LinnCo Change Order No. 1- Sawdust District Demolition
CHANGE ORDER NO. 1 TO: LinnCo Inc. Date: March 18,2020 Your present Contract-Sawdust District Demolition with the City of Oshkosh for the demolition of various structures is hereby amended and changed as follows: CB-1 UST Impacted Soil Disposal T&M Est.4Cro Tons Not to Exceed $ 8,100.00 CB-2 Unknown Concrete Structures Not To Exceed $ 67,600.00 CB-3 Luecks Home Improvement Demolition Lump Sum $ 166,400.00 Subtotal Increase $ 242,100.00 Original Award Contract Amount $467,714.50 Net Change Increase C.O.#1 $242,100.00 Revised Contract Amount $709,814.50 CITY OF OSHKOSH PPROVED ND ACCEPTED: 1—v"�/ u l?-r7- ity Manager LinnCo Inc. E- (j; City Clerk I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh,Wisconsin, under the within Chan e Order. RECEIV Finance Direct r ED Russ Van Gompel JUN - 1 2020 CITY CLERK'S OFFICE Apprgved as to form- renson, torney Construction Bulletin ArOshkosh Bulletin No CB-1 Date 3/18/2020 To Contractor LinnCo Inc. Project City Contract Demolition of Various Structures at Sawdust District 43 E 7th Avenue Project Number 60614182 Owner City of Oshkosh Engineer AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required) Fuel Oil Subsurface Impacted Soil Emergency Clean up at 43 E. 7th Avenue Potential Fuel Oil Subsurface Clean up at 706 S. Main Street Reason for Modification(s) An underground fuel oil tank assumed to have been used for suppling a heating system was discovered during demolition of the office building at 43 E. 7th Avenue. The steel tank had several holes in it, and fuel oil apparently leaked into the subsurface. The tank was properly decommissioned but the soil surrounding the tank appeared to be severely impacted with fuel oil. AECOM recommended removal of the impacted material to limit future liability. LinnCo provided an estimate to load and transport 200 tons of impacted material to Waste Management's Valley Trail Landfill, Berlin Wisconsin. In addition, there is a potential for a fuel oil tank associated subsurface clean up with the Luecks Facility. This budget includes and estimated 200 tons for this potential cleanup also. AECOM recommends approval as the quote is acceptable based on a comparison of similar project costs. Time and Materials Not-to-Exceed $8,100.00. Attachments (List Supporting Documents) LinnCo Inc. quote dated March 4, 2020 Change Order 1. Budget was doubled to account for Luecks possible fuel oil tank Owner Co tra for En ' eer Recommendation By By By A. Date Date 3/X 40 Date 411I r I...INNCQ Linn Co, Inc. 2-2nd Avenue South Suite#160 Sauk Rapids,MN 56379 Phone(320)2724288 Change Order Request# 1 Date: March 4,2020 To: Paul Timm -AECOM RE: Excavate,load and transport C-soils PER LOAD 200 ton estimated volume 18.2 ton hauled per load 10.99 loads to landfill 0.33 crew hours per load Item Hrs/Unit Rate Total Equipment Volvo 300 Exc-Demo Package 3.66 $ 204.00 $ 747.25 Kubota SSV75 3.66 $ 55.00 $ 201.47 Pickup 3.66 $ 25.00 $ 91.58 $' - $ - Total Equipment $ 1,040.29 Labor Foreman-Operator 3.66 $ 112.00 $ 410.26 Laborer 3.66 $ 95.00 $ 347.99 $ - $ - Total Labor $ 758.24 Subcontractors/Materials ITO hauling per hour(Soper) 19.2 $ 100.00 $ 1,923.08 105 minute RT with load/dump $ - $ - $ - $ - $ - $ - Materials-Cost plus 15% 1,923.08 $ 288.46 Total Subs/Mat'Is $ 2,211.54 Misc lump sum pricing - $ - Total Misc lump sum $ - Bond 0.0% 4,010.07 $ - Total Bond $ - Grand Total $ 4,010.07 Notes: We have priced the load out assuming our crew is working onsite. Construction Bulletin Aor Oshkosh Bulletin No CB-2 Date 3/18/2020 To Contractor LinnCo Inc. Project City Contract Demolition of Various Structures at Sawdust District 43 E 7th Avenue Project Number 60614182 Owner City of Oshkosh Engineer AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required) Unanticipated and Buried Concrete Structures Encountered i it-Requirement Reason for Modification(s) Unknown Concrete Floor Slab/Oa -L end-Valve`✓ During demolition of 43 E. 7th Avenue buildings, a