Loading...
HomeMy WebLinkAboutStormwater Management Facility Maintenance Agreement Brio Building 01-0202-0000 x�• RECEIVED . F 140391 JUN 2 8 2021 CITY OF OSHKOSH 8715021 STORMWATER MANAGEMENT FACILITY TX:4532881 CITY I-RK'S OFFICE DOC# 1854130 1..._ MAINTENANCE AGREEMENT NATALIE STROHMEYER Document Number Document Title REGISTER OF DEEDS • WINNEBAGO COUNTY,WI RECORDED ON: The City of Oshkosh,the Governing Body,and Brio Building LLC,the Property owner, 06/10/2021 10:46 AM along with their successors and assigns,are the parties to this Agreement. The purpose of RECORDING FEE: 30.00 this Agreement is to ensure adequate storm water drainage facilities for the Property PAGES: 8 described in this Agreement in connection with the surrounding public storm water facilities. The consideration for this Agreement includes the City's approval of proposed development on the Property. Additional consideration includes the Property owner's clearer understanding of storm water drainage obligations for the Property,and the Governing Body's assurance that the storm water drainage issues relating to the property can be more easily achieved through this Agreement. Recording Area CURRENT PROPERTY OWNERS SUBJECT TO THIS AGREEMENT: Name & Return Address: Oshkosh City Attorney's Office Brio Building LLC PO Box 1130 604 Clay Street Oshkosh,WI 54903-1130 Cedar Falls,IA 56013 Tax Parcel Numbers: 90102020000 GOVERNING BODY: City of Oshkosh PROPERTY SUBJECT TO THIS AGREEMENT The Property subject to this Agreement is located in the City of Oshkosh,Winnebago County,and is more particularly described as follows: SEE EXHIBIT"A" GRADING AND DRAINAGE PLAN The Property must always comply with the grading and drainage plan approved by the City. The approved grading and drainage plan may be amended or modified from time to time after consultation with the Property owner. Compliance will be evaluated according to the most current approved plan. A small scale version of the current grading and drainage plan is attached as Exhibit"B"for identification and reference purposes. The full scale grading and drainage plan is on file for review with the City Department of Public Works,and will be used to provide grading and drainage criteria and to govern compliance and any disputes. PURPOSE The three(3)primary purposes of this Agreement: 1)Notify the Property owner,as well as anyone interested in or connected to the Property that the Property is subject to thic Agreement and Chapter 14 of the Oshkosh Municipal Code,as amended,and that any owner of the Property assumes these obligations;and, 2)Identify specific storm water facilities that currently exist on the Property,or may be constructed or installed in the future;and, 3)Describe the minimum responsibilities for maintaining the Property's approved storm water management facilities and grading and drainage plan. RESTRICTIONS The Property must always conform to its most current grading and drainage plan approved by the City. The Property is also subject to all aspects of the Municipal Code,including storm water management requirements,as may be amended,which are currently located in Chapter 14 of the Municipal Code. The storm water management requirements of the Municipal Code change from time to time,with the Property owner receiving public notice as required by law. Changes may be made to the grading and drainage plan for the Property February 8,2021 l ,J wocV CITY OF OSHKOSH STORMWATER MANAGEMENT FACILITY MAINTENANCE AGREEMENT Document Number Document Title if requested by the Property owner and after review of any changed circumstances on the Property. The approved grading and drainage plan for the Property will be on file in the City of Oshkosh Department of Public Works and is fully incorporated by reference in this Agreement. RESPONSIBLE PARTIES Each owner of the Property,jointly and severally,as well as their heirs,successors,and assigns,is responsible