Loading...
HomeMy WebLinkAbout14. 22-52FEBRUARY 8, 2022 22-52 RESOLUTION (CARRIED___6-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD BID TO BADGER HARDWOOD FLOORING CO. FOR GRAND OPERA HOUSE STAGE FLOOR REPLACEMENT FOR GENERAL SERVICES ($42,400.00) INITIATED BY: PURCHASING WHEREAS, the City of Oshkosh has heretofore advertised for bids for replacement of the wood stage floor in the Grand Opera House; and WHEREAS, upon the opening and tabulation of bids, the following is the only bid: BADGER HARDWOOD FLOORING CO. W7740 School Road Greenville, WI 54942 Total Bid: $42,400.00 WHEREAS, this bid meets the minimum specifications and staff has reviewed the bid and recommends its acceptance; and WHEREAS, the 2021 CIP allocated $35,000 for this project; and WHEREAS, costs for this project will be charged to the Buildings - Improvements account which has sufficient funds from savings realized from other projects to address the overage. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that the said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 03221020 7214 63004 Buildings- Improvements City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Jon G. Urben, General Services Manager DATE: February 1, 2022 RE: Award Bid to Badger Hardwood Flooring Co. for Grand Opera House Stage Floor Replacement for General Services ($42,400.00) BACKGROUND The current wood stage floor in the Grand Opera House was installed during the 1986 restoration. The floor is in need of replacement due to wear and tear over the last 35+ years. The Common Council allocated $35,000 for this replacement in the 2021 CIP. Last year TR Karrels was engaged for professional services for designing the bid specifications for this project which includes removal of the existing finish flooring material, installation/finishing of the new finish flooring material and repairs of the ramp area from the stage floor to the exterior stage entrance door and framing over the orchestra pit to address signs of sagging. This project will be done this summer between July 12 and August 19. ANALYSIS Working with TR Karrels, Grand Foundation staff and Facilities Maintenance staff, Purchasing prepared bid specifications for this project. The bid was advertised in the local newspaper on posted on DemandStar. Bids were due February 1, 2022. The bid tab is attached. It is the consensus of TR Karrels and staff that the sole bid from Badger Hardwood Flooring Co. is competitive and meets all the minimum bid requirements. FISCAL IMPACT The fiscal impact of this bid is $42,400.00. This bid, added to TR Karrel’s A/E fee of $6,640.00 brings the total fiscal impact of this project to $49,040.00. The 2021 CIP allocated $35,000 for this project. This project will be charged to A/N#: 03221020 7214 63004 (Buildings- Improvements). This account has sufficient funds from savings realized from other projects to address the $14,040.00 overage. RECOMMENDATION Purchasing recommends the Common Council award this bid to Badger Hardwood Flooring Co. for $42,400.00. Respectfully Submitted, Approved: Jon G. Urben, General Services Manager Mark A. Rohloff, City Manager VENDOR INFORMATION BID PREQUAL BID BOND Badger Hardwood Flooring Co. W7740 School Road $42,400.00 X X Greenville WI 54942 BID TAB GRAND OPERA HOUSE STAGE FLOOR REPLACEMENT BIDS OPENED FEBRUARY 1, 2022 CITY OF OSHKOSH