Loading...
HomeMy WebLinkAboutItem II PLAN COMMISSION STAFF REPORT DECEMBER 7, 2021 ITEM II: SPECIFIC IMPLEMENTATION PLAN FOR AN INDOOR INSTITUTIONAL USE AT THE NORTHWEST CORNER OF CEAPE AVENUE AND BROAD STREET GENERAL INFORMATION Applicant: Day by Day Warming Shelter Owner: Oshkosh Housing Authority Action(s) Requested: The applicant requests approval of a Specific Implementation Plan for an indoor institutional use at the northwest corner of Ceape Avenue and Broad Street. Applicable Ordinance Provisions: Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Background Information: The subject area included in the request consists of a vacant commercial lot and vacant residential lot with a total of approximately 1.64 acres. The vacant commercial lot has frontage on Ceape Ave., Broad St., and Otter Ave. The vacant residential lot has frontage on Broad St. The surrounding area consists primarily of residential uses to the north and east along with Riverside Park to the south and Court Tower Condominium to the west. The 2040 Comprehensive Plan recommends Center City land use for the subject properties. On July 27, 2021, a zone change was approved to have the site zoned Institutional and add a Planned Development overlay, along with Conditional Use Permit/General Development Plan for an indoor institutional development on the subject site. Subject Site Existing Land Use Zoning Vacant Commercial & vacant residential I-PD Adjacent Land Use and Zoning Existing Uses Zoning North Residential UMU & TR-10 South Riverside Park I-PD-RFO East Residential TR-10 West Multi-family residential I Page 1 ITEM II: SIP NW corner Ceape Ave. & Broad St. 2 Recognized Neighborhood Organizations River East Comprehensive Plan Comprehensive Plan Land Use Recommendation Land Use 2040 Land Use Recommendation Center City ANALYSIS Use The applicant is proposing to combine the two subject parcels into a single lot for an institutional residential development (Day by Day Warming Shelter). A CSM will be required to combine the parcels, and will need to be submitted to the Department of Community Development for review. The proposed development includes a single story 13,124 sq. ft. warming shelter which will provide overnight accommodation for the local homeless population, allowing up to 50-60 guests per night. The site will also include a 13-stall parking lot for employee and guest parking, with one-way access from Broad Street to Otter Avenue. The proposed use has been approved through a Conditional Use Permit/General Development Plan (7/27/21). Site Design/Access Page 2 ITEM II: SIP NW corner Ceape Ave. & Broad St. 3 Required Provided Parking Spaces None 13 Impervious Surface Maximum: 60% of lot 63.6% of lot Minimum Provided Front Setback (Ceape Ave.) 30 ft. 23 ft. (roof overhang) Front Setback (Otter Ave.) 30 ft. 27 ft. +/- (pavement) Street Side Setback (Broad St.) 25 ft. 7.3 ft. (building) Side Setback (west) 7.5 ft. 10 ft. Side Setback (east) 7.5 ft. 7 ft. Side Setback (north) 7.5 ft. 11 ft. The proposed plan will require base standard modifications (BSMs) for reduced front setbacks along Otter Ave. and Ceape Ave. (minimum 30’ setback), reduced street side setback along Broad St. (minimum 25’ setback), and reduced side yard setback (east). According to the applicant, setback reductions are needed to meet the needs of the building program and easements located along the south and west property lines as well as vehicle access and parking further limit usable space on the site. Staff is supportive of BSMs for the reduced setbacks as site constraints related to the lot configuration result in difficulties meeting setback requirements. The reduced setbacks are appropriate as the property is located within a relatively high density center city area that would typically see smaller setbacks than required by Institutional zoning. Also, as neighboring properties within the block are zoned UMU which would allow for 0’-5’ setbacks, the proposed setbacks will be consistent with the surrounding properties. The total impervious surface ratio for the site is slightly over the maximum of 60% for the Institutional district. The applicant has stated that this is necessary to allow for the needed building and parking area on the site. Staff is supportive of a