for maintaining the Property in the manner described in this Agreement. The Property owner's responsibilities include maintaining approved vegetation, grading,drainage,and storm water facilities on the Property. STORM WATER FACILITIES The Property's storm water facilities consist of: 1. Biofilters;and, 2. Storm Sewer;and, 3. Catch Basins. INSPECTION AND MAINTENANCE All storm water facilities and components of the storm water system shall be inspected at least semiannually,once in the Spring and once in the Fall. The Property's storm water drainage system must also be inspected after major storm events,which for purposes of this Agreement are those events with an accumulation of one-half(1/2)inch within 24 hours prior to the site having a minimum of 70% stabilization,and an event with an accumulation of one and one-half(1'/2)inches within 24 hours after the site has a minimum of 70% stabilization. The storm water facilities and grading and drainage scheme must be maintained as designed in order to achieve the desired storm water drainage objectives. Therefore,maintenance and repairs must be performed expeditiously when system deficiencies are identified. The existence of soil erosion,clogged or damaged inlets and/or pipes,excessive sediment loads within the basin and/or biofilter,rilling of side slopes,and other damaged features of the stormwater system are examples of items requiring maintenance or repair work. Material removed from the basin or biofilter may require special handling dependent upon current Wisconsin Department of Natural Resources disposal practices. If a biofilter is installed/constructed,then biofilter maintenance activities include:remove coarse and gravel sediment that has accumulated;maintaining proper level of mulch;inspecting surface and repair eroded areas;inspect filter strip rip-rap and repair as needed;inspect energy dissipator rock or grass inlet areas;inspect overflow structures;replace filter bed;inspect perforated pipe under drain;remove litter and debris;water plants;replace dying plants;and replace vegetation when necessary. Biofilter inspection and maintenance requirements applicable to the Property will change as the rules enforced by the Governing Body change. If a wet basin is installed/constructed,then dredging operations are required to remove the excess sediment when the depth of water in the wet detention basin diminishes below three feet causing the efficiency of the detention basin to decrease. The storm water detention basin(s)must retain the safety shelf after dredging. Damage to the safety shelf or detention basin liner must be repaired to preserve the safety and operation of the facilities. If a dry basin and/or swale is installed/constructed,then dry basin and swale maintenance includes removal of trash and debris, repairing erosion,maintaining vegetation,and dredging when necessary. The examples of maintenance activities that are identified above are not intended to be complete. The minimum information required to be viewed as a guideline for potential maintenance or repair activities is identified in the Inspection and Maintenance Logs attached as Exhibit"C". The Property owner shall,upon request,make available for inspection all maintenance records to the City's Department of Public Works,or any agent of the City,during the life of the system. February 8,2021 CITY OF OSHKOSH STORMWATER MANAGEMENT FACILITY MAINTENANCE AGREEMENT Document Number Document Title PROHIBITIONS Mowing in buffer areas,detention basin banks and drainage ways shall be minimised in order to maximize filtration of runoff. If occasional mowing is necessary,the mowing height must not be less than six inches. Applications of fertilizers,herbicides,pesticide or other chemical applications are prohibited in buffer areas,on detention basin banks and along drainage ways. COMPLIANCE The Property benefits from a properly maintained grading and drainage