HomeMy WebLinkAboutWorkshop #1 PresentationWater Filtration Plant
Clearwells Replacement
May 2021
Agenda
•Meeting Purpose
•Project Overview
•Working with the Planning Commission
•Look Ahead
Meeting Purpose
•Provide information to the Planning Commission about a major
upcoming Water Filtration Plant (WFP) project
•Answer questions about the project
•Gather Planning Commission input on building architectural
concepts
Oshkosh Water System
Need for Clearwells Replacement
•Wisconsin Department of Natural
Resources (WDNR) notified the City
the clearwells do not comply with
current state statutes
•Treated water storage is below
groundwater & below the 100-year
flood plain
•The high lift pump stations’ wetwells
are similarly deficient
Need for Clearwells Replacement
•Water Filtration Plant
clearwells are 60 to
over 100 years old
Buried Clearwells
CT/BWS Basin
Holding
Tank
Sedimentation
Basins
CT/BWS = Chlorine Contact Time/Backwash Supply
Clearwells Replacement Project Development
•2007 Clearwells deficiency notice from WDNR
•2008-2010 Major WFP Project (construct CT/BWS Basin, demolish old plant)
•2012-2016 Water System Planning Studies & Clearwells Replacement
Preliminary Design
•2017 Clearwells Replacement Design & Permitting <Public Service Commission
required justification for pump station capacity, given historic water use>
•2018-2019 Water System Capacity Planning Study (new demand forecasts)
•2020 Revise Project Scope for New Design Criteria
•2021 Project Redesign and Permitting
2017 Project
•Replace 2.4 million gallon (MG)
finished water storage with 2.0 MG
•Add 16 million gallons per day (mgd)
intermediate pump station
•Replace 17.3 mgd high lift pumping
capacity with 16 mgd
•Replace two existing 750 kilowatt
(kW) generators with two 1,000 kW
generators
2017 Project
•Information meetings with
City Common Council,
Planning Commission,
Neighborhood
•City Planned Development
Application
•City Zoning Map
Amendment
•City Site Plan Review
2021 Project
•Replace 2.4 MG finished water storage with 2.0 MG
•Replace 17.3 mgd high lift pumping capacity with 13.7 mgd
•Add 13.7 mgd intermediate pump system located with high lift
pumps in single structure
•Replace two existing 750 kW generators with two 1,000 kW
generators
•Replace oxygen storage and ozone generation equipment
•Comply with new building, fire, electrical, mechanical codes
2021 Building Concepts –Option 1
2021 Building Concepts –Option 1
2021 Building Concepts –Option 2
2021 Building Concepts –Option 2
Next Steps
•Re-introduce project to City Common Council, and the public
(Neighborhood Meeting)
•Complete redesign, permitting documentation for City, WDNR, and
PSC
•Apply for Planning Commission approval fall 2021
•Construct project 2022-2024
Questions?