HomeMy WebLinkAboutChange Order No.1 Contract 19-22 Vinton Construction Co. I4CI5 r #11;111? City Oshkosh June 29, 2020 Heath Schopf Vinton Construction Co. P.O. Box 137 Two Rivers, WI 54241 RE: Change Order No. 1 (Final) Contract 19-22 Dear Heath: Enclosed is an executed copy of Change Order No. 1 (Final) between the City of Oshkosh and Vinton Construction Co. regarding the abovementioned project. If you have any questions, please call our office at(920)236-5065. Sincerely, 11 ►r James Rabe, P.E., CPESC Director of Public Works • JER/tit Enclosure: Change Order No. 1 (Final) cc: Pam Ubrig, City Clerk (w/original) Jennifer Messerschmidt, Assistant Finance Director (w/copy) File (w/original) L\Engineering12019CONTRACTS\19-22OshkoshAveRoundabout\Project_Information\Contract Page 1 of 1 Info Change Orders\19-22 Executed CO#1(Final)Ltr_6-29-20.docx City Hall,215 Church Avenue P.O.Box 1130 Oshkosh,WI 54903-1 1 30 http://www.ci.oshkosh.wi.us TO: VINTON CONST COMPAY CHANGE ORDER#1 (FINAL) P.O. BOX 137 DATE: MARCH 10, 2020 TWO RIVERS, WI 54241 Your present contract with the City of Oshkosh, Contract No. 19-22, awarded August 13, 2019, is hereby amended and changed as follows: NET DECREASE TO SECTION I: ($4,960.87) NET DECREASE TO ADDITIONAL WORK: ($1,540.00) NET DECREASE TO CONTRACT: ($6,500.87) TOTALS BID TOTAL $198,864.01 $198,864.01 CO#1 ($6,500.87) ($6,500.87) CONTRACT TOTAL $192,363.14 $192,363.14 CITY OF OSHKOSH BY: City Manager City Clerk Approved and acce ted: Contractor I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. �7 Com roller Approved as to rm: A CJ QAL • City Attorne • RECEIVED JUN 30 2020 CITY CLERK'S OFFICE CONTRACT 19-22 CHANGE ORDER#1 (FINAL) 19-22 ITEM CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER DESCRIPTION UNIT QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Clearing;complete as Inch 1011 specified Diameter 64.00 64.00 $30.00 Grubbing;complete as Inch 1021 specified Diameter 64.00 64.00 $30.00 Mobilization;complete as Lump 1050 specified Sum 1.00 1.00 $38,500.00 Removing pavement; Square 1100 complete as specified Yards 600.00 580.00 -20.00 $9.10 ($182.00) Removing concrete and asphalt sidewalk and driveway;complete as Square 1120 specified Feet 3,030.00 3,059.00 29.00 $0.85 $24.65 Unclassified excavation; Cubic 1200 complete as specified Yards 200.00 191.00 -9.00 $28.10 ($252.90) 9"concrete pavement doweled; HES;with 6"CABC and grading;complete as Square 1325 specified Yards 800.00 770.00 -30.00 $79.63 ($2,388.90) Crushed aggregate base course;complete as 1340 specified Tons 78.00 0.00 -78.00 $17.50 ($1,365.00) Pavement ties; complete as 1350 specified Each 115.00 110.00 -5.00 $10.00 ($50.00) Drilled dowel bars; 1 1/4"; 1354 complete as specified Each 20.00 12.00 -8.00 $14.00 ($112.00) Adjust manholes and inlets; i 1360 complete as specified Each 2.00 2.00 S400.00 Turf restoration;complete as Square 1370 specified Yards 610.00 727.00 117.00 $15.00 $1,755.00 18"curb and gutter;8";with 6"CABC and grading; Linear 1422 complete as specified Feet 70.00 64.00 -6.00 $40.00 ($240.00) /driveway/ramp with 3"CABC and grading;complete