Loading...
HomeMy WebLinkAbout14. 21-239MAY 11, 2021 21-239 RESOLUTION CARRIED__7-0_____LOST_______LAID OVER_______WITHDRAWN_______) PURPOSE: APPROVE GENERAL DEVELOPMENT PLAN AND SPECIFIC IMPLEMENTATION PLAN FOR A MULTI-FAMILY DEVELOPMENT LOCATED AT THE SOUTHWEST CORNER OF PEARL AVENUE AND RIVERWAY DRIVE INITIATED BY: MORGAN CROSSING 2, LLC PLAN COMMISSION RECOMMENDATION: Approved w/conditions WHEREAS, the Plan Commission finds that the General Development Plan and Specific Implementation Plan for a multi-family development located at the southwest corner of Pearl Avenue and Riverway Drive, is consistent with the criteria established in Section 30-387 of the Oshkosh Zoning Ordinance. NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Oshkosh that a General Development Plan and Specific Implementation Plan for a multi- family development located at the southwest corner of Pearl Avenue and Riverway Drive, per the attached, is hereby approved with the following conditions: 1. Cross access agreement for shared driveway/parking lot shall be filed with the Winnebago County Register of Deeds. 2. BSM to allow reduced front yard (Riverway Dr.) and street side (Pearl Ave.) setbacks to 17’. 3. BSM to allow increased density to 59 units per acres 4. BSM to allow increased building height to 76 feet. 5. BSM to allow reduced number of parking spaces to 97 spaces. 6. BSM to allow multi-family use without outdoor recreation space. 7. BSM to allow reduced yard landscaping points to 481 points 8. Final landscaping plan shall be reviewed and approved by the Department of Community Development. 9. BSM to allow increased lighting level at the east property line (driveway entrance) to 1.12 fc and 2.96 fc at the west property line. 10. BSM to reduced door/window area on the street-facing facades (north/east) to 14%. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us TO: Honorable Mayor and Members of the Common Council FROM: Mark Lyons, Planning Services Manager DATE: May 6, 2021 RE: Approve General Development Plan Amendment and Specific Implementation Plan for a Multi-Family Development Located at the Southwest Corner of Pearl Avenue and Riverway Drive BACKGROUND The applicant requests approval for a General Development Plan amendment and Specific Implementation Plan for a multi-family development. The subject area is zoned Urban Mixed Use District with a Planned Development Overlay (UMU-PD) and consists of a 1.4 acre vacant parcel, located at the southwest corner of Pearl Avenue and Riverway Drive. The surrounding area consists predominantly of multi-family residential and institutional land uses. ANALYSIS The subject property known as Morgan Crossing Apartments received various Planned Development and Conditional Use Permit approvals and amendments as indicated in the following timeline: 2004 - PD/CUP approval (Res. 04-429) which permitted, with conditions, construction of two 51 unit three-story buildings, a 1,200 square foot community room, and underground and surface parking. 2006 – PD/CUP amendment (Res. 06-313C) to eliminate the proposed 1,200 square foot community room and add a fourth floor to each building to serve as a community room, patio and fitness center. 2007 – PD/CUP amendment (Res. 07-71) to allow 2,250 linear feet of temporary construction signage with perimeter security fencing along Pearl Avenue and Dawes Street. 2015 – PD amendment to allow division of the parcel into two parcels. To date, one of the two proposed apartment buildings has been constructed. The applicant noted that this was planned to be a two-phase development; Phase I being the construction of the existing building and Phase II being the construction of the sister building soon after. The financial downturn occurred shortly after completion of the first building in 2008, and the applicant was unable to secure funding for construction of the second building. The applicant is now requesting Specific Implementation Plan approval for Phase II, with the existing Planned Development (Res. 04-429) for the site functioning as the General Development Plan. The applicant will also need approval of a General Development Plan amendment as the height and density are being significantly increased. City Hall, 215 Church Avenue P.O. Box 1130 Oshkosh, WI 54903-1130 920.236.5000 http://www.ci.oshkosh.wi.us The proposed development will include a 5-story, 83 unit apartment building with a total of 118 bedrooms (1.42 bedrooms per unit). The applicant is requesting Base Standard Modifications (BSMs) related to density, setbacks, building