plan as well as properly maintained storm water facilities. In the event the Property owner fails to perform any obligation related to this Agreement,the City of Oshkosh shall have the authority to enter the private Property to inspect,maintain,repair,reconstruct,and/or modify any component of the approved grading and drainage plan or storm water facility. The City has no duty to take such action but may do so at its discretion. The ability to enter the Property and take such action is not an exclusive remedy,and the City may take any lawful action to enforce this Agreement and/or the Municipal Code. The Property owner grants to the City of Oshkosh a limited,nonexclusive easement in perpetuity over the Property for the purpose of addressing grading and drainage deficiencies,as well as providing reasonable and necessary access to any storm water facility that is located on or within the Property. The City of Oshkosh shall use only that part of the Property reasonably necessary to allow the inspection,maintenance,and/or repair of the approved grading and drainage plan or any storm water facility. If the City elects to perform maintenance or repairs on the Property,then all associated costs for performing this work and enforcing this Agreement and/or storm water management requirements of Chapter 14 of the Municipal Code,as may be amended from time to time, are subject to reimbursement from Property owners,jointly and severally,or through encumbrances on the Property itself Reimbursement remedies include placing an encumbrance against the Property as a Special Charge for Current Services pursuant to Sec.66.0627 Wisconsin Statutes,as amended,or through other methods to collect directly from the Property owner as allowed by law at the City's discretion. Any Special Charge for Current Services shall be a lien on the Property and shall be collected with the real estate taxes.The Property owner affirmatively waives notice requirements for Special Charges,and this provision shall constitute the Property owner's,and any respective lot/parcel owner(s)if applicable,waiver of notice of hearing otherwise required by Sections 66.0627 or 66.0703 of the Wisconsin Statutes. The storm water management facilities shall be for the benefit of the City of Oshkosh and the Property as described in this Agreement. This Agreement is not intended to benefit third parties and there shall be no third party beneficiaries. RECORDING This agreement shall be recorded with the land records of the Winnebago County,Wisconsin,Register of Deeds.Brio Building LLC, shall bear the cost of recording this document. AMENDMENTS This Agreement may be amended in whole or in part at any time by the owner of the Property,provided: 1)the amendment(s)are approved in writing by the owners of a majority of the lots within the Property as recorded with the Register of Deeds,Winnebago County,Wisconsin;and,2)the amendment(s)are approved in writing by the City of Oshkosh Board of Public Works. This Agreement shall be a permanent covenant that shall,as provided by law,run with the land and any amendment to this Agreement shall be subject to the prior approval by the City of Oshkosh. SIGNATURES ON FOLLOWING PAGE February 8,2021 i CITY OF OSHKOSH j STORM-WATER MANAGEMENT FACILITY ' MAINTENANCE AGREEMENT Document Number Document Title q For the Owner/Developer: BRIO BUILDING LLC By. 4 ;. oy 4. 1:emann,Member STATE OF IOWA ) ss. BLACK HAWK COUNTY ) Personally came before me this 13 day of /4 , 2021, the above named Joy Hanemann, to me known to be such person who executed the foregoing ent and acknowledged the same,for the purpose herein contained_ ;�'-‘ lltMl Notary Public,State of Wiscons' d t My Commission expires E 2/2 (( i ,,,,_. ,: �!EMENS For the City of Oshkosh: f+ �" - :' ,'' f..„--1,..