PLAN COMMISSION STAFF REPORT AUGUST 3, 2021
ITEM IV: SPECIFIC IMPLEMENTATION PLAN AMENDMENT FOR A BUILDING
ADDITION LOCATED AT 2530 W 9th AVENUE
GENERAL INFORMATION
Petitioner: Ruekert & Mielke, Inc.
Owner: Wihlm Properties
Action(s) Requested:
The petitioner requests an amendment to the Specific Implementation Plan approval for a
building addition located at 2530 W 9th Avenue.
Applicable Ordinance Provisions:
Planned Development standards are found in Section 30-387 of the Zoning Ordinance.
Background Information Property Location and Type:
On August 15th, 2012, the Common Council approved a Planned Development with conditions
for construction of a professional office building at the northwest corner of West 9th Avenue and
Westhaven Drive. A dental office building was constructed at 2530 W 9th Ave. in the months
following, per the approved Planned Development.
According to City Assessor information, the subject site is approximately 1.08 acres and includes
a 1-story structure that was built in 2012, which is 3,644 square feet in size. This development also
included a parking lot and stormwater management detention basin. The surrounding area
contains a mix of commercial, institutional, and residential uses.
This building addition being proposed is the same size and in a similar location as was previously
shown in the original development plan set from 2012.
Subject Site
Existing Land Use Zoning
Dental Office SMU-PD
Adjacent Land Use and Zoning
Existing Uses Zoning
North Office SMU-PD
South Single Family Residential SR-5
East Office SMU-PD
West Church I
Page 1
ITEM IV- SIP Amendment – 2530 W 9th Ave. 2
Recognized Neighborhood Organizations
None
Comprehensive Plan Land Use Recommendation Land Use
2040 Land Use Recommendation General Commercial
ANALYSIS
Use
The previously approved Planned Development (2012) of the site was for a professional dental
office and that is still what the current land use is today. The applicant is proposing to amend the
approved Specific Implementation Plan to construct a 657 square foot building addition to
accommodate three treatment rooms and an office space. The amendment also proposes a new
135 square foot patio to replace the existing patio that will be demolished as a result of the
building addition. Staff is supportive of the proposed SIP amendment as this was part of the
originally approved Planned Development and the use is consistent with Suburban Mixed Use
Zoning.
Site Design & Access/Parking
The petitioner is proposing to construct a building addition on the east façade, which includes
removal of an outdoor patio area and construction of a new patio area just to the south of the new
addition. No changes are occurring to the parking.
Page 2
ITEM IV- SIP Amendment – 2530 W 9th Ave. 3
Lighting
No changes are occurring to the lighting.
Signage
No changes are occurring to the signage.
Landscaping
A detailed landscaping plan has been submitted and slight modifications will need to be done to
be in compliance with landscaping point requirements. This can be addressed during site plan
review process. Three coniferous style trees (Arborvitae) are shown to be added northeast of the
addition and four coniferous shrubs (Taunton Yew) are shown to be added to the east of the new
patio area.
Page 3
ITEM IV- SIP Amendment – 2530 W 9th Ave. 4
Points Required Points Provided
Building Foundation 26.08 20 (4 tall-medium shrubs)
Yards 13.14 99 (3 tall-medium trees)
Total 39.22 119
Building Foundation
The building foundation landscaping point requirement of 40 landscaping points per 100 linear
feet of building foundation is not being met for the proposed building addition. The landscape
plan shows evergreen shrub plantings being utilized to meet these requirements but are deficient
by 6.08 points. Staff recommends moving one of the three yard trees within 10 feet from the
building addition to meet the building foundation requirement.
Yards
Code requires 20 landscaping points per 1,000 sq. ft. of gross floor area. The landscape plan
shows three evergreen trees to meet this requirement, which is much more than what is required.
Staff recommends moving one of the three yard trees within 10 feet from the building so its point
value can be used for both the building foundation and yards requirements.
Storm Water Management
The Department of Public Works reviewed the plans and noted that storm water requirements
need to follow the Municipal Code. This can be addressed during the site plan review process.