height, reduced parking, landscaping, lighting, and façade glazing. To offset the landscaping code deficiencies, the applicant has provided enhanced architectural features on all façades to improve the appearance of the site. Given the challenges related to the lot layout, the applicant has provided sufficient overall landscaping for the site. Staff is comfortable that the applicant has adequately offset the requested BSMs and the overall site is complimentary to the surrounding area. PLAN COMMISSION DISCUSSION Plan Commission discussed several aspects of the development plan but affordability garnered a majority of the discussion. The applicant discussed how their projected rents compared to WHEDA multifamily income and rent limits of HUD medium family income for Winnebago County. The chart below is a compilation of that information from the WHEDA website and the projected rents. Project rent 80% County Median Income (2021) 60% County Median Income (2020) Studio $950 $1,085 $849 One BR $1,100 $1,162 $909 Two BR $1,385 $1,395 $1,092 FISCAL IMPACT Approval of this project should result in an increase in assessed property value for the site. The developer is anticipating spending approximately $15.5 million on the project. RECOMMENDATION The Plan Commission recommended approval of the General Development Plan amendment and Specific Implementation Plan with conditions on May 4, 2021. Please see the attached staff report and meeting minutes for more information. Respectfully Submitted, Approved: Mark Lyons Mark A. Rohloff Planning Services Manager City Manager ITEM: GENERAL DEVELOPMENT PLAN AMENDMENT & SPECIFIC IMPLEMENTATION PLAN APPROVAL FOR A MULTI-FAMILY DEVELOPMENT LOCATED AT SOUTHWEST CORNER OF PEARL AVENUE & RIVERWAY DRIVE Plan Commission meeting of May 4, 2021. GENERAL INFORMATION Property Owner/Applicant: Morgan Crossing 2, LLC Action(s) Requested: The applicant requests approval for a General Development Plan (GDP) amendment and Specific Implementation Plan (SIP) for a multi-family development. Applicable Ordinance Provisions: Planned Development standards are found in Section 30-387 of the Zoning Ordinance. Property Location and Type: The subject area is zoned Urban Mixed Use District with a Planned Development Overlay (UMU-PD) and consists of a 1.4 acre vacant parcel, located at the southwest corner of Pearl Avenue and Riverway Drive. The surrounding area consists predominantly of multi-family residential and institutional land uses. The 2040 Comprehensive Land Use Plan recommends Center City use for the subject area. Subject Site Existing Land Use Zoning Vacant land UMU-PD Recognized Neighborhood Organizations N/A Adjacent Land Use and Zoning Existing Uses Zoning North Institutional I-UTO South Multi-family residential RMU-PD-RFO & I-PD East Commercial UMU-PD West Multi-family residential UMU-PD Comprehensive Plan Land Use Recommendation Land Use 2040 Land Use Recommendation Center City ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 2 ANALYSIS The subject property known as Morgan Crossing Apartments received various Planned Development and Conditional Use Permit approvals and amendments as indicated in the following timeline: 2004 - PD/CUP approval (Res. 04-429) which permitted, with conditions, construction of two 51 unit three-story buildings, a 1,200 square foot community room, and underground and surface parking. 2006 – PD/CUP amendment (Res. 06-313C) to eliminate the proposed 1,200 square foot community room and add a fourth floor to each building to serve as a community room, patio and fitness center. 2007 – PD/CUP amendment (Res. 07-71) to allow 2,250 linear feet of temporary construction signage with perimeter security fencing along Pearl Avenue and Dawes Street. 2015 – PD amendment to allow division of the parcel into two parcels. To date, one of the two proposed apartment buildings has been constructed (completed in 2008). The applicant has noted that this was planned to be a two-phase development; Phase I being the construction of the existing building and Phase II being the construction of the sister building soon after. Shortly after completion of the first building in 2008, the financial downturn occurred and the applicant was unable to secure funding for construction of the second building. The applicant is now requesting Specific Implementation Plan (SIP) approval for phase II, with the existing Planned Development (Res. 04-429) for the site functioning as the General Development Plan (GDP). The applicant will also need approval of a GDP amendment as the height and density are being significantly increased. Use The proposed development will include a 5-story, 83 unit apartment building with a total of 118 bedrooms (1.42 bedrooms per unit). Density for the site is approximately 59 units per acre. The UMU District allows for 1,200 sq. ft. per dwelling unit, which results in a maximum of 51 dwelling units for the site. The proposed 83 units for the site result in approximately 740 sq. ft. of lot area per dwelling unit. Staff is supportive of a BSM to allow the increased density as the proposal is consistent with the 2040 Comprehensive Land Use Recommendation of Center City use for the area, which promotes high density housing. ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 3 Site Design/Access Propose site plan. The site will have a single access from Riverway Drive for a two-way driveway with a parking lot that will connect with the existing Phase I parking lot. A total of 97 parking spaces will be provided for the site (57 underground spaces, 40 surface spaces). The total number of parking spaces does not meet the minimum of 2 spaces per dwelling unit containing 0-2 bedrooms, plus 0.5 space per additional bedroom over 2 bedrooms per unit, and 1 guest parking space for every 3 dwelling units. The applicant is requesting a BSM for the reduced parking number. According to the applicant, the provided parking for the site will be sufficient due to the availability of rideshare programs. Staff is supportive of the reduced parking as each unit will be provided at least one parking space and the majority of the units will be one-bedroom or studios with the remaining units being two-bedroom units. Also, the site is centrally located and the area is relatively walkable. The total impervious surface ratio for the site will be 67%, which is well under the maximum of 75% for the UMU district. Required Provided Parking Spaces Minimum: 193 97 Impervious Surface Maximum: 75% 67% Building Height Maximum: 45 ft. 76 ft. ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 4 Setbacks Minimum Provided Front Setback (Riverway Dr.) 25 ft. 17 ft. Street Side Setback (Pearl Ave.) 25 ft. (may be reduced to 12 ft.) 17 ft. Side (south) 7.5 ft. 20 ft. Rear (west) 25 ft. 0 ft. (shared parking) 25 ft. (building) Base Standard Modifications are needed for the proposed front (Riverway Dr.) and street side (Pearl Ave.) setbacks. Staff is supportive of the front and street side setbacks being reduced to 17’, where code requires a 25’ setback, as it is consistent with the setbacks of the existing phase I building and is appropriate due to the higher density character of the area. The shared parking area (0’ rear setback) will require a cross access agreement. Staff is also supportive a BSM for the increased height of the structure as the proposed 5-story height is consistent with the heights of buildings in the surrounding area, including the recently approved Merge development, and is appropriate given the center city setting of the site. Multi-family uses are required to provide outdoor recreation space. A BSM is needed to waive this requirement. Staff is supportive of this BSM as site constraints do not provide feasible area for outdoor recreation. Also, the site is located in a walkable urban area and with predominantly studio/1-bedroom units, the residents will be primarily adults. Storm Water Management/Utilities Storm water management plans have been provided and are being reviewed by the Department of Public Works. The applicant has been in discussion with the Department of Public Works regarding storm water management for the area. Finalized storm water management plans will need to be submitted and approved as part of the Site Plan Review processes. ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 5 Landscaping Proposed landscaping plan. Points Required Points Provided Building Foundation 302 (151 on side of main entrance, 75.5 on street facing side) 303 (151 on side of main entrance, 76 on street facing side) Paved Area 160 (48 tall trees, 64 shrubs) 165 (55 tall trees, 64 shrubs) Street Frontage (Riverway Dr.) 119.4 (59.7 medium trees) 120 (90 medium trees) Street Frontage (Pearl Ave.) 219.6 (109.8 medium trees) 220 (130 medium trees) Total Street Frontage 339 (169.5 medium trees) 340 (220 medium trees) Yards 1,230 481 Total 2,031 1,629 Building Foundation The landscape plan meets the total point requirement for the building foundation. The landscaping ordinance also specifies that 25% must be on the side facing the public street and ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 