Loading...
HomeMy WebLinkAboutItem VI PLAN COMMISSION STAFF REPORT JULY 20, 2021 ITEM VI: PUBLIC HEARING: ZONE CHANGE FROM INSTITUTIONAL DISTRICT (I) TO INSTITUTIONAL DISTRICT WITH A PLANNED DEVELOPMENT OVERLAY (I-PD) AND APPROVAL OF A GENERAL DEVELOPMENT PLAN AND SPECIFIC IMPLEMENTATION PLAN FOR PROPERTY LOCATED AT 240 W. 9TH AVENUE GENERAL INFORMATION Applicant/Owner: Matthew Pfluger, Peace Lutheran Church Action(s) Requested: The applicant requests to add a Planned Development Overlay to the existing Institutional District. The applicant also requests approval of General Development Plan and Specific Implementation Plan to allow for creation of a new lot from the parent church lot with an existing single-family structure (former parsonage) which will result in substandard setbacks for existing structures. This request will also remove current nonconforming conditions affecting the entire subject site. Applicable Ordinance Provisions: The Zoning Ordinance does not establish criteria relative to appropriateness of changing zoning from one classification to another but relies on the Comprehensive Plan and good planning principles. Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Background Information: The subject area consists of a single lot, totaling 1.865 acres in size, bounded by W. 9th Avenue to the south, Minnesota Street to the west and W. 8th Avenue to the north. The site contains Peace Lutheran Church and Peace Christian School as well as a single-family structure with attached garage formerly used as a parsonage which discontinued that use in the 1990s. The 1,856 square foot house located at the southwest corner of the lot was constructed in 1944 and has four bedrooms and two bathrooms. The church has since rented the house, its current tenant being Clarity Care which uses the site as an assisted living facility. Clarity Care intends to purchase the property to bring it under its own management. The surrounding area consists primarily of single and two-family residential uses to the north, south and west and Oregon Street commercial corridor to the east. The 2040 Comprehensive Land Use Plan recommends institutional uses for the subject site. Subject Site Existing Land Use Zoning Vacant auto service facility Institutional (I) Page 1 ITEM VI: Rezone, GDP & SIP – 240 W. 9th Avenue 2 Recognized Neighborhood Organizations N/A Adjacent Land Use and Zoning Existing Uses Zoning North Single & Two-Family Residential Two Flat Residential (TR-10) South Single & Two-Family Residential Two Flat Residential (TR-10) East Commercial Central Mixed-Use (CMU) West Single & Two-Family Residential Two Flat Residential (TR-10) Comprehensive Plan Land Use Recommendation Land Use 2040 Comprehensive Land Use Recommendation Institutional ANALYSIS Zone Change The applicant is requesting to add a Planned Development Overlay for the subject lot. This request is intended to provide some flexibility to the zoning ordinance as site constraints result in difficulties meeting zoning requirements, especially in regard to the proposed land division. Staff is supportive of the proposed rezone as it will help to accommodate the land division, and eliminate several nonconforming conditions affecting the site. Use No changes to the current uses are planned at this time. Site Design/Access The site is fully developed, containing the church/school facility constructed in 1950, the former parsonage, off-street parking areas, dumpster enclosure, playground and numerous service walks. As a whole, the site contains 53,000 square feet of impervious surface equating to 65.3% exceeding the 60% permitted in the I district. The applicant is proposing a land division to split the former parsonage from the church property via Certified Survey Map which will result in two different surface coverages for each lot. Page 2 ITEM VI: Rezone, GDP & SIP – 240 W. 9th Avenue 3 Lot one contains the former parsonage, driveway access off of Minnesota Street and the church’s dumpster enclosure. The lot’s rear yard is also enclosed by a semi-solid fence on the north and east lot lines. The submitted site plan shows the dumpster enclosure to be removed and relocated on the church lot. The proposed lot will be located at the southwest corner of the current lot, measuring 90.25 feet wide, 122.00 feet deep and 11,011 square feet in area, exceeding the minimum requirements of the I District. The existing structures result in a lot coverage of 3,420 square feet or 31.5% lot coverage, complying with district standards. Distances from the house to the proposed lot lines are substandard in all yards: o Front Yard: 30.0’ required, 28.4’ proposed (existing setback) o Side Yard: 7.5’ required, 5.7’ proposed o Street Side Yard: 25.0’ required, 21.5’ proposed (existing setback) o Rear Yard: 25.0’ required, 11.1’ proposed Staff is recommending Base Standard Modifications (BSMs) be granted for front and street side yard reductions due to that the house was constructed in conformance with previous zoning requirements and that there is no practical way to make it come into compliance. Staff is also in support of BSMs for side and rear yard reductions as the proposed lot lines border the edge of the church’s off-street parking area, leaving no area for increased setbacks. Proposed Lot 2 contains the church/school, off-street parking area, numerous service walks, playground and other accessory structures. The result of the land division creates an “L”-shaped lot, measuring 450 feet long by 180 feet wide along its longest lines and 70,216 square feet in area. The existing structures make up 49,590 square feet in area with a lot coverage of 70.6%, exceeding the 60.0% maximum allowed. Staff is supportive of a BSM for exceeding the maximum lot coverage since again, this is an existing development with no practical options to reduce impervious area. Similar to Lot 1, Lot 2 will result in substandard setbacks related to the off-street parking areas from the new lot lines: o Side Yard Setback (for off street parking area north of former parsonage): 7.5’ required, 0.5’ proposed o Side Yard Setback (for off street parking area east of former parsonage): 7.5’ required, 0.3’ proposed Page 3 ITEM VI: Rezone, GDP & SIP – 240 W. 9th Avenue 4 Staff is recommending a base standard modification for the reduced setbacks as this is another case where there is no viable option to increase the setbacks without hampering the function of the drive lanes and parking areas. Parking The church property contains 64 off-street parking stalls located in two separate areas. The applicant is not proposing any changes to the existing parking facilities. The property is located in the Parking Requirement Overlay exempting minimum stall requirements. Required Provided: Lot 1 Provided: Lot 2 Parking Spaces N/A (parking exemption overlay) 4 64 Impervious Surface Maximum: 60% of lot 31.5% of lot 70.6% of lot Dumpster Enclosure The existing dumpster enclosure is currently shown on the north side of proposed Lot 1 facing the church parking lot. The enclosure is an open wooden structure without gates in plain view from W. 8th Avenue. The submitted site plan shows the enclosure will be removed and relocated to an alcove at the northwest part of the church building facing west towards the parking area. Although a solid wood structure would meet design standard requirements, the applicant is proposing a brick structure with gates using a color to compliment the church’s stone facades. Staff sees this as an improvement from the current location and materials from the existing enclosure. Storm Water Management/Utilities The applicant is not proposing any site changes that require development of storm water management plans. Landscaping The applicant is not proposing any site changes that require development of landscape plans. Signage No additional signage is being proposed at this time. The church has an existing ground sign with reader board along W. 9th Avenue. On December 4, 1992, the church was approved a variance to place a ground sign with a 15-foot setback where, at the time, a 25-foot setback was required. The variance will continue to be in effect until such time the church removes or chooses to alter the sign. Any new signage for either lot will need to comply with I District standards. Page 4 ITEM VI: Rezone, GDP & SIP – 240 W. 9th Avenue 5 Site Lighting No alterations to on-site lighting are required or being proposed at this time. Building Facades No alterations to either the church building façades nor the former parsonage facades are required or being proposed at this time. Overall Site The applicant is requesting BSMs related to new setback requirements as a result of the proposed land division and to comply with the preexisting surface coverage. To offset these requested code exceptions, the applicant has proposed a new, less visible location of the dumpster enclosure using higher quality materials exceeding what is required. Staff is comfortable that the applicant has adequately offset the requested BSMs and the overall site is complimentary to the surrounding area. Staff also considered that many of the BSM requests are a result of existing structures constructed utilizing previous ordinance base standards. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-387 (C)(6): (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. Staff recommends approval of the rezone, General Development Plan and Specific Implementation Plan and the findings listed above with the proposed following conditions: 1. BSMs for reduced setbacks for proposed Lot 1: a. Front Yard: 30.0 feet required, 28.4 proposed. b. Side Yard: 7.5’ required, 5.7’ proposed. c. Street Side Yard: 25.0 required, 21.5’ proposed. d. Rear Yard: 25.0’ required, 11.1’ proposed. 2. BSMs for reduced setbacks for proposed Lot 2: a. Side Yard Setback (for off street parking area north of former parsonage): 7.5’ required, 0.5’ proposed. b. Side Yard Setback (for off street parking area east of former parsonage): 7.5’ required, 0.3’ proposed. 3. BSM to allow proposed Lot 2 to have 70.6% surface coverage where 60.0% is allowed. Page 5 Sign_______ Staff ________ Date Rec’d ________ City of Oshkosh Application Zoning Map Amendment (Rezoning) **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: _________________________________________________________________________________ Date: ____________ Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email Status of Petitioner (Please Check): Owner Representative Tenant Prospective Buyer Petitioner’s Signature (required): _______________________________________________________________ Date: ____________ OWNER INFORMATION Owner(s): __________________________________________________________________________________ Date: ____________ Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email Ownership Status (Please Check): Individual Trust Partnership Corporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner’s Signature: ___________________________________________________________________ Date: ____________ ZONING AND DEVELOPMENT INFORMATION Address/Location of Rezoning Request: _________________________________________________________________________ Tax Parcel Number(s): _________________________________________________________________________________________ Rezone property from: ___________________________________________ to ___________________________________________ Purpose for Rezoning:__________________________________________________________________________________________ ____________________________________________________________________________________________________________ Describe existing property development and land use: ________________________________________________________________ ____________________________________________________________________________________________________________ Describe proposed development and/or proposed land use: ____________________________________________________________ ____________________________________________________________________________________________________________ Proposed time schedule for development and/or use of the property: ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ Zoning Adjacent to the Site: North: _________________________________________________________________________ South: _________________________________________________________________________ East: _________________________________________________________________________ West: _________________________________________________________________________ SUBMIT TO: Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 PHONE: (920) 236-5059 Peace Lutheran Church c/o Matthew Pfluger 6/16/2021 240 W. 9th Avenue Oshkosh WI 54902 920 680-9122 treasurer@peaceoshkosh.org X X Peace Lutheran Church c/o Matthew Pfluger 6/16/2021 240 W. 9th Avenue Oshkosh WI 54902 920 680-9122 treasurer@peaceoshkosh.org X 240 and 250 W. 9th Avenue 90900470000 (I) Institutional Institutional with PD Overlay to have the parsonage on its own parcel church and residential church and residential, there are no proposed changes in use TR-10 and CMU TR-10 and CMU CMU TR-10 6/17/2021 6/17/2021 Page 6 2 SUBMITTAL REQUIREMENTS – Must accompany the application to be complete. (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy) Map of the immediate area showing property involved. Area to be rezoned must be outlined in color A site plan drawn to readable scale showing present status of property and proposed development Street address, adjacent streets, intersections and any other information or landmarks to help identify the property Location of existing uses, structures, fences and signs and location of proposed uses, structures, fences and signs A narrative statement explaining the zone change and discussion of the project Application fees are due at time of submittal. Make check payable to City of Oshkosh. Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE SUMMARY OF PROCESS The City of Oshkosh Plan Commission and Common Council act on all amendments to the Official Zoning Map. The petitioner or owner should be present at both the Plan Commission and Common Council meetings to discuss and answer questions regarding the request. The application package is reviewed by Planning Services staff to determine conformance with adopted city plans, zoning requirements and development standards. A staff recommendation is prepared for consideration by the Plan Commission and Common Council. The petitioner will be provided with a copy of the staff report and meeting notice several days prior to the Plan Commission meeting. The staff report and meeting notice will also be available on the City’s website. No notice is sent to the petitioner or owner regarding the Common Council’s consideration of the request. Petitioners and owners are encouraged to contact Planning Services staff to find out when the request will be sent to the Common Council for review. Neighborhood opinion is an important factor in the decision-making process. If the proposed development is expected to have significant impact on other properties, the petitioner may be required to conduct a neighborhood meeting to solicit public input prior to action by the Plan Commission and City Council. Planning Services staff is available to offer assistance in compiling a mailing list for the neighborhood meeting. If deemed appropriate, notification by mail informing the property owners within 100 feet of the subject property of the proposal may substitute for the public meeting. Please note that a meeting notice will be mailed to all abutting property owners regarding your request. Within 90 days of filing a complete application, Plan Commission shall hold a public hearing to consider the request. Within 60 days of the public hearing, the Plan Commission may make a written report to the Common Council with recommendations regarding the proposal. The Plan Commission’s report is advisory only. The Common Council will make the final decision regarding all zone change requests. The Plan Commission may lay over requests to subsequent meetings if incomplete information is provided or additional questions or concerns are raised at the meeting. After the Plan Commission makes its recommendation, the request will be forwarded to the Common Council for consideration. This generally occurs three weeks after the Plan Commission meeting depending on the date the Council meeting is scheduled (the Council meets on the 2nd and 4th Tuesday of every month) and on the availability of a legal description for the zone change. Wisconsin State Statutes require a zone change to be published as Class II notice in the local newspaper, the City takes care of this publication requirement prior to the Council meeting. The Common Council may approve the Official Zoning Map amendment as originally proposed, may approve the proposed amendment with modifications, or may deny approval of the proposed amendment. If the Official Zoning Map amendment is approved, the Ordinance is published in the newspaper on the following Saturday and will be effective on Sunday. City administrative offices are notified of the effective date of the Ordinance and will make changes to the Official Zoning Map accordingly. For more information please visit the City’s website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm Page 7 Sign_______ Staff ________ Date Rec’d ________ City of Oshkosh Planned Development Application For General Development Plan or Specific Implementation Plan **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: _________________________________________________________________________________ Date: ____________ Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email Status of Petitioner (Please Check): Owner Representative Tenant Prospective Buyer Petitioner’s Signature (required): _______________________________________________________________ Date: ____________ OWNER INFORMATION Owner(s): __________________________________________________________________________________ Date: ____________ Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Email: _______________________ Contact preference: Phone Email Ownership Status (Please Check): Individual Trust Partnership Corporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner’s Signature: ___________________________________________________________________ Date: ____________ TYPE OF REQUEST: General Development Plan (GDP) General Development Plan (GDP) Amendment Specific Implementation Plan (SIP) Specific Implementation Plan (SIP) Amendment SITE INFORMATION Address/Location of Proposed Project: __________________________________________________________________________ Proposed Project Type: ________________________________________________________________________________________ Current Use of Property: ________________________________________________________________Zoning: ________________ Land Uses Surrounding Your Site: North: _________________________________________________________________________ South: _________________________________________________________________________ East: _________________________________________________________________________ West: _________________________________________________________________________ It is recommended that the applicant meet with Planning Services staff prior to submittal to discuss the proposal. Application fees are due at time of submittal. Make check payable to City of Oshkosh. Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE For more information please visit the City’s website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm SUBMIT TO: Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, WI 54901 PHONE: (920) 236-5059 X Peace Lutheran Church c/o Matthew Pfluger 6/16/2021 240 W. 9th Avenue Oshkosh WI 54902 920 680-9122 treasurer@peaceoshkosh.org X X X 240 and 250 W. 9th Avenue church and residential 2-Lot Certified Survey Map, having the parsonage on its own parcel (I) Institutional residential residential commercial residential Peace Lutheran Church c/o Matthew Pfluger 6/16/2021 240 W. 9th Avenue Oshkosh WI 54902 920 680-9122 treasurer@peaceoshkosh.org X 6/17/2021 6/17/2021 Page 8 2 SUBMITTAL REQUIREMENTS – Must accompany the application to be complete. (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy) The following information must be provided in order for the application to be considered complete and able to be scheduled for Plan Commission Review. Please use the checklist below to determine the required information to be submitted at the time of application. If all information below cannot be provided at the time of application, please request a waiver in writing to the Division’s Director or designee. A General Development Plan (GDP) submittal, per Section 30-387(C)(4), shall include the following items (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy): General location map of the subject site depicting: All lands for which the Planned Development is proposed and other lands within 100 feet of the boundaries of the subject property. Current zoning of the subject site and abutting properties, and the jurisdiction(s) that maintains that control. A graphic scale and north arrow. Generalized site plan showing the pattern or proposed land uses, including: General size, shape, and arrangement of lots and specific use areas. Basic street pattern and pattern of internal drives. General site grading plan showing preliminary road grades. Basic storm drainage pattern, including proposed on-site stormwater detention. General location of recreational and open space areas, including designation of any such areas to be classified as common open space. Statistical data, including: Minimum lot sizes in the development. Approximate areas of all lots. Density/intensity of various parts of the development. Building coverage. Landscaping surface area ratio of all land uses. Expected staging. Conceptual landscaping plan. General signage plan. General outline of property owners association, covenants, easements, and deed restrictions. A written description of the proposed Planned Development, including: General project themes and images. The general mix of dwelling unit types and/or land uses. Approximate residential densities and nonresidential intensities. General treatment of natural features. General relationship to nearby properties and public streets. General relationship of the project to the Comprehensive Plan or other area plans. Proposed exceptions from the requirements of the Zoning Ordinance. Traffic Impact Analysis (TIA), if deemed necessary by the Director of Planning Services, or designee. A Specific Implementation Plan (SIP) submittal, per Section 30-387(C)(5), shall include the following items. Note that the area included in an SIP may be only a portion of the area included in a previously approved GDP (Submit only digital files. Please note at the discretion of Community Development staff may request a hard copy): An existing conditions map of the subject site depicting the following: All lands for which the Planned Development is proposed and other lands within 100 feet of the boundaries of the subject site. Current zoning of the subject property and all abutting properties, and the jurisdiction(s) that maintains that control. Existing utilities and recorded easements. All lot dimensions of the subject site. A graphic scale and a north