Building
The proposed building elevations show the addition to match the existing building and include a
combination of stone veneer, stucco, cut stone sills, windows with grills, and architectural
shingles. Additionally, the proposed new patio area will be screened with a matching stone
veneer 4’ tall wall.
Page 4
ITEM IV- SIP Amendment – 2530 W 9th Ave. 5
Staff does not have concerns with the proposed building addition as the facades will maintain the
appearance of the existing building. Exterior materials will be predominantly stone veneer,
stucco, and glass on all street-facing facades and will remain compatible with materials of
surrounding buildings.
FINDINGS/RECOMMENDATION/CONDITIONS
In its review and recommendation to the Common Council on an application for a Planned
Development district, staff recommends the Plan Commission make the following findings based
on the criteria established by Chapter 30-387 (C)(6):
(a) The proposed Planned Development project is consistent with the overall purpose and
intent of this Chapter.
(b) The proposed Planned Development project is consistent with the City’s
Comprehensive Plan and other area plans. (It is the responsibility of the City to determine
such consistency.)
Page 5
ITEM IV- SIP Amendment – 2530 W 9th Ave. 6
(c) The proposed Planned Development project would maintain the desired relationships
between land uses, land use densities and intensities, and land use impacts in the environs
of the subject site.
(g) The proposed architecture and character of the proposed Planned Development project
is compatible with adjacent/nearby development.
(h) The proposed Planned Development project will positively contribute to and not
detract from the physical appearance and functional arrangement of development in the
area.
Staff recommends approval of the Specific Implementation Plan amendment as proposed, with
the findings listed above.
Page 6
Page 7
Page 8
N/A
N/A
N/A
N/A
Page 9
Wihlm Dental Building Addition
Specific Implementation Plan Amendment
City of Oshkosh
Winnebago County, WI
Project Narrative
The proposed project is located at 2590 W 9th Avenue in the City of Oshkosh, WI. The 1.08-acre
lot has been previously developed and contains a 3,644 square foot dental office, parking lot, and a
stormwater management detention basin serving the zoning lot. The project will consist of a roughly
650 square foot building addition to accommodate three treatment rooms and an office space. The
project will also include a 135 square foot concrete patio to replace the existing patio that will be
demolished as a result of the building addition. The proposed addition was previously shown as a future
addition on the original 2012 plan set for the zoning lot. The proposed addition is the same size, and in
the same location as shown on the 2012 plan set. The proposed addition is consistent with the existing
Suburban Mixed-Use Planned Development zoning. The project will not involve utility installation or
significant grading as the original site plan was designed in anticipation of this proposed addition. The
storm water management plan for this zoning lot also considered the increased impervious area
resulting from this expansion. The site will continue to meet regulatory stormwater requirements
without modifications to the existing storm water detention basin.
Page 10
CP
2
CP
3
CP
4
CP
5
CP
6
CP
7
ST
GUY
E G
CO
CO
TCP
100
TCP
ST
CONC
ASPH
ASPH
WEST 9TH AVENUE
ASPH
ASPH
24' CROSS ACCESS
EASEMENT
75' STORMWATER DRAINAGE
EASEMENT
23' DUMPSTER
FACILITIES
EASEMENT
23' CROSS
PARKING
EASEMENT
24' CROSS
PARKING
EASEMENT
24' CROSS
PARKING
EASEMENT
12" STO SWR
12" STO SWR10" STO SWR
12" STO SWR
12" STO SWR12" STO SWR20100 40
SCALE IN FEET
WIHLM PROPERTIES LLC
2530 WEST 9TH AVENUE
TAX KEY: 90613620102
DASHA LLC
2510 WEST 9TH AVENUE
TAX KEY: 90613620103
POKLASNY INC
865 SOUTH WESTHAVEN DRIVE
TAX KEY: 90613620000
MERCY MEDICAL CENTER OSH INC
TAX KEY: 90613660000
EXISTING BUILDING
3,644 S.F.
FFE = 776.50
PROPOSED ADDITION
657 SF
FFE = 776.50
SINGLE STORY
CP 2
4"
S
A
N
SW
R
1.