BSM to allow the increased impervious surface, again, due to the unique lot configuration and center city location of the property which would typically see higher density development with higher impervious surface ratios. The surrounding UMU zoning allows for up to 85% impervious surface, so the proposed 63.6% impervious surface ratio is consistent with the surrounding area. The applicant has provided increased landscaping to offset the reduced setbacks and increased impervious surface ratio. The site plan shows a total of 13 parking stalls. According to the applicant, the provided parking stalls will accommodate 10 daytime staff and 2-3 guest spaces. As the site is located within the Parking Requirement Exemption Overlay, there is no minimum number of parking stalls required. Staff feels the provided number of parking stalls is appropriate based on the use of the site. Signage Page 3 ITEM II: SIP NW corner Ceape Ave. & Broad St. 4 The proposed site plan includes a monument sign along Ceape Avenue that is located under the roof overhang near the entrance. Sign dimensions have not been included, but appear to be within the maximum sign area for the Institutional district of 1 sq. ft. per linear foot of frontage and under the maximum height of 15’. Final signage plans will be addressed under a separate building permit. Landscaping Points Required Points Provided Building Foundation 202.8 (101.4 main entrance) 221 (88 main entrance) Paved Areas 65 (19.5 tall trees, 26 shrubs) 156 (100 tall trees, 56 shrubs) Street Frontage (Ceape Ave.) 174.5 (87.25 medium trees) 137.5 (82.5 medium trees) Street Frontage (Broad St.) 169.4 (84.7 medium trees) 282.5 (127.5 medium trees) Page 4 ITEM II: SIP NW corner Ceape Ave. & Broad St. 5 Street Frontage (Otter Ave.) 48.3 (24.15 medium trees) 30 (30 medium trees) Yards 267 275 TOTAL 927 1,102 Building Foundation The building foundation landscaping point requirement of 40 landscaping points per 100 linear feet of building foundation is being met for the proposed building. However, the plan is slightly short of the requirement that 50% of the points be on the main entrance (south) side of the building. Staff is supportive a BSM to allow the slight reduction as the building has two street facing facades, resulting in difficulty meeting this specific requirement. Staff feels that the provided building foundation landscaping has been appropriately placed along the building facades. Paved Area The paved area requirement of 50 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area is being more than doubled. The code further specifies 30% of all points will be devoted to tall trees and 40% will be devoted to shrubs. Both of these requirements are being met. A tall deciduous or shade tree is required at the end of all parking row ends and driveway entrances. The plan is missing deciduous trees at two parking row ends that will need to be added. This can be addressed during Site Plan Review. Street Frontage Code requires 100 points per 100 feet of street frontage. The landscaping ordinance also specifies that 50% of the required points must be devoted to medium trees. The landscape plan is short of the total street frontage point requirement for the Ceape Ave. and Otter Ave. frontages as well as the medium tree point requirement for the Ceape Ave. frontage. The plan significantly exceeds the street frontage point requirement for the Broad St. frontage and results in the total street front landscaping exceeding the minimum requirement for the three frontages, as well as the medium tree point requirement. Staff is supportive of BSMs for the point reductions along the Otter Ave. and Ceape Ave. frontages as the total street frontage point requirement is being exceeded. All street frontage landscaping will need to be planted so that the drip line is within 10’ of the right-of-way line. This can be verified during site plan review. Yards Code requires 20 landscaping points per 1,000 sq. ft. of gross floor area. The provided yard landscaping points exceed this requirement. The Oshkosh Police Department has also reviewed the plan and noted that all shrubs should be trimmed to a maximum height of 2 ft. tall and not blocking any windows or doors and the trees Page 5 ITEM II: SIP NW corner Ceape Ave. & Broad