arrow. An SIP map of the proposed site showing at least the following: Lot layout and the arrangements of buildings. Public and private roads, driveways, walkways, and parking facilities. Specific treatment and location of recreational and open space areas, including designation of any such areas to be classified as common open space. Page 9 3 Proposed grading plan. Specific landscaping plan for the subject site, specifying the location, species, and installation size of plantings. The landscaping plans shall include a table summarizing all proposed species. Architectural plans for any nonresidential buildings, multi-family structures, or building clusters, other than conventional single-family or two-family homes on individual lots, in sufficient detail to indicate the floor area, bulk, and visual character of such buildings. Engineering plans for all water and sewer systems, stormwater systems, roads, parking areas, and walkways. Signage plan for the project, including all project identification signs, concepts for public fixtures and signs, and group development signage themes that may or may not vary from City standards or common practices. Specific written description of the proposed SIP including: Specific project themes and images. Specific mix of dwelling unit types and/or land uses. Specific residential densities and nonresidential intensities as described by dwelling units per acre, and landscaping surface area ratio and/or other appropriate measures of density and intensity. Specific treatment of natural features, including parkland. Specific relationship to nearby properties and public streets. Statistical data on minimum lot sizes in the development, the precise areas of all development lots and pads; density/intensity of various parts of the development; building coverage, and landscaping surface area ratio of all land uses; proposed staging; and any other plans required by Plan Commission. A statement of rationale as to why PD zoning is proposed. This statement shall list the standard zoning requirements that, in the applicant’s opinion, would inhibit the development project and the opportunities for community betterment that are available through the proposed PD project. A complete list of zoning standards that would not be met by the proposed SIP and the location(s) in which such exceptions/base standard modifications would occur. Phasing schedule, if more than one development phase is intended. Agreements, bylaws, covenants, and other documents relative to the operational regulations of the development and particularly providing for the permanent preservation and maintenance of common open areas and amenities. A written description that demonstrates how the SIP is consistent with the approved GDP and any and all differences between the requirements of the approved GDP and the proposed SIP. I hereby certify that to the best of my knowledge all required application materials are included with this application. I am aware that failure to submit the required completed application materials may result in denial or delay of the application request. Applicant’s Signature (required): _________________________________ Date: _____________________ 6/17/2021 Page 10 Staff ______ Date Rec’d ______ City of Oshkosh Application Subdivision & Certified Survey Map **PLEASE TYPE OR PRINT USING BLACK INK** APPLICANT INFORMATION Petitioner: _________________________________________________________________________________ Date: ____________ Petitioner’s Address: ________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Fax: ( ) __________________ Other Contact # or Email: _______________________ Status of Petitioner (Please Check): Owner Representative Tenant Prospective Buyer Petitioner’s Signature (required): _______________________________________________________________ Date: ____________ OWNER INFORMATION Owner(s): __________________________________________________________________________________ Date: ____________ Owner(s) Address: __________________________________________ City: ______________________ State: _____ Zip: ________ Telephone #: ( ) _________________ Fax: ( ) __________________ Other Contact # or Email: _______________________ Ownership Status (Please Check): Individual Trust Partnership Corporation Property Owner Consent: (required) By signature hereon, I/We acknowledge that City officials and/or employees may, in the performance of their functions, enter upon the property to inspect or gather other information necessary to process this application. I also understand that all meeting dates are tentative and may be postponed by the Planning Services Division for incomplete submissions or other administrative