5
"
WM
20' BUILDING
SETBACK LINE
5' PAVEMENT
SETBACK LINE
20' BUILDING SETBACK LINE
5' PAVEMENT SETBACK LINE
20' BUILDING SETBACK LINE
20' BUILDING SETBACK LINE
PROPOSED PATIO
ZONING: SMU-PD
JURISDICTION: CITY OF OSHKOSH
ZONING: I-PD
JURISDICTION: CITY OF OSHKOSH
SINGLE STORY
CONC
CONC
CONC
CONC
(DESIGNATED TRUCK ROUTE)
EXISTING
DUMPSTER
ZONING: SMU-PD
JURISDICTION: CITY OF OSHKOSH
EXISTING STORMWATER BEST
MANAGEMENT PRACTICE
SOUTH WESTHAVEN DRIVEEXISTING DRAINAGE SWALE
MANUFACTURE DITCH CHECK
DESIGNATED CONSTRUCTION
WASTE DISPOSAL FACILITIES
51.9'177.4'43.4'110.7'9.0'18.0'24.0'LIMITS OF DISTURBANCE: ≈ 1,840 SF
776
77
7
777776775
776
774
775
776
775
775
776
X 776.30X
776.09
X
776.09
X
21.0'31.4'CONSTRUCTION SEQUENCE:
1.INSTALL SEDIMENT BALE BARRIER AND MANUFACTURED DITCH CHECK IN LOCATIONS SHOWN PER
PLAN OR AS DIRECTED BY ENGINEER.
2.CONSTRUCT BUILDING ADDITION.
3.PLACE TOPSOIL, TURF SEED, AND MULCH AS NEEDED FOLLOWING THE COMPLETION OF THE
BUILDING ADDITION. INSTALL PLANTINGS AS SHOWN ON LANDSCAPING PLAN.
4.REMOVE EROSION CONTROL MEASURES ONLY ONCE 70% OF VEGETATION HAS BEEN ESTABLISHED.
NOTES:
CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL EXCESS MATERIALS FROM SITE.
CONTRACTOR IS RESPONSIBLE FOR CLEANING UP SEDIMENT FROM ADJACENT STREETS. STREET
CLEANING SHALL BE PERFORMED DAILY OR AS NEEDED.
CONTRACTOR SHALL DISPOSE OF ALL CONSTRUCTION WASTE AT THE DESIGNATED ON SITE WASTE
DISPOSAL FACILITY.
NOTES CONTINUED:
NO HAZARDOUS MATERIALS WILL BE STORED ON SITE.
ALL EROSION CONTROL MEASURES SHALL BE INSTALLED IN ACCORDANCE WITH WDNR TECHNICAL
STANDARDS.
ALL TRUCKS SHALL TAKE THE SHORTEST ROUTE TO THE NEAREST TRUCK ROUTE. THE CITY ENGINEER
DEPARTMENT MAY APPROVE AN ALTERNATE ROUTE UPON REQUEST.
FIRE PROTECTION FOR BUILDING WILL INCLUDE SMOKE ALARMS WITH STROBE SYSTEM.
ALL MECHANICALS ARE EXISTING WITH EXCEPTIONS OF (1) NEW FURNACE TO BE INSTALLED IN CRAWL
SPACE AND (1) NEW AC CONDENSER TO BE LOCATED ON THE EXTERIOR OF THE BUILDING IN THE REAR OF
THE PROPERTY.PROPOSED SEDIMENT
BALE BARRIER
34.0'
24.0'
10.0'
12.8'
EXISTING HYDRANT
EXISTING MONUMENT SIGN PROPOSED FOR:PLANNERS ARCHITECTS BUILDERS
Keller
OSHKOSH,WISCONSIN"COPYRIGHT NOTICE"WIHLM DENTAL"ISSUED NOT FOR CONSTRUCTION"
FOX CITIES
MILWAUKEE
MADISON
WAUSAU
Waukesha
MielkeRuekert
Kenosha Madison
Global Water Centerwww.ruekertmielke.comFox Valley
RUEKERT/MIELKE TAKES NO RESPONSIBILITY FOR ANY UNDERGROUND
STRUCTURES OR BURIED MATERIALS SUCH AS, BUT NOT LIMITED TO,
FOUNDATIONS, WELLS, SEPTIC, HOLDING TANKS, UTILITIES, HAZARDOUS
MATERIALS, OR ANY OTHER ITEMS OF WHICH NO EVIDENCE CAN BE FOUND ON
THE SURFACE BY A REASONABLE INSPECTION.