St. 6 shall be trimmed up to 6 ft. high to keep line of sight unobstructed. Planning staff will verify that this is reflected in the landscaping maintenance schedule as part of the Site Plan Review process. Storm Water Management/Utilities The Department of Public Works has reviewed the plans and noted that sidewalk shall be installed through the driveway aprons and final submitted plans are required to be in full compliance with the requirements of the City of Oshkosh Municipal Code Chapter 14 for storm water management. Site Lighting The applicant has not submitted a photometric lighting plan for the site, but has noted that they intend to meet all applicable lighting requirements. A minimum 0.4 footcandle lighting level must be provided for all parking/drive areas and the lighting levels under the maximum of 0.5 footcandles at the property lines. Light fixture height may not exceed 20’ and must be full cut- off fixtures. Staff will also work with the Police Department to verify that final lighting plans provide a safe environment for the site. These items will be reviewed during the Site Plan Review process. Building Facades Building Materials The City’s Exterior Design Standards do not apply to Institutional land uses. However, the exterior design may be reviewed as part of the Planned Development review process. The petitioner has provided elevations for the building as well as a material list and material breakdown for the building for each building facade. The specific elevations breakdown is as follows: North: Class I – 26% Class III – 74% South: Class I – 39% Class III – 61% East: Class I – 66% Class III – 34% West Class I – 11% Class III – 89% Page 6 ITEM II: SIP NW corner Ceape Ave. & Broad St. 7 The proposed building elevations consist of a combination of stone panel, brick veneer, composite lap siding, and glazing. When compared to the Class I material allotment that would be required under commercial standards, the proposed elevations are under the minimum of 50% Class I materials for the north, south, and west facades and exceeding 50% Class I materials on the east facade. Staff feels that the proposed facades consist of a sufficient proportion of Class I materials as the total of the street facing facades (south/east) exceeds 50% of the façade area. The proposed elevations were presented to Plan Commission at a workshop on June 1, 2021. Plan Commission voiced support for the proposed building design. Overall Site The submitted plans are consistent with the approved Conditional Use Permit/General Development Plan for the site. Base Standard Modifications are being requested for reduced setbacks, increased impervious surface ratio, and specific landscaping requirements. Staff feels that the additional landscaping being provided beyond the code minimum serves to offset the requested BSMs and the overall site is complimentary to the surrounding area. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission consider findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) Page 7 ITEM II: SIP NW corner Ceape Ave. & Broad St. 8 (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. Staff recommends approval of the Specific Implementation Plan with the findings listed above with the proposed following conditions: 1. BSM to allow reduced front setback (Otter Ave.) to 27’, where code requires a 30’ setback. 2. BSM to allow reduced front setback (Ceape Ave.) to 23’, where code requires a 30’ setback. 3. BSM to allow reduced street side setback (Broad St.) to 7.3’, where code requires a 25’ setback. 4. BSM to allow reduced side setback to 7’, where code requires a 7.5’ setback. 5. BSM to allow increased impervious surface ratio to 63.6%, where code allows a maximum of 60% 6. BSM to allow reduced building foundation landscaping points on the main entrance side to 88 points, where code requires 101.4 points. 7. BSM to allow reduced street frontage landscaping (Ceape Ave.) to 137.5 points including 82.5 medium tree points, where code requires 174.5 points including 87.25 medium tree points. 8. BSM to allow reduced street frontage landscaping (Otter Ave.) to 30 points, where code requires 48.3 points. 