6 50% of the required points must be located along the main entrance side of the building. The plans is meeting both of these requirements. Paved Area The paved area requirement of 40 landscaping points per 10 parking stalls or 10,000 sq. ft. of paved area is being met. The code further specifies 30% of all points will be devoted to tall trees and 40% will be devoted to shrubs. Both of these point requirements are being met. Landscape planter islands are required at the ends of all parking rows, driveway entrances and intermediate locations and each island shall include a tall deciduous/shade tree. The landscape plan shows 5 parking row ends that are missing trees. Staff is recommending that the applicant add trees to the plan to meet this requirement. Street Frontage Code requires 60 landscape points per 100 feet of street frontage. The landscaping ordinance also specifies that 50% of the required points must be devoted to medium trees. The provided landscaping plan is meeting these requirements for both the Pearl Ave. and Riverway Dr. frontages. Yards Code requires 10 landscaping points per 1,000 sq. ft. of gross floor area. The provided yard landscaping points does not meet this requirement. Staff is supportive of a BSM to allow reduced yard landscaping points as site constraints provide minimal available yard area for additional plantings. Due to the site constraints and the center city setting, staff does not have concerns with reduced yard landscaping points. Signage Signage plans have not been included with this request, however the site plan includes a proposed ground sign that appears to be located within the 20’ X 20’ vision triangle. Ground signage for the site may not be placed within the 20’ X 20’ vision triangle and must meet requirements for multi-family residential signage. Signage for the site may be addressed under a separate building permit. Site Lighting A photometric plan has been provided by the applicant. The provided plan is exceeding the maximum 0.5 foot candle lighting level allowed at the north, east, and west property lines. Staff is supportive of a BSM to allow the proposed increased lighting levels along the driveway entrance (east property line) to 1.12 fc as it will provide increased lighting for vehicular access in the public right-of-way. Staff is also supportive of increased lighting along the west property line to 2.96 fc as proposed, to accommodate the shared property line/parking lot. Staff is recommending that the remaining areas of the site be limited to 0.5 fc at the property line. The parking areas are meeting the minimum 0.4 fc lighting level and 20’ high light poles are being utilized which meet the code maximum of 20’ for the UMU district. ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 7 Building Facades ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 8 Final building elevations have been submitted for the development which consist predominantly of masonry (approximately 80%) on all facades. The street-facing facades (north and east) show a total of 14% of the façade area devoted to door/window area, where code requires a minimum of 20% street-facing facades be devoted to door/window area. Staff is supportive of a BSM to allow the reduced door/window area as the enhanced exterior materials provide an attractive appearance from the street and are consistent with the style/materials of the existing phase I apartment building immediately to the west. Overall Site The applicant is requesting BSMs related to density, setbacks, building height, reduced parking, landscaping, lighting and façade glazing. To offset the landscaping code deficiencies the applicant has provided enhanced architectural features on all facades to improve the appearance of the site. Given the challenges related to the lot layout, the applicant has provided sufficient overall landscaping for the site. Staff is comfortable that the applicant has adequately offset the requested BSMs and the overall site is complimentary to the surrounding area. FINDINGS/RECOMMENDATION/CONDITIONS In its review and recommendation to the Common Council on an application for a Planned Development district, staff recommends the Plan Commission make the following findings based on the criteria established by Chapter 30-387 (C)(6): ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 9 (a) The proposed Planned Development project is consistent with the overall purpose and intent of this Chapter. (b) The proposed Planned Development project is consistent with the City’s Comprehensive Plan and other