PURSUANT TO WISCONSIN STATUTE 182.0175, AVAILABLE DATA ON
UNDERGROUND STRUCTURES, CONDUIT AND PIPES HAS BEEN SHOWN ON THIS
MAP. THE LOCATIONS SHOWN HAVE BEEN COMPILED FROM A COMBINATION OF
EXISTING UTILITY MAPS AND MARKINGS PLACED IN THE FIELD FOR THE
VARIOUS FACILITIES BY "DIGGERS HOTLINE" (TICKET NO. 20210601941,
20210601943) SHALL NOT BE TAKEN AS CONCLUSIVE. FIELD VERIFICATION
SHALL BE REQUIRED BEFORE ANY EXCAVATION.SITE PLAN C4.0
(9/7/2021)
(9/8/2021 - 12/6/2021)
(4/1/2022)
(5/2/2022)Page 11
SIP AMENDMENT
2530 W 9TH AVE
PC: 08-03-2021
CALVARY LUTHERAN CHURCH
2580 W 9TH AVE
OSHKOSH, WI 54904
POKLASNY INC
865 S WESTHAVEN DR
OSHKOSH, WI 54904
DASHA LLC
2510 W 9TH AVE
OSHKOSH, WI 54904
MERCY MEDICAL CENTER OSH INC
PO BOX 7
STEVENS POINT, WI 54481
ROGER G/NANCY A BONGERT
3374 W 20TH AVE
OSHKOSH, WI 54904
ROGER G BONGERT
2561 W 9TH AVE
OSHKOSH, WI 54904
MICHELLE LOPEZ
2507 W 9TH AVE
OSHKOSH, WI 54904
RUEKERT & MIELKE, INC
1400 LOMBARDI AVE SUITE 101S
GREEN BAY, WI 54304
WIHLM PROPERTIES LLC
2530 W 9TH AVE
OSHKOSH, WI 54904
Page 12
W 9TH AVW 9TH AV S WESTHAVEN DRS WESTHAVEN DRARCADIA AVARCADIA AV
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 7/7/2021
1 in = 120 ft1 in = 0.02 mi¯2530 W 9TH AVE2530 W 9TH AVE
City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer
Page 13
SR-5
II-PD
MR-12
I
I SR-3
MR-12-PD
SMU-PD
MR-12
MR-12
I
MR-12
MR-12
SMU-PD
SR-3
DR-6
Westhaven Golf Course Abbey Area ParkOshkosh City LimitOshkosh City LimitW 9TH AVW 9TH AV
S
S
WWEE
SS
TT
H
H
AAVVEENNDDRRGGRREEEENNFFIIEELLDDTTRRMMAARR II CC OO PP AA DDRR
ABBEY AVABBEY AV
H
H
EE
RRIITTAAGGEETTRRBARTON RDBARTON RDGOLDEN AVGOLDEN AV
AARRDDMMOO
RR
EE
TT
RRHENNESSY STHENNESSY STCCAAMMDDE
E
NNLL
A
A
ARCADIA AVARCADIA AV
KKIINNGGSSTTOO NN PP LLKATY CTKATY CT
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 7/7/2021
1 in = 500 ft1 in = 0.09 mi¯2530 W 9TH AVE2530 W 9TH AVE
City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer
Page 14
C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs
Prepared by: City of Oshkosh, WI
Printing Date: 7/7/2021
1 in = 100 ft1 in = 0.02 mi¯2530 W 9TH AVE2530 W 9TH AVE
City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer
Page 15