9. Final landscaping, lighting, and signage plans shall be reviewed and approved by the Department of Community Development. Page 8 Page 9 Page 10 Page 11 1934 Algoma Blvd | Oshkosh WI 54901 | P 920.426.4470 | F 920.426.8847 November 8, 2021 SIP Project Narrative Project: Day by Day Warming Shelter Ceape Ave Day by Day Warming Shelter is requesting Specific Implementation Plan (SIP) approval for a new facility located on Ceape Ave. the site has previously been rezoned I-PD (Institutional – Planned Development) by council ordinance 21-389. This site also has a previously approved General Development Plan (GDP) and Conditional Use Permit (CUP) by council resolution 21-391. The area of the proposed site is .86 acres and is currently vacant property. The proposed warming shelter will be a single-story building with a 13,124 square foot footprint, detached waste enclosure and on-site staff/guest parking. Stormwater will be routed to a proposed stormwater pond on the northeast corner of the property. SIP Narrative Requirements: • Specific project themes and images o The exterior of this building is a mixture of brick veneer, stone panels, composite siding and glazing to meet city design standard requirements. • Specific land use o The proposed use of this facility is Institutional Residential which is allowed in the Institutional Zoning with a CUP. The CUP was previously approved by council resolution 21-391. • Specific non-residential density o The proposed facility will be a 13,124 square foot footprint area. The proposed site will include 23,947 square feet (63.6%) impervious area (building, walks, parking) and 13,719 square feet (36.4%) open space. • Specific treatment of natural features and parkland o The major natural features and parklands near this site are the Fox Rive and the Leach Amphitheater. These features are located to the south but not immediately adjacent to this property. The proposed development will not negatively impact these features and will compliment other properties and facilities in the area. • Specific relationship to nearby properties and public streets o The proposed site is located an the corner of Ceape Ave and Broad St and will be compatible with the surrounding zoning and uses. The main Page 12 1934 Algoma Blvd | Oshkosh WI 54901 | P 920.426.4470 | F 920.426.8847 building entrance will face Ceape Ave and vehicle access to the site will be from Broad St. the parking area will be a one-way flow entering on Broad St and exiting onto Otter Ave. • Statistical data on minimum lot sizes in the development, the precise areas of all development lots; density/intensity of various parts of the development; building coverage, and landscaping surface area ration of all land uses; proposed staging o The lot size is 37,666 square feet. The proposed site will contain a building footprint of 13,124 square feet (.30 acres), 10,823 square feet (.25 acres) of impervious surface and 13,719 square feet (.31 acres) of open space. Based on these surface coverages, the site is comprised of 63.6% impervious surface and 36.4% open space. The proposed project will be completed in one phase. • Statement of rationale as to why PD zoning is proposed. This statement shall list the standard zoning requirements that, in the applicant’s opinion, would inhibit the development project and the opportunities for community betterment that are available through the proposed PD project. o This site has an approved GDP and the SIP is a requirement for this site. • A complete list of zoning standards that would not be met by this proposed SIP and the location in which such exceptions/base standard modifications would occur o Maximum impervious surface ratio: This development will slightly exceed this requirement due to the program requirements of this facility. o Minimum front, side and rear yard setbacks: Slight reductions in the front, side and rear yard setbacks are required to meet the needs of the building program. Easements located along the south and west property lines as well as vehicle access and parking further limit the usable space on the site. o Parking provided on site will accommodate 10 daytime staff and two to three guest spaces. The ordinance is unclear as to specific parking requirements for this type of facility. Looking at the parking requirements listed, any additional parking onsite is not possible. Based on