area plans. (It is the responsibility of the City to determine such consistency.) (c) The proposed Planned Development project would maintain the desired relationships between land uses, land use densities and intensities, and land use impacts in the environs of the subject site. (d) Adequate public infrastructure is or will be available to accommodate the range of uses being proposed for the Planned Development project, including but not limited to public sewer and water and public roads. (e) The proposed Planned Development project will incorporate appropriate and adequate buffers and transitions between areas of different land uses and development densities/intensities. (g) The proposed architecture and character of the proposed Planned Development project is compatible with adjacent/nearby development. (h) The proposed Planned Development project will positively contribute to and not detract from the physical appearance and functional arrangement of development in the area. (i) The proposed Planned Development project will produce significant benefits in terms of environmental design and significant alternative approaches to addressing development performance that relate to and more than compensate for any requested exceptions/base standard modifications variation of any standard or regulation of this Chapter. (j) For Planned Development projects that are proposed to be developed in phases, the applicant can provide a timeline for development and can demonstrate that the project would be successful even if all phases were not or could not be completed. Staff recommends approval of the General Development Plan amendment and Specific Implementation Plan and the findings listed above with the proposed following conditions: 1. Cross access agreement for shared driveway/parking lot shall be filed with the Winnebago County Register of Deeds. 2. BSM to allow reduced front yard (Riverway Dr.) and street side (Pearl Ave.) setbacks to 17’. 3. BSM to allow increased density to 59 units per acres 4. BSM to allow increased building height to 76 feet. 5. BSM to allow reduced number of parking spaces to 97 spaces. 6. BSM to allow multi-family use without outdoor recreation space. 7. BSM to allow reduced yard landscaping points to 481 points 8. Final landscaping plan shall be reviewed and approved by the Department of Community Development. 9. BSM to allow increased lighting level at the east property line (driveway entrance) to 1.12 fc and 2.96 fc at the west property line. 10. BSM to reduced door/window area on the street-facing facades (north/east) to 14%. ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 10 The Plan Commission approved of the general development plan and specific implementation plan as requested on May 4, 2021. The following is the Plan Commission’s discussion on the item. Site Inspections Report: Ms. Propp and Mr. Groth reported visiting the site. Staff report accepted as part of the record. The applicant requests approval for a General Development Plan (GDP) amendment and Specific Implementation Plan (SIP) for a multi-family development. Mr. Slusarek presented the item and reviewed the site and surrounding area as well as the land use and zoning classifications in this area. The subject area is zoned Urban Mixed Use District with a Planned Development Overlay (UMU-PD) and consists of a 1.4 acre vacant parcel, located at the southwest corner of Pearl Avenue and Riverway Drive. The surrounding area consists predominantly of multi-family residential and institutional land uses. The 2040 Comprehensive Land Use Plan recommends Center City use for the subject area. Staff recommends approval of the General Development Plan amendment and Specific Implementation Plan and the findings and conditions listed in the staff report. Ms. Propp opened up technical questions to staff. Mr. Mitchell asked if they could clarify the accessibility features or any areas that could be considered affordable housing. Mr. Lyons said that the developer should be able to help answer that. Ms. Propp asked if there were any public comments and asked if the applicant wanted to make any statements. Peter Jungbacker representing the applicant, Morgan Crossing phase 2, said the project is an expansion of an existing phase that was started 12 years ago. Much of the landscaping that has been commented on will exist in the next phase. Over time they have expanded the height of the building by two floors from the originally three floors in phase 1. The have had to adjust according to demand. The parking demand will be different