Loading...
HomeMy WebLinkAboutItem IIPLAN COMMISSION STAFF REPORT OCTOBER 19, 2021 ITEM II: PUBLIC HEARING: CONDITIONAL USE PERMIT REQUEST FOR A VEHICLE SERVICE AND REPAIR USE AT 1465 S. WASHBURN STREET GENERAL INFORMATION Applicant: Bret Flory Owner: Steinert Property Holdings LLC Action(s) Requested: The applicant is requesting a Conditional Use Permit to establish a vehicle service and repair use at 1465 S Washburn Street. Applicable Ordinance Provisions: Vehicle Service and repair land uses are permitted only through a Conditional Use Permit (CUP) in the Suburban Mixed Use District (SMU) as regulated in Section 30-52(C) of the Zoning Ordinance. Criteria used for Conditional Use Permits are located in Section 30-382 of the Zoning Ordinance. Property Location and Background Information: The subject site consists of a 1.86 acre parcel located on the west side of S. Washburn Street, south of Dickenson Avenue. The property currently has an existing 19,296 sq. ft. industrial/light manufacturing building and associated parking area and has a Suburban Mixed Use (SMU) zoning designation, while the 2040 Comprehensive Land Use Plan recommends Interstate Commercial for the site. Subject Site: Existing Land Use Zoning Industrial SMU Recognized Neighborhood Organizations None Adjacent Land Use and Zoning: Existing Uses Zoning North Commercial SMU South Infrastructure I West Multi-family residential MR-12 East Interstate 41 SMU Comprehensive Plan Land Use Recommendation Land Use 2040 Comprehensive Land Use Plan Recommendation Interstate Commercial Item I – CUP/Auto Repair Shop – 1465 S. Washburn Street 2 ANALYSIS Use The applicant is proposing to utilize the existing building for a vehicle service and repair use (Caliber Collision Auto Body Paint and Repair shop). Per the applicant’s narrative, all repair activities will be conducted within the facility with overhead doors closed. Noise, dust and odors will be confined to inside the building and will not be detectable at the lot lines. The western portion of the existing parking lot as well as a proposed additional paved area will be used for enclosed storage of vehicles. The proposed auto service facility is a conditional use in the SMU district. Site Design The existing parking lot has a single access off of S Washburn Street. The plans include an additional 7,698 square feet of additional pavement as well as a dumpster enclosure on the west end of the parking lot. Six-inch curbing will be required for all new paved areas. This will be verified during the Site Plan Review. Required Provided Front Setback (east) 25 ft. min. 28.7 ft. (existing pavement) Side Setback (south) 10 ft. min. ~4 ft. Side Setback (north) 10 ft. min. 14 ft. Rear Setback (west) 25 ft. min. 45 ft. Impervious Surface 70% max. ~59.6% Item I – CUP/Auto Repair Shop – 1465 S. Washburn Street 3 The proposed parking lot will meet setback requirements for the SMU district for the front, sides (north), and rear property lines and will match the existing legal nonconforming setback along the side (south) property line. The total proposed impervious surface area for the site will be 59.6%, under the 70% maximum. The provided plans show the vehicle storage area fully enclosed with 8’ tall chain link fencing with privacy slats and sliding gate for access. The fence slats will need to be pre-woven or interwoven and provide at least 90 opacity. An eight-foot tall chain link fence elevation has been provided showing black vinyl interwoven privacy slats. This will be verified during site plan review to ensure the slats meet the 90% opacity requirement. Signage The applicant’s submittal does not include signage. The narrative does state that signage will be updated. All new signage will need to meet code requirements of the SMU District. Lighting A lighting plan has not been included with this request. Any changes to the existing site lighting will need to be addressed during the site plan review process. Storm Water Management The applicant has been in contact with the Department of Public Works regarding storm water management for the site. Plans will be required and reviewed during the Site Plan Review process. Landscaping Paved area and bufferyard landscaping points are required for the proposed parking lot. Landscape Plan Item I – CUP/Auto Repair Shop – 1465 S. Washburn Street 4 Points Required Points Provided Paved Areas 50 36 (1 tall tree) Bufferyard 500 with 6’ tall solid fence/10’ setback 508 (14 tall trees, 8’tall solid fence/45’ setback) Total 550 544 Paved Areas The provided landscaping plan is deficient of the code requirement of 50 paved area