the use of this facility, guest rarely have vehicles which would then require minimal guest parking therefore leaving the onsite parking primarily for staff use. • Phasing schedule o All work for this project will be completed in a single phase. • Agreements, bylaws and covenants o None of these documents apply to this property. • How is the SIP consistent with the GDP o The building footprint is unchanged from the GDP approval. o The building location on the site was shifted to the north on the site due to a previously unknown utility easement along the south property line. Page 13 1934 Algoma Blvd | Oshkosh WI 54901 | P 920.426.4470 | F 920.426.8847 o This change in location increased the originally proposed front yard setback, but also then slightly reduced the onsite parking availability. o The vehicle access is a one-way flow to minimize vehicular conflicts with neighboring properties. o Landscaping shown on the landscape plan may yet be required to be adjusted in the area of the main entrance for security reasons. this issue will be further reviewed with continued project development. o Exterior lighting has not yet been completed. Consultants were recently engaged to design these systems. Exterior lighting will be designed to comply with ordinance and code requirements. o Hours of operation for this facility remain the same, 6:00pm to 8:00am. Page 14 Proposed Building Proposed Asphalt Proposed Concrete Proposed Gravel ONE WAY ONEWAYLot 2 (CSM 6702) 37,662 Sq. Feet 0.8646 Acres Lot Area 3,342 Sq. Feet 0.0767 Acres 48.3'169.6'121.5'55.0'60.8'55.0'60.8'169.4'174.5'338.0'Proposed Parking Lot ProposedParkingLot Replace Sidewalk Replace Sidewalk Proposed Building 23'155'7' Propose d Stormwat e r Pond Relocate Light Pole 25.5' New Ac c e s s Stop SignOne Way Do Not Enter Sign 7' 150'100'18'5' 6'70'106' 16' 10' 11' ProposedDumpsterEnclosure 10' 22'23'33.81'New Access24'16.6' 5.7'5'28'25'103'29.8' 31.5'9'FF=753.60 R8' 16' 8' 7.3' 129'11'Sign RoofOverhang Handrail 40.6'Provide Curb Ramp LEGEND Overhead Utility Lines Utility Guy Wire Underground Electric Underground Gas Line Underground Telephone Fence - Steel Index Contour - Existing Intermediate Contour - Existing Sanitary MH / Tank / Base Storm Manhole Inlet Catch Basin / Yard Drain Hydrant Utility Valve Utility Pole Light Pole / Signal Guy Wire Ex Spot Elevation Deciduous Tree Coniferous Tree Benchmark Asphalt Pavement Concrete Pavement Gravel Sanitary Sewer (Pipe Size) Storm Sewer (Pipe Size) Water Main (Pipe Size)PageAuthor:Date:C1.0JRDLast Saved by:jenniferFilename:6844eng.dwgDay by Day Warming Shelter City of Oshkosh, Winnebago County, WI For: Mike Karrels SITE PLAN DAVEL ENGINEERING & ENVIRONMENTAL, INC. Civil Engineers and Land Surveyors 1164 Province Terrace, Menasha, WI 54952 Ph: 920-991-1866 Fax: 920-441-0804 www.davel.pro 20 0 20 40 60 11/2/2021NO SCALE LOCATION MAP SW 1/4 SEC 24, T 18 N, R 16 E, CITY OF OSHKOSH WINNEBAGO COUNTY, WI 2425E 9th AveOregon StProjectLocation 2423 24 23 2426 25 Fo x R i v e r Broad St.STH "45"WashingtonAve Ceape A v e Otter Av e SHEET INDEX: Sheet Page Site Plan C1.0 Topographic Survey C1.1 Utility Plan C1.2 Drainage and Grading Plan C1.3 Erosion & Sediment Control Plan C1.4 Construction Details C2.1 Pond Details C2.3 Owner Oshkosh Housing Authority Day by Day Warming Shelter 600 Merritt Ave. Oshkosh, WI 54901 Architect T.R. Karrels & Associates 1934 Algoma Blvd. Oshkosh, WI 54901 Telephone:(920) 426-4470 Site Information Proposed Day by Day Warming Shelter 420 Ceape Ave. Oshkosh, WI 54901 Parcel # 0800280000 Building Coverage 13,124 SF Parking and Drives 9,455 SF Concrete Walks 1,368 SF Lawn and Landscaping 13,718.79 SF Total Site Area 37,665.79 SF (0.86 Acres) Zoning Existing Zonings: UMU-PD & UMU Zoning Descriptions: Urban Mixed-Use Planned Development Overlay & Adjacent Zonings: North & East: UMU & TR-10 South: CMU-RFO & I-PD-RFO West: I & CMU Setbacks City of Oshkosh: A)Urban Mixed Use - Planned Development Overlay Setbacks: Front Yard: 25' Side Yard: 7.3' Rear Yard: 40.6' Height: 16' B)Urban Mixed Use Setbacks: Front Yard: 25 Feet (Residential); 0 Feet (NonResidential) Side Yard: 7.5 Feet (Residential); 0 or 5 Feet (NonResidential) Rear Yard: 25 Feet (Residential); 5 Feet (NonResidential) Height: 35 Feet (Residential); 