-----,(;e4rifi.etrz--( tnvo__Itif ' #41 ':.'' Mark A.Rohloff City Man ger Pamela R.Ubrig,City Clerk • STATE OF WISCONSIN ) ss. WINNEBAGO COUNTY ) Personally came before me on this 211 11day of MQ.t,1 ,2021,the above named,Mark A.Rohloff and Pamela R.Ubrig,to me known to be the persons who executed the foregoing instrument and acknowledged the samc N lic,S of Wisconsin My Commission expires: L 2/(5/20 2,3 Approved as to for= Date: 'X13-� _ , , ,A,,C, , 'a" alSkA)(-(3? ''' 1\4\/\ Lorenson,,City A... . This document was drafted by. David J.Praska Deputy City Attorney Oshkosh,WI 54903-1130 February 8,2021 • • • LEGAL DES[RIPTION LOT 2 OF CERTIFIED SURVEY MAP NO.6553,RECORDED IN THE OFFICE OFTHE REGISTER OF • DEEDS FOR WINNEBAGO COUNTY,WISCONSIN ON AUGUSTS,2911,IN VOLUME 1 PAGE R ;•4, AS DOCUMENT NO.1577796,BEING A RE-DIVISION OF ALL OF wt(IRED SURVEY MAP NO. 6506,BEING A PART OF THE SOUTHEAST 1/4 OF THE NORTHEAST 1/4 AND PART OFTHE NORTHEAST 1/4 OFTHE SOUTHEAST 1/4 OF SECTION 23,TOWNSHIP LS,NORTH RANGE 16 EAST,FIRST WARD,CITY OF OSHKOSH,WINNEBAGO COUNTY,WLSCONSIN.. • • • Mall=A-Page 1 c11 • EXHIBIT A (1 of 1) , - !I 4 la k fa b.. 0 al Pi-------L 0 , •.'(i frl • • • . I hilli . ' • •,i, -AA 1 9 1., el . I.I itc ri 0 iw E I . ii I iii i 11 ' 11[1111 i fu:i i . , — ---, - --. — - i 1 n I II 11111 z • .. _ I Il 11 11- I li 1 .7; 1 i I I I 1 • 14 0: it 'll ' I i i g it 1 1 J IP 1 1 1.1 ii i 1 IP rill 1. t ii 1 ! , „:,,, .Li, ,„ g: ,L1 t - • • z'- lull, Aildi In E i I "011 1114 IN : li LIII , • i /- '• - ,. __. '---,,,.........r-..-.-.-.•-=z-..-."7".-:-....• .."------=7- ... .1:11 .-. ; 1i if — r•-f-1: -' — '(, , IT fie ----- ---1-1' ,- \ - .-' - ill(ifilie .. (.,1 .i —------------- , • ..,•,...,, / „.. 11-- 0 14.4 -:- -- ----_-.,- •,_ .1. --.1 rt--- . • 1 t -%• ,;."--•-•,,, -. 1 1 , 1 ----- -•-•—5,--.-L-. MI 1 I:1 1 101 111 , Ait 'C.,' • '' 'i • : ?_,..._,,,.,, - -Tx --1---t--- -- 10 L -- "c•1 .4., Ili } • 111' 1 In 1 i• .ri ,11 %5:.:•,...4-jti• . _. ------ ....,1 ) 1...----4--k '-"" r— —4-- il lif •• ;'•-1 - .1. • „r., ;1,•1..... sts ef1 ../ ''• .7 '• -•-• Mrb.r.TatZarl=enria7gRagignaMg.iMeersffair,:ir---A'-- /' , /1„,, 444‘ .3E122051;:i:C. 19MVIIMallift=Livi‘ ...,, ,-. ,,- .4 • - •/- , / -frau......- — .—Ecgoex.T:-•• 01.••, 1 1, 1."1 ) •-',.,T 1r '-4- -...„, 1 NT rI.• •:.4171 ..: 1.c:12.` 1.>•5:..(itirill)1'I.'ll4•P'''l;..-:-7:XV j71E71 411/.,s'i "' 41'•' ,A.c.Z.....•,,'," • ' • 1"'' A. I 'I'la n I,i,. F:••••• • r • ,,,;,. a iii - •• r‘ .,""' ......t• ,+; „. ,,, , ..-.7.:,, .1„,f•'..4!„. p :AIX:....1111 E ks ir,if,.r.,\V„... 41,614-'1.1 ;le,'tir alki .,!...„1•4.i ..,,' fi ,sr•'. . ',' / 1,--4!, ‘..'.—"••••1.- .1 ' • (1 li i'' I ..b,l-`'-.g.71 11 t".L'4:jitt .6.i',4'.; .`4,-4.`,......'•`?.: -./ 1:11i1 , ,,g.t.1.1., , ,,.. at • ,., (..:.- ... • , . T r- Ai ei.J.?,, 4e,,--kri[ T. i I %IL.!....-.;1.!,•*. .1 1..).:.7)::0:5:,.J.. "( ..,, ...C. . ../,..71::--........:•—.. ..... ....-. • e . • 'PC ';''21:1,'.7%.7 / Ml-fAVARNMINNORP'47TraffialinNaZill"PrOjaWitiggaSS 1 ill ; *. ) W 12D.9A1.1%ffeiF.RAIMOMINgt:1=:-Itc'..g;i•;:', ',13.:1,.,...- ,N, :0,....ti.r• ,/,.,;;;, ,..g...,,igpi.g.vJeir,..cp.,„,,. -„4t4.g;.-, ,..,,z?; 16. !,6;1:,',F. -:'' ..-...i ' i 1 ,-• * - r ,_,„,,,;....i...,•!.. ..,,„-..„....• • W.-..: ,....7.,,,,,,,,,•,.. _., -4•,--::-,m,:s7 ....Z.; ,/ I ',' ,r .•. ,,:', ,'..//'...10,Y. 1, •...,...--.1.-1-1•••••••".1*,14:;7.,-.,:,:',T it.-;---.-...,-•.; '„,=74-...p.t4-4,-,.,..t,,-,-;b2-e....7,::-..1 ;'.7,-..!tri , '-'11 -7 ..4.- Kt..tr-) .'-r.*:- Z-7r''..7-'••/' - -''s. -.1. 14;y4I_.'n*.',1,,,l'.:.i.41 ,C-4:'••••,...1-'`.,41.../::-.,-, .',,,..' ' . fs','I .,,,., ,. ' „..1 6:112CIP rite tkiSt. ftc'' • 3 re••-,,,,:...4:Fj:,:-..=!:•144SIN":;;;7111?..../..iri--.4.';`-:.-: .A ,,,,f, .71.-e ,NL:1---,;).,11..0---,-- -;11,;." ,-.1. ---1 .1 y..,-,. . ;-.-i., :-.-.;--...—:Z•.,e-7_:::. ...,.:'•-.E!"1,,,::.i .:?;; 1 _ :., T. •`, - . •.1:1,L.01 7") 1 rl _ ; : •-,,, --, -... . .-,.. „ ,/, • N, ,,.. 1-4 :, ...,, cs::1 ,i41-.',7,-..., •I ' ./.0 ILI '.. . ,,/ r., t•-• /' . .or; r N "' '' .1. ....' 'tAl ' rkz:I.• ' , .