landscaping points per 10,000 square feet of new paved area. Code further specifies that 30% of the points shall be devoted to tall trees and 40% devoted to shrubs. The plan shows 1 tree accounting for 36.3 points (including a 10% bonus for using native species). This can be addressed during the site plan review process. Bufferyard The proposed use requires a 0.6 opacity bufferyard along the west property line as the site is abutting an MR-12 zoning district. The applicant is providing sufficient evergreen tree landscaping along with a 8’ solid fence along with a 45’ to 50’ setback to meet this requirement. The applicant is also providing at least 50% of the required points on the exterior side of the fencing per bufferyard requirements. RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Conditional Use Permit, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-382 (F)(3): (1) Is in harmony with the Comprehensive Plan. (2) Would not result in a substantial or undue adverse impact on nearby property, the character of the neighborhood, environmental factors, traffic factors, parking, public improvements, public property or rights-of-way, or other matters affecting the public health, safety, or general welfare. (3) Maintains the desired consistency of land uses, land use intensities, and land use impacts as related to the environs of the subject property. (4) The conditional use is located in an area that will be adequately served by, and will not impose an undue burden on, any of the improvements, facilities, utilities or services provided by public or private agencies serving the subject property. (5) The potential public benefits outweigh any potential adverse impacts of the proposed conditional use, after taking into consideration the applicant’s proposal and any requirements recommended by the applicant to ameliorate such impacts. Item I – CUP/Auto Repair Shop – 1465 S. Washburn Street 5 Staff recommends approval of the proposed Conditional Use Permit for an automobile service facility at 1465 S. Washburn Street with the findings listed above and following condition: 1. Landscape plan shall be revised to increase the number of provided paved area landscape points to a minimum of 50 points. Bret Flory 879 Junction Dr Allen TX 75013 972 467 9749 bflory@crossarchitects.com 1465 S. Washburn St. Oshkosh, WI Auto Body Paint & Repair Shop Industrial Warehouse SMU SMU-Suburban Mixed Use I-Institutional Interstate-41 MR-12 Multi Family REsidential 12 9/14/2021 Gary Turk Architects Gary Turk Architects 879 Junction Drive ▪ Allen, Texas 75013 ▪ 972.398.6644 1 TO: City of Oshkosh Planning Services Division 215 Church Ave., P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5059 FROM: Bret Flory RE: Project Narrative – 1465 S. Washburn St. – Conditional Use Application DATE: September 17, 2021 ______________________________________________________________________________ In anticipation of our upcoming arrival to the City of Oshkosh please allow this letter to serve as a description of this project and Caliber Collision. I. PROJECT NARRATIVE: Site consists of platted +/-1.86-acres of developed land, which is part of general plan zoned SMU - Suburban Mixed Use. Site has 2-way access point from S. Washburn St. We are requesting for a Conditional Use permit to remodel an existing building to become a Caliber Collision Auto Body Paint and Repair shop at this location. It is the intent of the owner and all consultants to construct a quality project within the standards set by the City of Oshkosh for Building and Engineering Design. a. Details about the type of proposed operation (including hours of operation) All repair activities will be conducted in-doors and completely screened from public view. Public parking will located in the front drive/parking field. All vehicles received for repair will remain behind the screened wall. Vehicles that are taken in for repairs are typically admitted by tow truck which limits our customers coming to this location. b. Facility Information: • Site Area: +/- 1.86 Acre Lot • Bldg SF: +/-12,296 SF (existing) • Hours of Operation. 