45 Feet (NonResidential) Notes: Contractor shall locate all buried facilities prior to excavating. This plan may not correctly or completely show all buried utilities. The Contractor shall verify all staking and field layout against the plan and field conditions prior to constructing the work and immediately notify the Engineer of any discrepancies. The Contractor shall comply with all conditions of the Erosion Control Plan and the Storm Water discharge Permit. All Erosion Control shall be done in accordance with the Plan and Wisconsin DNR Technical Standards. All curb and gutter shall be reject (inverted pan) unless noted on C1.4. Repair curb in accordance with City of Oshkosh curb repair details for the access locations to be closed or partially closed per plan. Driveways shall be constructed in accordance with City of Oshkosh specifications including sidewalk replacement within the driveway and may require adjacent sidewalk replacement for minor grade changes or sidewalk conditions. Otter and Ceape Aves are truck routes and are designed to handle heavy traffic. All public sidewalk repairs over trenches require reinforcing bars (3 - #4 bars equally spaced). ADA Accessible Public Sidewalks shall be maintained throughout construction. Parking lot striping shall be 4" painted safety yellow. No Hazardous materials will be stored on the site. Snow storage shall be located beyond curb in lawn areas. Demolition to include structures, pavements, and trees not shown to be preserved on development plans; Refer to Topographic Survey for existing site conditions. Proposed traffic signs shall be in accordance with the Manual of Uniform Traffic Control Devices (MUTCD), latest edition. Page 15 SIP 400 CEAPE AVE PC: 12-07-21 MICHAEL L MILLER 3267 CLAIRVILLE RD OSHKOSH, WI 54904 JOHN B SULLIVAN 406 OTTER AVE OSHKOSH, WI 54901 KEITH A/AMANDA M WIRCH 402 OTTER AVE OSHKOSH, WI 54901 BRIAN A/MARGART BREUER 5255 IVY LN OSHKOSH, WI 54904 CITY OF OSHKOSH PO BOX 1130 OSHKOSH, WI 54903 SARAH A MUELLENBACH 421 OTTER AVE OSHKOSH, WI 54901 KAKOLA B AUGUSTIN/FURAHA LUTONDE 415 OTTER AVE OSHKOSH, WI 54901 GABRIELSON PROPERTIES LLC 1731 MILL POND LN NEENAH, WI 54956 ANGELA J KOHNKE 112 BROAD ST OSHKOSH, WI 54901 SYMPHONY HOMES LLC 1130 SYMPHONY BLVD NEENAH, WI 54956 KATHY WEBB 543 OTTER AVE OSHKOSH, WI 54901 TAMMY HACKETT 349 BOWEN ST OSHKOSH, WI 54901 CARMEN LEAL 521 OTTER AVE OSHKOSH, WI 54901 DAY BY DAY WARMING SHELTER 449 HIGH AVE OSHKOSH, WI 54901 OSHKOSH HOUSING AUTHORITY 600 MERRITT AVE OSHKOSH, WI 54901 Page 16 Riverside Park CEAPE AVCEAPE AV BROAD STBROAD STOTTER AVOTTER AV COURT STCOURT STWAUGOO AVWAUGOO AV POPLAR AVPOPLAR AVBROAD STBROAD STC:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 11/16/2021 1 in = 120 ft1 in = 0.02 mi¯400 CEAPE AVE400 CEAPE AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 17 I SR-9I TR-10 CMU HI I TR-10-PD I-PD-RFO IUMU I RMU-RFO RMU I-PD TR-10 UMU CMU-RFO UMU UMU-RFO I-PD UMU UMU I UMU RMU-PD-RFO I-PD I UMU-PD UMU CMU CMU MR-36 I CMU-PD I-PD CMU UMU-PD MR-20 RMU-PD-RFO CMU MR-12PDLRO SR-3-LRO MR-20 SR-5-LRO CMU-PD UMU CMU SR-5PD-LRO CMU-PD-RFO RMU-PD CMU-RFOI-RFO RMU-PD-RFO I-PD MULTIPLE TR-10 I-PD CMU TR-10 I RMU RMU-RFO Roe ParkOshkosh City Limit Oshkosh City Limit BBOOWWEENNSSTTCEAPE AVCEAPE AVN MAIN STN MAIN STWASHINGTON AVWASHINGTON AV S MAIN STS MAIN STHIGH AV HIGH AV ALGOMA BLVD ALGOMA BLVD OTTER AVOTTER AV BAY STBAY STBROAD STBROAD STMERRITT AVMERRITT AV WAUGOO AV WAUGOO AV MILL STMILL STBAY SHORE DR BAY SHORE DR PIONEER DR PIONEER DR SCHOOL AVSCHOOL AVBOYD STBOYD STCOURT STCOURT STSTATE STSTATE STMMOONNRROOEESSTTE 10TH AVE 10TH AV POPLAR AVPOPLAR AVDDIIVVIISSIIOONNSSTTMT VERNON STMT VERNON STJEFFERSON STJEFFERSON STE 9TH AVE 9TH AV W 8TH AVW 8TH AV W 10TH AVW 10TH AV COMMERCE STCOMMERCE STEVANS STEVANS STGRAND STGRAND STHARNEY AVHARNEY AVMADISON STMADISON STPPLLEEAASSAANNTTSSTTWWIINNNNEEBBAAGGOO AAVV E 7TH AVE 7TH AV BBRROOAADDSSTTI-PD UMU TR-10 C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 11/16/2021 1 in = 500 ft1 in = 0.09 mi¯400 CEAPE AVE400 CEAPE AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 18 C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 11/16/2021 1 in = 100 ft1 in = 0.02 mi¯400 CEAPE AVE400 CEAPE AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 19