in this phase and over time. They will be installing electric charging units and have a large bicycle storage area in the lower level and underground parking. It’s unique from the first two developments in the area. It does eliminate the need for large parking areas around the building. This is a true urban high density multi-family project that does need underground parking to work. In terms of the exterior, this is largely a block of red brick exterior with little other materials which is also different from the other developments. All of the units have exterior balcony systems. This is something that is not present in the other developments like The Annex. This has a higher cost but makes the units more livable. ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 11 Mr. Lyons asked Mr. Jungbacker to answer Mr. Mitchell’s questions about accessibility and affordability. Mr. Jungbacker said if you look at WHEDA’s affordability chart for Winnebago County and the projected market rents for this project, we are not even getting into what WHEDA’s affordability numbers are for a WHEDA assisted project given the current market rates. This is a market rate property, albeit one that doesn’t achieve the WHEDA targeted rental rates. It’s a problem that results in supply issues in the community and the tight housing market that we are experience in Oshkosh and the rest of Wisconsin. It’s constrained by the inability to match up effective demand with costs to build these projects. One of the problems we are experiencing today is that we are finalizing our construction contract. Lumber prices have increased substantially since last spring. For context, a year ago 1000 board feet of southern pine which is what would be used for dimensional lumber for framing was in the market for about $300/1000 board feet. Today it is $1300. It is a substantial change in the economics which hasn’t allowed us to close the gap. It has made the economics of these buildings more difficult to build. During the last recession we lost a lot of the producers at the middle of logistics chains for the dimensional lumber and they haven’t come back. Now the market is roaring because of low interest rates. It’s not for lack of lumber, it’s for lack of producers. In terms of accessibility, we do meet all of the states requirements and several units are fully accessible for all handicap needs. Mr. Mitchell asked that when a project is proposed, are there any resources available so that a few units could be for affordable housing. Not directly related to this project, but so that future developments don’t exclude the population that say there isn’t enough housing for. How is it presented to the developer to do this? Mr. Jungbacker said that he does not develop housing with that population in mind but there are developers that specifically do that. They do that with the assistance of a variety of public sector programs that essentially provide subsidies in the cost of developing and managing these types of programs. Those subsidies are provided by investment tax credits. They are also assisted by Wisconsin Housing and Economic Development Authority that has programs. Mr. Mitchell asked if the city is encouraging you or offering you support that might lead you to say that you would dedicate some units to lower income populations along with your normal clientele. Mr. Jungbacker said that the city staff does not have the flexibly to modify code. There are certain procedures and building products that might minimize costs. The answer isn’t going to come from city staff making adjustments on margins, the gap is too big. A significant part of the cost structure has been changed by market forces. The other problem is the WHEDA approved medians of fair market rent is about $1400 for a two bedroom unit. We are barely going to be there. When we do this project, it’s going to take about 10 years for it to mature and to make sense economically. Riverside Apartments in the 80’s took 10 years for it to make financial sense. You don’t build these as a developer expecting a quick return. This project will be locally owned and locally managed. ITEM VI: GDP amdt. & SIP Pearl Ave./Riverway Dr. 12 Ms. Davey said she understands why there is no outdoor recreation space but wonders if they have a requirement for parkland based on new buildings or construction. She wants to know if there is a fee paid per unit so that a park can be built elsewhere. Mr. Lyons said the only parkland code requirements are related to subdivision dedications, CSM’s or plats. New