Loading...
HomeMy WebLinkAbout07. 21-328JUNE 22, 2021 21-328 RESOLUTION (CARRIED___7-0____ LOST _______ LAID OVER _______ WITHDRAWN _______) PURPOSE: AWARD CONTRACT 19-13 TO ADVANCE CONSTRUCTION, INC. FOR CONSTRUCTION OF RAINBOW MEMORIAL PARK TRAIL ($311,110.70) INITIATED BY: COMMUNITY DEVELOPMENT WHEREAS, the City of Oshkosh has heretofore advertised for bids for construction of the Rainbow Memorial Park Trail, connecting the Tribal Heritage Crossing and the Wiouwash State Trail, beginning on the north end of the corridor and terminating at the northeast corner of STH 21/Oshkosh Avenue and Rainbow Drive ; and WHEREAS, upon the opening and tabulation of bids it appears that the following is the most advantageous bid: ADVANCE CONSTRUCTION, INC. 2141 Woodale Avenue Green Bay, WI 54313 TOTAL BASE BID $311,110.70 NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that said bid is hereby accepted and the proper City officials are hereby authorized and directed to enter into an appropriate agreement for the purpose of same, all according to plans, specifications, and bid on file. Money for this purpose is hereby appropriated from: Acct. No. 0323-0740-7216-63071 Multimodal Trail – Rainbow Park City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Alexa Naudziunas, Associate Planner DATE: June 17, 2021 RE: Award Contract 19-13 to Advance Construction, Inc. For Construction of the Rainbow Memorial Park Trail ($311,110.70) BACKGROUND The Wisconsin Department of Transportation awarded $255,277 to the City of Oshkosh through the Transportation Alternatives Program (TAP) 2018-2022 funding cycle for construction of a trail through Rainbow Memorial Park that will connect to the greater Riverwalk network. The favorable bid contained in the proposed construction contract will allow the City to complete the Riverwalk from Punhoqua Street through Rainbow Memorial Park. ANALYSIS The Rainbow Memorial Park Master Plan provides recommendations to improve the trail through Rainbow Memorial Park and this project will achieve that element of the plan. The Tribal Heritage Crossing Trail and the Wiouwash State Trail are vital segments of the state trail network. The multimodal routes in the City and the Riverwalk trail system all contributed to this connected system. There is a gap in the multimodal system in the Oshkosh Avenue Corridor that discourages pedestrians from using the trails due to the lack of a designated route. This project is an opportunity to connect the Tribal Heritage Trail to the City’s bicycle and pedestrian network. Construction would begin this summer and finish by the end of 2021, thereby connecting the new Lakeshore Park Trail to Rainbow Memorial Park. Engineering staff reviewed three (3) bids. The low bid was received from Advance Construction, Inc. of Green Bay, Wisconsin. The total bid is $311,110.70. FISCAL IMPACT The City funding for the project comes from the 2021 CIP Multimodal Trail – Rainbow Memorial Park Account 0323-0740-7216-63071. The City budgeted $330,000 for the local match and the City received the TAP grant in the amount of $255,277. The lower bid will ultimately save the City over $100,000. RECOMMENDATION The Council awards the bid for construction of the Rainbow Memorial Park Riverwalk to Advance Construction, Inc. for $311,110.70. Respectfully Submitted, Approved: Alexa Naudziunas Mark A. Rohloff Associate Planner City Manager Contract 19-13 - Tribal Heritage Crossing-STH 21 Multi-Modal Trail (#7430771) Owner: Oshkosh WI, City of Solicitor: Oshkosh WI, City of Bid Opening: 04/29/2021 10:00 AM CDT Quantity Unit Price Extension Unit Price Extension Unit Price Extension Section 1 $311,110.70 $331,613.45 $334,865.95 1011 Clearing; complete as specified Inch Diameter 264.00 $25.00 $6,600.00 $30.00 $7,920.00 $70.80 $18,691.20 1021 