reasons. Property Owner’s Signature: ___________________________________________________________________ Date: ____________ SUBDIVISION INFORMATION (Please Check): Residential Commercial/Industrial Other Approvals Requested (Please Check): Preliminary Subdivision Plat* Final Subdivision Plat Certified Survey Map *If preliminary plat, is the entire area owned or controlled by subdivider included? Yes____ No____ Location of Proposed Project: _________________________________________________________________________________ Zoning Classification: _________________________________________________________________________________________ Reason for Division: __________________________________________________________________________________________ Proposed Number of Lots: _________________ Proposed Lot Sizes: Min. ___________ Max. ____________ Average ___________ Acres in Parcel(s): ____________________________________________________________________________________________ Proposed Project Type (include use of buildings and property): ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ Current Use of Property (include existing structures): ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ SUBMIT TO: Dept. of Community Development 215 Church Ave., P.O. Box 1130 Oshkosh, Wisconsin 54903-1130 PHONE: (920) 236-5059 Peace Lutheran Church c/o Matthew Pfluger 6/16/2021 X 240 W. 9th Avenue Oshkosh WI 54902 920 680-9122 treasurer@peaceoshkosh.org X X X 240 and 250 W. 9th Avenue (I) Institutional To have the parsonage on its own parcel 2 11,011sf 70,214sf 46,118sf 1.865 there are no proposed changes in use of existing buildings and property church and residential Peace Lutheran Church c/o Matthew Pfluger 6/16/2021 240 W. 9th Avenue Oshkosh WI 54902 920 680-9122 treasurer@peaceoshkosh.org 6/17/2021 6/17/2021 Page 11 2 Significant Natural Amenities (slope, vegetation, large tree stands, etc.): ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ Floodplains, navigable streams, wetlands, and Other Development Restrictions: ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ Variances- List and explain any requested variances from the Subdivision Regulations: ________________________________________________________________________________________________________________________ ________________________________________________________________________________________________________________________ **Please note that a meeting notice will be mailed to all abutting property owners regarding your request. SUBMITTAL REQUIREMENTS – Must accompany the application to be complete. Basic Materials Completed Application Legal Description of Site Twenty-Six (26) full size paper prints of the preliminary or final plat prepared in accordance with City Subdivision Regulations One copy of the subdivision plat reduced to 8 ½” x 11” One copy of the Certified Survey Map Digital Copy of Preliminary Plat, Final Plat, or CSM in Autocad 2000 format (plans may be e-mailed to the Planning Office) Plat Data Title Legal description and general location of property Date, scale and north arrow Names and addresses of the owner, subdivider, and land surveyor preparing the plat Entire area contiguous to the proposed plat owned or controlled by the subdivider shall be included on the preliminary plat Exterior boundaries Contours Water elevations Location, rights-of-way widths and names Location and names of any adjacent subdivisions Type, width and elevation of existing street pavements within the plat or adjacent thereto Location, size, and invert elevation of existing infrastructure items such as sewers, manholes, power poles, etc. Locations of all existing property boundary lines Dimensions of all lots with proposed lot and block numbers Location and dimensions of any sites to be reserved or dedicated for parks, trails, playgrounds, drainage ways, or other public use, or which are to be used for group housing, shopping centers, church sites, or other non-public uses not requiring lotting Approximate radii of all curves Corporate limit lines Any proposed lake and/or stream access Any proposed lake and stream including the notice of application for Dept. of Natural Resources’ approval, when applicable Location of environmentally sensitive areas (wetlands, floodplains, navigable streams, etc.) For further information see Section 30-72 of City of Oshkosh Subdivision Regulations for Submittal Requirements Application fees are due at time of submittal. Make check payable to City of Oshkosh. Please refer to the fee schedule for appropriate fee. FEE IS NON-REFUNDABLE For more information please visit the City’s website at www.ci.oshkosh.wi.us/Community_Development/Planning.htm