developments of this nature on an existing lot does not have a parkland fee associated with it. It is something that will be discussed at the upcoming joint workshop. There were no other public comments on this item. There were no public comments on this item. Ms. Propp closed public comments and asked if the applicant wanted to make any closing statements. There were no closing statements from the applicant. Motion by Mitchell to adopt the findings and recommendation as stated in the staff report. Seconded by Davey. Ms. Propp asked if there was any discussion on the motion. Mr. Mitchell said that he appreciates the projects and does not ask questions to be derogatory towards the development at all. Motion carried 7-0. MORGAN CROSSING PHASE 2 GDP/SIP Written Description The Property consists of approximately 1.41 acres located at the intersection of Pearl Ave and Riverway Dr in Oshkosh, WI. The parcel is currently vacant land. Past uses of the site include City of Oshkosh Right-of-Way (Railroad Corridor), a University Parking Lot, Universal foundry and residential buildings. Morgan Crossing 2, LLC (“The Developer”) proposes to environmentally remediate the site and construct a multifamily apartment community with underground parking. The units will be rented at market-rate with a target market of young professionals, UW Oshkosh staff, seniors and co-living. The density will be approximately 59 units per acre. Construction will begin with the excavation of the underground par king garage. Based on discussions between the Developer and their Environmental Consultant, contaminated soils will likely be able to be reused on site and capped by a combination of the building, parking lot and geogrid fabric. The building structure will be a 5 story wood frame construction with a red brick façade, materially similar in appearance to the existing Morgan Crossing building. Several existing trees on the site will have to be removed in order to carry out the environmental remediation and make room for the improvements. The landscaping for the project will be high density with small trees and shrubbery planted along the perimeter of the building and a sprinkler system installed to maintain the landscaping. There will be a monument sign on the corner of Pearl Ave and Riverway Dr that will meet code requirements. Base Standard Modifications: The Developer is requesting a base standard modification on the number of parking spaces. Current code requires 2 parking stalls for every one bedroom and two bedroom unit. The development plans reflect 83 units (5 studios, 43 one bedroom, 35 two bedroom). The development plans have 97 parking stalls, which is fewer than the 166 stalls that would be required by code per the proposed unit mix. The Developer has had conversations in the past with the City development office in which the City expressed support for fewer parking spaces than required by current code based on reduced need due to the widespread availability of rideshare services. The Developer is also constructing underground parking in accordance with the City’s desire for higher density along the Pearl Ave corridor. Per the terms of an easement agreement with ATC, the Developer is unable to place trees within the bounds of the easement and is therefore relocating those trees elsewhere on the parcel. The Developer is additionally requesting a base standard modification on the number of points for the yard requirement. Based on the total square footage of the building, 1230 points are MORGAN CROSSING PHASE 2 GDP/SIP Written Description required in the yard category. Due to the high density of the proposed development (with underground parking and 2 additional floors compared to existing phase ), the limited size of the parcel and restrictions of the ATC easement and powerlines, the Developer is able to achieve 481 points in the yard category. The landscaping will be similar in appearance and volume to the existing phase (photos in section “Proposed Exterior Finishes & Landscaping”). Site Data:  Total Site Area: 1.41 Acres, 61,501 SF  Building Footprint: 0.45 Acres, 19,650 SF (32.0%)  Sidewalk/Parking Lot Area: 0.49 Acres, 21,545 SF (35.0%)  Green Space: 0.47 Acres, 20,306 SF (33.0%) Building Data:  5 floors of wood frame construction above one level of underground parking  Gross Building Area (including underground parking): 123,025 SF  Classic red brick façade (materially similar to adjacent existing phase)  83 total units: Parking Data:  Total Parking Stalls: 97 (57 covered, 40 surface)  Handicap Accessible Parking Stalls: 