7:30 a.m. – 5:30 p.m. Monday through Friday • Total Full-Time Employees on-site: approximately 18 to 22 • Yearly Salary Ranges: o Site Manager = $90K Base (+ incentive bonuses/commissions) • Support/Office Admin Staff: 4-5 Count @ $25K average = $100K to $125K • Junior Shop Techs = 10-12 Count @ $50K average = $500K to $600K • Senior Shop Painters = 4 Count @ $110K average = $440K • Anticipated Employee Base Payout = $1,220,000 to $1,445,000 c. Damage or nuisance arising from noise, smoke, odor, dust, vibration or Illumination. • Noise – The type of facility proposed shall be limited to vehicle body “prep”, parts replacement and finishing work room. Typical repairs include hood replacement, fender repair, hail damage, light interior, molding and windshield replacement. Inherently, these types of repairs are not loud enough to project recognizable sound beyond the proposed property lines. Furthermore, this Gary Turk Architects Gary Turk Architects 879 Junction Drive ▪ Allen, Texas 75013 ▪ 972.398.6644 2 facility shall operate with all exterior doors closed. The shop contains a full HVAC System that shall provide climate control year-round. With all doors closed, there should be no nuisance to neighboring properties in the way of noise. • Dust – Within the facility, light dust is to be expected. The amount of dust is akin to a classroom chalkboard. Regularly scheduled cleaning ensures control. All sanding performed with a filtered vacuum assist sanding machine. o Exterior – the only dust that would be on this facility would be that which blew in from adjacent properties. This facility has adequate paving, perimeter landscaping and screening walls. Nothing that occurs within the premises this site generates dust. Any dust that enters the site would likely attach to perimeter landscaping and not pass through to the adjacent properties. 2. GENERAL NOTES ABOUT THE OPERATOR: As a multi-state/multi-operator of Body Shops, Caliber Collision is well versed in the procedures and requirements to divert any operational hazards. Prior to opening for business, Caliber Collision will secure a Business License to operate said facility. Any hazardous material shall be documented, handled and/or stored per local, state and federal requirements The proposed facility (site and building) will be designed by licensed Architects/Engineers who are thoroughly versed in Body Shop Designs. Final interior designs shall be designed by same Architects/Engineers. Interior Lighting, HVAC Ventilation, and Storm Sewer oil/sand interceptors shall be properly placed to facility safe conditions within and outside the entire property. These designs shall receive City of Oshkosh a Plans Review/Permit Approval to ensure structural, life safety, ADA and Building Code compliance for the proposed operations. Furthermore, the operator implements specific operational and safety guidelines that secure on- going daily assurance of employee, customer, property and surrounding area safety. These include: a) Drug Testing – Applicants are required to pass drug screening. Once employed, Caliber reserves the right to perform both random and/or employee-specific testing. Any failure results in immediate loss of employment. b) Authorized Employment – Applicants are required to provide proof of citizenship and/or verification that they are authorized to be lawfully employment in the US. c) Background Checks – Applicants are required to pass a background check. This includes but is not limited to any incidents involving sexual crime, child endangerment, and other acts of violent nature. d) Facility Management – Each facility is managed with adequate and competent staff to oversee and monitor the repair services and customer interface. e) Safety Training – Given the nature of using automated machinery and restoration supplies, each employee is required to complete and continue ongoing safety training. All equipment used is state of the art and properly maintained. This instruction safeguards the employees, the environment, the clients, their vehicles and all neighboring facilities. a. All training guidelines ensure prevention of the following: i. Loud noise, fumes, odors, dust, vibration, illumination ii. Fire, explosions, flooding, iii. Contamination of persons, property or nearby equipment Gary Turk Architects Gary Turk Architects 879 Junction Drive ▪ Allen, Texas 75013 ▪ 972.398.6644 3 f)Environmental Protection Agency and other Governmental Regulations – All products used,services rendered, and disposals of waste are highly regulated to prevent unwanted affects. All products and equipment are designed to ensure compliance. Laws and limitations are monitoredand enforced so that any employee, clientele and passerby may be assured of a safe environment. 