second layer of concrete floor slab was encountered under the building floor slab. This concrete slab was approximately 8" thick and reinforced. tn-addition-a- A &-diameter natural gas line-and-valve was identified. This gas line and valve had to be investigated-in an effort-to-determine if-it-was-decommissioned. This slab and-gasfine1valve were not apparent or anticipated during the bidding process. Unknown Former Foundry Machine Foundations During demolition of 43 E. 7th Avenue buildings, a second layer of concrete floor slab was encountered under the building floor slab. Under this second layer of concrete several massive historic foundry machine foundations were encountered. These foundations were not apparent or anticipated during the bidding process. Warni-►q--FalaFie, As-regaired=bq-the-Beneficial.Reuse-o€-erushed-Lead-Impacted-Concrete permit, a layer-affabric is required to be-placed-onrtop-of-the-material-and-tinder-the topsoit:This permit requirement-was-not-part-e �CP the bidding-doGurents: AECOM recommends approval as the quote is acceptable based on a comparison of similar project costs. The approved budget is on a time and materials basis in the amount of$67,600.00. Attachments (List Supporting Documents) LinnCo Inc. Quote dated March 18, 2020 Owner on actgc\ Engileer Recommendation By By d By At, u,lili-1 Date Date y.-X Date 2IU CLii'jiiCo LinnCo, Inc.. 2-2nd Avenue South Suite#160 Sauk Rapids,MN 56379 Phone(320)272-8288 Change Order Request# 2 Date: March 16, 2020 To: Paul Timm -AECOM RE: Buried items discovered through 3/16/20 See attached for item breakdown Equipment q pment Volvo 300 Exc-Demo Package 104.46 $ 204.00 $ 21,309.77 Kubota SSV75 79.15 $ 55.00 $ 4,353.04 Dozer 17.68 $ 91.00 $ 1,608.51 Wacker Smooth Drum Compactor 28.43 $ 56.00 $ 1,592,26 Genesis LXP 25.31 $ 105.00 $ 2,657,91 Pickup 104.46 $ 25.00 $ 2,611.49 $ - $ - Total Equipment $ 34,132.98 Labor Foreman-Operator 122.14 $ 112.00 $ 13,679.18 Laborer 107.58 $ 95.00 $ 10,220.04 $ $ - C Total Labor $ 23,899.22 Subcontractors/Materials Subcontractor Loader/Operator 69.9 $ 106.00 $ 7,410.49 $ - $ $ $ Materials-Cost plus 15% 7,410.49 $ 1,111.57 Total Subs/Mat'ls $ 8,522.07 Misc lump sum pricing - $ Total Misc lump sum $ - i Bond 1.5% 66,554.27 $ 998.31 Total Bond $ 998.31 Grand Total $ 67,552.58 Notes: Pricing assumes utilizing same crushed concrete materials referenced as backfill in docu Unknown items left to address that require more Investigation before we can price: Add'i unknown footings-Foundry and under North Building Gas Line beneath slab Fabric over crushed concrete C-soil removals and backfill - { q % if) b / % 2 e — # - s_ IX 4 J 2 re CL CC { N> 0 o § d | 0 0 J § § m | 0 0 / | 0 foin@ 0 D I $ & & r .- ao a | o Cu Cu o o I. - ill R ; m § I k / { \ / j // \ / § \ f % ! ! / / \ ] f J | | (0 _ ƒ ! / § $ I I § { ƒ / § / § / § 2 2 3 / } § % 2 3 § LU si 77 nqq / \ e ! / 7 ; { - $ / � / j } I ~ ! , \ \ / 0 \ \ § al i L ) 3 k ,000 . w _ w / | Si 2 > > 0 2 0 I ! 6- » ! I } 2 f * u 0 p L. | Eo 0000 ! k \ & & & & | 7 \ 3Q2 1 i .40 | | k 2 | ■ § § 0 f | 7 / ƒ / \ | k 2 ƒ I = ® ® | ! = A = e ! | ( / ± 2 ! G c \ Cu / eee99 | \ a. 0 = f § / ƒ/ / / $ 88 K ` $ ® - $ / // \ £ fu. / / / k £ \ _ (I) 4 1 a / 2 E k ii 3 2 ® G § / _ 1 ~ / i I | / N. N. PI ¥ \ w w \ / 2 ƒ / } X cc ® N. 000000 0 § % 2 L. § aUdada e ! N N 0 cu 0 § t ! 0 N , { AmmmmA | / N. = co '— otn N- ! ! { ® $ i L. e ¥ dead a g 4 | | o co ] ] \ L. 6 | 0 | m 2Q4Qmm I | ® f m 0 \ Q ) f /\ / / / / N. § 0 | i / \ R \ ] i | 5 C ® L.& | § / \ § \ / \ / \ / \ e 2 j / 2 \ § : 111 , m d 6 1 1 - _ - N , I ) / $ P J / & § Am — mm m - | ; 9 g m 2 � wdddd } 2 W is 8 a � ' ' g ! { it it x ui ƒ it 2.1 / U 000000 _ a' , � - - - - | , > / 00 > } & o & ! CO co 2 CO 0 � ~ \ ] \ \ R pR } ; 2 > >> 00 >> K &/// % | RI } \ , Q © ) ] ` 4 cgn - an ( | 1 \ i ] § ( © an@ ; | f n 4 _ / 0 0 2 a CY 1 ! 4.4. o. \ E / k ° 3 } E5 , // # § , # � 1111 \ 2 \ f , « 20 E 0ECEEa $ # e2 ° 4 > | - to ® ƒ / / tiowoo > (0000 / § a' # � Ti > £a = CDm = » E0- a. Im � 5/ / | % @2 2 % ± / © � - � / = s } \ % Jas co o E / | ! Im « 2 to 1 1 I I r 1 | | % / % w 1. ir 2 2 | 00000 | ddddd 0 h , s- § # a) o N ¥ 0 000000 N N 0 | � � w , | I g & wm # | - dwarf / .6 d , § ■ m . \ 2 0 ] 0 | | nR ; mR 2 | � m « mc o m ; , } wowed \ a 2co 2 ; ! 13 CO 1 I ...2 cn " ( \ Mo = » k co u / dwaa § § W CL § m us ) \ % I § 3 LU / 1 ; ; - G = ) \ d dd ) 1.... ~ 0 ¥ / \ ■ ) ! J ƒ ( ! . wade wo E a) | > 0 / > a) | > | _ & ± 0 4 0 ® 2 N. \ @ 2 , , , \ / jam / | U0000U) „ NInw § n $ e « § | | 1 ! ! 2 ! ] Gnu § H an } (is i | \ bra OCD 73 - d ! | } kk / \ § 2 \ \/ / t > > m * R { 27 ERR3 \ @ o $ \ ERR § § a # > = c ° E ° m ! / . � oo � 2E „ , LLuU. u / \ / //} ƒ $ I / A - rV- rr 3 = IX CO o | ] ! so { - | I A - --�, 054#v5 I cc 'S!-- i--6`•a .12 " i I i E ---_ 4f7 x3 ' ` >c y' Il • z • i .1! ' --- 291 X 3w x V ' 1/ 1 / . , V. r�c40xit A!/: , \ .� ..�....._ t Z�c4A+�'xa" ors xy¢844. t c 7/140E4. 0404_ 1 1 IILX3wX 1f&II i •d pis jFes.+....-........ .. .: ... _ Iwr wiio-nyg�.�- 9 , F'a• '.. , F ► i F' eta n‘A 4 r Co r f k//per 1 /fi _; kr;- or 4 • • • ti f ::., u- , .4 ,, 4. , . _ _ . .,. .;.4 --:' s i E e j e t 1 1 1 i Construction Bulletin Ar Oshkosh Bulletin No CB-3 Date 3/5/2020 To Contractor LinnCo Inc. Project City Contract Demolition of Various Structures at Sawdust District 43 E 7th Avenue Project Number 60614182 Owner City of Oshkosh Engineer AECOM The following modification(s)to the Contract are hereby ordered (use additional pages if required) Addition of Lueck's Home Improvement, 706 S. Main Street, Oshkosh Wisconsin. An approximate 12,000 square foot building with an asphalt paved parking lot. Reason for Modification(s) This facility is part of the Sawdust District Redevelopment area. All the surrounding buildings are already included in the demolition contract. AECOM recommends approval as the quote is acceptable based on a comparison of similar project costs. The approved budget is on a time and materials basis in the amount of$167,000.00. Attachments (List Supporting Documents) LinnCo Inc. quote dated March 18, 2020. Owner Co tra for En n er Recommendation By � By 7 IC t�_ By 14.A.A Date 3/d� �� Date �J�� Date �_ L Proposal LINNCO LinnCo, Inc. 2-2nd Avenue S#160 Sauk Rapids, MN 56379 Phone(320)272-8288 Submitted to Job Name Name Paul Timm Name Leucks Building Demolition Attn: AECOM Address 558 N Main Street Address City,State,Zip Oshkosh,WI 54901 City,State,Zip Phone: 920-235-0321 Cell: Bid Date: Time Due: Date: 3118/2020 Description Complete demolition of the former Luecks Building in Oshkosh,WI. Included: Temporary fence 600 If Erosion Control-Compost Logs 485 If Disconnect one water service at building foundation Disconnect one sewer service at building foundation Complete above grade demolition of structure Note 2,300 sf of exterior brick walls can not be recycled due to lead paint. All other masonry,brick and concrete will be put in owners stockpile next to jobsite LinnCo to work off of the asbestos abatement contractors notification Permits by Owner All roofing debris is assumed to be asbestos containing. All non recycle debris will be landfilled. Partial wood floor on warehouse to be landfilled. Concrete was noted below slab Complete below grade demolition Note West foundation wall to be broke off below grade yet left in place to limit sidewalk/road damages A crawlspace was noted below a portion of the building. Backfill footing voids and crawlspace with Owners crushed stockpiled materials adjacent to jobsite as noted in original bidding documents. Note Some backfill materials are noted in raised warehouse floor. This material figured for reuse. Excluded: Fabric above Owners crushed backfill materials. Topsoil/seed/restoration Note This will be completed at similar rates to other areas in original bid Universal/regulated wastes Examples Bulbs/ballasts/chemicals/freon/etc... TOTAL PRICE: $ 166,337.00 Prepared by-Nick Linnemann,President Accepted by(Signature) LinnCo, Inc. 3/18/2020 Date Title,Company Date