n/a n/a Proposed PD Overlay to allow for reduced setbacks Page 12 Peace Lutheran Church, City of Oshkosh GDP/SIP Narrative Peace Lutheran Church – 240 and 250 W. 9th Avenue City of Oshkosh, Winnebago County, WI Peace Lutheran Church is proposing a 2-Lot Certified Survey Map of Tax Parcel No. 90900470000, located at 240 and 250 W. 9th Avenue in the City of Oshkosh. The total site property is 1.865 acres in size. The existing parsonage is located at 250 W. 9th Avenue and would be located on Lot 1 of the proposed Certified Survey Map, Lot 2 being the remaining parcel. The proposed lot line between the two lots follows closely to existing limits of occupation. The GDP/SIP application is being submitted because the proposed lot layout and existing conditions do not meet certain zoning standards. The property at 250 W 9th Ave was originally built in 1944. The building measures approximately 1856 square feet with four bedrooms and two bathrooms. The property includes a two-car garage and patio with a partial fence. The property recently received new windows throughout. No further major improvement projects are planned for the building or property in the next year, other than relocating the Church's dumpster enclosure away from the building and towards the church. The community of Peace Lutheran Church used the building as a parsonage (home for the pastor and his/her family) until the 1990s. The last several pastors have opted to not live in the home, and the Church opted to allow a tenant to occupy the property. The current tenant, Clarity Care, uses the building as an assisted living facility for adults. Clarity Care wishes to purchase the property and bring it under their management. Page 13 W 9TH AVW 9TH AV W 8TH AVW 8TH AV C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 6/29/2021 1 in = 60 ft1 in = 0.01 mi¯240-250 W 9TH240-250 W 9TH City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 14 REZONE 240-250 W 9TH PC: 07-20-2021 ROBERT GONZALEZ 256 W 8TH AVE OSHKOSH, WI 54902 D ANN L MILLER 240 W 8TH AVE OSHKOSH, WI 54902 JASON BILBREY 442 WADLEIGH ST STEVENS POINT, WI 54481 DAVEY BARTLETT N5644 HIGHWAY G SAINT CLOUD, WI 53079 JENNIFER KETTNER 222 W 8TH AVE OSHKOSH, WI 54902 CBC PROPERTY MANAGEMENT LLC 912 WINDWARD CT OSHKOSH, WI 54901 DIVERSIFIED REAL ESTATE LLC 12900 BLYTHE RD BROOKFIELD, WI 53005 MTOXINS VENOM LAB LLC 717 OREGON ST OSHKOSH, WI 54902 DANUTA SWIECICKI 225 E DIVISION ST FOND DU LAC, WI 54935 ROBERT J MAZZA 1558 COUNTY ROAD I OSHKOSH, WI 54902 GJK PROPERTIES LLC 2934 SHOREWOOD DR OSHKOSH, WI 54901 FABULOUS FINDS LLC 428 FOREST VIEW RD OSHKOSH, WI 54904 ANN E ELMER 257 W 9TH AVE OSHKOSH, WI 54902 CMB HOLDINGS LLC 253 W 9TH AVE OSHKOSH, WI 54902 JAMES/JUDY L MARTINEZ 247 W 9TH AVE OSHKOSH, WI 54902 JOSEPH T ERD/ALLISON CRIVELLO 241 W 9TH AVE OSHKOSH, WI 54902 ABIGAIL W BASTIAN 237 W 9TH AVE OSHKOSH, WI 54902 KEVIN J/MARY B GABRIEL 233 W 9TH AVE OSHKOSH, WI 54902 BURNS OREGON STREET LLC 905 OREGON ST OSHKOSH, WI 54902 SCOTT A/LORI A BERHOLTZ 1804 N OAKWOOD RD OSHKOSH, WI 54904 RAYMANN PROPERTIES LLC 823 MOUNT VERNON ST OSHKOSH, WI 54901 ELMER/ELSIE BRAGG 807 MINNESOTA ST OSHKOSH, WI 54902 EDWARD C/DIANNE J WILCOX 835 WAUGOO AVE OSHKOSH, WI 54901 MCCLONE PROPERTIES LLC 1207 WINNEBAGO AVE OSHKOSH, WI 54901 PEACE LUTHERAN CHURCH 240 W 9TH AVE OSHKOSH, WI 54902 Page 15 W 9TH AVW 9TH AV OREGON STOREGON STW 8TH AVW 8TH AV W 7TH AVW 7TH AV W 10TH AVW 10TH AVMINNESOTA STMINNESOTA STC:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 6/28/2021 1 in = 120 ft1 in = 0.02 mi¯240-250 W 9TH240-250 W 9TH City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 16 TR-10 I CMU RMU-PD-RFO I HI I UMU I CMU-RFO UMU CMU-PD UMU CMU I I-PD IRMU-PD-RFO I-PD I RMU-RFO RMUTR-10 I I CMU-PD I I I UMU-PD RMU-PD I I-PD-RFO CMU RMU-PD RMU-PD I-RFO UMU I-PD-RFO CMU-PD-RFO UMU RMU RMU-PD I-PD-RFO UMU-PD CMU-PD I-PD RMU-PD W 9TH AVW 9TH AV OREGON STOREGON STS MAIN STS MAIN STW SOUTH PARK AVW SOUTH PARK AV N MAIN STN MAIN STJACKSON STJACKSON STIOWA STIOWA STW 7TH AVW 7TH AV W 6TH AVW 6TH AV W 8TH AVW 8TH AV W 11TH AVW 11TH AV W 10TH AVW 10TH AV W 12TH AVW 12TH AV W 14TH AVW 14TH AVMICHIGAN STMICHIGAN STNEBRASKA STNEBRASKA STMINNESOTA STMINNESOTA STW 5TH AVW 5TH AV W 4TH AVW 4TH AV COMMERCE STCOMMERCE STE 9TH AVE 9TH AV E 14TH AVE 14TH AV E 11TH AVE 11TH AV RMU C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 6/28/2021 1 in = 500 ft1 in = 0.09 mi¯240-250 W 9TH240-250 W 9TH City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 17 C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 6/28/2021 1 in = 100 ft1 in = 0.02 mi¯240-250 W 9TH240-250 W 9TH City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer Page 18