as Square 1510 specified Feet 4,800.00 4,794.00 -6.00 $7.50 ($45.00) Salvage and re-use brick; Square 1528 complete as specified Feet 265.00 241.00 -24.00 $19.00 ($456.00) Curb ramp detectable warning field(natural/non- painted);complete as Square 1540 specified Feet 48.00 48.00 $35.00 Drilled No.4 sidewalk tie bars -deformed;epoxy-coated; 1560 complete as specified Each 11.00 12.00 1.00 $10.00 $10.00 Sawing concrete pavement full depth;complete as Linear 1710 specified Feet 335.00 415.00 80.00 $4.50 $360.00 Pavement markings;epoxy; 4"(white);complete as Linear 1974 specified Feet 138.00 0.00 -138.00 $7.00 ($966.00) Pavement markings;epoxy; 4"(yellow); complete as Linear 1975 specified Feet 500.00 451.00 -49.00 $7.00 ($343.00) Pavement markings;arrow epoxy;Type 2(white); 1980 complete as specified Each 1.00 1.00 $450.00 Pavement markings;arrow epoxy;Type 3(white); 1981 complete as specified Each 1.00 1.00 $450.00 Page 1 of 2 I. CONTRACT 19-22 CHANGE ORDER#1(FINAL) ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE Pavement markings;epoxy; 12"diagonal(yellow); Linear 1982 complete as specified Feet 11.00 0.00 -11.00 $14.00 ($154.00) Pavement markings;word epoxy;(white);complete as 1983 specified Each 3.00 3.00 $500.00 Pavement markings;dotted extension;epoxy; 18'; Linear f1 1987 (white);complete as specified Feet 85.00 71.00 -14.00 $15.00 ($210.00) Pavement markings;curb epoxy;(yellow);complete as Linear 1988 specified Feet 24.00 6.00 -18.00 $13.00 ($234.00) Pavement markings;epoxy; 12"chevron(white);complete Linear 1990 as specified Feet 18.00 57.00 39.00 $14.00 $546.00 Pavement markings;epoxy; 8"line grooved wet reflective contrast(white);complete as Linear 1991 specified Feet 120.00 118.00 -2.00 $25.00 ($50.00) Pavement markings;island nose epoxy(yellow); 1992 complete as specified Each 1.00 1.00 $300.00 Furnish;install;maintain;and remove Type D modified inlet protection;complete as 2508 specified Each 5.00 7.00 2.00 $70.00 $140.00 Furnish;install;maintain;and remove stone tracking pad; 2512 complete as specified Each 1.00 0.00 -1.00 $0.01 ($0.01) Furnish;install;maintain;and remove stone bag;complete 2516 as specified Each 2.00 4.00 2.00 $20.00 $40.00 Furnish and install standard sanitary sewer manhole(4' diameter);complete as Vertical 3100 specified Feet 6,00 5.23 -0.77 $1,023.00 ($787.71) sanitary sewer manhole 3114 chimney seal;complete as Each 1.00 1.00 $600.00 SECTION I-(ITEMS 1011 -3114)-SUBTOTAL: $2,875.66 ($7,836.52) NET DECREASE TO SECTION I SUBTOTAL: ($4,960.87) ADDITIONAL WORK REQUIRED: CO#1 ITEM DESCRIPTION UNIT CONTRACT INSTALLED NET NET UNIT INCREASE IN DECREASE IN NUMBER QUANTITY QUANTITIES INCREASE DECREASE PRICE CONTRACT PRICE CONTRACT PRICE j Credit for non-HES concrete in lieu of HES concrete; Square 1-10000 complete as specified Yards 0.00 770.00 770.00 ($2.00) ($1.540.00) ADDITIONAL WORK REQUIRED: CO#1 (ITEM 1-10000)-SUBTOTAL: ($1,540.00) $0.00 NET DECREASE TO ADDITIONAL WORK SUBTOTAL: ($1,540.00) NET DECREASE TO SECTION I ($4,960.87) NET DECREASE TO ADDITIONAL WORK ($1,540.00) NET DECREASE TO CONTRACT: ($6,500.87) i� L Page 2 of 2