3. COMPATIBILITY OF PROPOSED FACILITY WITH SURROUNDING:Applicant suggests that this facility will serve as the single-most compatible site with the types ofuses permitted in the surrounding area. As such, it will promote further success of an existingbusiness, re-occupancy of an existing vacant facility, provide expanded job growth and assuranceof good custodial care.Finally, please note the contributions that Caliber Collision brings surrounding communities for allof their locations. Among their traditions of charity and community enrichment programs(http://calibercollision.com/about-us/community-involvement/), Caliber Collision actively supports: •American Heart Association Heart Walk, American Heart Association Cotes Du Coeur, andChildren’s Advocacy Center of Collin County•Military personnel through Carry The Load, Wounded Warriors and 3M’s Hire Our Heroes program•Supplied local food banks with more than 275,000 meals for needy families in 2013•Gifted 13 fully-refurbished vehicles to needy families through the Caliber Collision Recycled Rides program in 2012. Plan on gifting 25 in 2013 To further endorse their commitment to excellence, USAA has identified Caliber Collision as having “an exceptionally high standard when it comes to service delivery. 4.SCOPE OF IMPROVEMENTS TO EXISTING SITE AND BUILDING: Exterior work is:• Repaint the building• Reseal concrete and asphalt paving, restripe parking lot, add paved parking spaces• Install chain link fence with black vinyl slats (90% opaque)• Rebrand/add building signage• Enhance landscape Interior work is: •Renovate interior space to accommodate new office and shop space•Add one detail bay and tie into the existing sand/oil interceptor • Add two paint booths ENCLOSURES: Traffic Letter Respectfully, Bret Flory 972-467-9749 TS. WASHBURN ST.EXISTING PROPERTY LINE407.00' (+\-)EXISTING PROPERTY LINE406.00' (+\-)EXISTING PROPERTY LINE 201.00' (+\-) EXISTING PROPERTY LINE 197.00' (+\-)1724' SLIDING GATE 1235EXISTINGPAVINGEXISTINGPAVINGNEWPAVINGEXISTING RAMPCALIBERCOLLISIONSIDE SETBACKSIDE SETBACK25'-0" SET BACK 20.00' TYP. 24.94' MIN. 20.00' TYP. 3.53' 15.25' 20.18'36.22'20.00' 20.00'20.00'26.03'20.02'18.93'DO NOT EXTEND ADDITIONALPAVEMENT CLOSER TO THEPROPERTY LINE8'-0" CHAIN LINK FENCEW/ BLACK VINYL SLATS.SEE DETAL 26'-4" 4" 8'-0" FENCE HEIGHT, REF. SP1.0 FOR LOCATION NOTE:ALL STEEL FENCING AND ASSOCIATED FENCE HARDWARE TOBE PRIMED AND PAINTED OR POWDER COATED BLACK STEEL8'-0" PER SECONDARY FENCING SECTION(FENCE LENGTH / HOLD DIMENSION)ROUND STEEL PIPEPOSTS, REF. SPECSFOR SIZE AND PIPEWALL THICKNESSBLACK VINYL CLADCHAIN LINK FENCINGPANEL WITH BLACKPRIVACY SLATS1SITE PLAN1" = 20'-0"05'10'20'40'ACREAGE TOTAL=PROPOSED HEIGHT=1.86PARKING CALCULATIONSBICYCLE CALCULATIONSSITE DATA58OFFICE @ 1:350 REQ'D=SHOP @ 1:300 REQ'D=MAX. HEIGHT=64CITY TOTAL REQUIRED=TOTAL BUILDING SQ.FT.=SHOP FLOOR SQ.FT.=OFFICE SQ. FT.=SETBACKS:FRONT: 40'REAR: 25'SIDES: 10'6XOFFICE @ 5% OF 10=SHOP @ 5% OF 47=XCITY TOTAL REQUIRED=X64TOTAL PARKING SHOWN=XTOTAL BICYCLE SHOWN=ZONINGUSEWATERSEWERN/APARCEL CONTROL NUMBER:FLOOD ZONE 'X' (OUTSIDE 500 YEAR PLAIN)CONCEPTUAL SITE PLANOSHKOSH.WIGARY TURK879 JUNCTION DRIVEALLEN, TEXAS 75013PH: 972.398.6644CALIBER COLLISION21.09.16DATE:PROJECT #:DRAWN:SCHEMCVO00GRAPHIC SCALE (IN FEET)1 INCH = FT.2040202CHAIN LINK FENCE ELEVATION1" = 20'-0" CUP 1465 S WASHBURN ST PC: 10-19-2021 WIS PUBLIC SERVICE CORP PO BOX 19001 GREEN BAY, WI 54307 1451 SOUTH WASHBURN LLC 5722 S 108TH ST HALES CORNERS, WI 53130 JEMAZA PROPERTIES LLC 1920 W WAUKAU AVE OSHKOSH, WI 54902 BLUE MOON HOLDINGS LLC PO BOX 3808 OSHKOSH, WI 54903 MICHAEL W/CHRISTINE M WILHARM 628 KESSLER DR NEENAH, WI 54956 MARICOPA LLC 2530 OLD ALEX CT OSHKOSH, WI 54904 PINE INVESTMENTS OF OSHKOSH LLP 3389 COUNTY ROAD A OSHKOSH, WI 54901 BRET FLORY 879 JUNCTION DR ALLEN, TX 75013 STEINERT PROPERTY HOLDINGS LLC 1465 S WASHBURN ST OSHKOSH, WI 54904 !"#$41 !"#$41S WASHBURN STS WASHBURN STMMAARRIICCOOPPAADDRRDD IICC KK IINN SS OO NN AA VV C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 9/21/2021 1 in = 120 ft1 in = 0.02 mi¯1465 S WASHBURN ST1465 S WASHBURN ST City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer SR-5 SMU I SMU-PD HI I SMU I I SR-5 MR-12 I-PD DR-6 I-PD SMU-PD SMU-PDSR-5 MR-12 SMU-PD Westhaven Golf Course !"#$41 !"#$41 SS KK OO EELLLLEE RR SSTTSSWWAASSHHBBUURRNNSSTTMMAARRIICCOOPPAADDRR OOSSBB OO RRNNAAVVVVIILLLLAAPPAARRKKDDRRCOVINGTON DRCOVINGTON DRTTHHOORRNNTTOONNDDRRG G RR EE EE NNFFIIEELLDDTTRR DDEEEERRFFIIEELLDDDDRRCCUUMMBBEERRLLAANNDDTTRRMORELAND STMORELAND STAARRDDMMOO RR EE TTRR ALLERTON DRALLERTON DRS WESTFIELD STS WESTFIELD STDD II CC KKIINNSSOONN AAVV MENARD DRMENARD DR NMU C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 9/21/2021 1 in = 500 ft1 in = 0.09 mi¯1465 S WASHBURN ST1465 S WASHBURN ST City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 9/21/2021 1 in = 100 ft1 in = 0.02 mi¯1465 S WASHBURN ST1465 S WASHBURN ST City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer