HomeMy WebLinkAbout2003-HVAC (Plan # J1-81-0703) ' ' CITV HALL
Inspection Services Div
ziscn��cnn�eo�e City of Oshkosh
PO Box n 30
OOshkosh WI
� 56903-1130
01HKOIH
�.� ���� �,���� Juiy 3Q 2003
Kcith Paul Greg Emenecker
Gartman Mechanical Scrvices Pacur Inc.
520 W South Park Avc 3555 Moser St
Oshkosh, WI54902 Oshkosh, WI 54901
Re: Ventilation System
3555 Moser St
File #J1-87-0703
Heating and ventilating plans have been reviewed by t6is office for compliance. All items that
aze requircd to be changed by this lette�, m�s[be conected before commencing that part of the
work. This approval is not a Heating Permit. Neccssary city permits must be secured before
commencing work.
You aze hereby adviscd that the owner, as defined in Chapter 101.01 (I) of the W isconsin State
Statutes, is responsible for all code requirements not specificalty ci[ed herein. Code
requirements aze set Forth in Chapters 61 [hrough 65 of the mles of the Department of �
Commerce.
The building will be inspected during constmction and a final inspec[ion will be made after
completion to insure compliance with eity and state codes.
The architect,professional engineer, builder or owner shall keep at the building as evidence of
approval,one set of plans bearing the stamp of approval.
COMM 61.30 Submit one copy of signed and sealed plans and structura] calculations for the
design of the entire AHU support systcm.
COMM 6130 Submit one copy of signed and sealed pLans and calculations for any alterations
of the roof structure that may be needed to support the exhaust fans. If no strucmral alterations
are needed, provide documentation showing such.
COMM 64.501.4 To maintain proper balance, the AHU's and exhaust fans for[his system shall
be intedocked so they run simultaneously.
COMM 64.0309(1) As this system is designed for the sole pucpose of removing excess heat from
production processes during the cooling season,this system shall not be run during the winter
months unless additional information is provided demonstrating compliance witl�tempered
make-up air requirements.
NFPA 13 If the ductwork is located near a sprinkler linc,please have a sprinkler system designer
determine if the high amount of air Flow [hrough each diffuser will negatively affect the
performance of any adjacent sprinkler heads. Prior to taking any reductions for static pressure
' ' • ' CITV HALL
Inspec[ion Services Div
215ChurchAvenue City of Oshkosh
PO Box 1130
OOshkos�WI
� 54903-1130
IHKOIH
loss, each diffuser has in excess of 2900 CFM of airflow. This could prevent sprinkler heads
from responding due to the cooling effect of Ihis amount of airflow.
7-8 A Building Permit mus[be secured for any building alterations or sprinkler sys[em
alterations.
Si cerel ,
io f
Dir ctor of spection Servi
AD