
226 OHIO ST
OSHKOSH, WI 54902
ROWLOCK LLC
3220 SHOREWOOD DR
OSHKOSH, WI 54901
CITY OF OSHKOSH
PO BOX 1130
OSHKOSH, WI 54903
AREC 24 LLC
PO BOX 29046
PHOENIX, AZ 85038
FORWARD REAL ESTATE SERVICE
C/O MARK JOHNSON
150 SECRET CANYON ROAD A-25
SEDONA, AZ 86336
EXCEL PROPERTIES LLC
230 OHIO ST STE 200
OSHKOSH, WI 54902
Page 13
FVTC Athletic Field
William A. Steiger Park
OOHHIIOOSSTTWWIITTZZEELLAAVV
W 3RD AVW 3RD AV
SS
CC
AA
MM
PP
BB
EE
LL
LL
RR
DD
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 1/25/2022
1 in = 120 ft1 in = 0.02 mi¯228 OHIO ST228 OHIO ST
City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer
Page 14
I
SR-9
I-PD
TR-10
UMU
UMU-PD
I
RMU-PD-RFO
RMU
UI
UI UMU
MR-36-UTO
RMU-PD
UI-RFO
I-PD
UMU-PD-UTO
I-PDRMU
I
UMU I-PD-UTO
NMU RMU-PD
RMU-PD-RFO
MR-12
I-PD-RFO
UMU
NMU
SR-5
I-UTO
NMU
RMU
I-PD-RFO
UMU
UMU-UTO
I-PD
MR-36
RMU-PD
MR-20
FVTC Athletic Field OOHHIIOOSSTTWWIITTZZEELL AAVV WISCONSIN STWISCONSIN STW 8TH AVW 8TH AV
W 6TH AVW 6TH AV
W 5TH AVW 5TH AVIDAHO STIDAHO STW 7TH AVW 7TH AV
PPEEAARRLLAAVV
W 4TH AVW 4TH AV
W 3RD AVW 3RD AV
MICHIGAN STMICHIGAN STIOWA STIOWA STNN
CC
AA
MM
PP
BB
EE
LL
LL
RR
DD
MMAARRIIOONNRRDD
D E M P S E Y TR
D E M P S E Y TR OSCEOLA STOSCEOLA STDDAAKKOOTTAASSTTBISMARCK AVBISMARCK AV
SS
CCAA
MM
PP
BB
EELLLL
RR
DD
W 4TH AVW 4TH AV
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 1/25/2022
1 in = 500 ft1 in = 0.09 mi¯228 OHIO ST228 OHIO ST
City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer
Page 15
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 1/25/2022
1 in = 100 ft1 in = 0.02 mi¯228 OHIO ST228 OHIO ST
City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer
Page 16
1
Schueler, Hannah
From:jacqueline belter <jbelterdds@yahoo.com>
Sent:Tuesday, February 8, 2022 9:00 AM
To:Schueler, Hannah
Subject:Caribou Coffee plan
EXTERNAL SENDER. Only open links and attachments from known senders. DO NOT provide your
username or password to anyone.
Hello Planning Commission!
I will not be available for the Tuesday 4:00pm meeting regarding this plan so I would like to offer my 2 cents in this
email. I support the sale of this land and a successful business such as Caribou Coffee ( I have many relatives in
Minnesota). My concern however involves the traffic on Ohio street and the inadequate entrance.
Cars from the north turning left from Ohio street into the parking lot line up already in the morning and cars entering
from the south turning right into the parking lot have only 1 lane to enter. The parking lot for Health Waves and
Midwest Dental are separated by a curb but there have been accidents and near misses there as patrons often fail to
recognize that the entrance there has incoming traffic. There is only ONE entrance (and exit) from Ohio street into/out
of the north side of this large professional park. The left hand turning lane on Ohio street can hold an absolute
maximum of 3 cars. How many cars can wait in the left lane before blocking the busy intersection of Ohio and
Witzel? As I’m sure you know between 7:30am and 8:00am the traffic there is busiest, which unfortunately will also be
a peak time for Caribou Coffee customers. The foot traffic and bicycle traffic also is heavy on the sidewalk all summer
long and that intersection has already been questionably safe. I strongly recommend the City look at the safety of that
entrance and it’s capacity to safely navigate the increase of traffic Caribou Coffee will bring.
Jacqueline G. Belter DDS
Bridgeview Dental, S.C.
212 Ohio Street
Oshkosh, WI 54902
(920) 235-6040
Sent from Mail for Windows
Page 17