HomeMy WebLinkAbout2000-Building (roofing & siding) ti. •
� CITY OF OSHKOSH No 0083395
�
OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 2440 2442 VINLAND ST Owner RANDY W HUGHES ETAL Create Date 12/14/2000
Designer Contractor EXTERIOR CONSTRUCTION SPECIALISTS
Category 141 -Exterior Remodeling Plan
Type � Building � Sign � Canopy __� Fence � Raze �
Zoning Class of Const: Size
Unfinished/Basement Sq.Ft. Rooms Height Ft. ❑ Projection I
Finished/Living Sq.Ft. Bedrooms Stories Canopies
Garage Sq.Ft. Baths Signs
Foundation � Poured Concrete � Floating Slab Q Pier � Other
� Concrete Block � Post Q Treated Wood
Occupancy Permit Not Required Flood Plain Height Permit
Park Dedication #Dwelling Units 0 #Structures 0
Use/Nature uplex/Tear off and replace existing roofing on entire duplex due to hail damage.Replace aluminum siding on entire unit with vinyl due to
of Work ail damage.'Electric not applicable. (NO STRUCTURAL WORK)
HVAC Contractor Plumbing Contractor
Electric Contractor
Fees: Valuation $12,800.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedicatio� $0.00
Issued By: ✓" Date 12/14/2000 Final/O.P.
� Permit Voided I
In the pe nce this wo i a ree o perform all w pur ant to rules governing the described construction.
Signature Date � `�����
Ag UOwner
Address 909 MILLB OK NEENAH WI 54956 - 0000 Telephone Number 920-720-5961
4 �
Check all applicable boxes and fill out as much information as possible. Thank you.
����
1 Address of Property � L-f y(, v r �t �a ''� � ��
2 The Property is owned b �1 � �a� �- �� - �� �T t u � e
Y
3 I am the ❑ Owner OR I am the fZ�Contractor
4 The contractor doing the work is ����f`n r C� � s��� �.�'� -. S���,'�=-/��,�
5 This is a ❑ Single Family Residence, ,a Rental, ❑ Commercial
6 Work being done:
ROOFING
.�Tear off and replace existing roofing on � house, C�"garage
❑ Replace wood decking
❑ Add 1 layer of roofing to the existing layer(s) on ❑ house, ❑ garage
This work is being done due to I�f Hail Damage � Other
SIDING �
� Install siding on �house, � garage
�Replacing vinyl with vinyl
QTReplacing steel o alu inu ith vinyl (circle steel or aluminum)
O Replacing with
This work is being done due to �Hail Damage ❑ Other
When siding is done, one of the boxes below must be checked:
❑ Electric— Electric Meter, receptacle, lighting and Electric Service entrance
alterations/modifications are being performed by
Electric Installation Verification form is attached ameo icense ectnc onVactor)
�3,Electric— not applicable
O Install new or ❑ Replace gutters
❑ Install new or ❑ Replace downspouts
❑ Other work being done: (please note)
�� �J
Value of the job $ l a� � � • (include fair market price for labor even if you are
not paying for labor)