4 (2 covered, 2 surface) Zoning Data:  UMU-PD: Urban Mixed Use – Planned Development Unit Type # of Units Average SF Studio 5 655 1 Bed, 1 Bath 43 762 2 Bed, 2 Bath 35 1120 MORGAN CROSSING PHASE 2 GDP/SIP Written Description Proposed Interior Finishes (representative photos): MORGAN CROSSING PHASE 2 GDP/SIP Written Description Proposed Exterior Finishes & Landscaping (representative photos): MORGAN CROSSING PHASE 2 GDP/SIP Written Description Proposed Elevation: NORTH SCALE IN FEET 0'20'40' CONCRETE PAVEMENT ASPHALT PAVEMENT (LIGHT) (17,601 S.F.) ASPHALT PAVEMENT (HEAVY) LANDSCAPE AREA GREEN SPACE PROPOSED 18" STANDARD CURB AND GUTTER PROPOSED 18" STANDARD SHEDDING CURB AND GUTTER TRAFFIC FLOW ARROW HANDICAPPED PARKING INDICATES NUMBER OF PARKING STALLS WALL PACK LIGHT POLE (1 LAMP) LIGHT POLE (2 LAMPS) LIGHT POLE (3 LAMPS) LIGHT POLE (4 LAMPS) 1 SITE DATA TOTAL PARKING STALLS PROVIDED = 97 (57 COVERED, 40 SURFACE) HANDICAP ACCESSIBLE PARKING STALLS = 4 (2 COVERED, 2 SURFACE) ZONING LEGEND TOTAL AREA = 1.41 ACRES, 61,501 S.F. BUILDING AREA = 0.45 ACRES, 19,650 S.F. (32.0%) SIDEWALK/PARKING LOT AREA = 0.49 ACRES, 21,545 S.F. (35.0%) GREEN SPACE = 0.47 ACRES, 20,306 S.F. (33.0%) PARKING DATA UMU-PD: URBAN MIXED-USE - PLANNED DEVELOPMENT NOTE ALL DISTURBED AREAS SHALL BE TOPSOILED TO A DEPTH OF 6 INCHES, SEEDED AND MULCHED. AREA TO BE RAKED FREE OF STONES AND CLUMPS. 90102440200 PARCEL NO. 12 *NOTE: ALL DIMENSIONS ARE TO THE FACE OF CURB, UNLESS NOTED OTHERWISE RESERVEDPARKING 2 RESERVEDPARKING VANACCESSIBLE PEARL AVENUE RIVERWAY DRIVEDAWES STREET2 1 7 8 7 11 7 PROPOSED BUILDING 19.650 S.F. PROPOSED RETAINING WALL AND CONCRETE STEPS PER ARCHITECTURAL PLAN 24.0'20 . 6 ' 5. 9 ' 20 . 0 ' 24 . 0 '20.0'20.0'24.0'24.0'20.0'20.0'7.0'9.0' (T Y P . ) 8. 0 '10.0'10.0' 10.0' 10 . 0 '10.0'R5.0'R3.0'R5.0'R5.0'R3.0'R3.0' R8.0' R42.0' R18.0'R100.0'R30.0'R54.0'24.0'30.0'PROPOSED 18" STANDARD SHEDDING CURB AND GUTTER (TYP.) PROPOSED 18" STANDARD CURB AND GUTTER (TYP.) 10/2020 2035373D 2035373 BDR BBB BDR 2SITE PLAN MORGAN CROSSING APARTMENTS PHASE II FOR BAYLAND BUILDINGS, INC. CITY OF OSHKOSH WINNEBAGO COUNTY, WISCONSIN CURB CUT PER CITY OF OSHKOSH STANDARDS SIDEWALK WITH INTEGRAL CURB RIDE SHARE DROP OFF LOCATION CURB OPENING REQ'D PER CITY OF OSHKOSH STANDARDS FOR RIDE SHARE DROP OFF LOCATION. RECONSTRUCT SIDEWALK AS NEED TO INSTALL INTEGRAL CURB RETAINING WALL PER ARCHITECTURAL PLAN R10.0'R5.0'RETAINING WALL, BY OTHERS 5. 0 ' 5. 8 ' 10 . 0 ' PROPOSED LIGHT POLE PROPOSED LIGHT POLE PROPOSED SIGN TO MEET CITY CODE GDP/SIP 0 Pearl Ave PC: 05-04-21 90 RIVERWAY LLC 90 RIVERWAY DR OSHKOSH, WI 54901 ANNEX 71 LLC 409 MASSACHUSETTS AVE 300 INDIANAPOLIS, IN 46204 ST PETERS CONG 449 HIGH AVE OSHKOSH, WI 54901 MORGAN CROSSING 2 LLC 300 N MAIN ST 300 OSHKOSH, WI 54901 HIGH AV HIGH AV PPEEAARRLLAAVVDDAAWWEESSSSTT RIVERWAY DRRIVERWAY DRCAMPUS PL CAMPUS PL MARION RD MARION RD C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 4/6/2021 1 in = 120 ft 1 in = 0.02 mi¯0 PEARL AVE0 PEARL AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer I I-PD TR-10-PD CMUUMU-PD RMU-PD-RFO UMU I-PD-UTO I-UTO CMU-RFO TR-10 UMU I-PD IMR-36-UTO RMU-PD-RFO CMU UI-RFO UMU-PD-UTO I I-PD RMU-PD CMU I-PD I-PD UMU-PD MR-36 RMU UMU-UTO I-PD UMU I I-PD-RFO I-PD-RFO UMU UMU-UTO I-RFO CMU-PD CMU-PD-RFO I-PD-RFO RMU CMU-PD RMU-PD UMU I-PD UMU I-PD RMU-PD UMU-PD-UTO CMU UMU-UTO TR-10PDUTO TR-10PDUTO RMU-PD RMU-RFO TR-10PDUTO I-PD HIGH AV HIGH AV N MAIN STN MAIN STJACKSON STJACKSON STALGOMA BLVD ALGOMA BLVDWISCONSIN STWISCONSIN STOREGON STOREGON STPPEEAARRLLAAVVDDIIVVIISSIIOONNSSTTCHURCH AV CHURCH AV MMAARRIIOONNRRDD W 5TH AVW 5TH AV IDA AVIDA AV DAWES STDAWES STFRANKLIN STFRANKLIN STOSCEOLA STOSCEOLA STW 4TH AVW 4TH AV CENTRAL STCENTRAL STMMIICCHHIIGGAANNSSTTFREDERICK STFREDERICK STW PARK WAY AVW PARK WAY AV CAMPUS PL CAMPUS PL UNIO N AVUNION AV COMMERCE STCOMMERCE STMULTIPLE RMU-PD TR-10PDUTO C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 4/6/2021 1 in = 500 ft 1 in = 0.09 mi¯0 PEARL AVE0 PEARL AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer C:\Users\Public\Desktop\2020 Plan Commission Site Plan Map Template.mxd User: hannahs Prepared by: City of Oshkosh, WI Printing Date: 4/6/2021 1 in = 100 ft 1 in = 0.02 mi¯0 PEARL AVE0 PEARL AVE City of Oshkosh maps and data are intended to be used for general identification purposes only, andthe City of Oshkosh assumes no liability for the accuracy of the information. Those using theinformation are responsible for verifying accuracy. For full disclaimer please go towww.ci.oshkosh.wi.us/GISdisclaimer