Grubbing; complete as specified Inch Diameter 264.00 $25.00 $6,600.00 $15.00 $3,960.00 $18.00 $4,752.00 1050 Mobilization; complete as specified Lump Sum 1.00 $17,250.00 $17,250.00 $55,000.00 $55,000.00 $28,600.00 $28,600.00 1120 Removing concrete and asphalt sidewalk and driveway; complete as specified Square Feet 550.00 $1.00 $550.00 $1.50 $825.00 $2.80 $1,540.00 1200 Unclassified excavation; complete as specified Cubic Yards 2,430.00 $26.74 $64,978.20 $22.65 $55,039.50 $15.30 $37,179.00 1210 Borrow excavation; complete as specified Cubic Yards 2,600.00 $9.00 $23,400.00 $0.01 $26.00 $11.50 $29,900.00 1220 Excavation special (paving); complete as specified Tons 200.00 $10.00 $2,000.00 $30.00 $6,000.00 $22.00 $4,400.00 Northeast Asphalt, Inc. Section Title Item Code UofMItem Description Advance Construction Inc.Vinton Construction Company2141 Woodale Avenue Green Bay, WI 54313 1360 Adjust manholes and inlets; complete as specified Each 1.00 $500.00 $500.00 $300.00 $300.00 $500.00 $500.00 1370 Turf restoration; complete as specified Square Yards 4,210.00 $7.00 $29,470.00 $8.00 $33,680.00 $8.00 $33,680.00 1410 12" radius curb with 6" CABC and grading; complete as specified Linear Feet 75.00 $37.00 $2,775.00 $35.00 $2,625.00 $45.55 $3,416.25 1448 30" concrete curb and gutter removal and replacement; including sawing; pavement ties; dowel bars; bond breaker; integral curb and fine grading; turf restoration; and traffic control; complete as specified Linear Feet 215.00 $45.00 $9,675.00 $35.00 $7,525.00 $48.55 $10,438.25 1510 6" concrete sidewalk/ driveway/ramp with 3" CABC and grading; complete as specified Square Feet 1,550.00 $6.55 $10,152.50 $6.95 $10,772.50 $7.55 $11,702.50 1540 Curb ramp detectable warning field (natural/ non-painted); complete as specified Square Feet 188.00 $30.00 $5,640.00 $30.00 $5,640.00 $30.00 $5,640.00 1541 Curb ramp detectable warning field (natural/ non-painted) - radial; complete as specified Square Feet 33.00 $70.00 $2,310.00 $70.00 $2,310.00 $70.00 $2,310.00 1560 Drilled No. 4 sidewalk tie bars - deformed; epoxy- coated; complete as specified Each 5.00 $5.00 $25.00 $5.00 $25.00 $5.00 $25.00 1580 Cold weather covering (sidewalk) - single visquine; complete as specified Square Feet 500.00 $1.00 $500.00 $1.00 $500.00 $1.00 $500.00 1590 Up-charge for late season cold weather concrete sidewalk; complete as specified Cubic Yards 10.00 $12.00 $120.00 $12.00 $120.00 $12.00 $120.00 1700 Sawing existing pavement; complete as specified Linear Feet 265.00 $2.00 $530.00 $3.00 $795.00 $1.95 $516.75 1802 Base aggregate dense; 3"; complete as specified Tons 2,000.00 $14.75 $29,500.00 $16.35 $32,700.00 $13.60 $27,200.00 1900 Tack coat; complete as specified Gallons 265.00 $3.00 $795.00 $3.03 $802.95 $3.00 $795.00 1916 4" asphaltic surface LT with 6" CABC and grading; complete as specified Square Yards 3,750.00 $24.40 $91,500.00 $26.09 $97,837.50 $28.20 $105,750.00 1918 Asphaltic cold weather paving; complete as specified Square Yards 950.00 $2.10 $1,995.00 $2.10 $1,995.00 $2.10 $1,995.00 2508 Furnish; install; maintain; and remove Type D modified inlet protection; complete as specified Each 7.00 $125.00 $875.00 $70.00 $490.00 $70.00 $490.00 2510 Sediment removal - Type D modified inlet protection; complete as specified Each 7.00 $20.00 $140.00 $5.00 $35.00 $5.00 $35.00 2514 Furnish; install; maintain; and remove silt fence; complete as specified Linear Feet 1,430.00 $2.00 $2,860.00 $3.00 $4,290.00 $3.00 $4,290.00 2516 Furnish; install; maintain; and remove stone bag; complete as specified Each 10.00 $7.00 $70.00 $10.00 $100.00 $10.00 $100.00 2518 Furnish; install; maintain; and remove 12" diameter sediment logs; complete as specified Linear Feet 30.00 $10.00 $300.00 $10.00 $300.00 $10.00 $300.00 Bid Total:$311,110.70 $331,613.45 $334,865.95