-• . ,Yr .! • . / •/ . •••. '...... ..."•.:'7-7 .'I"e''''V''''''-',%''' , L'i•'.:10 I, -i 1 .', .',. ' ' -'"- -ik:-...-• 7.:trii...i.-.-• • /7 r / I • /1 1.„:N.,:,"\:‘..: •A';,.` .. .t.;:.. --1 .'-'*\ -7 r-'7 4 ',-, / • 40A•f„ I 'l II . . ;a. ..d . i#1 -.—...• ; '',„N.s.,'•.--, . ..... )1,...m.., VII ' ,i• •; 'i :- ..‘ •., -, N.••. , . 'IF • •I'' .. , 4. . .' i' j.. t' ' • 5 7 ,.0.. • i'le at „ ..,,,,„. , ., ,, ,, ,- -N•et __.- : 1 ,-'t .,,,b1, 1. 1-. • . ... • ••• --A.-''',:-.•14, \ ' • • 1 N I 1 !kJ 1 "ti I 1 ..... . c ..,. 1 . • , c,,......N:. , ... ' • .1. i 21 114 ''','•'"• . s. ii / ,Z:e, „\ •7. . ....., — ' ---4:1---- `--- - "it, ,,- :..`,..;› ......', ,.._._ z,...m:; _.____;_-_-- ;- , • ...., -;4% ../ _,/, ‘7 zo: r, N..,,•.• •' -••••f• ';---,•t.- ---..-..1:.:---- :\L- jj'''.'• , . .'-j.-' I•,'-. •' - ---•-- igfr,..J • ,, • .. 4 • 'FPO...4w.... -1 t. . .. '-.. '....\''...2„.... ./ . t " ' " , • . • •:‘,...i •7.,.. / • / ./.N. .. '' . . ,'.../..-, .- -..-—,---., ,,-..--.-. o• ,, .t, / e• • • . . P.' • s , - . _ ., ....• . ,A,.. _..-7, ,. . •4-•-h- ./ / >N l 1 • . - EXHIBIT B (1 of 1) • • Inspection & Ma&nte.nance Log Bloretention & Rain Garden • I inspection Year: Name of Site: Address: Inspector. Company: Municipality Phone: Contact: Facility owner Is responsible for inspecting,maintaining,and repairing facility components after anymajor storm event and at the beginning of the Spring and Fall seasons. Check any deficiencies noted and comment for maintenance actions taken,date of repair,and any alerts. inspection Items with no*should be completed by a qualified professional every five years(or more frequently If concerns are noted). Inspection Item Storm Storm. Storm Maintenance Action Date •• Date Date Date OutletlStandpipe -- Debris/Trash Accumulation' Clean upiRernove 'sigh water levels (near top of basin)' Clean/Inspect discharge Pipe- Emergency Spillway Erosion or Depressions' RepairlRestore Missing Rock' - Repair/Restore Basin - { Debris/Trash Accumulation' Remove • Visible pollution(oil sheen,algae,etc)' Report to municipality. . Clean and remove pollution Wilting/Dying Plants' Water and/or Replant per approved plan Erosion or Depressions` Repair/Restore Long-Term Standing Water(greater Restore(remove mulch, than 3 days after rain event)' scarify soils around plants,add new mulch). Poor vegetation density Replant per approved plan Animal Burrows* Repair. Remove nuisance animals Undesirable/invasive vegetation Remove/Treatwith herbicide. Voids In mulch area Add mulch to depth of 3' Pegs 1 of i Rev.0212212008 • EXHIBIT C (1 of 2) • Inspection & Maintenance Log Catch Basin I Proprietary Device Inspection Year; Name of Site: Address: Inspector: Company: Municipality Contact: Phone: *Facility owner is responsible for inspecting,maintaining,and repairing facility components after any major storm event and at the beginning of the Spring and Fall seasons. Check any deficiencies noted and comment for maintenance actions taken,date of repair,and any alerts, inspection items with no •should be completed by a qualified professional every five years(or more frequently if concerns are noted). h Plee9e refer to the Malnienance a1 a f=lr chcet fnr more inforrnation. inspection item" Storm Storm Storm Maintenance Action Date Date Date Date Catch Basin/Proprietary Device Inlet Protection• Remove after Stabilization Debris/Trash Accumulation Clean up/Remove Abnormal water levels' Contact Municipality Sediment/Floatables Accumulation• Remove(pump and dispose of at wastewater treatment plant)" Depressions around facility Contact Municipality Joint Separation. Contact Municipality Cracks in Concrete Contact Municipality Deteriorated piping Contact Municipality Displacement of Structure Contact Municipality " Pumping Details (based on design guidelines): Type of untt(s) Design Pumping Frequency Dates Pumped Pumper Disposal Location • • Page 1 of 1 • Rev.02/22/2008 EXHIBIT C (2 of 2)